Page 1: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

APP E-1

APPENDIX E

Irrigation Planning

APP E-1

Page 2: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

Appendix E-1: Drawing of Irrigation Plan

(1) Drawing list of related facilities for Yeghvard reservoir

DWG No. Title of Drawings

01 General Plan of the Project 02 Main Canal, Rehabilitation Plan of the Arzni-Shamiram Irrigation Canal

04 Feeder Canal System 1, Layout of the Water Distribution System

05 Feeder Canal System 1, Longitudinal Profile of a Water Transmitting Pipeline of the Feeder Canal 1 and the Outlet 1 (1/2)

06 Feeder Canal System 1, Longitudinal Profile of a Water Transmitting Pipeline of the Feeder Canal 1 and the Outlet 1 (2/2)

07 Feeder Canal System 1, General Layout of Inlet Works 08 Feeder Canal System 1, Water Regulation Works 09 Feeder Canal System 1, Structural Drawing of the Water Regulation Works 10 Feeder Canal System 1, Water Diversion Works 11 Feeder Canal System 1, Structural Drawing of the Water Diversion Works 12 Feeder Canal System 1, Diversion Works for Arzni-Shamiram Branch Canal 13 Feeder Canal System 1, Structural Drawing of the Diversion Works for the Arzni-Shamiram Branch Canal14 Feeder Canal System 1, Bottom Inlet- and Outlet- Works under the Dike No.2 15 Feeder Canal System 1, Structural Drawing of the Bottom Inlet- and Outlet- Works 16 Feeder Canal System 1, Structural Drawing of the Outlet 1 17 Feeder Canal System 2, General Layout of the Canal 18 Feeder Canal System 2, Structural Drawing of Water Regulation Works 19 Feeder Canal System 2, Structural Drawing of Diversion Works 20 Feeder Canal System 2, Structural Drawing of Chute with an Energy Dissipater 21 Feeder Canal System 2, Structural Drawing of the Baffled Chute 22 Outlet System, Layout of the No.1 Dike Water Distribution System of the Outlet 2 and Outlet 3 23 Outlet System, Longitudinal Profile of Water Transmitting Pipeline for Outlet 2 and Outlet 3 24 Outlet System, Structural Drawing of the Bottom Outlet Works for Outlet 2 and Outlet 3 (1/2) 25 Outlet System, Structural Drawing of the Bottom Outlet Works for Outlet 2 and Outlet 3 (2/2) 26 Outlet 2 & 3, Diversion Works for Outlet 2 for Ashtarak WUA 27 Outlet 2, Standard Drawing of the Outlet 2 for Ashtarak WUA 28 Outlet 3, Layout of the Outlet Facilities 29 Outlet 3, Fixed Cone Valve with an Energy Dissipation Chamber 30 Outlet 3, Longitudinal Profile of the Waterway from Outlet 3 31 Outlet 3, Structural Drawing of a Baffled Chute 32 Outlet 3, Structural Drawing of a Road Crossing Culvert

(2) Drawing list of rehabilitation plan of facilities for irrigation fields 1 General Plan 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich canal 6 Upgrade for Lower Hrazdan canal 7 Standard drawing of the diversion works 8 Standard drawing of the aqueduct bridge, the water measure facility and the outlet of pipe 9 Water transmitting pipeline for Upper and Inner Aknalich canal system

APP E-2

Page 3: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

200

210

220

230

240

280

270

BP(No.0)

No.

A-0

No.A

-2

No.

A-4

No.A

-5

No.

A-9

(N

o.B

-13)

No.

A-1

0 (

No.

B-1

2)

No.

A-1

1 (

No.

B-1

1)

No.A

-14

(No.

B-8

)

No.

A-1

5 (N

o.B

-7)

No.

A-1

6 (N

o.B

-6)

No.

A-1

7 (N

o.B

-5)

No.

B-1

6

No.

B-1

9+6

0.813

No.A

-6+

63.

866

PK130+2.40

Arzni-Shamiram Canal

(No.B

-15+

136.1

34)

No.

B-1

7

No.

B-1

8

No.

B-1

9

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

er

Gen

eral

Pla

n of

the

Proj

ect

Re

visi

on I

niti

als

S =

1 / 3

0,00

0

Prep

arat

ory

Surv

ey fo

r Yeg

hvar

d Irr

igat

ion

Syst

em Im

prov

emen

t Pro

ject

Botto

m O

utle

t

Out

let 3

(a) O

pera

tion

Perio

d: A

pr. 2

nd ~

Oct

. 3rd

(b) D

isch

arge

: 0.1

6 ~

8.89

m3/

sec

(c) C

ompo

nent

s

- F

ixed

Con

e Va

lve

Dia

. 1,2

00m

m x

1

- F

ixed

Con

e Va

lve

Dia

. 350

mm

x 1

-

Ero

sion

Pro

tect

ion

Wor

ks

- B

affle

d C

hute

Wor

ks

Feed

er C

anal

2 (P

K262

+53.

747)

(a) O

pera

tion

Perio

d: M

ar. 2

nd ~

May

2nd

(b) D

isch

arge

: 2.2

0 ~

13.0

0m3/

sec

(c) C

ompo

nent

s

- W

ater

Reg

ulat

ion

Wor

ks

- D

iver

sion

Wor

ks

- C

hute

with

Stil

ling

Basi

n

- B

affle

d C

hute

Wor

ks

Out

let 2

(No.

49+4

9.22

7)(a

) Ope

ratio

n Pe

riod:

Apr

. 2nd

~ O

ct. 3

rd(b

) Dis

char

ge: 0

.05

~ 0.

56m

3/se

c(c

) Com

pone

nts

-

Con

trol V

alve

Dia

. 1,7

20m

m

- C

ontro

l Val

ve D

ia. 8

00m

m

Arzn

i-Sha

mira

m C

anal

Sect

ion

to b

e re

habi

litat

ed;

(1) P

K14+

37 to

PK1

7+00

, L =

263

.0m

;(2

) PK2

8+52

to P

K32+

30, L

= 3

78.0

m;

(3) P

K64+

32 to

PK6

9+00

, L =

468

.0m

(4) P

K85+

65 to

OK9

3+40

, L =

775

.0m

;(5

) PK9

4+26

to P

K96+

00, L

= 1

74.0

m;

(6) P

K96+

00 to

PK9

7+65

, L =

165

.0m

(7) P

K101

+55

to P

K105

+35,

L =

380

m.

Feed

er C

anal

1(a

) Ope

ratio

n Pe

riod:

Mar

. 1st

~ M

ay 3

rd(b

) Dis

char

ge: 1

.50

~ 9.

00m

3/se

c(c

) Com

pone

nts

-

Wat

er R

egul

atio

n W

orks

-

Div

ersi

on W

orks

for F

eede

r Can

al 1

-

Div

ersi

on W

orks

for A

rzni

-Bra

nch

Can

al

- W

ater

Tra

nsm

ittin

g Pi

pelin

e

*

Dia

.1,7

20m

m, L

= 1

,939

.0m

* D

ia.1

,600

mm

, L =

1,6

00m

Out

let 1

(a) O

pera

tion

Perio

d: A

pr. 2

nd ~

Oct

. 3rd

(b) D

isch

arge

: 0.2

2 ~

2.33

m3/

sec

(c) C

ompo

nent

s

- W

ater

Tra

nsm

ittin

g Pi

pelin

e

*

Dia

.1,6

00m

m, L

= 1

,600

.0m

(Fee

der C

anal

1)

* D

ia.1

,720

mm

, L =

753

.0m

(Fee

der C

anal

1)

* D

ia.1

,200

mm

, L =

724

.0m

-

Con

trol V

alve

Dia

.1,2

00m

m

Botto

m In

let-

& O

utle

t- W

orks

of F

eede

r Can

al 1

and

Out

let 1

(a) O

pera

tion

Perio

d:

* In

flow

Con

ditio

n: M

ar. 1

st ~

May

3rd

(Q =

1.5

0 ~

9.00

m3/

sec)

*

Dis

char

ge C

ondi

tion:

Apr

. 2nd

~ O

ct. 3

rd(b

) Com

pone

nts

-

Inle

t & O

utle

t Box

-

Con

duit

Barre

l

- O

pera

tion

Hou

se

- H

ead

race

can

al in

Res

ervo

ir

Botto

m O

utle

t Wor

ks o

f Out

let 2

& 3

(a) O

pera

tion

Perio

d: A

pr. 2

nd ~

Oct

. 3rd

(b) D

isch

arge

: 0.2

3 ~

9.50

m3/

sec

for O

utle

t 2/3

(c) C

ompo

nent

s

- W

ater

Inta

ke T

ower

-

Con

duit

Barre

l

- O

pera

tion

Hou

se

APP E-3

Page 4: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

MR

GA

SH

EN

NO

R A

RT

AM

ET

PK

10

PK

20

PK

40

PK

50

PK

60

PK

70

PK

90

PK

100

PK

110

PK

120

PK

140

PK

13

0

PK

150

PK

30

PK

80

PK

0A

rzni

-Sha

mira

m B

ranc

h C

ana

l

PK

0

PK28+52

PK32+30

PK14+37

PK17+00

L = 263.0m

L = 37

8.0m

PK69+0

0

PK64+32

L =

468.

0m

PK93+40

PK85+65

L =

468.

0m

PK94+26

PK97+65

L =

174.

0m

PK96+00

L =

165.

0m

PK10

5+35

PK101+55

L =

380.

0m

0.3

0

0.30 H

1 : m

De

sig

n W

ate

r L

eve

l (O

rigin

al)

h

Back

fille

d u

sing b

y S

and

bag

s

1 : 0.5

bH

m(H

+ 0

.30)

m

b +

2 (

H +

0.3

0)

m (

Wid

th a

fter

Rea

hbili

atio

n)0

.30

Orig

ina

l Co

nditi

ons

Con

ditio

ns

to b

e R

eha

bilit

ated

0.32

h' = (0.52+H)/3h'h'

0.12

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

er

Mai

n C

anal

, Reh

abilit

atio

n Pl

an o

f the

Arz

ni-S

ham

iram

Irrig

atio

n C

anal

Re

visi

on I

niti

als

S =

1 : 2

5,00

0

Prep

arat

ory

Surv

ey fo

r Yeg

hvar

d Irr

igat

ion

Syst

em Im

prov

emen

t Pro

ject

APP E-4

Page 5: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

No.

A-0

No.

A-2

No.

A-4

No.

A-5

No

.A-9

(N

o.B

-13)

No.

A-1

0 (

No

.B-1

2)

No.

A-1

1 (

No

.B-1

1)N

o.A

-14

(N

o.B

-8)

No

.A-1

5 (

No.

B-7

)

No

.A-1

6 (

No.

B-6

)

No

.A-1

7 (

No.

B-5

)

No.

B-1

6

No.

B-1

9+

60.

813

No.

A-6

+63

.866

(No

.B-1

5+13

6.13

4)

No.

B-1

7

No.

B-1

8

No.

B-1

9

PK

129

+3

7.68

8P

K1

29+

61.

303

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

er

Feed

er C

anal

Sys

tem

1, L

ayou

t of t

he W

ater

Dis

tribu

tion

Syst

em

Re

visi

on I

niti

als

S =

1 / 1

2,50

0

Prep

arat

ory

Surv

ey fo

r Yeg

hvar

d Irr

igat

ion

Syst

em Im

prov

emen

t Pro

ject

APP E-5

Page 6: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

DL=

12

00.0

0

122

0.00

124

0.00

126

0.00

128

0.00

130

0.00

132

0.00

134

0.00

136

0.00

138

0.00

140

0.00

1 :

1500

0

1 : 2000

Sta

tion

Dis

tan

ce (

m)

Acc

umul

ate

Dis

tanc

e (m

)

Gro

un

d E

leva

tion

Ele

vatio

n o

f Pip

e C

ente

r

Ear

th C

over

ing

A-0

A-1

A-2

A-3

A-4

A-5

A-6

A-7

A-8

A-9

A-10

A-11

A-12

A-13

A-14

A-15

A-16

A-17

A-18

0.00

79.93 20.07

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

63.8736.13

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

84.2715.73

100.00

100.00

100.00

0.00

79.93100.00

200.00

300.00

400.00

500.00

600.00

700.00

800.00

900.00

1000.00

1100.00

1200.00

1263.871300.00

1400.00

1500.00

1600.00

1700.00

1800.00

1900.00

2000.00

2100.00

2200.00

2300.00

2400.00

2500.00

2600.00

2700.00

2800.00

2900.00

3000.00

3100.00

3200.00

3300.00

3400.00

3500.00

3584.273600.00

3700.00

3800.00

3900.00

1343.50

1340.001338.50

1332.50

1328.35

1325.71

1319.50

1322.00

1314.50

1310.50

1303.90

1304.00

1302.00

1302.98

1304.731304.84

1305.59

1306.77

1306.15

1305.75

1303.78

1301.50

1298.78

1296.29

1294.83

1295.09

1294.46

1294.29

1294.42

1294.31

1294.29

1294.95

1296.00

1298.00

1297.00

1297.50

1295.50

1298.31

1294.121291.81

1301.72

1294.50

1296.00

1338.481337.17

1330.64

1326.49

1323.85

1317.50

1318.50

1313.57

1308.64

1302.04

1301.09

1300.14

1301.12

1289.091289.05

1288.95

1288.85

1288.75

1288.65

1288.55

1288.45

1288.35

1288.25

1288.15

1288.05

1287.95

1287.85

1287.75

1287.65

1287.55

1287.45

1287.35

1287.25

1287.15

1287.05

1286.95

1286.85

1286.771284.80

i = 6

.53%

i = 4

.93

i = 0

.95

i = 0

.10%

i = 1

2.5

2%

1338.48

1330.64

1326.49

1323.85

1317.50

1318.50

1308.64

1302.04

1300.14

1301.12

1289.09

1286.771284.80

0.660.47

1.00

1.00

1.14

2.64

0.07

1.00

1.00

2.05

1.00

1.00

14.7814.93

15.78

17.06

16.54

16.24

14.36

12.19

9.57

7.17

5.82

6.24

5.71

5.63

5.87

5.85

5.94

6.70

7.85

9.95

9.05

9.65

7.75

10.65

6.556.21

1.00

Diversion W

orks of F

eeder Canal 1

Air Valve

A-6 + 63.866

Air Valve

Air Valve

Air Valve

Air Valve Botto

m Inlet & Outlet W

orks

Slo

pe (

%)

Wat

er

Tra

nsm

ittin

g P

ipel

ine

L-=

3,52

3.0m

Ste

el P

ipe

Dia

.1,7

20m

m, L

=1,

186.

0mS

tee

l Pip

e D

ia.

1,60

0m

m

L=1,

583

.8m

A-18 (B-4)

A-0 + 79.933

Outlet 1

L =

15

.9m

L =

2,32

0.4m

(B-12)

L =

120

.3m i =

4.1

5%

L =

100

.1m

i = 2

.64%

L =

10

0.0

mi =

6.3

5%L

= 1

00.

2mi =

1.0

%L

= 1

00

.0m

L=20

0.2

i = 6

.6%

L =

100

.2m

L=20

0.0

i = 0

.98

%L

= 1

00.

0m

i = 1

8.8

5%

L =

65.

0m

Ste

el P

ipe

Dia

.1,7

20m

m, L

=75

3.2m

0.50

D0.

50

B

Varia

ble

0.90 (min.) 0.30D

Safety Slope

0.30 + 0.5D

D

Bac

kfill

Ma

teria

l San

d B

ed

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

erR

evi

sion

In

itia

ls

Indi

cate

d

Prep

arat

ory

Surv

ey fo

r Yeg

hvar

d Irr

igat

ion

Syst

em Im

prov

emen

t Pro

ject

Long

itudi

nal P

rofil

e of

a W

ater

Tra

nsm

ittin

g Pi

pelin

e of

the

Feed

er C

anal

1 a

nd th

eO

utle

t 1 (1

/ 2)

APP E-6

Page 7: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

DL

= 1

200.

00

122

0.00

124

0.00

126

0.00

128

0.00

130

0.00

132

0.00

134

0.00

136

0.00

138

0.00

140

0.00

1 :

1500

0

1 : 2000

Sta

tion

Dis

tanc

e (m

)

Acc

umul

ate

Dis

tanc

e (m

)

Gro

und

Ele

vatio

n

Ele

vatio

n of

Pip

e C

ente

r

Ea

rth

Cov

erin

g

B-3

B-4

B-5

B-6

B-7

B-8

B-9

B-10

B-11

B-12

B-13

B-14

B-15

B-16

B-17

B-18

B-19

100.00

100.00

100.0015.73

84.27

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.0036.13

63.87

100.00

100.00

100.00

100.00

100.00

100.00

60.00

0.00

100.00

200.00

300.00315.73

400.00

500.00

600.00

700.00

800.00

900.00

1000.00

1100.00

1200.00

1300.00

1400.00

1500.00

1600.00

1700.00

1800.00

1900.00

2000.00

2100.00

2200.00

2300.00

2400.00

2500.00

2600.002636.13

2700.00

2800.00

2900.00

3000.00

3100.00

3200.00

3300.00

3360.00

1296.00

1294.50

1301.72

1291.811294.12

1298.31

1295.50

1297.50

1297.00

1298.00

1296.00

1294.95

1294.29

1294.31

1294.42

1294.29

1294.46

1295.09

1294.83

1296.29

1298.78

1301.50

1303.78

1305.75

1306.15

1306.77

1305.59

1304.841304.56

1304.15

1302.46

1300.72

1298.65

1297.52

1293.00

1290.01

1289.61

1284.801286.77

1286.85

1286.95

1287.05

1287.15

1287.25

1287.35

1287.45

1287.55

1287.65

1287.75

1287.85

1287.95

1288.05

1288.15

1288.25

1288.35

1288.45

1288.55

1288.65

1288.75

1288.85

1288.95

1289.051289.09

1289.02

1288.92

1288.82

1288.72

1288.62

1288.52

1288.42

1288.36

6.216.55

10.65

7.75

9.65

9.05

9.95

7.85

6.70

5.94

5.85

5.87

5.63

5.71

6.24

5.88

7.23

9.63

12.25

14.42

16.30

16.60

17.12

15.84

14.9914.67

14.53

12.94

11.30

9.33

8.30

3.88

0.99

0.65

Slo

pe (

%)

i = -

12.5

2%

i = 0

.10%

i = -

0.1

0%

1284.801286.77

1289.09

1288.36

Bottom Inlet &

Outlet - Works

Air Valve

Feeder Canal 1

Outlet 1 B-19 + 60.00

Wat

er

Tra

nsm

ittin

g P

ipel

ine

L=

3,06

6.6m

Ste

el P

ipe

Dia

. 1,

600

mm

, L

= 1

,599

.7m

Ste

el P

ipe

Dia

.1,2

00m

mL

=71

3.7m

Air Valve

Air Valve

Air Valve

Air Valve

Air Valve

Control V

alve

L =

15

.9m

Ste

el P

ipe

Dia

. 1,

720

mm

, L

= 7

53.2

m

L =

713

.7m

L =

1,5

83

.8m

B-15+136.134 (A-6+63.866)

(A-12)

(A-13)

(A-14)

(A-15)

(A-16)

(A-17)

(A-18)

(A-19)

(A-11)

(A-10)

(A-9)

(A-8)

(A-7)

0.50

D0.

50

B

Var

iabl

e

0.90 (min.) 0.30D

Safety Slope

0.30 + 0.5D

D

Bac

kfill

Mate

rial San

d B

ed

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

erR

evi

sion

In

itia

ls

Indi

cate

d

Prep

arat

ory

Surv

ey fo

r Yeg

hvar

d Irr

igat

ion

Syst

em Im

prov

emen

t Pro

ject

Long

itudi

nal P

rofil

e of

a W

ater

Tra

nsm

ittin

g Pi

pelin

e of

the

Feed

er C

anal

1 a

nd th

eO

utle

t 1 (2

/ 2)

APP E-7

Page 8: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

PK130+

10 (A

xis o

f the

Exis

ting

Inta

ke W

orks

)

E.L.1,

339.

130

R = 65.50m

PK129+

96.1

91 (A

xis o

f Dive

rsio

n W

orks

), E.L

. 1,3

39.1

37

PK129+

87.2

41, E

.L. 1

,339

.141

PK129+17.668

E.L.1,339.176

PK129+10.168

E.L.1,339.180

43.3

46°

PK129+37.688E.L.1,339.166

PK129+

99.8

91, E

.L. 1

,339

.135

PK129+

92.4

91, E

.L. 1

,339

.139

PK130+

12.6

41, E

.L. 1

,339

.129

E.L.1,339.166

No.0

E.L.1,339.134

No.0+64.833

E.L.1,339.129

No.0+74.834

E.L.1,337.669

No.0+79.633

No.0+45.633

No.0+54.833

i = 1

/2,0

00

No.0+24.048

PK129+61.303, E.L. 1,339.154

E.L.1,339.137

No.0+58.734

No.0+40.383

22.6

89°

60.8

59°

E.L. 1,339.154

E.L. 1,339.146

E.L. 1,339.143

E.L. 1,339.139

1 :

10

Coo

rdin

ate

:

4

56,7

38.

633

E 4

,462

,394

.447

N

Arz

ni-

Sh

am

iram

Ca

nal

Fee

der

Cana

l 1

69

.57

12.65

12.75

7.5

0

7.958

°

PK129+78.143, E.L. 1

,339.1

46

12.6

08.0

0

1.80

4.00

19.0

0

Arz

ni-S

ham

i ram

Bra

nch

Can

a l

9.2

05.

2516.3

4

10.0

015

.10

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

er

Feed

er C

anal

Sys

tem

1, G

ener

al L

ayou

t of I

nlet

Wor

ks

Re

visi

on I

niti

als

Indi

cate

d

GEN

ERAL

LAY

OU

T O

F IN

LET

WO

RKS

OF

FEED

ER C

ANAL

1 S

YSTE

MSc

ale

1 : 5

00

Wat

er D

istri

butio

n Pl

an fo

r Fee

der C

anal

1 S

yste

m

Prep

arat

ory

Surv

ey fo

r Yeg

hvar

d Irr

igat

ion

Syst

em Im

prov

emen

t Pro

ject

APP E-8

Page 9: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

i = 1

/2,0

00A

rzn

i-S

ha

mira

m C

anal

Arz

ni-

Sh

amira

m C

anal

Feed

er C

anal

1

1,3

39.1

80

PK129+10.168

1,3

39.1

76

PK129+17.668

1,3

39.1

661

,339

.166

PK129+37.688No.0 (Feeder Canal 1)

1,3

39.1

29

PK130+12.641

PK129+99.891 1,3

39.1

35

PK129+92.491

1,3

39.1

39

PK129+87.241

1,3

39.1

41

PK129+82.241 1,3

39.1

44

PK129+61.303

1,3

39.1

54

1,3

42.6

30

Ga

te:

1.6

0 x

3.05

PK130+10.000Existing InletWorks

1,3

39.1

30

7.5

06

9.57

5.2

57

.40

12.

75

25.

407

7.07

PK

130

+1

2.64

1E

.L.

1,3

39.1

29

PK

130

+1

0.00

0E

.L.

1,3

39.1

30

PK

129

+9

9.89

1E

.L.

1,3

39.1

35P

K1

29+

92.

491

E.L

. 1

,339

.139

PK

129

+8

7.24

1E

.L.

1,3

39.1

41P

K1

29+

82.

241

E.L

. 1

,339

.144

PK

129

+6

1.30

3E

.L.

1,3

39.1

54P

K1

29

+3

7.6

68 (

No.

0)E

.L.

1,3

39.1

66P

K1

29+

17.

668

E.L

. 1

,339

.176

PK

129

+1

0.16

8E

.L.

1,3

39.1

80

PK

129

+9

6.19

1E

.L.

1,3

39.1

37

i = 1

/2,0

00

7.50

5.2

5

7.4

0

12.

7525.

40

69.

57

77.

07

i = 1

/2,0

00

1.80

3.50

3.5

0

8.8

00.

300.

30

3.50

H =

2.8

5m(Q

od

= 2

4.0

m3/

s)

2.850.65

5.4

0

4.80

0.30

0.3

0

3.50 0.65

4.15

6.1

00

.10

0.10

0.12

1 : 1 .0

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

er

Feed

er C

anal

Sys

tem

1, W

ater

Reg

ulat

ion

Wor

ks

Re

visi

on I

niti

als

Indi

cate

d

Scal

e 1

: 300

PLAN

VIE

W

LON

GIT

UD

INAL

SEC

TIO

NSc

ale

1 : 3

00

STAN

DAR

D C

RO

SS S

ECTI

ON

OF

OR

IGIN

AL D

ESIG

NSc

ale

1 : 2

00D

ESIG

N S

TAN

DAR

D C

RO

SS S

ECTI

ON

OF

ARZN

I-SH

AMIR

AM C

ANAL

Scal

e 1

: 200

Prep

arat

ory

Surv

ey fo

r Yeg

hvar

d Irr

igat

ion

Syst

em Im

prov

emen

t Pro

ject

APP E-9

Page 10: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

1,3

39

.129

1,3

39

.135

1,3

39

.139

1,3

39.

141

1,34

2.63

0

Ga

te:

1.6

0 x

3.05

5.2

57

.40

12

.75

5.2

57

.40

12

.75

8.30

[email protected] + [email protected] = 6.900.70 0.70

2.63

2.5

02

.27

6.4

00.

500

.50

3.30

1.1

52

.95

2.5

02

.27

2.63

4.70 3.50 1.05

0.65 4.05

6.45

0.45

0.5

0

8.3

0

4.70

0.65 4.05

4.55

3.50 1.05

0.10

9.25

0.7

00

.70

3@

1.6

0 +

2@

1.0

5 =

6.9

0

1.0

56

.90

1.05

9.0

0

7.50

4.800.31 0.31

5.42

3.50 1.80 3.50

8.800.60 0.60

1 :

5

1 : 1 .0

10.0

0

0.60

0.60

8.80

4.15

0.60 2.90 0.65

4.20

0.10

0.10

5.40

0.30

4.8

00.

30

4.15

3.50 0.65

6.10

0.65

0.65

4.8

0

A A

B B

6.900.31 0.31

7.51

5.25

4.800.31 0.31

5.41

5.4

0

0.30

4.80

0.30

4.15

3.50 0.65

6.1

0

0.65

0.65

4.80

6.90

0.30

0.3

0

7.50

3.50 0.65

4.15

6.90

0.65

0.65

8.20

1 :

5

CD D

C

3.50 1.80 3.50

8.800.60 0.60

12.7

5

12.4

50.

30

6.900.30 0.30

7.506.

900.3

00.

30

7.50

3.50 0.65

4.15

6.90

0.65

0.65

8.20

1 : 1 .0

10.0

0

0.60

0.60

8.80

4.15

0.60 2.90 0.65

4.20

0.10

0.10

1 :

5

E E

F F

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

er

Feed

er C

anal

Sys

tem

1, S

truct

ural

Dra

win

g of

the

Wat

er R

egul

atio

n W

orks

Re

visi

on I

niti

als

Indi

cate

d

Scal

e 1

: 250

DIV

ERSI

ON

WO

RKS

: FR

ON

T VI

EWScal

e 1

: 250

DIV

ERSI

ON

WO

RKS

: LO

NG

ITU

DIN

AL S

ECTI

ON

Scal

e 1

: 250

DIV

ERSI

ON

WO

RKS

: PLA

N V

IEW

Scal

e 1

: 250

TRAN

SITI

ON

: PK1

29+1

0.16

8 ~

PK12

9+17

.668

SEC

TIO

N B

- B

SEC

TIO

N A

- A

PLAN

VIE

W

Scal

e 1

: 250

TRAN

SITI

ON

: PK1

29+8

7.24

1 ~

PK12

9+92

.491

SEC

TIO

N D

- D

SEC

TIO

N C

- C

PLAN

VIE

W

Scal

e 1

: 250

TRAN

SITI

ON

: PK1

29+9

9.89

1 ~

PK13

9+12

.641

SEC

TIO

N F

- F

SEC

TIO

N E

- E

PLAN

VIE

W

Prep

arat

ory

Surv

ey fo

r Yeg

hvar

d Irr

igat

ion

Syst

em Im

prov

emen

t Pro

ject

APP E-10

Page 11: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

9.20

6.0

09.

505.6

0

3.40

Gate

: 1.4

0 x

3.05

1,33

9.12

91,3

39.1

36

1,33

9.13

7

1,33

9.13

91,

339.

154

1,33

9.1

66

1,34

2.64

31,

343.0

43

1 : 1

0

4.00

19.2

0

6.0

0

19.2

0

4.00

9.50

9.20

1,33

9.14

31,

339.

134

5.6

0

1,33

8.62

9

1,34

1.9

92(2

4.5

m3

/s)

45.6

3

No.0

No.0+24.048

24.0

516.

34

No.0+40.383

5.25

No.0+45.633

1,33

9.14

6

15.1

0

1,34

7.34

3

No.0+54.833

No.0+60.833

No.0+64.833

No.0+74.333

No.0+79.933

4.70 3.50

i = 1

/ 2,

000

1,33

7.66

9

5.25

16.

3424

.05

1,336

.500

1,33

8.54

6

1.72

1,34

1.8

291,

342.4

291,3

42.4

34

1.72

Arz

ni-S

ham

iram

Can

al

Fe

ed

er C

anal

1

45.6

315

.10

4.80

0.30

0.33

0.304.800.30

1,33

9.1

66

No.

0 (

PK

12

9+37

.668

)E

.L. 1

,33

9.1

66

PK

12

9+6

1.3

03E

.L.

1,3

39

.154

No

.0+

24

.048

E.L

. 1

,33

9.1

54N

o.0+

40.3

83E

.L.

1,3

39

.146

No

.0+

45.

633

E.L

. 1,3

39

.143

No.

0+

54.8

33E

.L. 1

,33

9.1

39

No

.0+

60

.833

E.L

. 1

,339

.136

No.

0+

64.

833

E.L

. 1,3

39

.134

No

.0+

74

.333

E.L

. 1,

339

.129

No

.0+

74

.333

E.L

. 1

,33

9.1

29

i = 1

/2,0

00i =

1/2

,000

i = 1

/2,0

00

12.0

02.

002.

33

1 :

5

1 :

5

1,34

0.58

8(M

ay 3

rd: 1

.1m

3/s)

1,34

1.88

2(A

pr 1

st:

9.0m

3/s)

3.40

2.80

0.30

0.30

3.50 0.65

4.15

4.10

0.10

0.10

0.1

0

2.8

0

3.4

0

0.3

00.

30

3.50 0.65

4.45

4.1

00

.10

0.30

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

er

Feed

er C

anal

Sys

tem

1, W

ater

Div

ersi

on W

orks

Re

visi

on I

niti

als

Indi

cate

d

Scal

e 1

: 250

PLAN

VIE

W

LON

GIT

UD

INAL

SEC

TIO

NSc

ale

1 : 2

50

DES

IGN

STA

ND

ARD

CR

OSS

SEC

TIO

N O

F FE

EDER

CAN

AL 1

WIT

HO

UT

GAT

E O

PER

ATIO

N O

F D

IVER

SIO

N W

OR

KS

Scal

e 1

: 200

Prep

arat

ory

Surv

ey fo

r Yeg

havr

d Irr

igat

ion

Syst

em Im

prov

emen

t Pro

ject

APP E-11

Page 12: APPENDIX E Irrigation Planning · 2 Rehabilitation for Arzni Branch canal 3 Rehabilitation for Tkahan canal 4 Rehabilitation for Shakhi-Aru canal 5 Rehabilitation for Upper Aknalich

5.2

5

4.70 4.55

3.50 1.054.050.65

8.70 0.10

1,3

43.0

43

1,3

42.6

43

5.9

56.

15

0.1

00.

10

1,3

47.3

43

1,3

39.1

43

1.4

01.

05

1.4

01

.05

1.0

5

Gat

e:

1.4

0 x

3.05

1,3

39.1

361

,339

.137

1,3

39.1

39

1,3

42.6

43

1,3

43.0

43

6.0

0

19.2

0

4.0

09

.20

1,3

39.1

431

,339

.134

1,3

41.9

93(Q

od

= 2

4.0

m3/

s)

1,3

47.3

43

3.50 1.55

5.0

51

.15

3.0

0

2.5

0

0.65 3.65 0.40 3.50 1.05

1.40 0.70

9.2

06

.00

5.25

0.70 1.05

3.0

0

1.40

2.5

04.

38

2.3

2

3.9

01

.35

4.7

51

.15

5.0

5

1 : 10

4.0

0

19.2

0

3.07

2.80

3.85

0.40 0.40

60.029°

4.6

5

4.66

0.40 3.51 0.75

5.3

50.

10

5.5

50.

10

3.8

50.

40

0.4

0

1.4

01.

05

0.7

51.

40

0.7

50

.75

3.6

0

4.3

0

4.5

0

0.1

00.

10

0.70 3.51 0.75

4.96 0.10

2.8

00.

40

0.4

0

2.8

00

.75

3.51

3.30

5.6

09.

50

0.65

0.753.

90

2.1

0

1,33

9.1

29

1 :

5

1,3

38.6

29

1,3

37.6

69

9.5

05.

60

G G

H H

I I

K K

J J

L

8.7

20

.48

Saf

ety

Rac

k1

,340

.588

(Ma

y 3r

d:

1.1m

3/s)

1,3

41.8

83(A

pr

1st:

9.

0m3/

s)

3.6

0

0.4

02.

80

0.4

0

4.26

3.51 0.75

0.10

4.3

00.

10

0.1

0

2.8

00.

40

0.4

0

3.6

0

3.30 0.75

4.05

4.2

60.

10

2.8

0

3.4

0

0.3

00

.30

3.30 0.65

3.95

4.0

60

.10

0.1

00.

10

3.4

0

2.8

00

.30

0.3

0

4.153.50 0.65

4.1

00.

10

0.1

0

4.4

5

3.8

50.

30

0.3

0

3.50

4.15

0.65

0.10

0.10

5.1

50.

10

0.1

0

5.2

5

4.45

3.850.30 0.30

3.40

2.800.30 0.30

P P

Q Q

1,3

39.1

29

3.4

0

2.8

00.

30

0.3

0

3.4

0

2.8

00

.30

0.3

0

4.1

60.

10

0.1

0

3.80 0.85

4.65

3.30 1.35

4.3

50.

10

0.1

0

4.76 0.82

5.58

5.6

0

2.32

3.40

2.800.30 0.30

0.5

04.

80

0.3

0

1 :

5

5.6

0

5.3

00.

30

3.30 1.35

4.65

4.76 0.82

1,3

38.6

29

1.720.30

0.80

1,3

37.6

69

MM

N N

O O

Dra

win

g T

itle:

Sca

le:

Dra

win

g N

o:

All

dim

ensi

on in

:

Che

cked

by:

App

rove

d by

:

Pro

ject

:D

raw

n b

y:

San

yu C

onsu

ltant

s In

c.

Met

erR

evi

sion

In

itia

ls

1 : 2

00IN

LET

WO

RKS

: FR

ON

T VI

EW

INLE

T W

OR

KS: L

ON

GIT

UD

INAL

SEC

TIO

N

INLE

T W

OR

KS: P

LAN

VIE

W

SEC

TIO

N H

- H

SEC

TIO

N G

- G

SEC

TIO

N K

- K

SEC

TIO

N J

- J

SEC

TIO

N O

- O

SEC

TIO

N I

- I D

ETAI

L L

SEC

TIO

N N

- N

SEC

TIO

N M

- M TR

ANSI

TIO

N N

o.0+

40.3

83 ~

No.

0+45

.633

SEC

TIO

N P

- P

SEC

TIO

N Q

- Q

Prep

arat

ory

Surv

ey fo

r Yeg

hvar

d Irr

igat

ion

Impr

ovem

ent P

roje

ct

Feed

er C

anal

Sys

tem

1, S

truct

ural

Dra

win

g of

the

Wat

er D

iver

sion

Wor

ks

APP E-12