APPENDIX A
ADMINISTRATION BUDGET
Calculation of the Council Tax 2012/13 (No Tax Increase)
Portsmouth City Council 2012/13 2011/12
£ £
Gross Expenditure 569,494,600 577,868,700
LESS: Gross Income (380,575,509) (385,121,969)
Net Expenditure 2012/13 188,919,091 192,746,731
LESS: Government Grants (120,068,302) (123,897,321)
Council Tax Requirement - Portsmouth City Council Purposes 68,850,789 68,849,410
Council Tax Base 59,916.1 59,914.9
Council Tax - Portsmouth City Council Purposes at Band D
68,850,789
59,916.1 = £1,149.12 £1,149.12
Hampshire Police Authority Precept (provisional) 9,047,331 8,762,554
Council Tax - Hampshire Police Authority Purposes at Band D £151.00 £146.25
Hampshire Fire and Rescue Authority Precept 3,677,650 3,677,577
Council Tax - Hampshire Fire and Rescue Authority Purposes at Band D £61.38 £61.38
The Council Tax to be levied for all bands in 2012/13 will be as follows :
Portsmouth Hampshire Hampshire
City Police Fire & Rescue TOTAL 2011/12
Council Authority Authority
Estimated Valuation as 1 April 1991 £ £ £ £ £
Up to £40,000 A 766.08 100.67 40.92 907.67 904.50
£40,001 - £52,000 B 893.76 117.44 47.74 1,058.94 1,055.25
£52,001 - £68,000 C 1,021.44 134.22 54.56 1,210.22 1,206.00
£68,001 - £88,000 D 1,149.12 151.00 61.38 1,361.50 1,356.75
£88,001 - £120,000 E 1,404.48 184.56 75.02 1,664.06 1,658.25
£120,001 - £160,000 F 1,659.84 218.11 88.66 1,966.61 1,959.75
£160,001 - £320,000 G 1,915.20 251.67 102.30 2,269.17 2,261.25
£320,001 and over H 2,298.24 302.00 122.76 2,723.00 2,713.50
39
GENERAL FUND SUMMARY APPENDIX AADMINISTRATION BUDGET 2011/12 TO 2015/16
Original Revised
Estimate NET REQUIREMENTS OF PORTFOLIOS Estimate Estimate Estimate Estimate Estimate
2011/12 2011/12 2012/13 2013/14 2014/15 2015/16
£ £ £ £ £ £
0 Community Safety 3,727,574 3,522,474 3,322,574 3,384,274 3,468,87425,432,953 Children's Services (Joined with Education) 0 0 0 0 013,376,345 Culture Leisure & Sport 13,647,645 12,886,645 12,578,945 12,815,345 13,031,24527,051,108 Children & Education 53,921,161 52,979,061 53,132,361 54,120,034 54,924,46120,361,009 Environment (Community Safety transferred out) 15,755,735 15,651,135 16,024,735 16,606,935 16,976,33552,188,441 Health & Social Care 49,584,341 51,829,841 52,177,841 53,205,841 53,464,44113,722,688 Housing 13,636,388 13,833,488 13,867,488 14,024,988 14,261,788
339,816 Leader 331,216 321,816 328,716 322,116 329,6163,961,077 Planning Regeneration Economic Development 5,883,315 5,381,515 4,536,315 3,879,515 3,899,515
30,906,752 Resources 29,194,652 28,362,552 29,387,052 30,318,352 31,269,05213,773,135 Traffic & Transportation 14,156,135 15,584,635 16,386,635 17,446,335 17,974,735
555,300 Governance & Audit Committee 503,000 514,200 428,400 537,500 558,600(56,695) Licensing Committee (99,295) (43,395) (57,695) (52,395) (47,295)
201,611,929 Portfolio Expenditure 200,241,867 200,823,967 202,113,367 206,608,840 210,111,367
Other Expenditure
119,200 Precepts 119,200 122,200 125,300 128,400 131,600
(122,500) Portchester Crematorium - Share of Dividend (122,500) (150,000) (152,500) (155,000) (158,200)
1,444,400 Pension Costs 5,336,000 5,336,000 5,336,000 5,336,000 5,336,000
5,912,100 Contingency Provision 2,166,300 6,301,550 3,343,300 3,246,300 3,246,300
2,502,500 Revenue Contributions to Capital Reserve 5,046,800 3,382,300 3,022,200 2,600,000 2,600,000
308,100 Transfer to / (from) Other Reserves (175,100) 333,900 483,900 633,900 633,900
(16,998,029) Asset Management Revenue Account (20,974,867) (21,544,267) (23,573,167) (23,558,540) (23,000,467)
4,063,100 Other Expenditure 2,822,000 1,906,700 2,944,300 3,950,100 4,950,100
(2,771,129) Other Expenditure (5,782,167) (4,311,617) (8,470,667) (7,818,840) (6,260,767)
198,840,800 TOTAL NET EXPENDITURE 194,459,700 196,512,350 193,642,700 198,790,000 203,850,600
FINANCED BY:
4,738,969 Contribution (to) from Balances and Reserves 390,733 7,847,349 7,373,137 17,624,029 26,669,106
91,262,955 Formula Grant 91,254,140 84,426,986 81,943,810 76,152,631 72,806,526
30,474,283 Other General Grants 30,555,183 30,901,434 30,735,789 29,659,092 28,933,564
438,848 New Homes Bonus 333,899 1,297,377 1,297,377 1,297,377 1,297,377
1,721,235 Council Tax Freeze Grant 1,721,235 3,442,505 1,721,235 1,721,235 0
70,204,510 Collection Fund 70,204,510 68,596,699 70,571,352 72,335,636 74,144,027
198,840,800 194,459,700 196,512,350 193,642,700 198,790,000 203,850,600
BALANCES & RESERVES
15,830,667 Balance brought forward at 1 April 20,248,000 19,857,267 12,009,918 4,636,781 (12,987,249)
Transfers to / (from) General Reserves
(4,738,969) Deduct (Deficit) / Add Surplus for Year (390,733) (7,847,349) (7,373,137) (17,624,029) (26,669,106)
11,091,698 Balance carried forward at 31 March 19,857,267 12,009,918 4,636,781 (12,987,249) (39,656,355)
4,400,000 Minimum Level of Balances 4,900,000 5,500,000 6,100,000 6,100,000 6,100,000
4,738,969 Underlying Budget Deficit / (Surplus) 390,733 7,847,349 7,373,137 17,624,029 26,669,106
40
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
Community Safety Portfolio
Head of Community Housing & Regeneration1 Income Additional income from business support activities,
including the provision of training services to
external organisations, that could be both full cost
recovery and trading activity
No direct cut to service but some limited
impact on organisational capacity
28,000 56,000 84,000
Head of Community Housing & Regeneration Total 28,000 56,000 84,000
Head of Community Safety2 Commissioning & Procurement CCTV monitoring saving Police required to book appointments to view
CCTV footage
36,000 36,000 36,000
3 Better Performing Workforce Street Scene Review Little or no direct cut to service but some
limited impact on organisational capacity -
Service is being reconfigured and redesigned
during the Street Scene Review
25,000 25,000 25,000
4 Better Performing Workforce De-layering and staff review Reduction in management capacity 103,000 105,000 105,000
5 Commissioning & Procurement Category Management - vehicles More efficient as a result of Transformation
work
10,000 10,000 10,000
6 Other Service
Reductions/Efficiencies
Reduction in early intervention project equivalent to
reduction in central government grant funding
There are several implications on a number of
projects all of which have been agreed by the
Safer Portsmouth Partnership as priorities. In
the last 2-3 years the partnership has been
working to mainstream a number of projects
which support key priorities.
110,000 110,000 110,000
7 Better Performing Workforce IT equipment - Wardens May have a small impact on efficiency 20,000 20,000 20,000
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
41
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
8 Commissioning & Procurement Premises and Office Overhead savings following
office relocation
No direct cut to service but some limited
impact on organisational capacity
30,000 30,000 30,000
Head of Community Safety Total 334,000 336,000 336,000
Community Safety Portfolio Total 362,000 392,000 420,000
42
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Culture, Leisure and Sport Portfolio
Head of Culture9 Better Performing Workforce De-layering of staff structure No direct cut to service but some limited
impact on organisational capacity
251,500 395,200 440,300
10 Commissioning & Procurement Reduction in metered water supply costs No direct cut to service but some limited
impact on organisational capacity
10,100 10,100 10,100
11 Commissioning & Procurement Reduction in number of Fleet vehicles used by
Library Service
No direct cut to service but some limited
impact on organisational capacity
12,000 12,000 12,000
12 Income Increase in Sun Hut Charges & Wakeboarding
Income at Hilsea
No direct cut to service but some limited
impact on organisational capacity
14,000 14,000 14,000
13 Income Increased income from rental of more library space No direct cut to service but some limited
impact on organisational capacity
10,000 10,000 10,000
14 Income Increased income from Parks and Open Spaces
concessions
No direct cut to service but some limited
impact on organisational capacity
4,000 4,000 4,000
15 Income Increase in grant funding for Portsdown Hill from
English Nature means that funding from PCC can
be reduced
No direct cut to service but some limited
impact on organisational capacity
7,500 7,500 7,500
16 Property & Assets Reduction in building maintenance carried out by
external providers, simple repairs and general
maintenance to be carried out by seafront and
playground maintenance teams
No direct cut to service but some limited
impact on organisational capacity
80,000 80,000 80,000
Head of Culture Total 389,100 532,800 577,900
Culture, Leisure and Sport Portfolio Total 389,100 532,800 577,900
43
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Education and Children Portfolio
Head of Children's Social Care and Safeguarding17 Better Performing Workforce Review of operation of Beechside - Review of
operation Re: staffing requirements
No reduction in availability of respite care for
children with disabilities based on current
numbers
16,000 31,000 31,000
18 Property & Assets Discontinue use of Skye Close admin block and
relocate staff
No direct cut to service but some limited
impact on organisational capacity
8,000 17,000 17,000
19 Commissioning & Procurement Review of contracts e.g. Enableability, National
Youth Advisory Service, Research In Practice
Overall level of service will reduce but will be
more targeted towards need.
30,000 50,000 70,000
20 Better Performing Workforce Review of staffing / construction of teams to create
efficiencies following staff move from Merefield
House to Civic Offices
Potential diminution in service 66,000 66,000 66,000
21 Commissioning & Procurement Assume 1.5% procurement savings (based on
2010/11 expenditure) - IT & Communications
No direct cut to service but some limited
impact on organisational capacity
1,000 1,000 1,000
22 Commissioning & Procurement Assume 1.5% procurement savings (based on
2010/11 expenditure) - Commodities
No direct cut to service but some limited
impact on organisational capacity
2,000 2,000 2,000
23 Commissioning & Procurement Assume 1.5% procurement savings (based on
2010/11 expenditure) - Utilities
No direct cut to service but some limited
impact on organisational capacity
1,000 1,000 1,000
24 Commissioning & Procurement Assume 1.5% procurement savings (based on
2010/11 expenditure) - Property
No direct cut to service but some limited
impact on organisational capacity
1,000 1,000 1,000
25 Commissioning & Procurement Safeguarding share of savings from hosting SWIFT
in-house (currently hosted by HCC)
No direct cut to service but some limited
impact on organisational capacity
41,000 41,000 41,000
26 Income Sell supported placements at residential home(s) to
other Local Authorities
Potentially reduces beds available for PCC
looked after children who may need to be
placed in high cost, alternative provision
outside the city due to the unavailability of bed
spaces
50,000 100,000 150,000
44
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
27 Income Review charging policies and implement the
existing (though rarely used) policy to pursue
parental contributions towards the cost of placing
their child in care and for short breaks where this is
appropriate and affordable
Charges will only be made where appropriate
and affordable and will provide the opportunity
for parents and carers to purchase short
breaks (e.g. at Beechside) where the child
does not currently meet the criteria for
accessing short breaks at no cost
10,000 20,000 40,000
28 Better Performing Workforce Review staffing requirements for Integrated Youth
Support Service following merger of teams to
support Priority D (Young people at risk). Details to
be agreed
No direct cut to service but some limited
impact on organisational capacity
100,000 100,000 100,000
29 Other Service
Reductions/Efficiencies
Delete budget providing nursery placements for
vulnerable children. Eligible children are now being
referred and are receiving support directly from
Children's Centres
No direct cut to service but some limited
impact on organisational capacity
20,000 20,000 20,000
Head of Children's Social Care and Safeguarding Total 346,000 450,000 540,000
Head of Community Housing & Regeneration30 Customer Management Service efficiencies / review of working practices No direct cut to service but some limited
impact on organisational capacity
4,000 6,000 8,000
31 Income Additional Service Income - fee paying Adult and
Family Learning clients
Wider offer for Adult and Family Learning 3,000 7,000 11,000
Head of Community Housing & Regeneration Total 7,000 13,000 19,000
45
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Head of Education & Strategic Commissioning32 Better Performing Workforce Review of Learning & Achievement (L&A) service to
provide statutory service only. Reductions in grants
and a shift of funding to schools, has made it
necessary to review the way in which the service is
managed
L&A would provide challenge and limited
support to schools most in need with minimal
input to achieving schools. Schools now
receive funding directly and are able to
procure services from providers rather than
rely on "free" support from the L&A Service
200,000 200,000 200,000
33 Customer Management Review of Admin function across service to
increase efficiency and reduce overheads
Should maximise efficiency of admin staff by
allowing movement between teams to provide
flexible support where needed
70,000 100,000 100,000
34 Commissioning & Procurement Further review of current offer at Children's Centres
by rationalising staffing and use of buildings to
provide more targeted services
Review will ensure that the offer is targeted at
those most in need of services. There is a
potential to generate some income from
charging for non-essential activities where
families can afford to pay
247,000 250,000 250,000
35 Commissioning & Procurement Assume 1.5% procurement savings (based on
2010/11 expenditure) - IT & Communications
No direct cut to service but some limited
impact on organisational capacity
9,000 9,000 9,000
36 Commissioning & Procurement Assume 1.5% procurement savings (based on
2010/11 expenditure) - Commodities
No direct cut to service but some limited
impact on organisational capacity
2,000 2,000 2,000
37 Commissioning & Procurement Assume 1.5% procurement savings (based on
2010/11 expenditure) - Property
No direct cut to service but some limited
impact on organisational capacity
2,000 2,000 2,000
38 Other Service
Reductions/Efficiencies
Continuation of review of Children's Centres. The
service is currently under review to reduce costs
over a 3 year period. Earlier reorganisation may
reduce capacity to provide early intervention for
vulnerable children and families
Review will seek to ensure that the most
vulnerable clients are protected
100,000 100,000 100,000
Head of Education & Strategic Commissioning Total 630,000 663,000 663,000
Education and Children Portfolio Total 983,000 1,126,000 1,222,000
46
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Environment Portfolio
Head of Community Housing & Regeneration39 Customer Management Service efficiencies / review of working practices No direct cut to service but some limited
impact on organisational capacity
20,000 45,000 45,000
Head of Community Housing & Regeneration Total 20,000 45,000 45,000
Head of Transport and Street Management40 Commissioning & Procurement New Waste Collection - Open Book Accounting
Contract
No direct cut to service but some limited
impact on organisational capacity - The waste
collection contract started on the 1st October
2011 and collection days were changed from
that date. This additional saving should not
impact negatively upon service users.
300,000 350,000 400,000
41 Commissioning & Procurement Rationalisation of two IS systems. Currently Waste
Management use Mayrise and Transport and
Environment use Exor. The feasibility of migrating
to a single system will be investigated
No direct cut to service but some limited
impact on organisational capacity
10,000 40,000 40,000
42 Commissioning & Procurement Reduction in metered waters supply costs No direct cut to service but some limited
impact on organisational capacity
1,000 1,000 1,000
43 Income DCLG Weekly Waste Collection and Recycling
Fund
The fund is intended to allow local authorities
to retain, or reinstate, weekly collections or
increase recycling rates. Full details of the
fund conditions are not yet available and so
the impact is not yet known
150,000 150,000 150,000
Head of Transport and Street Management Total 461,000 541,000 591,000
Environment Portfolio Total 481,000 586,000 636,000
47
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Governance and Audit Committee
Head of Customer, Community and Democratic Services44 Commissioning & Procurement Reduced cost of Election Management Software No direct cut to service but some limited
impact on organisational capacity
5,000 5,000 5,000
45 Commissioning & Procurement Reduced cost of printing for elections No direct cut to service but some limited
impact on organisational capacity
5,000 5,000
46 Customer Management Reduction in direct cost of staffing for elections More use of unpaid volunteers and existing
staff
15,000 15,000
47 Customer Management Transfer of customer service functions to City
Helpdesk
Response times may increase 10,000 10,000 10,000
Head of Customer, Community and Democratic Services Total 35,000 15,000 35,000
Governance and Audit Committee Total 35,000 15,000 35,000
48
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Health and Social Care Portfolio
Head of Adult Social Care48 Better Performing Workforce Streamlining of staffing following restructure of
service with effect from September 2011.
Reduction in management; change in skill mix;
reduction in back office etc.
Service has been redesigned with integration
with Health in mind, which should improve
performance with more streamlined care
pathways
295,000 295,000 295,000
49 Commissioning & Procurement Joint Supporting People and Social Care Contracts Change of provider therefore an initial settling
in period for service users
165,000 165,000 165,000
50 Commissioning & Procurement Standardise Domiciliary Care by reducing number
of providers from 25 to 10, working in 'zones' across
the city, and standardising rate of payment to
providers
Change of provider therefore an initial settling
in period for service users. No deterioration in
quality although carer may change
550,000 550,000 550,000
51 Commissioning & Procurement Alexandra Lodge Closure/4 Sites Extra Care
development to provide extra care facilities for older
& disabled people
Change of provider for existing residents - see
report to Council
100,000 100,000 100,000
52 Commissioning & Procurement Harry Sotnick Nursing Home opened February
2011. Gradual fill rate to achieve full year saving
from 2013/14
Change of provider for those who choose to
move - see report to Cabinet
200,000 200,000 200,000
53 Commissioning & Procurement Joint Equipment Store to deliver small annual
saving through greater efficiencies
Improved service through more efficient
working
8,000 8,000 8,000
54 Commissioning & Procurement Reconfiguration of some services being provided
(Art Groups, Internet Cafes, Day Centres, etc).
Adult Mental Health clients
Some services to be commissioned in a
different way which could lead to more efficient
procurement and greater choice. Level of non-
chargeable services may be slightly reduced
25,000 25,000 25,000
55 Commissioning & Procurement Approved Mental Health Practitioners - Statutory
specialist Mental Health assessment service. Re-
commission service, possibly in partnership with
other councils
Improved, more responsive and timely service 200,000 200,000 200,000
56 Commissioning & Procurement Adult Mental Health S75 Pooled fund efficiency Some reduction in capacity 80,000 80,000 80,000
49
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
57 Commissioning & Procurement Possible efficiency savings for Carers services
through reconfiguring processes and support
Parity of services for carers across client
groups, through a more consistent and
equitable service
25,000 25,000 25,000
58 Commissioning & Procurement Re-structuring of Adult Social Care in 2011/12 has
identified savings in premises costs
No direct cut to service but some limited
impact on organisational capacity
17,000 17,000 17,000
59 Customer Management Review of Processes Will be a positive impact on the service user
through reduced duplication of assessment,
more timely intervention and 'One & Done'
200,000 500,000 1,000,000
60 Customer Management Savings from non-staffing Vanguard Service as part
of Adult Social Care re-structuring
No direct cut to service but some limited
impact on organisational capacity
10,000 10,000 10,000
61 Customer Management Back Office redesign More efficient as a result of Transformation
work
43,000 43,000 43,000
62 Customer Management Reablement efficiencies through timely interventions
maximising people's independence and reduced
reliance on traditional style care
Improved health and wellbeing of service
users
100,000 300,000 500,000
63 Commissioning & Procurement Reduction in metered waters supply costs More efficient as a result of Transformation
work
2,400 2,400 2,400
Head of Adult Social Care Total 2,020,400 2,520,400 3,220,400
50
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Head of Health Improvement & Development Service64 Customer Management Business Support management & administration
efficiencies
No direct cut to service but some limited
impact on organisational capacity
20,000 20,000 20,000
65 Commissioning & Procurement Carers Centre efficiencies No direct cut to service but some limited
impact on organisational capacity
8,000 8,000 8,000
66 Commissioning & Procurement Supporting Independence - Commissioned Services
efficiencies
No direct cut to service but some limited
impact on organisational capacity
49,000 86,000 88,000
67 Better Performing Workforce Minibus - workforce saving No direct cut to service but some limited
impact on organisational capacity
2,000 2,000 2,000
68 Income Behaviour Change Training Training offered through HIDS Training
calendar for which there is now a small charge
for attendance
1,000 1,000 1,000
69 Better Performing Workforce Management team costs No direct cut to service but some limited
impact on organisational capacity
2,000 2,000 2,000
Head of Health Improvement & Development Service Total 82,000 119,000 121,000
Health and Social Care Portfolio Total 2,102,400 2,639,400 3,341,400
51
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Housing Portfolio
Head of Community Housing & Regeneration70 Better Performing Workforce Review of financial support & structure & working
practices
No direct cut to service but some limited
impact on organisational capacity
40,000 60,000 85,000
71 Income Shared services - provision of services to
neighbouring LAs
No direct cut to service but some limited
impact on organisational capacity
5,000 10,000 15,000
72 Better Performing Workforce Administration savings resulting from transfer of
Supporting People activity to ASC
No direct cut to service but some limited
impact on organisational capacity
30,000 30,000 30,000
Head of Community Housing & Regeneration Total 75,000 100,000 130,000
Head of Housing Management (Housing Options)73 Better Performing Workforce Service Review following a systems thinking
intervention in 2008 which led to improvements in
working practices. Savings have been made by a
reduction in staff by natural wastage not
redundancies
An improved service providing advice &
realistic housing options tailored to individuals
personal circumstances & a reduction in
waiting times
73,000 137,000 201,000
74 Better Performing Workforce Reduction in charge from HRA with regard to
Wardens Welfare
No direct cut to service but some limited
impact on organisational capacity
31,000 31,000 31,000
Head of Housing Management (Housing Options) Total 104,000 168,000 232,000
Housing Portfolio Total 179,000 268,000 362,000
52
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Leader Portfolio
Head of Customer, Community and Democratic Services75 Income Income from rental of Lord Mayor's Facilities Negative Impact - some charges to be
implemented where previously facilities were
used free of charge. Positive - greater choice
of venue for events and opening the LM
rooms to the public
10,000 10,000 25,000
76 Commissioning & Procurement Reduced cost from 'Badges & Scrolls' No direct cut to service but some limited
impact on organisational capacity
2,000 2,000 2,000
Head of Customer, Community and Democratic Services Total 12,000 12,000 27,000
Leader Portfolio Total 12,000 12,000 27,000
53
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Planning Regeneration and Economic Development Portfolio
Head of Asset Management Service77 Commissioning & Procurement Reduction in metered water supply costs No direct cut to service but some limited
impact on organisational capacity
1,100 1,100 1,100
Head of Asset Management Service Total 1,100 1,100 1,100
Head of Community Housing & Regeneration78 Better Performing Workforce Service efficiencies / review of working practices No direct cut to service but some limited
impact on organisational capacity
10,000 20,000 30,000
79 Income Additional Service Income Broader commercial offer to business
customers
10,000 20,000 30,000
80 Income Review of operational budgets No direct cut to service but some limited
impact on organisational capacity
5,000 10,000 19,000
81 Commissioning & Procurement Category Management e.g. energy and supplies No direct cut to service but some limited
impact on organisational capacity
4,000 4,000 4,000
82 Income Additional Income derived from increased orders at
Portsmouth Craft & Manufacturing Industries
(PCMI)
No direct cut to service but some limited
impact on organisational capacity
9,000 9,000 9,000
Head of Community Housing & Regeneration Total 38,000 63,000 92,000
Head of Culture83 Better Performing Workforce De-layering of staff structure No direct cut to service but some limited
impact on organisational capacity
67,000 67,000 67,000
84 Property & Assets Building costs associated with the closure of the
VIC at the Hard
No direct cut to service but some limited
impact on organisational capacity
11,000 11,000 11,000
54
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
85 Customer Management Delayering of staff structure and closure of the
Visitor Information Centre at The Hard. Service to
be re-provided via web site following results of
customer usage survey
No direct cut to service but some limited
impact on organisational capacity
99,000 99,000 99,000
Head of Culture Total 177,000 177,000 177,000
Head of Planning86 Better Performing Workforce Service Review No direct cut to service but some limited
impact on organisational capacity
45,000 60,000 75,000
87 Income Planning Application Fees - changed methodology Planning Fees could become more expensive
for applicants
10,000 65,000 105,000
88 Commissioning & Procurement Improved Procurement of supplies and services No direct cut to service but some limited
impact on organisational capacity
5,000 8,000 10,000
Head of Planning Total 60,000 133,000 190,000
Planning Regeneration and Economic Development Portfolio Total 276,100 374,100 460,100
55
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Resources Portfolio
Chief Executive and Strategic Directors89 Better Performing Workforce Staff Reorganisation No direct cut to service but some limited
impact on organisational capacity
136,700 182,200 182,200
90 Better Performing Workforce Additional Voluntary Redundancies Some limited impact on organisational
capacity
700,000 700,000 700,000
Chief Executive and Strategic Directors Total 836,700 882,200 882,200
Head of Asset Management Service91 Commissioning & Procurement Savings from reduced / prioritised demand for
contracted maintenance
Low impact 89,000 109,000 175,000
92 Customer Management Efficiency savings as a result of restructuring
property query and maintenance call handling
teams
No direct cut to service but some limited
impact on organisational capacity
30,000 36,000 36,000
93 Customer Management More efficient use of security team and changes to
Civic Office access
Service improvement and limited change to
access arrangements
36,000 36,000 36,000
94 Property & Assets Efficiency savings through restructuring valuation
and estate management teams
No direct cut to service but some limited
impact on organisational capacity
33,000 118,000 217,000
95 Commissioning & Procurement Savings from maintenance in the Admin buildings
budget, produced by changing the way in which
work is procured and completed
No direct cut to service but some limited
impact on organisational capacity
10,000 10,000 10,000
96 Property & Assets Further savings from planned maintenance element
of Landlord Maintenance budget
Any risk of service disruptions will be
minimised through improved management of
priorities. Mitigated by the proposed
Contingency contained within the Capital
Programme
70,000 70,000 70,000
Head of Asset Management Service Total 268,000 379,000 544,000
56
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Head of Audit and Performance Improvement97 Commissioning & Procurement Reduction in spend on commodities and ICT No direct cut to service but some limited
impact on organisational capacity
6,000 11,000 16,000
98 Customer Management Reduction in admin capacity within service resulting
from reviews of internal processes
No direct cut to service but some limited
impact on organisational capacity
25,000 50,000 50,000
99 Better Performing Workforce Reduction in staffing levels assumed from
increased staff productivity
No direct cut to service but some limited
impact on organisational capacity
25,000 43,000 86,000
100 Income Income streams developed for internal audit,
risk/insurance and procurement
No direct cut to service but some limited
impact on organisational capacity
10,000 20,000 30,000
Head of Audit and Performance Improvement Total 66,000 124,000 182,000
Head of Customer, Community and Democratic Services101 Commissioning & Procurement City Helpdesk - Delete Masterpoint contract
(covered by new telephony system)
More efficient as a result of Transformation
work
5,000 5,000 5,000
102 Customer Management Members Services - Reduction in staffing budget No direct cut to service but some limited
impact on organisational capacity
5,000 5,000 5,000
103 Income Flagship Magazine - Increase in income Need to ensure a balance between advertising
and articles
10,000 10,000 10,000
104 Customer Management Corporate Communications - Reduction in staffing
budget
Response times may increase 9,000 9,000 9,000
105 Commissioning & Procurement Applying rental charges to all voluntary sector
organisations at relevant contract renewal dates as
approved by Resources Portfolio
The organisations impacted by this will be
provided with plenty of notice to seek
alternative methods of funding rent or working
with other organisations to share space or find
alternative accommodation
60,000 60,000 60,000
106 Commissioning & Procurement Voluntary Sector - Reduced contract costs The organisations impacted by this will be
provided with plenty of notice to seek
alternative methods of funding rent or working
with other organisations to share space or find
alternative accommodation
10,000 50,000 50,000
57
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
107 Commissioning & Procurement Reduction in print costs across service greater requirement for e-communications and
for individuals to print their own on a needs
only basis
10,000 10,000 10,000
108 Commissioning & Procurement Re-negotiate cost of LGA subscription No direct cut to service but some limited
impact on organisational capacity
4,000 4,000 4,000
109 Customer Management Reduction in cost of supporting LiNKs/Healthwatch Representative 'voice' on health matters could
be reduced
25,000 25,000 25,000
110 Better Performing Workforce Reduction in management overhead following
review
Response times may increase 34,000 54,000 54,000
111 Commissioning & Procurement This represents a cut in funding for voluntary sector
services, specifically funding available for
infrastructure support for the voluntary sector
Reduction on breadth of offer available.
Greater need to be working in partnership
25,000 0 0
112 Commissioning & Procurement This represents a cut in funding for
LINK/Healthwatch
Representative 'voice' on health matters could
be reduced
20,000 20,000 20,000
Head of Customer, Community and Democratic Services Total 217,000 252,000 252,000
Head of Financial Services113 Better Performing Workforce Management de-layering/span of control.
Productivity & efficiencies gains
Slower decision making. Some potential for a
reduction in the speed at which suppliers are
paid but expected to be managed
387,900 417,900 447,900
114 Customer Management Review of postal service provision No direct cut to service but some limited
impact on organisational capacity
20,000 20,000 20,000
115 Customer Management Customer Interface efficiencies No direct cut to service but some limited
impact on organisational capacity
20,000 39,000 39,000
116 Commissioning & Procurement Reduction in audit fees No direct cut to service but some limited
impact on organisational capacity
25,000 25,000 25,000
117 Commissioning & Procurement Efficiencies in P2P process Some potential for a reduction in the speed at
which suppliers are paid but expected to be
managed
10,000 10,000 10,000
58
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
118 Income Charge for services to LEP No direct cut to service but some limited
impact on organisational capacity
5,000 5,000 5,000
Head of Financial Services Total 467,900 516,900 546,900
Head of Human Resources119 Customer Management Re-structure in Learning & Development
Administration and Support
More flexibility in admin response 58,000 58,000 58,000
120 Better Performing Workforce Re-structure in People Centre and Recruitment
team
More flexibility in response to enquiries 86,000 90,000 90,000
121 Income Increased dependence upon HR admin resource to
support Local Authority Designated Officer role
No direct cut to service but some limited
impact on organisational capacity
1,000 1,000 1,000
122 Better Performing Workforce Deletion of unused hours in full-time posts No direct cut to service but some limited
impact on organisational capacity
36,500 36,500 36,500
123 Better Performing Workforce Further review of staffing structure No direct cut to service but some limited
impact on organisational capacity
9,500 23,500 27,500
Head of Human Resources Total 191,000 209,000 213,000
Head of Information Service124 Commissioning & Procurement Renegotiate contracts to achieve reduction No direct cut to service but some limited
impact on organisational capacity
10,000 15,000 20,000
125 Other Service
Reductions/Efficiencies
Staff Reorganisation Wait times for calls to the Service Desk will
increase. Account changes such as
passwords will be subject to longer lead times
for resolution
40,000 40,000 40,000
126 Other Service
Reductions/Efficiencies
Staff Reorganisation Hardware support and installation capacity will
be reduced. All parts of PCC including visitor
facing facilities will receive a reduction in
service. Access to computer facilities will
remain unavailable for longer
30,000 30,000 30,000
59
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
127 Other Service
Reductions/Efficiencies
Staff Reorganisation Some systems will not be maintained,
developed or repaired. Focus will be on
delivering changes in statutory requirements
and maintenance of existing IS systems
35,000 35,000 35,000
128 Other Service
Reductions/Efficiencies
Staff Reorganisation Routine changes on training and systems
installations will be subject to longer wait times
30,000 30,000 30,000
129 Commissioning & Procurement Renegotiation of mobile phone contract No direct cut to service but some limited
impact on organisational capacity
78,400 78,400 78,400
130 Other Service
Reductions/Efficiencies
Reduction in training budget Services requiring a technical
change/project/service will have to fund
training. If this is not possible then work will be
delayed while technicians research from other
resources. This will reduce the speed of
technical change
13,600 13,600 13,600
131 Other Service
Reductions/Efficiencies
Staff Reorganisation Unable to run some small to medium projects
for services when they need them. A typical
project that would not now be resourced would
be supporting Social Care in attaining the
necessary compliance to exchange data
securely with Health
40,000 40,000 40,000
Head of Information Service Total 277,000 282,000 287,000
Head of Legal Licensing and Registrars (including Land Charges)132 Better Performing Workforce Licensing - Customer management No direct cut to service but some limited
impact on organisational capacity
16,000 16,000 16,000
133 Better Performing Workforce Registrars - Team Restructuring No direct cut to service but some limited
impact on organisational capacity
14,000 14,000 14,000
134 Income Registrars - Ceremony Fee increase No direct cut to service but some limited
impact on organisational capacity
19,000 19,000 19,000
60
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
135 Income Priority Certificate Service No direct cut to service but some limited
impact on organisational capacity
10,000 10,000 10,000
Head of Legal Licensing and Registrars (including Land Charges) Total 59,000 59,000 59,000
Head of Revenues and Benefits136 Customer Management Process re-design & service changes.
Assumption: 2013/14 and 2014/15 savings are
definite provided the Welfare Reform Bill, when
enacted, does not significantly alter the landscape
in those 2 years
May see a small diminution of service (slower
turnaround of claims, requests for
discounts/exemptions etc., some delays in
payment of benefit, rebilling of local tax)
237,000 443,000 649,000
137 Customer Management Process re-design & service changes. Assumption:
2013/14 and 2014/15 savings are definite provided
the Welfare Reform Bill, when enacted, does not
significantly alter the landscape in those 2 years
May see a small diminution of service (slower
turnaround of claims, requests for
discounts/exemptions etc., some delays in
payment of benefit, rebilling of local tax)
45,500 45,500 45,500
138 Customer Management Process re-design & service changes. Assumption:
2013/14 and 2014/15 savings are definite provided
the Welfare Reform Bill, when enacted, does not
significantly alter the landscape in those 2 years
Unable to provide service at all 5 HB counters,
owing to staff reductions. Lowest impact option
is to remove permanent Benefits presence at
the Landport counter & provide appointment
service on 2 half days pw. Nearby offices are
at Civic & Buckland
28,500 28,500 28,500
139 Income Increase in Court fees for summonses and liability
orders, as agreed with the Court Service
Increase in Court Fees which is below current
rates of inflation
25,000 25,000 25,000
Head of Revenues and Benefits Total 336,000 542,000 748,000
Resources Portfolio Total 2,718,600 3,246,100 3,714,100
61
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
Traffic and Transportation Portfolio
Head of Transport and Street Management140 Customer Management Service Review Following the service review there will be a
need for a redistribution and reprioritising of
work load to minimise any impact on service
users
30,000 30,000 50,000
141 Better Performing Workforce Service Review Following the service review there will be a
need for a redistribution and reprioritising of
work load to minimise any impact on service
users
145,000 145,000 225,000
142 Customer Management Closure of Parking Cash Desk/Office The parking office is open weekdays and 4
hours Saturday mornings for the issue of
residents permits, payment of fines and
purchase of scratchcards. Re-provision is
currently being investigated within libraries,
housing offices and central cashiers desk
35,000 35,000 35,000
143 Commissioning & Procurement Integrated Transport Review - Voluntary sector -
Review of the transportation of looked after children
and the home to school transport service to
incorporate best practice and deliver efficiencies
Minimal 10,000 15,000 20,000
144 Income Shared Services - IOW, Highways No direct cut to service but some limited
impact on organisational capacity
20,000 30,000 40,000
145 Income Parking - Increasing the provision of cash collection
services to third parties
No direct cut to service but some limited
impact on organisational capacity
20,000 30,000 50,000
62
Transformation Workstream Transformation Saving Impact on Service User Group
Saving
2012/13
£
Saving
2013/14
£
Saving
2014/15
£
APPENDIX B
RECOMMENDED BUDGET SAVINGS 2012/13 ONWARDS
146 Other Service
Reductions/Efficiencies
Reduction in value of Concessionary Travel Token
issue to £25 per annum for non disabled residents
Limited impact due to availability of free,
nationwide unlimited off peak bus travel to
eligible groups
27,400 6,300 6,300
Head of Transport and Street Management Total 287,400 291,300 426,300
Traffic and Transportation Portfolio Total 287,400 291,300 426,300
All Portfolios Grand Total 7,825,600 9,482,700 11,221,800
63
APPENDIX B
64
Budget Pressure Summary Impact if Bid Rejected Proposed Action to Minimise Impact2012/13
£
2013/14
£
2014/15
£
Children & Education Portfolio
1 The Learning Place (TLP) - loss of
external grant funding, due to the
cessation of the Family Learning
Innovation Fund programme.
It would be necessary to find alternative savings
in the service, at the expense of customer
service, staff expertise and a significant reduction
in the range and volume of the programmes
provided.
Prioritise the fee earning programmes and
reduce the previously free provision. Offer to
vulnerable learners will reduce.
20,000 10,000 0
2 Looked After Children - budget
pressure caused by the number of
Looked After Children placed through
Independent Fostering Agencies.
It is unlikely that alternative savings on this scale
can be identified in order to offset this pressure,
therefore the overall Safeguarding budget is likely
to overspend next year if the pressure is not
recognised.
The work within the Placement Strategy and
Looked After Children Commissioning
strategy is ongoing and numbers of looked
after children and independent fostering
agencies have reduced and projections are
that these will continue in a downward trend.
1,002,300 1,002,300 1,002,300
3 Youth Centres - this service has seen
significant external funding reductions
in recent years, this has required a re-
organisation of service provision. An
increase in funding will help to
provide positive activities for young
people in the city.
Existing available funding will be necessarily
targeted at statutory responsibilities which could
have a knock on effect on some of the wider
provision of the service.
None 25,000 25,000 25,000
Children & Education Portfolio Total 1,047,300 1,037,300 1,027,300
Culture, Leisure & Sport Portfolio
4 Community Centres - re-instate an
approved cost saving to support
transition of Community Centres to
arms length control and operation.
Rejection of the bid would impact on the
communities that the community centres serve.
The revenue support will aid the capacity of the
centres to move towards full independence in a
consensual way, rather than an enforced
transition.
None 33,200 33,200 33,200
APPENDIX C
RECOMMENDED BUDGET PRESSURES 2012/13 ONWARDS
65
Budget Pressure Summary Impact if Bid Rejected Proposed Action to Minimise Impact2012/13
£
2013/14
£
2014/15
£
APPENDIX C
RECOMMENDED BUDGET PRESSURES 2012/13 ONWARDS
5 Winter Bedding Plants - provision for
the continuation of flower beds in the
most prominent areas of the city
during the winter and early spring.
The flower beds in the remaining high profile
areas of the city will be without colour during the
winter and early spring.
Continuation of this service cannot be
funded from within the existing budget.
16,100 16,100 16,100
Culture, Leisure & Sport Portfolio Total 49,300 49,300 49,300
Environment Portfolio
6 Environmental Health - Pest Control
service, loss of income due to an
increase in demand for rat infestation
treatments that are non-chargeable in
domestic premises.
Pest control is customer demand led and
necessary in ensuring Public Health and Food
Safety legislation compliance in related areas.
Will need to review pricing structures,
numbers of visits per treatment, improve
signposting to self help and review Help
Desk referrals.
56,000 56,000 56,000
7 Waste Disposal - The Waste
Disposal contract costs will increase
in January 2012 when the contract
enters the next and final phase of the
charging rates.
Unable to meet payment obligations under the
disposal contract. Likely to lead to default of
contract.
There is no mitigating action that can be
taken to avoid these increased contract
costs.
148,000 148,000 148,000
8 Waste Disposal - The Waste
Disposal contract increases each
year in line with RPI. Cash limits are
not increased in line with RPI, but a
blended CPI and Pay Inflation index
which is lower than RPI.
Unable to meet payment obligations under the
disposal contract. Likely to lead to default of
contract.
The Waste Disposal contract is currently
being looked at with a view to renegotiating
elements of the contract based on the
contractors ambition to align and extend
elements of the contract. The issue of
indexation will be part of the negotiation.
150,000 150,000 150,000
Environment Portfolio Total 354,000 354,000 354,000
66
Budget Pressure Summary Impact if Bid Rejected Proposed Action to Minimise Impact2012/13
£
2013/14
£
2014/15
£
APPENDIX C
RECOMMENDED BUDGET PRESSURES 2012/13 ONWARDS
Health & Social Care Portfolio
9 Adult Social Care (ASC) - Budget
Pressure allowed to contribute
towards the costs of the following:
250,000 250,000 250,000
Transition Cases - Net costs of
Learning Disability transition cases
for which ASC are taking over funding
responsibility and service provision
from Children's Services.
The statutory service would continue to be
provided to clients, but it would lead to a potential
overspend if not adequately funded.
The statutory responsibility for these cases
is unavoidable. Each case is dealt with
individually and the amounts shown already
reflect an approach that seeks to meet the
clients needs in the most cost effective way.
S117 Cases - Due to changes in the
legislation on Mental Health care,
patients are no longer the sole
responsibility of the Department of
Health. These cases are now jointly
funded.
The statutory service would continue to be
provided to clients, but it would lead to a potential
overspend if not adequately funded.
Each case is dealt with individually and the
amounts shown already reflect an approach
that seeks to meet the clients needs in the
most cost effective way.
Continuing Health Care - S117
Learning Disability clients. A recent
change in legislation on the residency
of people in need of community care
services. These tend to be expensive
high needs clients.
The statutory service would continue to be
provided to clients, but it would lead to a potential
overspend if not adequately funded.
A Section 75 agreement to pool legal
powers and funding with NHS bodies is
being pursued which should enable this
service to be delivered in as efficient a
manner as possible.
Continuing Health Care (CHC) - non
S117 clients, transfer of funding
responsibility from Health budgets to
ASC budgets.
The statutory service would continue to be
provided to clients, but it would lead to a potential
overspend if not adequately funded.
A Section 75 agreement to pool legal
powers and funding with NHS bodies is
being pursued which should enable this
service to be delivered in as efficient a
manner as possible.
67
Budget Pressure Summary Impact if Bid Rejected Proposed Action to Minimise Impact2012/13
£
2013/14
£
2014/15
£
APPENDIX C
RECOMMENDED BUDGET PRESSURES 2012/13 ONWARDS
10 Health Improvement & Development -
Teenage Pregnancy & Substance
Misuse Officer: Supporting vulnerable
young people to address risk taking
behaviours related to drugs, alcohol
and sexual health working closely
with schools and colleges.
Loss of this post could potentially see an increase
in the teenage pregnancy rate as well as
removing a vital service in the prevention agenda
on substance misuse. There will be increased
pressures on other areas of the Council such as
crime prevention and truancy.
Will not be able to minimise pressure as loss
of skills and capacity is key to this area.
There will be no other posts who have the
specialist skills that are required.
13,700 27,500 27,500
Health & Social Care Portfolio Total 263,700 277,500 277,500
Resources Portfolio
11 Meet & Greet - there is a need to
make budget provision for the
existing "meet and greet" service
provided in the Civic Offices
reception area.
Service will cease from April 1st, 2012 resulting in
a decrease in service to the customer as they will
no longer be guided to the most appropriate
waiting area in Reception and loss of
development opportunities for staff employed in
partnership with Learning Disability organisations.
Alternative sources of funding have been
explored to no avail.
10,000 10,000 10,000
Resources Portfolio Total 10,000 10,000 10,000
Traffic & Transportation Portfolio
12 Concessionary Fares - The Bus
Service Operators Grant (BSOG) is
being withdrawn by central
government. This will see a rise in
fares and therefore an increase in
Concessionary Fare costs which is
based upon revenue foregone.
This is an unavoidable pressure, the
Concessionary Pass is a national scheme and the
City Council base it's reimbursement on the DfT
prescribed reimbursement calculator. The
decision to remove BSOG is a Government one
not a local decision.
The issue has been raised with Central
Government and we continue to apply
pressure to the Bus operator not to pass this
cost onto the passenger.
91,300 91,300 91,300
68
Budget Pressure Summary Impact if Bid Rejected Proposed Action to Minimise Impact2012/13
£
2013/14
£
2014/15
£
APPENDIX C
RECOMMENDED BUDGET PRESSURES 2012/13 ONWARDS
13 Concessionary Fares - Increased
costs of new back office system
needed to process and manage
smart travel cards.
PCC will not be able to procure a back office
system for smart cards as set out by the DFT.
We will seek to get the best value for money
service provider, although there are limited
providers in the market.
30,000 30,000 30,000
14 Street Lighting - Following a hardware
upgrade the methodology for
calculating volume usage under the
previous system was found to be
incorrect. A higher volume of usage is
consequently now being billed.
The Service will not be able to meet its cash limit,
and cuts will need to be made elsewhere within
the service.
Further work will be undertaken to review
"spend to save" schemes to reduce our
electricity usage. However there will be a
lead time on any spend to save schemes.
80,000 80,000 80,000
Traffic & Transportation Portfolio Total 201,300 201,300 201,300
All Portfolios Grand Total 1,925,600 1,929,400 1,919,400
69
APPENDIX C
70
Estimate Forecast Forecast Forecast
2012/13 2013/14 2014/15 2015/16
£'000 £'000 £'000 £'000
Service Cash Limits 150,410 151,663 156,118 159,430
Contingency 6,302 3,343 3,246 3,246
Debt finaning Costs 26,906 24,877 24,892 25,450
Levies and insurance premiums 1,964 2,001 2,041 2,232
Other income/expenditure 10,930 11,759 12,493 13,493
196,512 193,643 198,790 203,851
Less
- Council Tax Income 68,597 70,571 72,336 74,144
- Formula Grant 84,427 81,944 76,153 72,807
- Other General Grants 30,901 30,737 29,659 28,934
- New Homes Bonus 1,297 1,297 1,297 1,297
- Council Tax Freeze Grant 3,443 1,721 1,721 0
188,665 186,270 181,166 177,182
Budget Deficit (7,847) (7,373) (17,624) (26,669)
The budget deficit in 2012/13 will be funded from General Fund Balances
Deficits in 2013/14 to 2015/16 reflect future savings requirements
APPENDIX D
FORECAST EXPENDITURE 2012/13 to 2015/16
71
APPENDIX D
72
Cash Cash Cash
Limits Limits Limits
2013/14 2014/15 2015/16
£'000 £'000 £'000
Community Safety 3,229 3,170 3,289
Culture Leisure & Sport 8,201 8,388 8,728
Children & Education 31,726 32,906 34,238
Environment 12,477 13,133 13,646
Health & Social Care 45,192 47,210 47,644
Housing 8,763 8,886 9,201
Leader 289 295 293
Planning Regeneration Economic Development (8,725) (9,360) (9,394)
Resources 24,608 25,232 26,023
Traffic & Transportation 15,634 16,860 17,352
Governance & Audit Committee 342 466 473
Licensing Committee (73) (68) (63)
141,663 147,118 151,430
APPENDIX E
PROVISIONAL CASH LIMITS 2013/14 TO 2015/16 (BY PORTFOLIO)
(After Savings Requirements Deducted - Illustrative)
73
APPENDIX E
74
APPENDIX F
Cash Cash Cash
HEAD OF SERVICE Limits Limits Limits
2013/14 2014/15 2015/16
Major Services
Head of Adult Social Care 43,656 45,658 46,057Head of Children's Social Care and Safeguarding 22,597 23,531 24,430Head of Transport and Street Management 27,495 29,293 30,266
93,748 98,482 100,753
Support Services
Head of Asset Management Service 689 601 554Head of Audit and Performance Improvement 1,218 1,203 1,201Head of Customer, Community and Democratic Services 3,667 3,880 4,030Head of Financial Services 5,173 5,546 5,926Head of Human Resources 2,283 2,321 2,424Head of Information Service 4,552 4,744 4,959Head of Legal Licensing and Registrars 244 238 257
17,826 18,533 19,351
Other Front Line Services
Head of Community Housing & Regeneration 9,128 9,322 9,660Head of Community Safety 2,551 2,477 2,591Head of Education & Strategic Commissioning 8,998 9,251 9,684Chief Executive & Strategic Directors 659 682 699Head of Culture 8,809 9,087 9,458Head of Health Improvement & Development Service 1,541 1,551 1,587Head of Housing Management (Housing Options) 1,269 1,218 1,210Head of Planning 957 918 904Head of Revenues and Benefits 4,076 4,103 4,039Port Manager (7,899) (8,506) (8,506)
30,089 30,103 31,326
TOTAL CASH LIMITS 141,663 147,118 151,430
INDICATIVE CASH LIMITS 2013/14 TO 2015/16 (BY HEAD OF SERVICE)
(After Savings Requirements Deducted - Illustrative)
75