appendix 2: quality objectives 1) a) no process/criteria
TRANSCRIPT
Work Station : OIAQM Version No. : 02
Revision No. : 00
APPENDIX 2: QUALITY OBJECTIVES
1) Management of Academic Affairs A) (Undergraduate)
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1 Course Offering The deadline of issuing class schedule to the students prior to pre-registration period.
At least 1 week
2 Course Registration
i. Percentage of qualified UG students doing ‘on-line’ pre-registration for regular semester.
95% of UG students
ii. Percentage of UG students enrolled with minimum of 12 credit hours of the workload.
95% of UG students
3 Readmission Process Percentage of readmission results released within 6 weeks from the closing date of application.
100%
4 Preparation of Examination Question Papers
Percentage of question papers fully vetted before printing process. 100%
5 Preparation of End-of-Semester Timetable
Percentage of clashes between Kulliyyah Core Courses and University Required Courses.
Less than 3%
6 Handling of the Examination
i. Percentage of overlapping in generating students' sitting numbers.
Less than 1%
ii. Percentage of invigilators arriving at the examination venue within the stipulated time.
100%
7 Marking, Grading and Submission of Final Grades/ Results
i. Percentage of grading the answer scripts within the allowable period according to the University policies.
100%
ii. Percentage of errors in the calculation of scores and data entry prior to Senate endorsement.
Less than 1%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
8 Appeal for Rechecking of Answer Scripts
Percentage of results for appeal cases released within a week after BOE/BOA endorsement.
100%
9 Student Feedback Survey (SFS)
Percentage of lecturers obtained 80% weighted average score of SFS (Part A only).
80%
10 Analysis of Students' Performances
Percentage of Student Achievement Art-Based Programmes
i. Students achieve CGPA of 3.60 and above 5% ii. Students achieve CGPA of 2.80 - 3.59 45%
Science-Based Programmes i. Students achieve CGPA of 3.60 and above. 5% ii. Students achieve CGPA of 2.80 - 3.59 35%
11 Academic Review (Existing Programmes)
Percentage of academic programmes being reviewed according to the requirement or cycle whenever applicable.
95%
12 Preparation of New Course Outlines
Percentage of Course outlines are deliberated and recommended in KBM and endorsed by Senate at least 2 months prior to the implementation date.
100%
13 Evaluation of Graduating Students
Percentage of students graduated on time. 80%
14 Maintenance of Teaching Equipment
Percentage of teaching equipment are checked and maintained as scheduled by Kulliyyah.
At least 80%
15 Maintenance of Physical Facilities
Percentage of physical facilities are checked and maintained as scheduled by Kulliyyah.
At least 80%
16 Appointment of Part-Time Lecturers
Percentage of appointment letter issued to part-time lecturers before semester begins.
80%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
17
Customer Complaints i. Percentage of complaints received were acted upon within 5 working days.
80%
ii. Percentage of complaints received were solved within 2 weeks.
60%
Work Station : OIAQM Version No. : 02
Revision No. : 00
B) (Postgraduate)
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1 Course Scheduling (Course Offering and Course Registration)
i. The deadline of issuing class schedule to the students by week 14 of the semester.
100%
ii. Percentage of PG students doing registration by week four of the semester.
70% of PG students
iii. Percentage of PG students enrolled with minimum credit hours of the workload as per the PG Policies and Regulations.
95% of PG students
2 Preparation of Examination Question Papers
Percentage of question papers fully vetted before printing process. 100%
3 Preparation of End-of-Semester Timetable
Percentage of clashes between Kulliyyah Core Courses and University Required Courses.
Less than 3%
4 Handling of the Examination
Percentage of invigilators arriving at the examination venue within the stipulated time. 100%
5 Marking, Grading and Submission of Final Grades/ Results
i. Percentage of grading the answer scripts within the allowable period according to the University policies.
100%
ii. Percentage of errors in the calculation of scores and data entry prior to Senate endorsement.
Less than 1%
6 Appeal for Rechecking of Answer Scripts
Percentage of results for appeal cases released within a week after Senate endorsement.
100%
7 Student Feedback Survey (SFS)
Percentage of lecturers obtaining 80% weighted average score of SFS .
80%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
8 Analysis of Students' Performances
Percentage of Student Achievement
Art-Based Programmes
i. Students achieve CGPA of 3.67 and above 5%
ii. Students achieve CGPA of 3.00 - 3.66 80%
Science-Based Programmes
iii. Students achieve CGPA of 3.67 and above 5%
iv. Students achieve CGPA of 3.00 - 3.66 80%
11 Academic Review (Existing Programmes)
Percentage of academic programmes being reviewed according to the requirement or cycle whenever applicable.
95%
12 Preparation of New Course Outlines
Percentage of Course outlines are deliberated and recommended in KBM and endorsed by Senate at least 2 months prior to the implementation date.
100%
13 Evaluation of Graduating Students
Percentage of students graduated on time. 40%
14 Admission into IIUM
Postgraduate
Duration of evaluation of application by kulliyyahs:
- CPS to Kulliyyah
- Kulliyyah to CPS
3 working days
14 working days
15 Research Progress Report Percentage of report received by CPS by week 16 100%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
16 Appeal for Extension of Study
Period
Percentage of report received by CPS by week 16
100%
17 Appeal for Extension of
Beyond Maximum Study
Period
Submission of appeal to kulliyyah by week 10 (arts based)
and week 16 (science-based) of the current semester
80%
18 Appeal for Change of Mode Submission of appeal to kulliyyah by week 10 of the current
semester
80%
19 Appeal to Change Status Submission of appeal to kulliyyah by week 10 of the current
semester
80%
20 Application to Transfer Credit
and Exemptions of Courses Submission to transfer credit and exemption of courses
during first semester of the candidature
100%
21 Handling VIVA Voce [Master
by Research] Viva Voce is conducted within 14 working days after
receiving the report from examiners
100%
22 Thesis/ Dissertation
Evaluation (Master by Mixed
mode and Research)
Report of thesis evaluation received from examiner 4 weeks
after the date of examiner’s acknowledgement
70%
23 Thesis/ Dissertation
Evaluation (PhD) Report of thesis evaluation received from examiner 90 days
after the date of examiner’s acknowledgement of receiving
the thesis
70%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
24 Application for Leave of
absence (PG) Submission of application to CPS by week 13 of current
semester
100%
Work Station : OIAQM Version No. : 02
Revision No. : 00
C) CELPAD
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1
Course Offering
To ensure that each course will have at least 10 students to open a class.
10 students
2 To get the course offerings ready three (3) months before the
semester begins.
3 months
3 Teachers’ Timetables To ensure 100% course scheduling with no clashes for students or teachers.
100%
4 Monitoring of Students’ Attendance
To ensure all students who attend classes less than 80% are
barred from final examinations.
80%
5
Placement and Examination
To release 100% of the students’ results according to the
deadline given by Academic Management and Admissions
Division.
100%
6 To ensure students’ results are 100% correctly keyed-in into the Student Information System within the deadline given by Academic Management and Admissions Division.
100%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
7
Readmission Process
To ensure that 100% of readmission applications are processed within three (3) weeks.
100%
8 To ensure that motivational talks or workshops are organized by
SNECU for readmission students at least three (3) times per
regular semester.
at least three (3)
times per regular
semester.
9 Training
To facilitate applications of at least 5% of the academic staff
yearly to attend conferences/workshops/seminars as paper
presenters.
5%
10 Recruitment To ensure 100% of applicants’ names recommended for an
Academic post are submitted to Management Services Division
(MSD) within two weeks after being interviewed by CELPAD interview panel.
100%
11 Curriculum Review To conduct an academic review at least every academic cycle (four years) or when necessary.
at least every academic cycle (four years) or
when necessary. 12 Teaching and Learning
To ensure effective teaching
and learning
Teaching load is 18 hours per week
18 hours
The Weighted Average Score of SFS for each lecturer is 80%
80%
Ratio of staff to students is 1:25
1:25
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
Student Attendance : fulfilled 80%
80%
13 To ensure the achievement
of:
20% of registered CELPAD Presessional students fulfill the
language requirements
20%
14
To promote quality research and publication
Number of published articles/chapters in a book : 12 articles/book chapters per year
15 Research Grant secured:
RM10,000.00 per year
Work Station : OIAQM Version No. : 02
Revision No. : 00
D) CENTRE FOR PROFESSIONAL DEVELOPMENT
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1
Training for IIUM Academic Staff
Percentage of the preparation of proposal paper one month before the programme starts.
85%
2 Percentage of training programme planned successfully implemented according to CPD almanac.
90%
3 Percentage of preparing the summary report including the analysis of participants’ feedbacks at least three weeks after the programme.
90%
Work Station : OIAQM Version No. : 02
Revision No. : 00
2) RESEARCH AND PUBLICATION
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1
RESEARCH INITIATIVE UNITE
% of FRGS and ERGS applications assessed internally prior
submission to the Ministry 100%
2 % of application for EDW A approved within 5 working days Within 2 working
days after received results from MoHE
3 Announcement of FRGS and ERGS application results to all
applicants through IIUM webmail 100%
4 Announcement of EDW B application results to all
applicants within 5 working days after approval
100%
5
PUBLICATION MANAGEMENT
% of new manuscripts tabled in Publication Approval
Committee Meeting within 2 months after receiving date of
OR.
(OR : The original manuscript submitted by author).
100%
6 % of manuscript been forwarded to language editor within
6 weeks after receiving date of AM1.
(AM1 : The original amended manuscript one (based on
reviewer’s report) returned).
80%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
7 To increase the annual sales of books
15%
8
FINANCE UNIT
Duration of processing payment upon receiving complete
documents
14 working days
9 % of average budget utilization upon completion of
research projects
90%
Budget Utilized
10
CORPORATE SERVICE UNIT
% of RMC staff fulfilled training plan on professional , spiritual and skill courses (7 days)
100%
11 % of complaints received were acted upon within 5 working
days.
100%
12 % of complaints received were solved within two weeks.
60%
Work Station : OIAQM Version No. : 02
Revision No. : 00
3) STUDENT DEVELOPMENT
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1
STUDENT DEVELOPMENT ACTIVITIES
% of students involvement in voluntary activities
70%
2 awards received at national level
15
3 awards received at international level
7
4 % of trainer achieving 80% and above in Teaching Feedback Survey (TFS)
85%
5 guidebooks and module manuals published for credited courses yearly
2
6 % of students rated 4 and above for quality credited co-curricular management
70%
7 % of students rated at least 4 for students activities related facilities
60%
Work Station : OIAQM Version No. : 02
Revision No. : 00
4) CORPORATE COMMUNICATION DIVISION
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1
To provide efficient Event
Management
To coordinate 4 official events annually i.e. IIUM Convocation (VIP Reception, Protocol and Publicity), SyawwalGathering and Merdeka Launching Celebration.
4 official events
2 To assist at least 12 official university events annually.
12 events
3 To achieve at least 90% rating of 4 and above on the
smooth running of the event management based on the post survey form (Syawwal Gathering only).
at least 90% rating of 4 and above
4
To enhance the Media
Management / Promotion
of the University
To have at least 8 news on the university published in the mainstream newspaper monthly.
8 news
5 To have at least 90% of the university main event being covered in the newspaper annually.
90%
6 To have at least 12 television and radio appearances for
promotion purpose annually.
12
7 To have at least 90% of the University events covered by our photographers
90%
8 To acknowledge complaint received within 24 hours.
Within 24 hours
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
9
To enhance the Media
Management / Promotion
of the University
To ensure Annual Report is published at least at the end
of third quarter of the following year.
at least at the
end of third
quarter of the
following year.
10 To have at least 12 advertisements in print and broadcast
media annually.
12 advertisements
11 To ensure effective management on Hospitality & Protocol
12 To provide 100% service to new lecturer within stipulated time
i.e. transport, accommodation and human resource services.
100%
13 To achieve at least 80% of customer satisfaction during visits to
IIUM i.e. schools, colleges and other institutions (if applicable).
80%
14 To response within 5 working days on the request of external
organizations to visit IIUM.
5 working days
15
Administration
Customer Service Assistant :
To attend at least 2 courses on SPP to enhance
skills on customer service annually.
at least 2 courses on SPP
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
16 All CCD personnel to attend at least 2 related courses on Corporate Relations.
at least 2 related
courses on Corporate
Relations.
17
Administration
To conduct on supplier performance annually.
18 To ensure effective management of Corporate collateral:
To ensure the corporate collateral items i.e. management
diary, calendar and notebook to be ready by middle of
November and to be distributed by second week of
December every year.
19 souvenir To ensure 80% eligible souvenir request is entertained.
80%
Work Station : OIAQM Version No. : 02
Revision No. : 00
5) FINANCE DIVISION
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
ACCOUNTS UNIT 1
Account Management
Number of audit adjustment (Client Late Adjustment) passed during yearly financial audit exercise
Not more than 30
2 Timely posting of financial data from other legacy systems (Payroll & Student systems) into general ledger
7th working day of
subsequent month
3 Completion of audit schedules prior to yearly audit exercise
15th March every
year
4 Number of courses attended by staff members of Accounts Unit
15th March every
year
5 Revenue Management Timely production of bank reconciliation statements for BMMB
Current Account of Operating
End of subsequent month
STUDENT UNIT
6
Student Financial Services
% of student perceive financial services as good and excellent
85%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
7 % of students’ complaints to be settled within 14 days
75%
8 Fees Collection % of student’s fees are collected within same semester
80%
9 Sponsorship Distribution Time taken to distribute sponsorship payment after receiving money and listing of students from sponsors
Within 14 days
10 Monthly disbursement of allowance
Payment for monthly disbursement of allowances to be made by
5th of each month
By 5th of each month
Treasury unit 11
Payment
To process payment after receipt of complete documents
14 working days
12 % of accuracy in processing payment
100%
13 Achieve customer satisfactions index
4 of scale 1-5
14
Loan
To process payment after receipt of complete documents
14 working days
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
15 To process loan application within one week upon receipt of perfect documents (vehicle and computer)
Within 7 working days
16 To produce annual loan statement
By March each year
BUDGET UNIT
17
Submission of budget proposal by K/C/D
% K/C/D submitted budget proposal within the time period given (2 months i.e. in December)
85%
18 Budget submission to the Central Agencies
Submit the overall budget proposal to Central Agencies within the stipulated period
Latest by March
19 Budget Distribution to K/C/D
Budget to be distributed to K/C/D after approval by the Budget Committee or before starting of new year
By 31st December
before the start of the new budget year
20 Monitoring of budget
utilization % of K/C/D utilization of budget according to the programme
agreement
85%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
21 Budget supplementary to K/C/D
% of application for supplementary budget
<5% from initial approved budget
22 Budget virement to K/C/D % of application for virement of budget
<5% from initial
approved budget
TRUST AND FUND MANAGEMENT UNIT
23 Trust Account Management 1. Ensure monthly reports for K/C/D are produced in accordance to the agreed schedule.
2. Ensure preparation of year end reports are in accordance to the agreed schedule.
3. Implement systematic procedure of trust account management at K/C/D.
By 3rd week of the following month
By 3rd week of January
24
Ensure monthly reports are produced in accordance to the
agreed schedule.
By the 4th week of the
following month
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
25
Fund Management
Ensure monthly audit schedules are prepared in accordance to the agreed schedule.
By the 3rd week of the following month
26 Ensure all fund management and investments transactions are
reflected in the IFIS system.
By 2nd week of the
following month
27 Efficient secretariat duties of Investment Committee Meeting
(ICM) and Investment Sub Committee Meeting (ISCM).
- Adherence to the agreed schedule of meeting
Every quarterly for
each committee meeting
PURCHASING UNIT
28
Tender
% of adherence to the time period for tenders (4 months until issuance of Letter of Award)
90%
29 Time taken to submit tender evaluation report to Tender
Secretariat
Within 2 months
30 Quotation
% of adherence to the time period for quotation
Within 2 month
31 One-Off Allocation
% of utilization in accordance to program agreement
90%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
32 Registration of Qualified Vendor / Supplier
Time taken in processing supplier’s registration
7 working days until issuance of certificate
33 Communication /
briefing to K/C/D
% of rejected proposal
<10%
34 Customer Satisfaction Survey
Achieved customer satisfaction index
4 of scale 1-5
IT UNIT
35 Ensure minimal downtime of Financial System (Oracle Financial, Student Accounting system, Payroll system)
Time taken to initiate trouble shooting
Immediate
36 % System availability 24X7
99% from trouble
shoot
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
37 Effective utilisation of budget performance online system by K/C/D
Frequency of usage of the system
Min. 50%
38 Achieve fully integrated and reliable Financial Information System at Finance Division.
% of accessibilty of financial information system
100%
39 Establishment of online financial analytical module.
Implementation of on-line financial analytical module system as scheduled
Within 9 months
40 Full-proof security policy of the Financial System according to division financial policies
Minimize/maintain unauthorized access
Zero
41 Establishment of single source of data for reference and reporting use as a means to improve data integrity
Reliability of the data
> 95%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
42 Ensure ethical activities in using financial system
# of incidence on unethical usage of the system
Zero
STUDENT SPONSORSHIP UNIT
43 To assist qualified
undergraduate students to get financial assistance
• Time taken for at leastm90% senior students received PTPTN payment
• announcement of application’s result of financial assistance through notice to be released
Within the first week of semester Within 3 working days after Board of Financial Assistance meeting
FOOD, FACILITIES AND SERVICES DIVISION
44 Appointment and
reappointment of business
operators
% of food & beverages outlets meet 75% and above of the
monthly performance evaluation
90%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
45 Rental to external users
Duration to issue rental quotations to external users
Within 3 working days
46 Campus Bazaar
Duration to release notification on the result of campus
bazaar before the appointment date
At least 3 working
days
47 Customer Satisfaction
Survey
% of customers rated 3 and above (on the scale of 5) of
customer satisfaction index
70%
Work Station : OIAQM Version No. : 02
Revision No. : 00
6) IIUM SHAS MOSQUE
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1
Mosque Management
% of respondents rated 4 & 5 to the customer satisfaction survey per year
90%
2 % of monthly average of male population performing the
congregational prayers (counted on monthly average) during weekdays and during normal semester for (Zuhr’ and ‘Asr).
10%
3 Frequency of awareness programmes conducted for Jama’ah prayers per year
3 times.
4 Number of invitation received for official programmes per year 20 per year. 5 % of red zone breakdown cases are solved within 24 hours. 100% 6 Frequency of inspection done on Janazah Van per week:
1 time
7 Number of updates to be done for the website per month :
once
8 % of the targeted number of participants attends the programmes conducted by the Mosque
50%
9 % of planned activities adhere to the set schedule.
75%
10 % of rating 4 & 5 on the satisfaction survey for all programmes.
75%
11 Number of training attended by the Mosque staff per year: 7 days.
12 % of customer surveyed rate 4 & 5 on staff’s customer friendliness.
70%
Work Station : OIAQM Version No. : 02
Revision No. : 00
7) MANAGEMENT SERVICE DIVISION
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
Recruitment 1
Selection of staff: Recruitment of academic
staff
-To ensure recruitment of qualified candidates for academic positions:
Academic staff: at least CGPA 3.0 and above or 2nd Class
Upper (for universities which
do not have the CGPA System) for
their Bachelor’s degree.
2 To issue offer letters to successful candidates (with completed
documents) within fourteen (14) working days after the selection meetings.
within fourteen (14) working days
3 To issue out renewal of contract offer letters at least 3 months
before the current contract expires.
at least 3 months
4 To issue out completion of contract at least 3 months before the current contract expires.
at least 3 months
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
5
Selection of staff: Recruitment of
administrative staff
To ensure recruitment of qualified candidates for administrative
positions: at least fulfilled theminimum requirements of the
scheme;
Professional & Management / Administrative Support Group
At least credit in the English Language at the SPM level.
6 Technical/Medical
Health Sciences Supports Group
At least pass in English Language at the SPM level.
7 To issue offer letters to successful candidates (with completed
documents) withinfourteen (14) working days after the selection meetings.
withinfourteen (14) working days
8 To notify the relevant K/C/D regarding their staff’s contract
renewal / completion, within three (3) months before the
expiry dates of their present contract.
within three (3) months
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
SERVICES
9 Confirmation
To issue confirmation letters to staff members within fourteen
(14) working days from the date of receipt of completed
documents.
within fourteen (14) working days
10
Promotion
To process completed applications for promotion of academic
staff to be tabled to the Sub-SSC within fourteen (14) working days from the date notified by the secretariat.
within fourteen (14) working days
11 To process the applications for promotion recommended by Sub-
SSC to be tabled in the Interview Panel within six (6) months from the date of the said Sub-SSC meeting.
within six (6) months
12 To issue promotional letters to successful candidates within ten
(10) working days after the Majlis Meeting.
within ten (10) working days
13
Remuneration
To process the annual salary increment of eligible IIUM and SBU staff who submitted the required supporting documents on time.
14 To control all arrears payments for claims and allowances to be not more than 5% per year.
not more than 5% per
year.
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
15 Leave
To ensure all applications for leave are processed within fourteen (14)working days from receipt of completed documents
within fourteen (14)working days
16 Resignation / Termination To ensure all notices of resignation / released with permission /
optional retirement / shortening of contract are processed
within fourteen (14) working days from receipt of completed documents.
within fourteen (14) working days
Staff Development
17
Study Leave / Sabbatical
Leave
To ensure applications for study leave / sabbatical leave /
extension of study leave / research grant of academic staff are
tabled to the Scholarship and Study Leave Committee (SSLC)
within fourteen (14) working days from the date of receipt of
completed documents or the next SSLC meeting, whichever is
later.
within fourteen (14) working days
18 To notify the relevant parties of the decisions of Scholarship and
Study Leave Committee (SSLC) within fourteen (14) working
days from the date of the SSLC meeting.
within fourteen (14) working days
19 To issue offer letters of study leave to the staff within fourteen
(14) working days upon receipt of the approval of scholarship
from Ministry of Higher Education (i.e. the MoHE’s offer letter) /
IIUM / other sponsoring bodies.
within fourteen (14) working days
20 To process advice of payment of scholarship / sabbatical
allowances within fourteen (14) working days after
submission of the duly signed and stamped Study Leave /
within fourteen (14) working days
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
Sabbatical Leave Agreement by the staff on study leave / sabbatical leave.
21
Training (Non-Academic)
To ensure that 70% of the administrative and technical staff
(excluding new hire) attend registered training programmeat
least 7 days per year.
70%
22 To achieve at least 80% of the satisfaction level for the overall programme for each training programme.
at least 80%
Employee Benefits
23 Staff Khairat Fund
To ensure all eligible claims for IIUM Staff Khairat Fund being
disbursed within one month from the date of receiving the claims
forms.
Corporate Secretarial
24 Processing of appointment
/ resignation
To ensure registration of all appointments / resignations of
BOG members to CCM are within 30 working days from the
date of receipt of completed documents.
within 30 working days
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
25
Secretariat function for
meeting
To ensure all documents for deliberation of AGM / BOG / Majlis meetings are submitted within the following time frame
BOG &Majlis -7 working
days
AGM -14 working
days 26 To ensure all related K/C/Ds are being informed of the
decisions within 14 working days of the date of the meeting.
within 14 working days
Handling of Customer Complaint
27 % of complaints received were channeled to the relevant
officer within 5 working days. 80%
28 % of complaints received were solved within two (2) weeks.
60%
Work Station : OIAQM Version No. : 02
Revision No. : 00
8) INFORMATION TECHNOLOGY DIVISION
No Process Frequency of reporting
QO# Target Quality Objectives
1 Management of IT Projects
Quarterly 1 ST: 30% MT:50% LT:80%
% of average rate of 3.0 given by stakeholders that are satisfied with the content of the feasibility study.
Monthly 3 ST: 30% MT: 50% LT: 100%
% of projects on scope, time and on budget *
2 Management of IT Service Request and Incident
Quarterly 1 80% and above
% of delivered services not in the catalogue
Monthly 2 90% and above
% of services that meets service levels
Monthly 3 Less than 30%
Call abandonment rate
3 Management of IT Change
Monthly 1 50% or less % of IT changes not formally tracked, reported or authorized
4 Management of IT Problem
Monthly 1 20% or less % of recurring problems within an impact on the business
5 Management of Proof of Concept
Quarterly 1 90% and above
Number of POC registered and completed the POC cycle on time by assigned department
6 Data backup Annually 1 100% % compliance to the testing of backup data. 7 Management of
IIUM Data Centre Twice in a
year 1 100% % compliance to the preventive maintenance
schedule and routine activities 8 Management of ICT
Loan Equipment Annually 1 100% % request been process within three (3) days.
9 Management of ICS As planned 1 95% % of ICS lab service requests and incidences resolved within the agreed deadline.
Work Station : OIAQM Version No. : 02
Revision No. : 00
10 Product Training Twice a year 1 ST : 70% MT : 75% LT : 80%
% of product training meet target quality
11 Management of Performance Monitoring & Capacity Planning
Quarterly 1 Based on the baseline report
% services that adheres to the baseline.
Work Station : OIAQM Version No. : 02
Revision No. : 00
9) LIBRARY
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1
Acquisition Division
To ensure 98% budget allocation is spent by 15th December every year.
98%
2 To create orders for 80% of urgent requests within 3 working days upon approval from Head of Acquisition Section with the following provision:
i. No price justification required ii. Complete bibliographic details are provided iii. Minimum of 20 titles per day per staff
80%
3 To perform initial physical processing for 80% of urgent materials within 5 working days from the date of receipt from Receiving Unit
80%
4
Serials Division
To ensure that all subscription renewal of print periodicals are completed by end of October each year.
by end of October each year
5 To process all invoices within five (5) working days from its first verification date until the verification/approval date by the Head of Division.
within five (5) working days
6 To organize training sessions on electronic resources at least four (4) times a year.
at least four (4) times a year.
7 Bibliographic Control
Division
Ensure urgent requests materials are catalogued within three (3) working days.
within three (3) working days.
8 To catalogue 80% of new titles and other editions (OE) received in a year.
80%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
9 Circulation &Loans Section
To ensure that the Library is open 100% of advertised opening hours.
100%
10 To ensure that the registration of membership is completed within one working day under normal condition.
within one working day
11 Collection Management Unit To shelve all or at least 7 trolleys per level of used books within one working day.
within one working day
12
Fee-Based Unit
To ensure that processing of requests for interlibrary loans from IIUM members are completed and notifications sent to the respective libraries within five (5) working days.
within five (5) working days.
13 To ensure that processing of requests for books on interlibrary loan from other libraries and institutions are fulfilled within five (5) working days. This objective is restricted to request for books from IIUM Main Library’s collections.
within five (5) working days
14
Information Services Division
To forward the course reading list for acquisition within 5 working days from the date of receipt.
within 5 working days
15 To ensure that the Kulliyyah Board Meeting would act as an effective channel of communication platform, in identifying customers information needs.
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
16 To fulfill at least 95% of requests for information literacy workshops as a means to enhance customer learning and research needs.
95%
17
Technology Application Section
% of personal computers (staff and public) maintained by the library once a year.
18 % of problem reports/ requests received completed within the agreed dateline.
19 Digital Library Section
To digitize 40,000 pages of printed materials and microforms each year.
40,000 pages
20 To publish 80% of the digitized materials in the Digital Library system.
80%
Work Station : OIAQM Version No. : 02
Revision No. : 00
10) DEVELOPMENT DIVISION
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1
Campus Development Unit
To ensure 100% completion of project according to the approved schedule.
100%
2 To ensure attendance in Project Site Meeting is more than 70 %.
70%
3 To ensure the amount of variation works for each project is not more than 5% of contract sum.
5%
4 To ensure completion of making good defect works not later than 15 months and 14 days upon issuance of Certificate of Practical Completion.
not later than 15 months and 14 days
5
Building Renovation and
Upgrading Works Unit
To prepare tender/quotation document within 30 working days upon confirmation of scope of work and drawing (if any) from the end-user (for renovation work more than RM20,000.00).
within 30 working days
6 To prepare proposal paper/procurement form for approval within 14 working days after closing/receiving of quotation.
within 14 working days
7 To ensure 95% compliance with the Standard Guideline for Renovation and Upgrading Works and Purchase of Furniture.
95%
8
Facilities Monitoring Unit
To carry out joint inspection (i.e. mechanical and electrical, civil, landscape and cleaning) on monthly basis.
monthly basis
9 To ensure 95% adherence to agreed KPIs by the appointed contractor on monthly basis.
95%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
10
Finance Unit
To process payment within 14 working days upon receiving of complete documents
within 14 working days
11 To prepare Purchase Order within 14 working days from the date of receiving a copy of approved proposal paper/procurement form.
within 14 working days
12 To ensure availability of project cash flow data on quarterly basis.
on quarterly basis.
13
Administration Unit
To ensure that all staff attending at least 2 related courses per year.
at least 2 related courses per year.
14 To attend to any complaint received within 7 working days
upon receiving of the complaints. within 7 working
days 15
Estate Management Unit
To complete monthly Asset Registration process 14 days after monthly account closing
14 days
16 To distribute tagging to K/C/D within 14 days after complete register the asset. within 14 days
Work Station : OIAQM Version No. : 02
Revision No. : 00
11) STUDENT AFFAIRS AND DEVELOPMET DIVISION
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
Mahallah
1 To provide a conducive living environment 2 Change of Mahallah To process the application and notify the result of change of
mahallah within 5 working days after the deadline or date received, whichever is applicable except for cases with reasonable justifications
within 5 working days
3 Change Room To process the application and notify the result of change of room within 1 working day after the deadline or date received, whichever is applicable except for cases with reasonable justifications.
Note : In the absence of Principal, the covering Principal of Assistant Hostel Manager may approve/disapprove the application.
within 1 working day
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
4 Maintenance (Attending and rectifying maintenance)
70% of normal maintenance requests must be completed within the following period requirement. No
Type of Requests Period
1. Door Lock / Door Knob
1 day
2. Electrical supply interruption (tripping)
2 hours
3. Fan 2 days
4. Lamp (office and student rooms)
1 days
5 Room check out % of undergraduate students check out by the last day as stated in the mahallah vacation notice except for those who Live in During Vacation (LIDV).
85%
6 Maintenance % of students rooms are in good condition to be occupied prior to new regular semester begins.
80%
7 Registration for Senior Student
% of senior undergraduate students are registered within three (3) days of the registration period.
85%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
Welfare
8
Welfare
% payment of insurance claim is ready for collection within 10 working days after submission to Finance Unit (STADD).
80%
9 % application of Khairat fund for death cases to be approved within 3 working days
100%
10 90% approved applications for Khairat& Financial Advance Loan being processed for payment within 7 working days after the meeting
90%
Transportation 11 To provide efficient, safe
and comfortable transportation services for Students
% of transportation services provided rated 4 and above (5 being the best) of end user performance evaluation.
70%
12 Less than 1% breakdown of transportation services against total trips per year.
Less than 1% breakdown
Counseling Services 13 A counsellor has to have 2500 contacts with students per
year 1) 10% contacts
from counselling sessions
2) 90% of contacts from programs
14 % of clients rate counselling services provided 4 and 80%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
above (5 being the best) in the student’s feedback survey
Work Station : OIAQM Version No. : 02
Revision No. : 00
12) INTERNATIONAL INDUSTRY AND COMMUNITY RELATIONS (IICR)
NO PROCESS QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1 Management of MoU/MoA To ensure that the MoU/MoA are managed properly and the data are captured as well as reported
100% reported
2 Internship Application
To standardize the process of Internship Application for
all Kulliyyah. Processing by Office of Industrial Links /
Kulliyyah take 3 – 4 weeks
95% of application within 4 weeks
3 Management of Career Related Programmes
To organize one career programme for each Kulliyyah in each academic session
95% achieve
4 Application of new students pass
Percentage of application processed within 14 days by the International Affairs Division.
100%
Work Station : OIAQM Version No. : 02
Revision No. : 00
13) IIUM HEALTH AND WELLNESS CENTRE
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1
The Management of IIUM Health & Wellness Centre
ensure that the quality objectives, including those
needed to meet requirement for products, are establish at relevant
functions and levels within the organization. The quality objectives
shall be measurable and consistent with the quality
policy
To ensure fast, accurate and courteous registration procedures and to be seen by a doctor in less than 45 minutes in a normal working condition
less than 45 minutes in a normal working
condition 2 To ensure 90% simple routine procedures are done within
20 minutes during checkup session.
90%
3 To ensure fast, consistent and accurate laboratory test in less than 3 hours in a normal working condition.
less than 3 hours
4 To ensure safe, fast, consistent and accurate result of radiograph within 30 minutes.
within 30 minutes
5 To ensure fast and accurate dispensing of medicine as prescribed within 15 minutes to 30 minutes under normal working condition.
within 15 minutes to 30 minutes
6 To issue payment to vendors, suppliers within 14 days from the date of receipt of perfect document.
within 14 days
Work Station : OIAQM Version No. : 02
Revision No. : 00
14) CENTRE FOR FOUNDATION STUDIES
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
1 CURRICULUM REVIEW To review and update the academic curriculum as
determined by the respective kulliyyah and the Senate or to
be initiated by CFS.
2
ADMISSION
To ensure 100% of students admitted to the Centre for
Foundation Studies through UPU meet the minimum entry requirement.
100%
3 To finalize appeals for admission cases within one (1) week after the e-rayuan (UPU) meeting.
within one (1) week
4
REGISTRATION
To complete class scheduling within the first week of the semester for returning students and two weeks for new students.
within the first week of the
semester 5 To ensure 100% of classes commence as scheduled. 100% 6 To complete the course registration process within the
first two weeks of the semester. within the first two
weeks of the semester.
7
ANALYSIS &
MONITORING OF
To ensure that every semester:- i) 75% students achieve Clear Pass status.
ii) 10% achieve CGPA of 3.50 and above.
75%
10%
8 To ensure that 90% of students graduate within two (2) 90%
Work Station : OIAQM Version No. : 02
Revision No. : 00
NO PROCESS/CRITERIA QUALITY OBJECTIVES / KEY PERFORMANCE
INDICATORS TARGET
STUDENTS’
PERFORMANCE
&ATTENDANCE
years from the Centre for Foundation Studies.
9 To ensure percentage of barred students does not exceed 1.0%
does not exceed 1.0%
10
EXAMINATION
To ensure 100% submission of end-of-semester examination questions to Office of the Deputy Dean, Admission & Records three weeks before the commencement of the end-of-semester examination.
100%
11 To ensure 100% submission of final grades of each course
by individual lecturer to Office of the Deputy Dean,
Admission & Records within eight (8) working days of the
respective examination date.
100%
12
TEACHING
PERFORMANCE
EVALUATION
To ensure 100% of the Department average teachers achieve a minimum of 80% in the Student Feedback Survey (TFS) average score.
100%