  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    1/14

    Schema Product Roadmap

    January 2011

    www.schema.com

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    2/14

    Mentor Roadmap

    2

    http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    3/14

    Mentor Roadmap

    3

    20132012

    2010 2011

    Augustv7.2V7.1.1Septemberv7.1

    February

    Februaryv7.3

    FebruaryV8.1

    September

    V8

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    4/14

    Mentor Roadmap Components

    Mentor

    Optimization

    Analysis

    Geopositioning

    PerformanceImprovements

    Usability

    Server

    Vendorsupport

    NewApplications

    In every version we

    improve some of the

    components

    Priority is defined with

    customers

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    5/14

    Road Map Components Review

    Vendor support Rapid support for upgrades of existing vendors, and building

    support for new vendors is a top priority and a contractual commitment from

    Schema to each of its customers.

    Server Mentor server is one of the most advanced elements of the architecture,

    and provides a robust, distributed, high performance mediation and processing

    infrastructure. Roadmap effort is focused on adding additional management

    functions, new integration methods and interfaces.

    Optimization

    new optimization features, as well as enhancements to existingones.

    Analysisnew analysis features as well as the analysis infrastructure and

    enhancements to existing analysis features

    GeoPositioningGeo-positioning is a major part of the product offering. As such it

    is under constant evolution. The majority of the development effort is dedicated toimproving accuracy but performance and infrastructure are also addressed.

    Usability Schema invests continuous effort to improve product usage efficiency,

    through advanced wizards, simple workflows and integrated design.

    Performance Improvement Schema invests continuous effort to improve cross-

    platform performance.5

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    6/14

    Vendor Version Support

    Current support

    Ericsson P5, P6, P7, 7.1, W10 Huawei v9, v10, v11, v12,Single RAN

    Nokia

    ALU (legacy)

    Version 7.2

    Huawei, Ericsson, Nokia upgrade

    ALU latest version

    Version 7.3

    Vendor Upgrades

    Version 8.0 Vendor Upgrades

    6

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    7/14

    Server Roadmap - 7.2, 7.3, 8

    7

    7.2

    Neighbor List Dashboard Bad call data parsing into a standard DB

    7.3

    8

    All calls data in DB - Part I

    All calls data in DB part II

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    8/14

    Server Roadmap - 8.1, 8.2

    8

    8.1

    Automatic Customer usage analysis program

    Managing of IMSI-IMEI mapping file

    Server side execution of IMSI tracking (

    Market operation dashboard, presenting overall Mentor application

    usage in the network

    8.2

    Reading alarm data

    Configuration changes analysis Dashboard

    Server supports of personalized KPIs and RAB groups

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    9/14

    Import and Modeling

    9

    7.2

    8.x

    Ericsson read RET settings

    Model quality indicator

    Improved error handling

    Validation of antenna profiles during Import

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    10/14

    Analysis and Geomapping v7.2, 7.3

    10

    7.2

    Geo Accuracy indicator per bin

    CQI GeoMapping - by table heuristic

    Integration of LBS data

    iPad, iPhone and Android access to data

    7.3

    Cell availability KPI

    Filtering for Stationary and moving traffic

    Detailed table updates

    Identification of cross feeders and wrong azimuth

    Height Geopositioning

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    11/14

    Analysis and Geomapping v8

    8

    11

    Filtering of In-building & outdoor traffic analysis and mapping u

    New analysis and reporting platform - part I

    Multi-data per bin mechanism

    Improving mapping accuracy

    Channel switching maps

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    12/14

    Analysis and Geomapping v8.1

    12

    8.1

    GeoMapping of all events stored in the DB

    Statistics on session length and throughput per RAB

    Report on call setup-time

    New analysis and reporting platform part II

    Updates to the analysis wizard structure

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    13/14

    Optimization

    13

    7.3

    Interfrequency NL optimization

    8.x

    Parameter optimization

    SC based on counters and logs

    SC provisioning

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/
  • 8/2/2019 APPENDIX E - Schema Products Roadmap 2011-2013

    14/14

    Thank You [email protected]

    www.schema.com

    Schema retains the sole proprietary rights to all information contained in this document. No part of this publication may

    be reproduced, stored in a retrieval system, or transmitted in any form or by any means, including but not limited to

    electronic, mechanical, magnetic, photocopy, recording or otherwise, in use now or in the future, without prior written

    consent from Schema.

    Copyright 2011 Schema

    14

    http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/http://www.schema.com/