appendix c figures xxx xx i i i i i ii ii t-rt salvage yard equipment storage non-hazardous storage...
TRANSCRIPT
S T A C K - 2 -• LIME SILO
SPENT LIME RECOVERY
x x l l i l l I X
< .
x
< EQUIPMENT
STORAGE BLDG
NORTH END MAINTENANCE SHOP BLDG
d E g o o S "i
g^* UNIT 2
UNIT CRUSHED DRUM 4 TRAILER '
• M P - 2
DRUMCRUSHER
LZP DRUM STORAGE 1A
TANK 8 TANK 6
DRUM STORAGE IB
SUPPLIES STORAGE
a O m O D 2 4 a D
30 20 10 O O O E B B
GATE HOUSE
ADMINISTRATIVE OFFICES BULK TANKER UNLOADING
10.6mm BTU/hr BOILER —
VEHICLE REFUELING
AREA "A" SITE MAP
-TANK 100
10.6mm BTU/hr BOILER
iPROPOSED)
SCALE: 1" 30"
SITE MAP SCALE l"=80f!'
FIGURE l a FACILITY LAYOUT
VEOLIA ES; SAUGET, IL Based on Figure by Woodward-Clyde Consultants
SHEET 1 OF 4 SCHREIBER Q YONLEY
(X, ASSOCIATES
FIGURE l a FACILITY LAYOUT
VEOLIA ES; SAUGET, IL Based on Figure by Woodward-Clyde Consultants
APPROX. SCALE: NONE
SCHREIBER Q YONLEY
(X, ASSOCIATES C H E C K E D BY> DRAWN B Y : D A T E DRAWNi P R O J E C T ft: R E V I S I O N * E N V I R O N M E N T A L ENGINEERS
KMS BAH 04-20-07 070063
B
X X X X X
I I I I I II II T-rT SALVAGE
YARD
EQUIPMENT STORAGE NON-HAZARDOUS STORAGE UNIT
EXPLOSIVE MAGAZINE
DRUM STORAGE UNIT No 2 BUILDING C
DRUM STORAGE LAB UNIT No 2 PACK BUILDING B REPACK
DRUM STORAGE UNIT No 2 BUILDING A
J"
TRUCK SCALE
B TRAILERS •
TRANSFORMER
AREA "ff SITE MAP
FUEL TANKS
PARKING
WATER TANK
PORTABLE BOILER
ELECTRICAL
SCALE 1" - 3B'
SITE M A P SCALE r=8ea*
xn:
FIGURE l b FACILITY LAYOUT
VEOLIA ES; SAUGET, IL Based on Figure by Woodward—Clyde Consultants
SHEET 2 OF 4 SCHREIBER C> YONLEY
OC ASSOCIATES
FIGURE l b FACILITY LAYOUT
VEOLIA ES; SAUGET, IL Based on Figure by Woodward—Clyde Consultants
APPROX. SCALE: NONE
SCHREIBER C> YONLEY
OC ASSOCIATES
C H E C K E D B Y ' DRAWN B Y . D A T E DRAWNr P R O J E C T Si R E V I S I O N 8 E N V I R O N M E N T A L ENGINEERS
KMS BAH 04-20-07 070063 -
AREA * C SITE MAP SCAlfi 1" m 3g
SITE M A P SCALE 1"=6B0'
FIGURE l c FACILITY LAYOUT
VEOLIA ES; SAUGET, IL Based on Figure by Woodward—Clyde Consultants
SHEET 3 OF 4 SCHREIBER O YONLEY
(3CASS0CIATES
FIGURE l c FACILITY LAYOUT
VEOLIA ES; SAUGET, IL Based on Figure by Woodward—Clyde Consultants
APPROX. SCALE: NONE
SCHREIBER O YONLEY
(3CASS0CIATES
C H E C K E D BY< DRAWN B Y . D A T E D R A W N . P R O J E C T #i R E V I S I O N # E N V I R O N M E N T A L ENGINEERS
KMS BAH 04-20-07 070063 -
D LIME SILO
x x
D AIR POLLUTION CONTROL EQUIPMENT • BH1 • BH2 • CI
S ITE M A P SCALE 1"=B0B-
FIGURE I d FACILITY LAYOUT
VEOLIA ES; SAUGET, IL Based on Figure by Woodward-Clyde Consultants
SHEET 4 OF 4 SCHREIBER O YONLEY
OC ASSOCIATES
FIGURE I d FACILITY LAYOUT
VEOLIA ES; SAUGET, IL Based on Figure by Woodward-Clyde Consultants
APPROX. SCALE: NONE
SCHREIBER O YONLEY
OC ASSOCIATES
C H E C K E D B Y i DRAWN B Y ' D A T E D R A W N . P R O J E C T #. R E V I S I O N ft E N V I R O N M E N T A L ENGINEERS
KMS BAH 04-20-07 070063
STORAGE TANKS BLEND TANKS
pa
a
u a
LIQUID WASTE FEED TANK #10
C12a869 GAL)
I | [ CARBON CANISTERCS) «10
LIQUID WASTE FEED TANK ttHO
C12,B69 GAL) | 1 CARBON CANISTERCS) «2D
LIQUID WASTE FEED TANK «30
C12,BG9 GAL)
| [ CARBON CANISTERCS) 830
LIQUID WASTE FEED TANK 840
C12,B69 GAL)
I f — | CARBON CANISTERCS) #40
LIQUID WASTE FEED TANK 850
(12,869 GAL)
L _ _ j [ CARBON CANISTERCS) §50
LIQUID WASTE FEED TANK 360
C12,B69 GAL)
T - ] CARBON CANISTERCS) 860
LIQUID WASTE FEED TANK 82
C4,931 GAL) | 1 CARBON CANISTERCS) #2
LIQUID WASTE FEED TANK « 4
C4.931 GAL)
[ [ CARBON CANISTERCS) #4
LIQUID WASTE FEED TANK 86
C7,200 GAL)
I T — | CARBON CANISTERCS) 86
LIQUID WASTE FEED TANK 88
C5,2B0 GAL) | 1 CARBON CANISTERCS) 88
INCINERATION UNITS #2 & #3
FUEL OIL No. 2 TANK #100
C9,1S0 GAL)
ClnslgnlFlcant activity)
FIGURE 2 PROCESS FLOW DIAGRAM VEOLIA ES; SAUGET, IL
TANK FARM #1 Based on Figure by Woodward—Clyde Consultants
SCHREIBER YONLEY ASSOCIATES
CHECKED B Y i DRAWN BYi D A T E DRAWN' P R O J E C T #i ENVIRONMENTAL ENGINEERS
KS BAH 04-19-07 070063
STORAGE/BLEND TANKS
LIQUID WASTE FEED TANK 8300
(30,000 GAL)
1 1 CARBON 1 ICANISTER(S) 8300
LIQUID WASTE FEED TANK 8300
(30,000 GAL)
1 1 CARBON 1 ICANISTER(S) 8300 1 1 CARBON 1 ICANISTER(S) 8300
LIQUID WASTE FEED TANK 8302
(30,000 GAL)
1 1 CARBON 1 1 CANISTERCS) #302
LIQUID WASTE FEED TANK 8302
(30,000 GAL)
1 1 CARBON 1 1 CANISTERCS) #302 1 1 CARBON 1 1 CANISTERCS) #302
LIQUID WASTE FEED TANK 8304
00,000 GAL)
1 1 CARBON 1 1 CANISTERCS) 8304
LIQUID WASTE FEED TANK 831H
(12,000 GAL) I | 1 CARBON CANISTERCS) 8312
LIQUID WASTE FEED TANK 8314
C12,000 G A D
| j CARBON CANISTERCS) 8314
FUEL OIL TANK 8390
C30,000 GAL)
LIQUID WASTE FEED TANK 8306
C30,000 GAL)
| [CARBON CANISTERCS) 8306
LIQUID WASTE FEED TANK 330B
(30,000 GAL) | J CARBON CANISTERCS) 8308
INCINERATION UNIT 84
LIQUID WASTE FEED TANK 8310
(30,000 GAL) l [ 1 CARBON CANISTERCS) 8310
FIGURE 3 PROCESS FLOW DIAGRAM VEOLIA ES; SAUGET, IL
TANK FARM #3 Based on Figure by Woodward—Clyde Consultants
SCHREIBER -YONLEY , ASSOCIATES
CHECKED B Y ' DRAWN B Y ' D A T E DRAWN' P R O J E C T 81 ENVIRONMENTAL ENGINEERS
KS BAH 04-19-07 070063
O P E N VENT
OUTLET F L A N G E
TEMPERATURE
G A U G E F L A M E ARRESTER
C A R B O N C A N I S T E R VENT W / R A I N S H 1 E L D
C A R B O N C A N I S T E R
2" N P T M A L E FITTING
OUTLET F L A N G E
FIGURE 4 PROCESS FLOW DIAGRAM VEOLIA ES; SAUGET, IL
TANK TO CARBON CANISTER Based on Figure by Wood-ward—Clyde Consultants
SCHREIBER YONLEY ASSOCIATES
CHECKED BY< D R A V N BY- DATE DRAWN' P R O J E C T ii> ENVIRONMENTAL ENGINEERS
KS BAH 04-19-07 070063
Specialty] | WaBte „Feeder
Secondary Fuel Storage
Tank
Relief Stack
Natural Gas
Secondary^) ^ Fuel
Secondary Fuel (Hazardous Waste
Derived Fuel)
Primary Fuel (Naturol Gaa)
,_ Water
Lime Slurry
Drop Out Chamber
Drummed Solids
Staging Area
Enclosed Conveyors
I.D. Fan
V I
To Pneumatic Tanker Truck
FIGURE 5 SCHREIBER PROCESS FLOW DIAGRAM O r Y O N L E Y VEOLIA ES; SAUGET, IL O r Y O N L E Y
INCINERATOR UNITS 2 & 3 ASSOCIATES Based on ] Figure by Woodward—Clyde Consultants C H E C K E D BY< DRAWN BYi D A T E DRAWN. P R O J E C T 11. ENVIRONMENTAL ENGINEERS
KS BAH 04-19-07 070063
Lime Slurry Spent (Partially Reacted) Lime
AuxUlorv Gravity Food Ram Foed Containerized Containerized
Solids Solids
High Btu Liquid
Tempering Aah
Air Pollution Control Residue
(Spent Lime)
FIGURE 6 PROCESS FLOW DIAGRAM VEOLIA ES; SAUGET, IL
INCINERATOR UNIT 4 Based on Figure by Wood-ward—Clyde Consultants
SCHREIBER YONLEY ASSOCIATES
CHECKED BYi DRAWN B Y i D A T E DRAWNi P R O J E C T «i ENVIRONMENTAL ENGINEERS
KS BAH 04-19-07 070063
CONTAINERIZED SOLID WASTE
INERT ABSORBENT
CONTAINERIZED SOLID WASTE
INERT ABSORBENT _ J
CONTAINERIZED SOLID WASTE
INERT ABSORBENT
VOLATILE ORGANIC MATERIAL
•SOLID WASTE 'CHARGES' MP-1
- e ^ EMPTY DRUMS
VOLATILE ORGANIC MATERIAL
• SOLID WASTE 'CHARGES' HP-2
- B — EMPTY DRUMS
VOLATILE ORGANIC MATERIAL
LAB PACK REPACK
FACILITY
SOLID WASTE 'CHARGES'
- B — EMPTY DRUMS
FIGURE 7 PROCESS FLOW DIAGRAM VEOLIA ES; SAUGET, IL MATERIAL PROCESSING
Based on Figure by Woochyard—Clyde Consultants
SCHREIBER -YONLEY
ASSOCIATES
CHECKED BYi DRAWN B Y i DATE DRAWNi P R D J E C T ii i ENVIRONMENTAL ENGINEERS
KS BAH 04-19-07 070063
PARTICULATE MATTER, VOLATILE ORGANIC MATERIAL
CARBON ADSORPTIDN
SYSTEM
BH-2/C-1
INCINERATION UNIT #4 BULK FEED
BUILDING 'PITS'
TARPED ROLL-OFF /DUMP TRAILER
BULK SOLID WASTE
x BATCH DROP
sr* CLAM SHELL THRDUGH AN ENCLOSED GALLERY
•Ha* WHILE DOORS TO BULK FEED BUILDING ARE CLOSED, SINGLE BAGHDUSE CBH-D OPERATES, WHILE DOORS ARE OPEN (UNLOADING), THE COMBINED CYCLDNE/BAGHDUSE (BH-2/C-D OPERATES.
FIGURE 8 PROCESS FLOW DIAGRAM VEOLIA ES; SAUGET, IL
B U L K FEED BUILDING Based on Figure by Woodward—Clyde Consultants
SCHREIBER O YONLEY
OC ASSOCIATES
CHECKED B Y ' DRAWN BY. DATE DRAWN. P R O J E C T ft. ENVIRONMENTAL ENGINEERS
KS BAH 04-19-07 070063
VOLATILE ORGANIC MATERIAL
'EMPTY' DRUMS WITH RESIDUAL WASTE
DRUM CRUSHER CRUSHED DRUMS
WITH RESIDUAL WASTE
FIGURE 9 PROCESS FLOW DIAGRAM VEOLIA ES; SAUGET, IL
DRUM CRUSHER Based on Figure by Woodward—Clyde Consultants
SCHREIBER 0 7 Y O N L E Y
^ J ^ , ASSOCIATES
C H E C K E D BY. DRAWN B Y i D A T E DRAWN' P R O J E C T #: ENVIRONMENTAL ENGINEERS
KS BAH 04-19-07 070063
COMBUSTION GASES
PROPOSED NATURAL GAS *~ 10.6 MM BTU/HR
BOILER
COMBUSTION GASES
NATURAL GAS 10.6 MM BTU/HR BOILER
FIGURE 10 PROCESS FLOW DIAGRAM VEOLIA ES; SAUGET, IL
EXISTING AND PROPOSED BOILERS Based on Figure by Woodward-Clyde Consultants
SCHREIBER OrYONLEY
A S S O C I A T E S
CHECKED BYi DRAWN BYi DATE DRAWNi P R O J E C T iU ENVIRONMENTAL ENGINEERS
KS BAH 04-19-07 070063