appendices design requirements appendix a performance … · 2018-04-11 · design requirements...

43
PROVINCE OF NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL DTIR Document DC350 APPENDICES DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September 21, 2010 DC 350, Appendix A is not intended to be a complete architectural, mechanical or electrical specification for all projects. Such a complete specification must be written for each project by the Project Consultant. This section, in conjunction with DC 350, Part 1 and Part 2 and other Appendices, and client department design requirements, specifies, in outline form, the minimum acceptable standards for design services and building components.

Upload: others

Post on 27-Jun-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

PROVINCE OF NOVA SCOTIADEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL

DTIR Document DC350

APPENDICES

DESIGN REQUIREMENTS

Appendix A

Performance Criteriafor

Design Projects

2010 EDITION

Printed September 21, 2010

DC 350, Appendix A is not intended to be a complete architectural, mechanical or electricalspecification for all projects. Such a complete specification must be written for each project bythe Project Consultant.

This section, in conjunction with DC 350, Part 1 and Part 2 and other Appendices, and clientdepartment design requirements, specifies, in outline form, the minimum acceptable standardsfor design services and building components.

Page 2: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

DTIR - DC 350 Performance Criteria Appendix ADesign Requirements Manual for 2010 EDITION Design Projects September 21, 2010

1

1 PROFESSIONAL CONSULTANTS

1.1 All design services shall be provided by architects, mechanical engineers, electricalengineers, structural engineers, civil engineers, and landscape architects who areregistered with the respective professional association within the Province of NovaScotia. Professional Consultants shall provide complete consulting services during allstages of the projects as outlined by their professional associations. The PrimeConsultant; or in the case of a Design Build Project, the Contractor must confirm/identifytheir consulting team prior to the signing of the contract. Any change to the consultingteam must be accepted and approved by the Department of Transportation andInfrastructure Renewal.

2 DESIGN REVIEW PROCESS

2.1 At the end of the Schematic Design, Design Development and Construction Documentsstages of the project the Consultant; or in the case of a Design Build, the Contractor,shall submit to the DTIR for review and approval, drawings, specifications, and estimatesthat explain /detail the project. DTIR and our client Department will review thesubmitted material and shall provide written comments to the Consultant / Contractorwithin the time identified in Appendix B for the individual Stages of the Work. TheConsultant /Contrator, in timely fashion, shall submit a written respons to each reviewcomment outlining pending action(s)

2.2 The Consultant; or in the case of a Design Build, the Contractor may not move to thenext Stage of the project (as outlined in Appendix ‘B’ attached) until they have receivedwritten comments from the Department of Transportation and Infrastructure Renewal andthe client Department on the Contractor’s previous submission and the Contractor hasprovided an acceptable written response to Department of Transportation andInfrastructure Renewal and the client Department comments.

2.3 It is the province’s objective through this process, to build high quality buildings with a40-50 year life cycle. Although parts of this manual are meant to be/act as aguideline/performance document, if the consultant (after careful consideration anddiscussion by both parties) is unable to convince client Department and the Department ofTransportation and Infrastructure Renewal staff that, what the Consultant is proposing isequal to or exceeds the intent of the design guidelines as interpreted by Department ofTransportation and Infrastructure Renewal and the client Department staff, then DTIRand the client Department staff will make the final decision on all interpretations of thedesign guidelines.

END

Page 3: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

PROVINCE OF NOVA SCOTIADEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL

DTIR Document DC350

APPENDICES

DESIGN REQUIREMENTS

Appendix B

Design Review Process

2010 EDITION

September 21, 2010

DC 350, Appendix B is not intended to be a complete architectural, mechanical or electricalspecification for all projects. Such a complete specification must be written for each project bythe Project Consultant.

This section, in conjunction with DC 350, Part 1 and Client Department design requirements andother Appendices, specifies, in outline form, the minimum acceptable standards for designservices and building components.

Page 4: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

DTIR - DC 350 Design Review Process Appendix BDesign Requirements Manual

2010 EDITION September 21, 2010

-1-

GOVERNMENT OF NOVA SCOTIADESIGN REVIEW PROCESS

1 All information (drawings, specifications, reports) to be submitted in accordance withstandard practice procedures as described in the Professional Handbooks of Practice forArchitects and Engineers. All work is to be prepared in conjunction with the ProvincialActs and Regulations for both Nova Scotia Professional Associations.

2 Document submissions, for review and approval, are to be provided to the Department ofTransportation and Infrastructure Renewal and the client Department in accordance withthe following stages and submission guidelines. Written responses to these submissionswill be provided in a timely manner necessary to reasonably allow the work to continue.

3 Written responses to the province’s comments on a submission from the Consultant; or inthe case of a Design Build, the Contractor , must be provided by the Consultant; or in thecase of a Design Build , the contractor prior to starting the next stage. Government staffwill make every effort to achieve dates agreed to, but may require additional timedepending on work load and number of submissions made at one time.

4 Prior to the start of construction, the Consultant; or in the case of a Design Build theContractor and the Contractor’s consulting team must provide the province with a writtencertification that all standards in the design guidelines of the bid documents have beenmet. The province also reserves the right to inspect all work, without notice, to ensurecompliance with the DC350 - Design Requirements Manual and good building practice. Inspections will be carried out by DTIR staff or consultants acting as their agents. TheConsultant or in the case of a Design Build project, the Contractor shall also providecopies of all inspection reports, including but not limited to; Consultant’s orContractor’s Consultant site review reports, geotechnical, testing, balancing, andunderground services.

5 In addition to other meeting requirements, the Consultant or the Contractor’s Consultantshall attend a minimum of 3 meetings with DTIR and the client Department - at amutually convenient location: as well as 3 meetings , 3.5 hours each, in the subjectcommunity, for the purposes of consultation with users groups regarding detailed design.

6 Following Sign Off by Department of Transportation and the client Department in stages1 through 5, Design teams shall not make major changes to approved systems andlayouts, beyond the changes required to improve and complete those systems withoutwritten approval from the Minister’s Representative.

Page 5: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

DTIR - DC 350 Design Review Process Appendix BDesign Requirements Manual

2010 EDITION September 21, 2010

-2-

STAGE 1 - SCHEMATIC DESIGN STAGE

1 The Schematic Design Documents shall consist of the documents required to illustrate thescale and character of the Project and how the parts of the Project functionally relate toeach other, in sufficient detail to fully interpret the program.

2 Purpose: to demonstrate compliance with approved Program2.1 Review by DTIR , and our client Department.2.2 Sign Off by DTIR, and our client Department and the, and the Contractor.

3 Information Required:3.1 Design Concept Brief3.2 Space Program Comparison Report3.3 Architectural Schematic Floor Plans3.4 Architectural Schematic Building Elevations (including major elements)3.5 Architectural Schematic Building Sections (minimum scale 1:200)3.6 Schematic Site Plan3.7 Class ‘D’ estimate3.8 Outline specification including architectural, mechanical, electrical and structural3.9 Building Code Analysis Report3.10 LEED Target Summary Report including overview of sustainable initiatives.3.11 All documentation required by the LEED Commissioning Agent.

4 Submission4.1 Submit eight (8) copies of Schematic Design Documents

5 Timing5.1 To be submitted within 6 weeks of receiving award to proceed from the DTIR5.2 The Province will provide comments within 15 working days of Design Development

submission

STAGE 2 - DESIGN DEVELOPMENT STAGE

1 The Design Development Documents shall consist of drawings, specifications, reportsand other documents appropriate to the size of the Project, required to describe andrepresent the size and character of the entire Project as to the architectural, structural,mechanical, electrical and landscape systems, including materials and other elements asare appropriate.

Page 6: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

DTIR - DC 350 Design Review Process Appendix BDesign Requirements Manual

2010 EDITION September 21, 2010

-3-

2 Purpose:2.1 To demonstrate compliance with approved Program2.1.1 Review by DTIR, the our client Department 2.1.2 Sign Off by DTIR, the client Department , and the Design -Build Contractor if applicable.

3 Information Required:3.1 Design Development Brief3.2 Space Program Comparison Report3.3 Civil Drawings: Site Plan, Grading Plan & Servicing 3.4 Landscape Drawings: Site Layout3.5 Architectural Drawings: Floor plans, Building Elevations, Building Sections and Building

Envelope Details3.6 Structural: Foundation, Floor & Roof Framing and Details 3.7 Mechanical Drawings: HVAC, Plumbing, and Piping Floor Plans3.8 Electrical Drawings: Site Plan, Power Plans, Communications Plans, Lighting Plans and

Details3.9 Class ‘C’ estimate3.10 Outline specification including architectural, structural, civil, landscape, mechanical,

electrical and structural3.11 Building Code Analysis Report3.12 LEED Target Summary Report including overview of sustainable initiatives.3.13 All documentation required by the LEED Commissioning Agent.

4 Submission4.1 Submit eight(8) copies of Design Development Documents

5 Timing:5.1 Department of Education and Department of Transportation and Infrastructure Renewal

shall provide comments within 15 working days.

STAGE 3 - CONSTRUCTION DOCUMENT STAGE

1 Construction Documents shall consist of drawings and specifications setting forth indetail the requirements for the construction of the Project.

2 Purpose:2.1 To demonstrate compliance with approved design and design guidelines2.1.1 Review by DTIR, the client Department .

Page 7: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

DTIR - DC 350 Design Review Process Appendix BDesign Requirements Manual

2010 EDITION September 21, 2010

-4-

2.1.2 Sign Off by DTIR, the client Department , and Design Build Contractor if applicable.

3 Information Required at 50% and 100%:3.1 All Civil Work 3.2 Landscape Work3.3 All Structural Work3.4 All Architectural Work3.5 All Mechanical Work3.6 All Electrical Work3.7 All Specifications including LEED Commissioning Plan

4 Submission:4.1 Submit 10 full size sets of above information.4.2 Submit 5 drawing sets at half size.

5 Timing:5.1 To be submitted by Contractor in two submssions, at 50% and 100% completion as

identified above, at intervals agreed to by the Minister’s Representative but not to exceed6 weeks of Stage 2 approval by Department of Transportation and Infrastructure Renewal.

5.2 The province shall provide written comments within 15 working days.

STAGE 4 - FUNCTIONAL PERFORMANCE TESTING STAGE

1 Purpose1.1 Review by DTIR, client Department .1.2 Sign Off by DTIR, the client Department , and the Design Build Contractor, if applicable.

2 Information Required:2.1 Written plan and appropriate performance requirements2.2 For LEED registered projects provide documentation required by Owner’s LEED

Commissioning Agent.

3 Timing3.1 To be submitted by Contractor 3 months prior to Substantial Performance.3.2 DTIR and Client Department to provide written comments within 15 working days of

receiving Stage 4 submission.

Page 8: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

DTIR - DC 350 Design Review Process Appendix BDesign Requirements Manual

2010 EDITION September 21, 2010

-5-

STAGE 5 - OCCUPANCY

1 Components:1.1 Substantial Completion1.2 Functional Performance Testing Report1.3 As-builts and Warranty1.4 Final Completion Date1.5 Operation and Maintenance Manuals

2 Purpose:2.1 Review by DTIR, the client Department .2.2 Sign Off by DTIR, the client Department, and the Design Build Contractor, if applicable.

3 Information Required:3.1 For LEED registered projects provide documentation required by Owner’s LEED

Commissioning Agent3.2 6 copies of all above noted documentation, reports, permits and any other required

documentation3.3 3 copies of Operating and Maintenance Manuals.3.4 3 hard copies of As-built drawings3.5 3 copies of As-built drawings on 3 CD’s.

Page 9: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

PROVINCE OF NOVA SCOTIADEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL

DTIR Document DC350

APPENDICES

EDUCATIONAL FACILITIES DESIGN REQUIREMENTS

Appendix C

Drawings and Sketch Details

2010 EDITION

September 21, 2010

DC 350, Appendix B is not intended to be a complete architectural, mechanical or electricalspecification for a school project. Such a complete specification must be written for each projectby the Project Consultant.

This section, in conjunction with DC 350, Part 1 and Part 2 and other Appendices, specifies, inoutline form, the minimum acceptable standards for school components.

Page 10: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

Notes:

1. Centre line shall belevel unless siteconditions requirevariation as approvedby NSDTPW.

2. Provide space fbrpossible futurespectator seating.

3. There shall benostanding waterwithin 15 in oftheperimeter ofthe field.

4. Seed or sod turfunderideal conditions.Maintain until field isapproved for use byNSDTPW.

5. Field markings andgoals shall not beprovided until field isready lbr use asapproved by NSDTPW.

6. All measurements arein metric unless notedotherwise.

3.Omwide —

run-off zone

provide end fencingwhere required(confirm with NSDTPW)

0

0

I

Field orientation to be NNW SSEunless approved otherwise by NSDTPW

NORTH

3.0 61.Omn (200 ft.) 3.0

.

p —

— IL0 4- —•—----_———H

1

1.5% 1.5%

I

__ __

I l.0%slopeendto endpossible variation ifsiteconditions require,

I \ only ifapproved iy NSDTPW

R9.1

1.5% 1.5%

__I I. .I

_____

I_I____—---___1

Reference: Soccer Nova Scotia

project date: detail 11:06-10-10

MW.TADesign Requirements Manual

scale:

T1ic0dPubh1c’tc title: NTS ASK-iBuilding Design Group Soccer Field Layout and Grading drawn I checked:

LG

Page 11: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

The 400m Standard Track The 400m Standard Track has the advantages of a simple construction, straightand curved sections of almost equal length and uniform bends which are mostsuitable to the running rhythm of athletes: Furthermore, the area inside thetrack is large enough to accommodate all throwing events and also astandard football pitch (68m x 1 05rn).

Reference: International Amateur Athletic FederationTrack and Field Facilities Manual

project: date: detail #:

ansportadoiandPubIic WorksDesign Requirements Manual

06-10-10

Building Design Group title:

scwe: ASK—2NTS

Layout for 400 Metre Trackdrawn/checked:

. lglgr

The 400m Standard Track comprises 2 semi-circles, each with a radius of36.50m, which are joined by two straights, each 84.39m in length (Fig1 .i.3a). This diagram indicates the inside edge of the track which must havea kerb with a height of OO5m to 0.O65m and a width of O.OSrn to O.25m.The inner edge of the track is 398.12m in length (36.5m x 2 x it + 84.39mx 2) where it = 3.1416. This length for the inner edge gives a of400.OOm(368m x 2 x it- + 84.39m x 2) for the theoretical line of running (measurement line) at a distance of O.30m from the kerb. The inside lane (lane 1) will,therefore, have a length of 40000m along its theoretical line of running.

Page 12: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

7

65

4

3

2

I

Minimum Size RequirementAll squares, x’s, sernicircies, etc. shouldbe made large enough to accommodatea child’s foot comfortably (30-40cm).

6m•1•

1 2

trr-iECo

3 4

10

123+x

4560÷

789-=.

oT

OFF879

— — —

546

213

PLAYGROUND COMPUTER

Eo

project date: detail #:06-10-10

[CIJWJjfl4 Design Requirements Manual• sàale: ASK-3Transportation and Public Works NTStitle:

Building Design Group Pavement Markings for drawn/checked:

. Childrens’ Games lg/gr

Page 13: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

• RANGE WiTH MICROWAVE /EXHAUST HOOD ABOVE

TYPICAl. CLASSROOMCASEWORK

-TRAY STORAGE

WASHER & DRYERSTAGKED 30

PROJEC1ION SCREEN1830H X 2140WCENTERED ONCOMMUNICAI1ONBOARD

[LI:UUUU

UUUUUUUUI1•ElU

Hn

Transportation andInfrastructure Renewal

Public Turks

DWG. NO.

ASK-4

Page 14: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

CHEMICAL STORAGECABINET

[onATransportation and

L Infrastructure Renewal

Public WorksDRAWING

DWG. NO.

DATE:SEPT. 15. 2010

ASK-5CHEMISTRY LAB

Page 15: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

— NON—BARRIER FREECASEWORK UNIT

DC350

DESIGN REQUIREMENTS MANUEL

2010 EDfl1ON

GENERAL SCIENCE LABRifli fl(V I PWYcICc I AR

PROJECT NO.WOl -02-01-02

SCALE

NTS

DATE:SEPT 15. 2010

LAB.BENCH WITHSINK POWER ANDDATA—1

:]

FiRST JDFIRE EXTINGUISHEREYEWASHANDFIRE BLANKETSIA11ONS

I IiIL

PROJEC11ON SCREEN1830H X 2140WCENTERED ONCOMMUNICATiONBOARD

-t-——BARRIER FREECASEWORK UNIT

__

PROJECT

NoorLTransportation and

Infrastructure RenewalDRAMNG

DWG. NO.

ASK-6Public Works

Page 16: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

PROJECT NO.WO1-02-O1-02

SCALE

DATE:crpT 1’ 9fllfl

Transportation and

U Infrastructure Renewal

Public Works

PROJECTDC350

DESIGN REQUIREMENTS MANUEL

2010 EDI11ON

DRAWINGIMrnPkAA11nrJ TFflI-lNflI AflY

NTS

DWG. NO.

ASK-8

Page 17: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

AjL\A/LA/LA,J

S LB• V

CD

VCD

V TEACHERS

[] STAtiON

PROJECON SCREEN r—- C DCENTERED ONCOMMUNICA11ONBOARD V

• PROJECTDC350 WO1-02-O1-02

DWG. NO.

DESIGN REQUIREMENTS MANUEL SCALE

V

Transportation and 2010 EDflON NISInfrastructure Renewal V

V

______________

DRANGV

V DATE:Public Torb Cfl4kAIIkIIflA11flMTFflHNflIfl(Y FPT iS 9fllfl

Page 18: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

10’ RACKSTORAGEFLOOR TOCEILING

8’ CABINETSTORAGEFLOOR TOCEILING

PROJECT NO. DWG. NO.DC350 WOl -02-01-02

J!1iFCPIV4’SrrIA.

PROJECT

DESIGN REQUIREMENTS MANUAL SCALE

Transportation and Public Worlcs 2007 EDI11ON N.T.S. ASK— 9Public DRAVNG DATE:

TECHNOLOGY PRODUC11ON AREA 07-01-10

10’ LONG x 24” DEEP COUNTERAREA C/w BUTCHER BLOCK TOP,18” DEEP STORAGE CABINET BELOWWITH ADJUSTABLE SHELVING.

TUB SINK W1THFOOT

ACCESS TOADJACENTTECHNOLOGYEDUCATIONCLASSROOM

SAFErY’ ZONE AS REQUIRED

Page 19: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

PROJECT NO. DWG. NO.DC.350 WO1-02-O1 -02

PROJECT

DESIGN REQUIREMENTS MANUEL SCALEU Transportation and 2010 EDITION NTSJ Infrastructure Renewal ASK—i 0

DRANG DATE:I Public Worb TECHNOLOGY INNOVATION SEPT 15, 2010

Page 20: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September
Page 21: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

CORRIDOR

PROJECT PROJECT NO. DWG. NO.DC350 W01-02-O1 -02DESIGN REQUIREMENTS MANUAL SCALE

Transportation and Public Works 2007 EDI11ON N.T.S. ASK—i 2Public Verb DRAMNG DATE:

TYPICAL STAFF ROOM LAYOUT 07-01-10

24” COUNTERSUITABLE FORCPU STATIONS.SEE ROOMDATA SHEET

MICROWAVE

NOTE:BOTH WATERCLOSETS TO HAVEBARRIER FREE WALL HUNGLAVATORIES. BOTH SHOWERSTO BE BARRIER FREE.

Page 22: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

NOTE:

PRIMARY,1 ,2 CLASSESINCLUDE SINKS.

GRADES 3—12, UNITS 2ADJ U STABLE.SHELVESHAVE, NO SINKS

REFER TO ROOM DATASHEETS FOR MOUNTINGHEIGHTS

3657

UNIT 1 - UNIT 2 UNIT 3 UNIT 4 -

915 915 915 915

II II____

LL)

______

F’)

pp

TI

19mm SHELVESEVENLY SPACED

PROJECT NO. DWG. NO.DC350 WOl -02-01-02PROJECT

DESIGN REQUIREMENTS MANUAL scMITransportation and Public Works 2007 EDITiON N.T.S. ASK—i 3Public DRAMNG DATE:

TYPICAL CLASSROOM CASEWORK ELEVATiON 07-01-10

Page 23: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

NOTES:

BACK

COAT HOOK SECUREDTO DOOR 1600mmFROM FINISHED FLOOR.

-19mm ADJUSTABLESHELVES C/W EDGE

9mm DOOR C/W 5HINGES PER LEAF

6mm DIA. HOLESFOR SHELFSUPPORTS @ 500.C. ±

PROJECT NO. DWG. NO.DC350WOl -02-01-02

]!1LJIO7rI4111.PROJECT

DESIGN REQUIREMENTS MANUAL SCALEThmsportation and Public Works 2007 EDI11ON N.T.S. ASK —1 3aPublic Torb DRANG TYPICAL CLASSROOM CASEWORK DATE:

UNIT ONE - TEACHER’S CLOSET 07-01-10

TEACHER’S CLOSET DOOR SHALL BELOCKABLE.

PROVIDE ALL HARDWARE ITEMS: HINGES,PULLS, SHELF SUPPORTS, COAT HOOKS,DOOR HOOKS.

PLAN

SECTION A SECTION B

Page 24: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

325

300

NOTE:o a ,_—l9mm

o a ADJUSTABLE PRIMARY,1,2 CLASSESSHELVES C/w INCLUDE SINKS. GRADES 3—12,

o

° / EDGE PROVIDE 2 ADJUSTABLE

__________

SHELVES. NO SINKS. REFERo a TO ROOM DATA SHEETS FOR

o COUNTER TOP A.F.F. HEIGHTS0

o e

_______________________________

o a

—19mm FIXED

__________

SHELVES C/wEDGE

_______

I

r-)

610

—POST—FORMED COUNTERTOP C/W BACKSPLASH

_____________________ ______

-

________

—19mm FIXED

1 SHELF C/w EDGE

CE)

—BASE

PROJECT NO. DWG. NO.DC350

. W01-02-O1-02

]I1i1IOIK4JTIA.

PROJECT

DESIGN REQUIREMENTS MANUAL SCALE

Transportation and Public Works 2006 EDITiON N.T.S. ASK—i 3bPublic Worb DRAMNG TYPICAL CLASSROOM CASEWORK DATE:

UNIT 2 - STANDARD CABINET 06-10-10

Page 25: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

325 I—

25300

o 0

o o

00/

o 0

o o

o o

o 0

19mmADJUSTABLESHELVES c/wEDGE

..—l9mm FIXEDSHELVES C/wEDGE

0

co

PROJECT NO. DWG. NO.DC350 WOl -02-01-02

J,(JJrIA.PROJECT

DESIGN REQUIREMENTS MANUAL SCALETransportation and Public Works 2007 EDITION N.T.S. ASK—i 3cPublic ob DRAVING TYPICAL CLASSROOM CASEWORK DATE:

UNIT 3 - UNIT STORAGE 07-01-10

j

r)

c’J

-

CoCo

—POST—FORMED COUNTERTOP c/w BACKSPLASH

—19nm FIXEDSHELVES C/wEDGE

P-BASE

xJ

Page 26: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

NOTES:

ELEVATION SECTION

‘A’\3uir

PROJECT PROJECT NO. DWG. NO.DC350 WOl -02-01-02DESIGN REQUIREMENTS MANUAL SCALE

Transportation and Public Works 2007 EDI11ON N.T.S. ASK —1 3dPublic Job DRAWING TYPICAL CLASSROOM CASEWORK DATE:

UNIT FOUR - CABINET AND LATERAL FILES 07-01-10

LATERAL FILE DRAWERS SHALL BELOCKABLE.

PROVIDE ALL HARDWARE ITEMS: HINGES,PULLS, SHELF SUPPORTS, COAT HOOKS,DOOR HOOKS.

9mm DOORS 600

915

EQ,

EQ

II

19mm ADJUSTABLE

/‘SHELVES C/W EDGE

0LiJ

w

CLiJ

c%Ja

0 0

ADJUSTABLE SHELF

0 0

LATERAL FILEDRAWERS C/WLOCKS AND FILEROD SUPPORTS

75

Page 27: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

P’LAM SURFACE3mm PVC EDGESON ALL EXPOSEDEDGES.

PULL OUT KEYBOARDTRAY 610mm x 356mm

SIDE GABLE:P’LAM BOTH SIDES3mm PVC EDGING ONALL EXPOSED EDGES.

BACK GABLE:P’LAM BOTH SIDES3mm PVC EDGING ONALL EXPOSED EDGES.

CPU BOX:P’LAM BOTH SIDES3mm PVC EDGING ONALL EXPOSED EDGES.OPEN AT REAR.

LINE OF CPUBEYOND.

BACK GABLE:P’LAM BOTH SIDES3mm PVC EDGING ONALL EXPOSED EDGES.

DESIGN ANDCONSTRUCTION TOMEET APPLICABLECODES.

W/FULL SUSPENSION SLIDE\ P’LAM ALL EXPOSED SURFACES\ 3mm PVC EDGING\ ON ALL EXPOSED EDGES.

— POWER & DATARACEWAY.

TOP:

NCo0 c’J

0)- POWER & DATA

RACEWAY.

L 915 610 L 915 NFRONT Fl FVATION

‘I

POWER & DATARACEWAY.

BOX

LINEUNIT

OF DRAWERBEYOND.

GABLE SIDE ELEVATION

PROJECT NO. DWG. NO.DC350 WO1-02-O1-02PROJECT

DESIGN REQUIREMENTS MANUAL SCALETransportation and Public Works 2007 EDITION N.T.S. ASK—i 4Public Work! DRAWING TPYICAL TECH. EDUCATION COMPUTER DESK DATE:

07-01-10

Page 28: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

600 1-

C

19mm0

0

0

0

BACK0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

19mm DOOR C/W 5HINGES PER LEAFC/W EDGE

0

0

0

0

0

0

0

0

0

0

0

0

00

19mmADJUSTABLESHELVES

I4

0

0

0

0

0

0

0

0

0

0

0

0 PROVIDE ALL HARDWAREITEMS: HINGES, PULLS,SHELF SUPPORTS, COATHOOKS, DOOR HOOKS.

LOCKABLE DOOR

BASE

1’((]PVdJIrL4L.

PROJECT

Transportation and Public Works

Public lark!

DC350

DESIGN REQUIREMENTS MANUAL

2007 EDI11ON

DRMMNG

tWiG. NO.PROJECT NO.WOl -02-01-02

SCALEN.T.S.

DATE:07-01-10ASSISTIVE CARE WASHROOM TOTE STORAGE

ASK- 15

Page 29: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

762

1 ‘I

-J<Da

-J<DaU

19mm MELAMINEBACK

FIXED SHELF19mm MELAMINEC/W 3mm PVCEDGE

ELEVA11ON A

PROJECT NO. DWG. NO.DC350WOl -02-01-02

PROJECT

DESIGN REQUIREMENTS MANUAL SCALETransportation and Public Works 2007 E01110N N.T.S. ASK —1 6Public DRAWING DATE:

VISUAL ARTS ROOM - ART STORAGE CABINET 07-01 -10

1

SECTION B

Page 30: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

PROJECT NO.WO1 -02-01-02

DESIGN REQUIREMENTS MANUAL SCALE2007 EDfl1ON N.T.S.

DATE:07-01 -fo

PLAN

19mm ADJUSTABLESHELVES

FIXEDSHELF C/W EDGE

9mm LOCKABLEC/w EDGE

SECTION A SECTION B

PROJECT

Nnrs%raTransportation and Public Works

Public lorb

DC350

DRAYANG

DWG. NO.

ASK-17DRAMA ROOM - COSTUME STORAGE CABINET

Page 31: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

2 — 38 X 89 MAPLE/BIRCHCONTIN. C/W RADIUSED EDGESBOLT & PLUG TO BRACKET

19 X 55 NOM. MAPLE APRON

38 X 38 TUBULAR PIPE BRACKETS C/W75 X 330 X 6 MOUNTING PLATE. 2BOLTS PER BRACKET (TOGGLE BOLTS FORBLOCK & CONCRETE. INSERT T’PE FORINSULATED FORMING SYSTEM)

45 X 152 TURNED MAPLE/BIRCHCOAT HOOKS (MILK BOULE SHAPE)200mm O.C. DOWELLED & GLUEDINTO PLATE. SECURE PLATE WITHSCREW AND FINISH WITH WOODBUTFON CAP.

38 X 140 MAPLE/BIRCH PLATECONTIN. BETWEEN BRACKETS

PROJECT NO. DWG. NO.DC350 WO1-O2-O1-02

PROJECT

DESIGN REQUIREMENTS MANUAL SCALETransportation and Public Works 2007 EDITION N.T.S. ASK — 1 8Public Worb DRAVINC DATE.

COAT HOOKS, HAT RACK 07-01-10

rL

NOTES:

REINFORCE BEHIND DRYWALL WHEREREQUIRED — REFER TO FLOOR PLANS.

BRACKETS & PLATESCLEAR FINISH.

FULL RADIUS RETURNAND SHELF ENDS.

PAINTED, WOOD

AT ALL BENCH

Page 32: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

13mm DIA. THREADEDROD&2” WASHER.HILTI HIT HY15OINJECTION ADHESIVEANCHORS.

CONTINUOUS4’ X 4’ x3’STEEL ANGLESECURED © 2’ 0/C.

13mm DIA.ROD, HILTIINJECTIONANCHORS

THREADEDHIT HY15O

ADHESIVE

NOTE;LOCKERS TO BE SUPPLIED WITHOUT LOCKER BASES.REINFORCE BEHIND DRYWALL WHERE REQUIRED— REFER TO FLOOR PLANS.

b

PROJECTDC350

Public Jork.

Transportation and Public Works

DESIGN REQUIREMENTS MANUAI

2007 EDfl1ON

DRAWING

PROJECT NO.WOl -02-01-02

DWG. NO.

SCALE

LOCKER SUPPORT DETAIL

N.T.S.

DATE:07-01-10

ASK -19

Page 33: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

REINFORCED Y.” PLATEBACKBOARD.

METAL

HEAVY METAL RIM3’2” TO 2” ROLLED

18” DIA.FLAT BAR.

2”x2”x3/4” BASE PLATEGUSSET.TO BE INSTALLED WITHANCHOR BOLTS, 1 ‘—0”GRADE.

PROJECT NO. DWG. NO.DC350 WOl -02-Oj -02

JNi1OP!JrfL4i.

PROJECT

DESIGN REQUIREMENTS MANUAL

Transportation and Pnblic !orks 2007 EDI11ON N.T.S. ASK —20Public Works DRAWING DATE:

OUTSIDE BASKETBALL STANDARD 07-01-10

AND

3/4BELOW

Page 34: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

12’—D’

51_41

ADJUSTABLESHELVING

1

Fji”vT’i b,r4

Transportation andInfrastructure Renewal

Public Wcrb

DC350

DESIGN REQUIREMENTS MANUEL

2010 EDITION

PROJECT NO.WOl -02-01-02

SCALENTS

DATE:Aug 6, 2010

-4

1L1

PROJECT

DRANG

DWG. NO.

ASK- 21CUSTODIAL ROOM

Page 35: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

51

@ —CEILING MOUNTEDRECEPTACLE,SINGLE DATAOUTLET, ANDMULTIMEDIAOUTLET

-,-

CLASSROOM

r 1 F

NOTE: THIS bRAWING IS INTENDED TOSHOW THE RELATIONSHIP OF FURNITUREWITHIN A TYPICAL CLASSROOM FORELECTRICAL REQUIREMENTS.

PROJECT PROJECT NO. DWG. NO.DC35O WOl -02-01-02DESIGN REQUIREMENTS MANUAL SCALE

Transportation and 2010 EDI11ON N.T.S. ESK—1Infrastructure Renewal DATE:DRANGUbhC ELECTRICAL CLASSROOM CO-ORDINA11ON 09-04-02

C

If

1SINGLE VOiCE AND SINGLE DATA OUTLET

—INTERCOM HANDSET—TEACHERS DESK

OUTLETMOBILE RUN—OFFBIDIRECTIONAL CATV

- MULTIMEDIA OUTLETDUAL DATA OUTLET

—DUAL DATA OUTLET

DUAL DATA OUTLET

Page 36: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

NOTE 1: DOUBLE GANG BACKBOX COMPLETE WITH SINGLE GANG SQUARE WELDED RAISED 11LE RINGFOR MEDIA CONVERTER (SUPPUED AND INSTALLED BY OWNER). MEDIA CONVERTER TO BE MOUNTED ONTILE RING. PROVIDE A YELLOW LAMICOID WITH BLACK LEITERING FOR THIS ITEM.

NOTE 2: 1” EMT WALL STUB TURNED OUT INTO ACCESSIBLE CEIUNG SPACE.

NOTE 3: SINGLE DATA OUTLET (CABLED FROM THE MAIN TELECOMMUNICATIONS ROOM) LOCATED IN

THE ACCESSIBLE CEILNG SPACE ABOVE THE PROJECTOR AND WITHIN 30” OF CEILNG. BOX TO BEMOUNTED IN A VERTICAL ORIENTATION.

NOTE 4: QUAD POWER OUTLET LOCATED IN ThE ACCESSIBLE CEILNG SPACE ABOVE THE PROJECTORAND WITHiN 30” OF CEILNG, BOX TO BE MOUNTED IN A VERTICAL ORIENTATION.

NOTE 5: DUAL MEDIA CONVERTER OUTLET COMPLETE WITH COVERPLATE AND YELLOW CONNECTORSLOCATED IN THE ACCESSIBLE CEILNG SPACE ABOVE THE PROJECTOR AND WITHIN 30” OF CEILNG. BOXTO BE MOUNTED IN A VERTICAL ORIENTATION. PROViDE A YELLOW LAMICOID WITH BLACK LEFIERINGFOR THIS ITEM.

NOTE: THIS DRAWING IS INTENDEDTO SHOW THE RELATIONSHIP OFFURNITURE WITHIN A TYPICALCLASSROOM FOR ELECTRICALREQUIREMENTS.

NOTE 6: iWO CATEGORY 6 CABLES (YELLOW JACKET) TERMINATED WITH A YELLOW 8P8C AT EACH

END. CABUNG TO BE ROUTED THROUGH THE ACCESSIBLE CEILING SPACE ON “J—HOOKS”.

NOTE 7: DUAL DATA OUTLET (CABLED FROM THE MAIN TELECOMMUNICATIONS ROOM).

NOTE 8: QUAD POWER OUTLET.

NOTE 9: CA1V OUTLET.

P90J‘.GV

PROJECT NO. DWG. NO.DC350 WO1 -02-01-02

PROJECT

DESIGN REQUIREMENTS MANUAL scAll

Transportation and 2010 EDI11ON N.T.S. ESK—2Infrastructure RenewalDRA’MNG DATE

CLASSROOM MEDIA CONVERTER LAYOUT 10-07-19

Page 37: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

PROVINCE OF NOVA SCOTIADEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL

DTIR Document DC350

APPENDICES

EDUCATIONAL FACILITIES DESIGN REQUIREMENTS

Appendix D

Gymnasium Floor Layout

2007 EDITION

September 21, 2010

DC 350, Appendix B is not intended to be a complete architectural, mechanical or electricalspecification for a school project. Such a complete specification must be written for each projectby the Project Consultant.

This section, in conjunction with DC 350, Part 1 and Part 2 and other Appendices, specifies, inoutline form, the minimum acceptable standards for school components.

Page 38: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

Public Works - Building Design Group

Transportation and Public Works

GL 1

Page 39: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

GL 2

Public Works - Building Design GroupTransportation and Public Works

Page 40: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

GL 3

Transportation and Public WorksPublic Works - Building Design Group

Page 41: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

GL 4

Transportation and Public WorksPublic Works - Building Design Group

Page 42: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

GL 5

Transportation and Public WorksPublic Works - Building Design Group

Page 43: APPENDICES DESIGN REQUIREMENTS Appendix A Performance … · 2018-04-11 · DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed September

GL 6

Transportation and Public WorksPublic Works - Building Design Group