appendix 1 a pragmatic set of management practices to ...978-3-642-38244-4/1.pdf · a pragmatic set...

21
Appendix 1 A Pragmatic Set of Management Practices to Govern it in SME’S J. Devos et al. (eds.), Information Systems for Small and Medium-sized Enterprises, Progress in IS, DOI: 10.1007/978-3-642-38244-4, Ó Springer-Verlag Berlin Heidelberg 2014 399

Upload: duonganh

Post on 20-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Appendix 1A Pragmatic Set of Management Practicesto Govern it in SME’S

J. Devos et al. (eds.), Information Systems for Small and Medium-sized Enterprises,Progress in IS, DOI: 10.1007/978-3-642-38244-4,� Springer-Verlag Berlin Heidelberg 2014

399

Pla

npr

oces

sP

ract

ice

Mea

sure

1.D

efine

and

com

mun

icat

ew

hat

isex

pect

edfr

omIT

(ED

M02

,A

PO

02,

AP

O11

)1.

1.C

omm

unic

ate

the

goal

sof

the

ente

rpri

sean

dst

ate

wha

tyo

uex

pect

from

ITin

supp

ort

ofth

at.

Be

clea

ron

the

bala

nce

need

edbe

twee

nco

st,

spee

d,qu

alit

yan

dri

sk

•P

erce

ntof

join

tpr

esen

tati

ons

ofso

luti

ons

•C

lari

tyof

solu

tion

s

1.2.

Req

uire

that

ITan

dbu

sine

sspe

ople

alw

ays

reso

lve

that

toge

ther

.Ens

ure

they

alw

ays

thin

kin

term

sof

valu

efo

rth

een

terp

rise

•N

umbe

rof

maj

orde

viat

ions

inIT

solu

tion

san

dse

rvic

es•

Num

ber

ofcr

itic

albu

sine

sspr

oces

ses

supp

orte

dby

obso

lete

(or

soon

-to-

beob

sole

te)

infr

astr

uctu

re1.

3.C

onsi

der

the

curr

ent

stat

eof

the

infr

astr

uctu

rean

dth

epo

tent

ial

ofne

wbu

tpr

oven

tech

nolo

gy2.

Set

upan

ente

rpri

seda

tam

odel

(AP

O03

)2.

1.O

btai

nan

effi

cien

tda

tam

odel

for

the

ente

rpri

sew

ith

rule

sfo

rit

ssy

ntax

and

for

who

can

acce

ssan

dm

odif

yth

eda

ta

•F

requ

ency

ofup

date

sto

the

data

ente

rpri

sem

odel

2.2.

Iden

tify

one

pers

onpr

efer

ably

from

the

busi

ness

who

isth

eow

ner

ofth

eda

tam

odel

•N

umbe

rof

prob

lem

sw

ith

defi

cien

tda

tadu

eto

synt

axor

acce

ssru

les

3.E

stab

lish

afl

exib

lean

dre

spon

sive

ITor

gani

sati

on(A

PO

01)

3.1.

Ass

ign

clea

rly

and

regu

larl

yre

view

IT-r

elat

edro

les

and

resp

onsi

bili

ties

,w

ith

prop

erau

thor

ity

and

reas

onab

leex

pect

atio

ns.

Pay

part

icul

arat

tent

ion

tore

spon

sibi

liti

esin

the

area

ofse

curi

tyan

dqu

alit

y.C

omm

unic

ate

thes

ere

spon

sibi

liti

esto

all

•N

umbe

rof

issu

esw

ith

confl

icti

ngor

unre

solv

edre

spon

sibi

liti

es•

Num

ber

ofre

sour

cing

confl

icts

3.2.

Ass

ess

that

peop

leha

veth

ere

sour

ces

toex

erci

seth

ese

resp

onsi

bili

ties

and

beaw

are

that

conc

entr

ated

role

san

dre

spon

sibi

liti

esca

nbe

mis

used

.In

abse

nce

ofre

sour

ces,

defi

new

here

outs

ide

cont

ract

ing

and/

orou

tsou

rcin

gca

nbe

appl

ied

and

agre

eup

fron

tho

wth

eyw

ill

beco

ntro

lled

(con

tinu

ed)

400 Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S

(con

tinu

ed)

Pla

npr

oces

sP

ract

ice

Mea

sure

4.S

ecur

eop

tim

alva

lue

from

inve

stm

ents

inIT

-en

able

dbu

sine

sspr

ojec

ts(A

PO

05,

AP

O06

)4.

1.S

how

lead

ersh

ipin

inve

stm

ent

man

agem

ent

byap

plyi

ngap

prop

riat

ele

vel

ofan

alys

isof

pote

ntia

lin

vest

men

ts,

espe

cial

lyth

eva

lue/

risk

bala

nce.

To

this

end

requ

ire

full

busi

ness

case

sco

veri

ngco

st,

bene

fits

and

sche

dule

thro

ugho

utth

eir

full

econ

omic

life

-cyc

le

•U

p-to

-dat

ebu

dget

wit

hli

nkto

stra

tegy

•P

erce

ntof

proj

ects

wit

hbe

nefi

tsde

fine

dup

fron

t•

Per

cent

ofpo

st-p

roje

ctre

view

ofbe

nefi

ts

4.2.

Acc

ept

unce

rtai

nty

but

man

age

itby

requ

irin

gth

atas

sum

ptio

nsin

the

busi

ness

case

are

atap

prop

riat

eti

mes

re-e

valu

ated

.E

nsur

ebe

nefi

tsw

ill

bere

ceiv

edan

dif

that

isin

doub

tdo

not

hesi

tate

tost

opa

proj

ect

4.3.

Pla

nan

dm

anag

eIT

expe

ndit

ures

wit

hin

anan

nual

budg

et,i

nli

new

ith

wha

tis

expe

cted

from

ITan

dre

flec

ting

the

ente

rpri

se’s

prio

riti

es.T

rack

expe

ndit

ures

agai

nst

expe

cted

bene

fits

(con

tinu

ed)

Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S 401

(con

tinu

ed)

Pla

npr

oces

sP

ract

ice

Mea

sure

5.D

efine

and

diss

emin

ate

man

agem

ent

aim

san

ddi

rect

ions

wit

hre

spec

tto

IT(A

PO

01,

ED

M03

)

5.1.

Whe

nm

akin

gde

cisi

ons

rela

tive

toIT

com

mun

icat

eco

nsis

tent

lyto

key

pers

onne

lfr

omIT

and

the

busi

ness

toge

ther

,ge

nera

lly

inan

info

rmal

man

ner

and

mak

esu

reth

eyca

scad

eth

em

essa

ges

dow

nin

toth

eor

gani

sati

on

•F

requ

ency

ofjo

int

mee

ting

s•

Deg

ree

ofun

ders

tand

ing

atlo

wer

leve

ls•

Num

ber

ofvi

olat

ions

ofdo

’san

ddo

n’ts

5.2.

Dis

cuss

rule

sof

use

asw

ell

asac

cept

able

and

reas

onab

lebe

havi

our,

whi

leen

cour

agin

gre

spon

sive

ness

rela

tive

tori

sks

and

exte

rnal

requ

irem

ents

(e.g

.,in

tell

ectu

alpr

oper

ty,

priv

acy

etc)

.E

stab

lish

som

esi

mpl

edo

’san

ddo

n’ts

•D

egre

eob

sole

scen

ce/u

sefu

lnes

sof

docu

men

ts

5.3.

Doc

umen

tIn

hard

copy

only

for

impo

rtan

tan

dfr

eque

ntly

used

info

rmat

ion

that

need

sto

beat

hand

(ref

eren

ceca

rds,

bull

etin

gbo

ard,

chec

klis

ts,

cust

omer

/pro

duct

data

);w

here

poss

ible

leve

rage

anin

tran

et6.

Hir

e,tr

ain

and

mai

ntai

nqu

alifi

edpe

rson

nel

(AP

O01

,A

PO

07)

6.1.

Con

side

red

ucat

iona

lex

peri

ence

and

past

resp

onsi

bili

ties

toob

tain

the

ITsk

ills

need

edto

supp

ort

the

ITin

fras

truc

ture

and

ente

rpri

sego

als

whe

nhi

ring

ITst

aff.

Ass

ign

role

sth

atco

rres

pond

wit

hsk

ills

.V

erif

yre

fere

nce

chec

ks

•P

erso

nnel

sati

sfac

tion

•P

erce

ntof

ITst

aff

mem

bers

wit

hca

reer

path

•N

umbe

rof

year

-end

job

revi

ews

6.2.

Mot

ivat

ere

gula

rly

wit

hcl

ear

care

erpa

ths

and

veri

fyan

nual

lyw

heth

ersk

ills

and

qual

ifica

tion

sar

eup

-to-

date

and

act

acco

rdin

gly

6.3.

Ens

ure

that

esse

ntia

lIT

task

sdo

not

depe

ndon

one

pers

on

(con

tinu

ed)

402 Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S

(con

tinu

ed)

Pla

npr

oces

sP

ract

ice

Mea

sure

7.Id

enti

fy,

prio

riti

se,

cont

ain

orac

cept

rele

vant

ITre

late

dri

sks

(ED

M03

,A

PO

12)

7.1.

Ata

ppro

pria

teti

mes

,dis

cuss

wit

hke

yst

aff

wha

tca

ngo

wro

ngw

ith

ITth

atw

ould

impa

ctth

ebu

sine

ssob

ject

ives

sign

ifica

ntly

.E

spec

iall

yco

nsid

erda

tath

atar

ecr

itic

alfo

rth

esu

cces

sof

the

busi

ness

.Sta

teth

ele

vel

ofri

skth

een

terp

rise

isw

illi

ngto

take

•F

requ

ency

and

effe

ctiv

enes

sof

the

ITri

skas

sess

men

tpr

oces

s•

Num

ber

ofsi

gnifi

cant

inci

dent

sca

used

byri

sks

that

wer

eno

tid

enti

fied

byth

eri

skas

sess

men

tpr

oces

s

7.2.

Est

abli

shst

aff

unde

rsta

ndin

gof

the

need

for

resp

onsi

vene

ssin

risk

ysi

tuat

ions

•N

umbe

rof

sign

ifica

ntin

cide

nts

caus

edby

risk

sth

atw

ere

iden

tifie

dby

the

risk

asse

ssm

ent

proc

ess

7.3.

Con

side

rco

st-e

ffec

tive

mea

nsto

man

age

the

risk

sid

enti

fied

thro

ugh

insu

ranc

eco

vera

gean

dpr

otec

tion

prac

tice

s(e

.g.,

effe

ctiv

eba

ckup

,bas

icac

cess

cont

rol,

viru

spr

otec

tion

,fi

rew

alls

)

Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S 403

Bui

ldpr

oces

sP

ract

ice

Mea

sure

1.E

stab

lish

proj

ect

man

agem

ent

that

enab

les

stak

ehol

der

part

icip

atio

nan

dm

onit

ors

proj

ect

risk

san

dpr

ogre

ss(B

AI0

1)

1.1.

Ens

ure

the

corr

ect

prio

riti

sati

onan

dco

-or

dina

tion

ofal

lpr

ojec

ts,

bycl

earl

yde

fini

ngw

hat

need

sto

beac

hiev

ed,

byw

hom

,w

hen,

atw

hat

cost

and

wit

hw

hich

bene

fits

•D

egre

eof

stak

ehol

ders

invo

lvem

ent

inpr

ojec

ts•

Com

plet

enes

sof

proj

ect

docu

men

ts

1.2.

Req

uire

that

all

proj

ects

expl

icit

lyst

ate

thei

rsc

ope,

the

fina

lac

cept

ance

crit

eria

ofde

live

rabl

es,

and

how

they

wil

lm

onit

orde

live

rabl

es,

cost

,sc

hedu

lean

dri

sks

onan

ongo

ing

basi

s

•Q

uali

tyof

the

chan

gepl

ans

1.3.

Sup

port

the

busi

ness

chan

ges

link

edto

the

proj

ect

wit

ha

prop

ertr

aini

ngpl

anfo

rth

ose

invo

lved

inth

ech

ange

2.D

efine

tech

nica

lly

feas

ible

and

cost

-eff

ecti

veso

luti

ons

(BA

I02)

2.1.

Be

clea

ron

how

the

solu

tion

wil

lch

ange

and

bene

fit

the

busi

ness

.E

nsur

eth

atth

eso

luti

on’s

func

tion

alan

dop

erat

iona

lre

quir

emen

tsar

em

easu

rabl

ysp

ecifi

ed,

incl

udin

gm

aint

aina

bili

ty,

perf

orm

ance

,re

liab

ilit

y,se

curi

tyan

dco

mpa

tibi

lity

wit

hcu

rren

tsy

stem

s.R

evie

wre

quir

emen

tsw

ith

key

pers

onne

l

•Q

uali

tyof

the

busi

ness

chan

gepl

an•

Eas

eof

turn

ing

requ

irem

ents

into

test

plan

s•T

ime

betw

een

iden

tifi

cati

onof

need

san

dde

fini

tion

ofso

luti

ons

2.2.

Con

side

rw

heth

erto

buy

orbu

ild,

and

whe

ther

toup

grad

e,do

noth

ing

orap

ply

am

anua

lso

luti

on.

Ifth

ere

isno

clea

rid

eaab

out

how

toim

prov

ebu

sine

sspr

oces

ses,

dono

tin

ject

tech

nolo

gy

(con

tinu

ed)

404 Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S

(con

tinu

ed)

Bui

ldpr

oces

sP

ract

ice

Mea

sure

3.M

anag

esu

ppli

ers

topr

ocur

eIT

reso

urce

sin

anef

fici

ent

but

risk

-ave

rse

man

ner

(AP

O10

)3.

1.D

efine

the

appr

oach

tosu

ppli

erse

lect

ion

byob

tain

ing

are

fere

nce

chec

klis

tto

ensu

reth

atco

ntra

ctua

lar

rang

emen

tsco

ver

lega

l,fi

nanc

ial,

orga

nisa

tion

al,

secu

rity

and

perf

orm

ance

requ

irem

ents

.Inv

ite

mor

eth

anon

eve

ndor

tobi

dan

don

cese

lect

ed,

deve

lop

anop

enan

dfa

irre

lati

onsh

ip

•C

lear

agre

emen

ton

deli

vera

bles

wit

hm

utua

lsa

tisf

acti

onof

in-

and

outs

ourc

er•

Num

ber

ofch

ange

sto

the

agre

emen

taf

ter

sign

ing

the

cont

ract

3.2.

Agr

eeon

pric

ing

cons

ider

ing

cost

ofow

ners

hip,

mai

nten

ance

cost

,li

cens

efe

esan

dde

live

rybo

nuse

s/pe

nalt

ies

•N

umbe

rof

disp

utes

rela

ted

topr

ocur

emen

tco

ntra

cts

4.A

cqui

rean

dm

aint

ain

appl

icat

ion

soft

war

e,in

fras

truc

ture

and

ITre

sour

ces

(BA

I03)

4.1.

Ens

ure

wit

hth

esu

ppli

er/d

evel

oper

that

the

need

sar

ecl

earl

yun

ders

tood

:i.e

.,th

efu

ncti

onal

requ

irem

ents

but

also

ever

ythi

ngre

quir

edto

depl

oy,

oper

ate,

mai

ntai

n,su

ppor

tan

dse

cure

solu

tion

s,or

skil

ls,

capa

bili

ties

and

past

expe

rien

ces

for

inso

urce

dst

aff.

Obt

ain

com

mit

men

ton

bene

fits

expe

cted

.C

onsi

der

impa

cton

exis

ting

syst

ems

•N

umbe

rof

chan

ges

toth

ede

sign

duri

ngde

velo

pmen

tan

dte

stin

g•

Per

cent

ofus

ers

sati

sfied

wit

hth

efu

ncti

onal

ity

deli

vere

d

4.2.

Obt

ain

proc

essi

ngde

scri

ptio

nsan

dus

erdo

cum

enta

tion

for

new

solu

tion

san

den

sure

they

are

inli

new

ith

the

ente

rpri

seda

tam

odel

•Q

uali

tyof

staf

fpr

ovid

ed

5.P

rovi

deus

eran

dop

erat

iona

ltr

aini

ngan

ddo

cum

enta

tion

(BA

I08)

5.1.

Req

uire

that

know

ledg

ean

dsk

ills

for

effe

ctiv

ean

def

fici

ent

oper

atio

nan

dus

eof

new

and

curr

ent

syst

ems

are

easi

lyav

aila

ble

and

up-t

o-da

te.

To

this

end,

cons

ider

earl

yin

volv

emen

tof

key

oper

atio

nal

and

busi

ness

pers

onne

lin

the

desi

gn,

deve

lopm

ent

and

test

ing

ofso

luti

ons

•C

omfo

rtof

oper

ator

san

dbu

sine

ssus

ers

wit

hne

wso

luti

on•

Acc

urac

yan

dco

mpl

eten

ess

ofdo

cum

enta

tion

(to

beve

rifi

eddu

ring

test

ing)

(con

tinu

ed)

Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S 405

(con

tinu

ed)

Bui

ldpr

oces

sP

ract

ice

Mea

sure

6.M

anag

eth

epl

anni

ngan

dim

pact

ofch

ange

s(B

AI0

6)6.

1.E

nsur

ech

ange

sar

eca

tego

rise

d,as

sess

edfo

rim

pact

,pr

iori

tise

d,au

thor

ised

wit

hap

prop

riat

ete

stm

ater

ial

and

impl

emen

tati

ongu

idan

ce,

wit

hth

eob

ject

ive

tom

inim

ise

erro

rs

•P

erce

ntof

tota

lch

ange

sth

atar

eem

erge

ncy

fixe

s•

Num

ber

ofba

cklo

gged

chan

gere

ques

ts

6.2.

Set

upa

proc

ess

toin

itia

tech

ange

san

dtr

ack

the

prog

ress

,ri

sks

and

bene

fits

;co

nsid

erth

eim

pact

ofal

lch

ange

son

exis

ting

docu

men

tati

onan

dtr

aini

ng

•N

umbe

rof

disr

upti

ons

orda

taer

rors

caus

edby

inac

cura

tesp

ecifi

cati

ons

orin

com

plet

eim

pact

asse

ssm

ent

6.3.

All

owfo

ran

emer

genc

ych

ange

proc

ess

(inc

ludi

ngcr

iter

iato

invo

keit

,pr

oced

ures

,et

c.)

and

ensu

reth

atev

ery

emer

genc

ych

ange

isre

cord

edan

dau

thor

ised

7.In

stal

lan

dac

cred

itso

luti

ons

and

chan

ges

(BA

I07)

7.1.

Con

side

rth

atim

plem

enta

tion

may

enta

ilda

taco

nver

sion

and

ifso

,ana

lyse

impa

ctan

dpl

anfo

rit

.Als

oco

nsid

erth

eim

pact

onot

her

appl

icat

ions

and

proc

esse

san

dth

ede

gree

ofve

rifi

cati

onre

quir

edto

ensu

reth

eyst

ill

oper

ate

corr

ectl

y

•Q

uali

tyof

the

test

ing

plan

•U

ser

com

fort

wit

him

plem

enta

tion

plan

•N

umbe

rof

sign

ifica

nter

rors

inte

sts

7.2.

Tes

tth

ene

wso

luti

onor

chan

gein

are

pres

enta

tive

envi

ronm

ent

agai

nst

all

requ

irem

ents

,in

cl.

oper

atio

nal

and

user

docu

men

tati

on,

soth

atit

isfi

tfo

rpu

rpos

ean

dfr

eeof

sign

ifica

nter

rors

.D

ono

tte

ston

the

live

prod

ucti

onsy

stem

.In

volv

efu

ture

user

san

dop

erat

ors

•N

umbe

rof

erro

rson

othe

rsy

stem

sca

used

bych

ange

sor

new

solu

tion

s

7.3.

Per

form

fina

lac

cept

ance

byev

alua

ting

all

test

resu

lts,

invo

lvin

gke

yst

aff

who

wil

lus

e,ru

nan

dm

aint

ain

the

syst

em.

Eva

luat

eag

ains

tor

igin

alac

cept

ance

crit

eria

and

orig

inal

expe

cted

bene

fits

406 Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S

Run

proc

ess

Pra

ctic

eM

easu

re

1.D

efine

and

mon

itor

inte

rnal

and

exte

rnal

serv

ice

leve

ls(A

PO

09,

AP

O10

)1.

1.Id

enti

fyse

rvic

esde

live

red

byIT

.D

efine

,ag

ree

upon

and

regu

larl

yre

view

serv

ice

leve

lag

reem

ents

.T

hey

cove

rse

rvic

esu

ppor

tre

quir

emen

ts,

rela

ted

cost

s,ro

les

and

resp

onsi

bili

ties

,et

c.,

and

shou

ldbe

expr

esse

din

busi

ness

term

s

•P

erce

ntag

eof

serv

ices

mee

ting

serv

ice

leve

lsde

fine

din

the

SL

As

•N

umbe

rof

serv

ices

that

are

not

cove

red

byan

SL

A

1.2.

Con

side

rth

ede

pend

ence

onth

ird-

part

ysu

ppli

ers

and

mit

igat

eco

ntin

uity

,co

nfide

ntia

lity

and

inte

llec

tual

prop

erty

risk

by,

e.g.

,es

crow

,le

gal

liab

ilit

ies,

pena

ltie

san

dre

war

ds

•N

umbe

rof

iden

tifi

edan

ddo

cum

ente

dis

sues

•N

umbe

rof

SL

Are

visi

ons

afte

rpr

oble

ms

1.3.

Ass

ess

the

prof

essi

onal

capa

bili

tyof

thir

dpa

rtie

san

den

sure

they

prov

ide

acl

earl

yid

enti

fied

cont

actp

erso

nw

hoha

sth

eau

thor

ity

toac

tup

onen

terp

rise

requ

irem

ents

and

conc

erns

•T

ime

lost

inse

rvic

edi

sput

esdu

eto

uncl

ear

role

san

dre

spon

sibi

liti

es

2.M

anag

ean

dm

onit

orpe

rfor

man

cean

dca

paci

tyof

ITre

sour

ces

(BA

I04)

2.1.

Bas

edon

busi

ness

need

san

dth

ecu

rren

tan

dfu

ture

wor

kloa

ds,

defi

neth

em

inim

umav

aila

bili

ty,

perf

orm

ance

and

capa

city

requ

irem

ents

ofIT

serv

ices

and

syst

ems.

Mon

itor

acco

rdin

gly

and

act

proa

ctiv

ely

whe

repo

ssib

le

•F

requ

ency

ofca

paci

tyan

dpe

rfor

man

cead

just

men

ts•

Num

ber

ofin

cide

nts

due

toin

suffi

cien

tpe

rfor

man

ceor

capa

city

(con

tinu

ed)

Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S 407

(con

tinu

ed)

Run

proc

ess

Pra

ctic

eM

easu

re

3.B

uild

the

capa

bili

ties

toca

rry

out

the

day-

to-

day

auto

mat

edbu

sine

ssac

tivi

ties

wit

hm

inim

al,

acce

ptab

lein

terr

upti

on.

(DSS

01,

DSS

04,

DSS

05)

3.1.

Iden

tify

crit

ical

busi

ness

func

tion

san

din

form

atio

n,an

dth

ose

appl

icat

ions

,th

ird-

part

yse

rvic

es,s

uppl

ies,

data

-file

s,et

c.,t

hat

are

crit

ical

tosu

ppor

tth

em.

Min

imis

eke

yde

pend

enci

esw

here

poss

ible

•P

erce

ntag

eof

crit

ical

busi

ness

func

tion

sw

ith

clea

rly

defi

ned

mit

igat

ion

arra

ngem

ents

3.2.

Est

abli

shba

sic

prin

cipl

esfo

rsa

fegu

ardi

ngan

dre

cons

truc

ting

ITse

rvic

es,

incl

udin

gal

tern

ativ

epr

oces

sing

proc

edur

es,

how

toob

tain

supp

lies

and

serv

ices

inan

emer

genc

y,ho

wto

goba

ckto

norm

alpr

oces

sing

afte

rth

em

ajor

even

tand

how

toco

mm

unic

ate

wit

hcu

stom

ers

and

supp

lier

s

•P

erce

ntof

succ

essf

ulus

eof

alte

rnat

ive

proc

essi

ngan

dba

ckup

proc

edur

es•

Fre

quen

cyof

test

ing

ofth

eba

ck-u

pan

dre

cove

rypr

oced

ure

3.3.

Tog

ethe

rw

ith

key

empl

oyee

sde

fine

wha

tnee

dsto

beba

cked

upan

dst

ored

offs

ite

tosu

ppor

tre

cove

ryof

the

busi

ness

—e.

g.,c

riti

cal

data

file

s,do

cum

enta

tion

and

othe

rIT

reso

urce

s—an

dse

cure

itap

prop

riat

ely.

At

regu

lar

inte

rval

s,en

sure

the

back

upre

sour

ces

are

usab

lean

dco

mpl

ete

and

that

data

cann

otbe

retr

ieve

dat

disp

osal

•N

umbe

rof

hour

sof

unpl

anne

dou

tage

•F

requ

ency

ofse

rvic

ein

terr

upti

onof

crit

ical

syst

ems

3.4.

Ens

ure

that

data

are

prop

erly

stor

ed,

arch

ived

and

disp

osed

byde

fini

ngre

tent

ion

peri

ods,

arch

ival

requ

irem

ents

and

stor

age

term

sfo

rdo

cum

ents

,da

taan

dpr

ogra

ms.

Ens

ure

that

they

com

ply

wit

hus

eran

dle

gal

requ

irem

ents

•N

umbe

rof

tim

escr

itic

albu

sine

ssin

form

atio

nw

asno

tpr

oper

lyre

cove

red

(con

tinu

ed)

408 Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S

(con

tinu

ed)

Run

proc

ess

Pra

ctic

eM

easu

re

4.E

stab

lish

ITse

curi

typr

acti

ces

tom

onit

or,

dete

ctan

dre

solv

ese

curi

tyvu

lner

abil

itie

san

din

cide

nts.

(AP

O13

,D

SS02

,D

SS05

)

4.1.

Impl

emen

tpr

oced

ures

toco

ntro

lac

cess

base

don

the

indi

vidu

al’s

need

tovi

ew,

add,

chan

geor

dele

teda

ta.

Esp

ecia

lly

cons

ider

acce

ssri

ghts

byse

rvic

epr

ovid

ers,

supp

lier

san

dcu

stom

ers

•T

ime

itta

kes

togr

ant,

chan

gean

dre

mov

eac

cess

righ

ts

4.2.

Mak

esu

reon

epe

rson

isre

spon

sibl

efo

rm

anag

ing

all

user

acco

unts

and

secu

rity

toke

ns(p

assw

ords

,ca

rds,

devi

ces,

etc.

)an

dth

atap

prop

riat

eem

erge

ncy

proc

edur

esar

ede

fine

d.P

erio

dica

lly

revi

ew/c

onfi

rmhi

s/he

rac

tion

san

dau

thor

ity

•N

umbe

rof

acce

ssvi

olat

ions

•N

umbe

rof

acco

unts

ever

yone

can

use

4.3.

Log

impo

rtan

tse

curi

tyvi

olat

ions

(sys

tem

and

netw

ork,

acce

ss,

viru

s,m

isus

e,il

lega

lso

ftw

are)

.E

nsur

eth

eyar

ere

port

edim

med

iate

lyan

dac

ted

upon

ina

tim

ely

man

ner

•T

ime

sinc

ela

stse

curi

typa

tch

•N

umbe

rof

inci

dent

sdu

eto

unau

thor

ized

acce

ss

45.

Ens

ure

that

all

user

s(i

nter

nal,

exte

rnal

and

tem

pora

ry)

and

thei

rac

tivi

tyon

ITsy

stem

sar

eun

ique

lyid

enti

fiab

le

•F

requ

ency

ofre

view

ofth

ese

curi

tylo

g

4.4.

Impl

emen

tvi

rus

prot

ecti

on,

upda

tese

curi

typa

tche

s,an

den

forc

eus

eof

lega

lso

ftw

are.

Put

prev

enti

ve,

dete

ctiv

ean

dco

rrec

tive

mea

sure

sin

plac

eto

prot

ect

from

mal

war

e.In

stal

lan

dco

nfigu

refi

rew

alls

toco

ntro

lne

twor

kac

cess

and

info

rmat

ion

flow

(con

tinu

ed)

Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S 409

(con

tinu

ed)

Run

proc

ess

Pra

ctic

eM

easu

re

5.Im

plem

ent

ase

rvic

ede

sk/s

uppo

rtfu

ncti

onto

resp

ond

and

reso

lve

prob

lem

san

dus

erqu

erie

s.(D

SS02

,D

SS03

)

5.1.

Set

upa

serv

ice

desk

/sup

port

func

tion

tom

onit

orin

cide

nts

and

user

call

s.E

nsur

equ

ick

resp

onse

,cl

ear

esca

lati

onan

dex

pedi

ent

reso

luti

onof

ITre

late

dpr

oble

ms

•P

erce

ntag

eof

unre

solv

edin

cide

nts

•U

ser

sati

sfac

tion

wit

hfi

rst

line

supp

ort

5.2.

Fol

low

uppr

oble

ms,

sign

ifica

ntin

cide

nts

and

recu

rrin

gus

erqu

erie

s.In

vest

igat

eth

ero

otca

use

ofal

lpr

oble

ms,

iden

tify

and

init

iate

sust

aina

ble

solu

tion

sad

dres

sing

the

root

caus

ein

ati

mel

ym

anne

r

•N

umbe

rof

unju

stifi

edes

cala

tion

s•

Per

cent

ofpr

oble

ms

for

whi

chth

ero

otca

use

was

anal

ysed

•A

vera

geti

me

betw

een

logg

ing

and

anal

ysis

ofpr

oble

ms

•N

umbe

rof

recu

rren

tpr

oble

ms

6.R

evie

wco

nfigu

rati

onof

all

ITas

sets

and

lice

nses

.(D

SS02

,B

AI1

0)6.

1.B

uild

and

regu

larl

yup

date

anin

vent

ory

ofIT

hard

war

ean

dso

ftw

are

confi

gura

tion

.R

evie

wit

ona

regu

lar

basi

sto

ensu

real

lin

stal

led

soft

war

eis

auth

oris

edan

dli

cens

edpr

oper

ly

•T

ime

sinc

ela

stup

date

ofth

eco

nfigu

rati

onin

vent

ory

•N

umbe

rof

unau

thor

ised

soft

war

ein

stal

lati

ons

•T

ime

lost

due

toin

corr

ect

inve

ntor

yda

ta7.

Ope

rate

the

ITse

rvic

esin

asu

ffici

entl

yse

cure

envi

ronm

ent

and

inli

new

ith

agre

ed-u

pon

serv

ice

leve

ls(D

SS01

,D

SS05

)

7.1.

Phy

sica

lly

secu

reth

eIT

oper

atio

nal

asse

tsan

dco

nsid

era

no-b

reak

syst

em.

Be

awar

eof

othe

ren

viro

nmen

tal

fact

ors

such

ashe

at,

natu

ral

haza

rds,

dust

and

hum

idit

yan

d,if

appl

icab

le,

obta

inex

pert

advi

ce.P

aysp

ecia

lat

tent

ion

toth

ese

curi

tyof

mob

ile

orpo

rtab

leIT

asse

ts

•N

umbe

rof

phys

ical

secu

rity

inci

dent

s•

Dow

ntim

edu

eto

phys

ical

secu

rity

inci

dent

s

7.2.

Doc

umen

tan

dre

view

basi

c,st

anda

rdIT

oper

atio

nson

are

gula

rba

sis

toen

sure

that

proc

essi

ngoc

curs

aspl

anne

d(t

imin

g,se

quen

ce,

qual

ity,

etc.

).C

heck

oper

atio

nlo

gsto

ensu

reco

rrec

tnes

san

dco

mpl

eten

ess

ofpr

oces

sing

•F

requ

ency

ofre

view

ofth

eop

erat

ions

log

•T

ime

sinc

ela

stup

date

ofop

erat

ions

docu

men

tati

on•

Num

ber

ofde

lays

due

toop

erat

ions

fail

ure

410 Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S

Eva

luat

epr

oces

sP

ract

ice

Mea

sure

1.C

onti

nuou

sly

mon

itor

curr

ent

ITpe

rfor

man

ce,

futu

rere

quir

emen

tsan

dre

late

din

dust

rytr

ends

(ME

A01

,M

EA

03)

1.1.

Iden

tify

toge

ther

wit

hke

yIT

staf

fan

dke

yus

ers

ali

mit

ednu

mbe

rof

rele

vant

and

mea

sura

ble

resu

lts

and

perf

orm

ance

indi

cato

rsof

ITto

betr

acke

don

anon

goin

gba

sis.

Act

upon

resu

lts

wit

him

prov

emen

tin

itia

tive

s

•N

umbe

rof

impr

ovem

ent

acti

ons

driv

enby

mon

itor

ing

acti

viti

es

1.2.

At

appr

opri

ate

tim

es,

iden

tify

ifan

ythi

ngne

eds

tobe

done

toco

mpl

yw

ith

safe

ty,

heal

th,

ergo

nom

ic,

priv

acy,

lega

l,re

gula

tory

and

inte

llec

tual

prop

erty

requ

irem

ents

,el

ectr

onic

com

mer

ceag

reem

ents

and

insu

ranc

eco

ntra

cts

•N

umbe

rof

recu

rrin

gpe

rfor

man

ceis

sues

•N

umbe

rof

non-

com

plia

nce

issu

es1.

3.C

onsi

der,

but

wit

hca

utio

n,ho

wco

mpa

rabl

een

terp

rise

sad

dres

sIT

issu

esan

dm

ajor

ITde

cisi

ons

•C

ost

offi

xing

non-

com

plia

nce

and

perf

orm

ance

issu

es

Appendix 1: A Pragmatic Set of Management Practices to Govern it in SME’S 411

Appendix 2Sourcing Guidelines for SME’S

J. Devos et al. (eds.), Information Systems for Small and Medium-sized Enterprises,Progress in IS, DOI: 10.1007/978-3-642-38244-4,� Springer-Verlag Berlin Heidelberg 2014

413

S Selection guidelines: making a request for proposal (RFP)

S1 The RFP should be driven by a strategy document with ‘‘real tangible objectives’’, such aslower cost, improved core business performance, shorter product lifecycles, highersecurity, higher availability, outsource build functions etc

S2 The RFP should not be open ended, with vague references. The issuer’s business needs to beclearly identified (prepare an information package about your company for the vendors).The expectations need to be specific which will save much iteration

S3 The RFP must have a clear purpose and scope, a validity period, and a clear processdescription for the submission, selection and awarding of the contract

S4 Issuer must focus and be clear on what he will maintain and run coupled with the reasonswhy—what he will manage and how, coupled with reasons why—what will be expectedfrom the supplier coupled with reasons why

S5 Determine a high level classification of requirements prior to developing detailedrequirements, distinguishing between ’must’ and ’want’ features. Targeted technicalrequirements (has to run on this platform), the minimum necessary requirements,support for the installation and ongoing support would be mandatory high levelrequirements. Valued high level requirements would be that the product/service hasmost of the functionality and that the vendor is financially stable. Nice-to-have criteriacould be that the product and vendor are forward looking in nature and support thefuture technical and functional direction of the enterprise

S6 The scope of the RFP should cover the product, deployment services (e.g., system andproduct installations) to bring the product to operational readiness, and support servicessuch as build tools, automated test tools, documentation and training modules for:administrative personnel; software maintenance personnel; and end users

S7 Response should include both for the Bidder and sub-contractors:• Corporate profile, including identity of shareholders, directors and managers, company

size, growth rate, business divisions, historical perspective;• Financial situation (at least the last two annual reports shall be attached, preferably the last

five)S8 The RFP should request details on the following subjects:

• Project and program management;• Risk assessment/management;• Compliance with product/service requirements;• Migration planning/execution;• Service handover/acceptance;• Knowledge transfer and documentation;• Service management and support organisation;• Total cost of ownership;• Approach to help desk, provisioning and configuration management;• Implementation plan outline demonstrating the overall timescale necessary to meet

service objectives defined;• The technology solution (software, hardware, middleware, networking etc) and how to

gear up in the future;• Future budget costing per year;• Maintenance and enhancements process, compensation and schedules

(continued)

414 Appendix 2: Sourcing Guidelines for SME’S

(continued)

S Selection guidelines: making a request for proposal (RFP)

S9 Responders should be asked to state the degree of compliance with the requirements:• Complies—The proposed solution meets the requirements exactly as stated;• Does not comply—The proposed solution does not meet the requirements;• Alternate comply—Bidder proposes alternate solution;• Will comply—The requirements will be met at a future specified date

S10 The RFP should provide clear agreements on defect definition, severity classification andresponse requirements. Response to problems should be specified in function of thisclassification, both for acknowledgement of the problem and for fixing the problem. Thefollowing table illustrates severity and response time classification

S11 The RFP should require that responders provide a quality plan covering:d Software development lifecycle, its development stages and supporting activities;d Reviews that will be carried out with objective, scope and how quality faults will be

classified;d Documentation of project files and summary of all technical documentation;d Quality targets and metrics;d Tools, techniques and methodologies concerning: project, change, integration,

configuration and development managementS12 Vendor should submit for approval, the résumés of all human resources he intends to

employ on the project and makes all reasonable endeavours to ensure that such humanresources remain on the project for the scheduled duration

S13 Agree on a clear timetable linked to the deliverables and the quality plan and include aprocess to make changes to the different plans. Also agree on a change procedure to add/delete functionality from the original specification

S14 Any development should be defined by: activities; timing of activities; milestones anddeliverables; schedule for project steering meetings

S15 Define an acceptance process based on pre-agreed test scenarios and acceptance criteria andaugmented with a process to report and handle those functions that failed to meet thetests. The RFP issuer may consider producing all acceptance test documentation,including test data

S16 Reference should be made to all documentation already exchanged prior to the RFP and allRFP documents need to be covered by confidentiality agreements

S17 RFP response scoring methods, incl. the weights of the different response elements, need tobe worked out in advance and top management’s buy-in needs to be obtained for methodand scoring before the selection starts

Appendix 2: Sourcing Guidelines for SME’S 415

E Selection guidelines: evaluating the responses to the RFP

E1 Response Assessment should include:• Ability to demonstrate an understanding of the requestor’s business and experience in

providing the same or equivalent services into other similar organisations;• Perceived alignment of the solution with the requestor’s business requirements, both

current and future;• A scorecard taking into account; security, reliability, quality, ease of migration, costs

(capital as well as operational expenditure) and requestor’s staff satisfaction;• Ability to change as business requirements change and to migrate easily to future

technologies;• Ability to demonstrate effective project management experience on similar scale projects;• Appropriateness of the management proposed to plan, implement, test and commission

the solution, and generally to manage the requirements and account;• Access to vendor’s research and development material;• Degree of understanding the issuer’s requirements

E2 Ascertain that evaluation gives the right focus and value on the (fewer) high levelrequirements (see R5) and is not skewed towards the (more abundant) detailedrequirements. Begin with matching the ‘‘Mandatory’’ requirements to the proposedproduct’s strengths

E3 Functionality provided could be evaluated in function of the degree to which it• automates the business processes,• supports the integration across business functions and• provides fast and flexible end-user access to information

E4 The solution should fit with the enterprise’s existing technical environment and shouldcover development tools for future maintenance

E5 The technical solution proposed by the supplier must be evaluated both in terms ofappropriateness for the product and with regard to the supplier’s capability with thistechnology

E6 The functions to be delivered in the form of a product must be accounted for in infinitedetail

E7 The contractor must provide historic information in regards to the company’s financialrecord for the recent past as well as its current financial stability

E8 In order to gain an understanding of the soundness of a contractor the past experiences andcompany practices of the contractor should be reviewed

E9 In order to do business with any contractor, it is imperative to understand the contractor’sbusiness, size of operation, production and delivery processes

E10 Past experiences with the contractor should be given due consideration and references mustbe checked, e.g., site visits to existing customers and calling of a number of companyreferences with a prepared questionnaire. Questionnaires should have—in addition tospecific questions—open-ended questions allowing respondents to mention problems.Third party implementers are also a good source to find out about implementation issues

E11 Ascertain the vendor adequately applies software configuration management, changemanagement functions as well as software quality functions

E12 It is important that the project management roles are clearly defined and that the vendorassigns a project/program manager to cooperate with the issuer’s project manager

E13 The milestones, responsibilities, deliverables and configuration management of thedeliverables must be clearly stated

(continued)

416 Appendix 2: Sourcing Guidelines for SME’S

(continued)

E Selection guidelines: evaluating the responses to the RFP

E14 The project plan will be used as a controlling document for managing the project and willallow issuer to track against progress and costs

E15 During the development of the product it is essential that the supplier convey appropriatestatus and reporting information to management

E16 The responders should demonstrate adequate quality management to be applied to theproject

E17 Suppliers must provide visibility of the quality aspects of their defined softwaredevelopment processes

E18 Acceptance tests shall demonstrate to issuer’s satisfaction that each and every requirementwithin the agreement is met as specified. Each requirement expressed in the product/service specifications is subject to acceptance testing

E19 The supplier should be able to provide guidance to the issuer in the planning and executionof acceptance testing by making recommendations and suggestions. During theacceptance of the product, acceptance criteria must be specified

E20 A process of provisional acceptance should be set up that will verify that the product meetsall the requirements stated in this RFP; that the product meets all the performancecriteria; that the documentation provided is complete and accurate; and that the packagecan be built from its sources and off-the-shelf components

E21 The supplier must be able to provide staff with appropriate skill to successfully complete theproject

E22 If a contractor is going to be able to develop, deliver and maintain a quality product, thecompany must provide a stable environment for its employees. Employee turnover iscritical in determining the working environment. A yearly turnover rate of greater than5 % should be construed as an indication of potential risk

E23 As changes to the product desired are inevitable, adequate change management practicesmust be in place to accommodate them

E24 The contractor must be prepared to respond efficiently to correction requestsE25 A clearly defined cost for maintenance work must be statedE26 The contractor’s responsibilities in supporting the software once it has been accepted and

placed into operation must be clearly identified. This support includes both technicalsupport and the management thereof

E27 Contingencies should be pre-definedE28 Don’t overly rely on consultants for the implementation because cost will go up and

knowledge will be lost, and certainly let them not be influencing the selection decision

Appendix 2: Sourcing Guidelines for SME’S 417

c Contract guidelines: making a contract following the selection

C1 Don’t accept vendor’s standard terms and conditions but always strive to apply—and beheard to apply—fair contract terms

C2 Insist on user based rather than CPU based pricing for licences and drop initial maintenancerate by 3–4 %. If no drop in maintenance % then insist on service increases. Negotiate a2–5% drop for being a reference

C3 Suppliers to break out each cost component, then negotiate each one piece at a timeC4 Pay in escrow, release upon deliveryC5 Always keep a second supplier for leveragingC6 Agreed standard terms and conditions should address the areas of:

• nondisclosure rules• billing• payments• arbitration rules• responsible individuals from issuer and the contractor• length of contract

C7 It should be clear the requestor is not obligated to award the contract and if so, it will besubject to duly agreed terms and conditions between the parties

C8 RFP shall not be binding on issuer, i.e., an RFP is not a promise to acquire the product orservices

C9 Agree on clear terms of agreement for terminationC10 Consider service level agreements for support after delivery including compensation and

reporting of non-complianceC11 Consider incentives and recognition for quality service provided and for exceeding service

level agreements (SLA’s)C12 Consider to appoint an independent auditor to review and conclude that the strategy can be

met and objectives not compromised. Too often vendors don’t live up to their promisesC13 Consider establishing audit rights or SAS70-like exercisesC14 Provide protection against the chosen vendors outsourcing or being taken overC15 Provide for confidentiality agreement identifying what is confidential and how it needs to be

handledC16 RFP documents to be covered under confidentiality agreements and unsuccessful Bidders

when advised in writing, to destroy all RFP documents with confirmation in writing thatthey have done so

C17 The responder has to warrant correctness of facts and opinions and to not omit relevantinformation; also to be ready to provide additional information if requested which thenbecomes integral part of RFP

C18 Make it clear that a feature response to the RFP will become part of the software deliverycontract

C19 Exclude material or fiscal responsibility for costs, etc. that may be incurred by any vendorin the preparation of their RFP response.

C20 Bidder to provide a list, description and other relevant information of all IntellectualProperty involved, used for, useful for, or relevant to the proposal :

• Intellectual property owned by bidder;• Intellectual property rights licensed or sub-licensed to the bidder;• Patents and pending patents;• Trade secrets;• Copyrights;• Trademarks;• Claims and litigation relevant to the above list;• Internal policies in relation to ownership of inventions, copyrights etc

(continued)

418 Appendix 2: Sourcing Guidelines for SME’S

(continued)

c Contract guidelines: making a contract following the selection

C21 Vendor to grant to issuer a license or transfer ownership, that is non-exclusive, worldwide,irrevocable, perpetual and royalty-free, with unrestricted right to sub-license for use, ofall Intellectual Property used for, useful for, or relevant to the product/service or anyother deliverable

C22 Make escrow agreements, i.e., vendor to deposit with e.g. a notary, all source codes, designsand documentation such that the product/service can be independently reconstructed incase of need. Define what the conditions are for access to escrow objects. All costsrelated to the escrow shall possibly (to be negotiated) be borne by the vendor. Causes foraccess to the escrowed objects could be

• default, receivership, bankruptcy or insolvency by the vendor;• issuer becoming aware of any viruses, time bombs, worms or other programming devices

or features not identified to issuer;• written permission from the vendor

C23 Vendor to adhere to the internal control and security policies of the issuerC24 Provide coverage for hidden defects and fundamental and inherent system faults (including

software design faults) relating to the product/serviceC25 Define development, maintenance and implementation location and consider requiring

access to the vendor location by issuer’s auditorsC26 Define clearly all logistics involved in the project: travel, office support, communications

etcC27 The warranty period is a safeguard to issuer in the case of a faulty productC2! The warranty must clearly state what is covered and how corrective action will be

performed. It must specify the conditions under which the warranty is invalidated. Issuershould verify whether the warranty is acceptable for the type of product/service underevaluation

C29 The warranty period should specify the duration and any items that are specificallyexcluded. It should include software, hardware, support services and free of chargecorrection of defects in line with the priority/urgency

C30 Insist on a set of traditional warranties with associated indemnities, liabilities andinsurance:

• vendor has all rights, titles, licenses, permissions and approvals necessary to perform itsobligations and grants to issuer the necessary rights ;

• the rights granted by the vendor do not conflict with the rights of a third party with whomthe vendor already has an agreement;

• all the rights to support the development, use and onward sale by issuer of the product/service have been transferred by the vendor;

• the product/service will, when delivered, be in good working order and free from defects,and will operate in conformity with the functional specifications defined;

• the support services will be provided in a professional and timely manner and for the termstipulated

C31 The contractual considerations of any project legally obligate issuer and the contractor andtherefore should be thoroughly reviewed by the appropriate legal parties. The objectiveis to ascertain that all parties will be able to agree and perform to a suitable contract

(continued)

Appendix 2: Sourcing Guidelines for SME’S 419

(continued)

c Contract guidelines: making a contract following the selection

C32 Some projects may be sensitive to certain parameters and these items should be detailed andpenalties established for non-compliance in order to avoid costly litigation. To beconsidered are:

• penalty for late delivery (one time or increasing with each day, week or month late);• measurable quality level guaranteed with a penalty for not meeting this goal;• penalty for partial delivery of the product;• penalty for the contractor breaching any non-disclosure agreement;• penalty for failure of the contractor to meet the warranty obligations

C33 The contractor should provide liability coverage in cases where excessive down-time wasincurred due to the unresponsiveness of contractor support

420 Appendix 2: Sourcing Guidelines for SME’S