apm30h&tmc11h&ibbs200d&ibbs200t(ver.b) installation guide-(10)
TRANSCRIPT
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
1/39
HUAWEI TECHNOLOGIES Co., Ltd.
APM30H&TMC11H&IBBS200D&IBBS200T
Ver.B
Installation Guide
Issue: 10
Date: 2010-07-15
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
2/391
Content
Specification of the Cabinets
Modules in the Cabinets
Installation Scenarios
Installation Tools
1. Installation Procedure
2. Installing the Cabinets
3. Earth Grounding the Cabinets
4. Installing the Optional Modules
5. Installing the Cables6. Sealing the Cable Holes
7. Installing the Batteries and their Cables
8. Checklist for the Installation
9. Checking the Power-On Status
10. Appendix
11. Change History
2
3
3 4
5
6
12
13
16 26
27
28
30
31
36
Copyright Huawei Technologies Co., Ltd. 2010. All rights reserved.
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
3/392
Specification of the Cabinets
Supporting 48 V 100 Ah backup power by
connecting two 48 V 50 Ah battery groups in
parallel.
Supporting 48 V 184 Ah backup power byconnecting two 48 V 92 Ah battery groups in
parallel.
48 V 50 Ah or
48 V 92 Ah
battery group
that can be
maintained
from the front
Battery
Excluding the batteries 70 kgCabinet weight
Excluding the batteries 50 kgCabinet weight
Including the cabinet frame, inner air circulation
fan box, outer air circulation fan box, and core
of the heat-exchanger.
Excluding the customer equipment and batteries
57 kgCabinet weight
Cabinets
Weight of the
cabinet in fullconfiguration
Including the cabinet frame, inner air circulation
fan box, outer air circulation fan box, core of the
heat-exchanger, EPS subrack, and related
cables.
Excluding the BBU, customer equipment, PMU,PSUs, and batteries.
72 kg
Including the cabinet, one PMU, three PSUs,
and one BBU.Excluding the customer equipment and batteries.
91 kg
Cabinet weight
RemarksSpecificationItem
The APM30H(Ver.B) series cabinets consist of the APM30H, TMC11H, IBBS200T, and IBBS200D.
APM30H
TMC11H
IBBS200T
Cabinet dimensions (excluding the TEC cool hood of the IBBS200T): 600 mm x 700 mm x 480 mm (W x H x D)
IBBS200D
TEC cooler
hood (Depth:
206 mm)
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
4/393
Modules of the Cabinets
Installation Scenarios
DCDU-03
EPS48100DPMU
Junction box
IBBS200D
CMUA
IBBS200T
CMUA
Power
distribution box
Power box ofthe heating film
Power
distribution box
PSU
CMUAHPMI CMUAHPMI CMUAHPMI
Junction box
DCDU-03
Junction box
APM30H (+24 V DC power supply)APM30H (AC power supply) TMC11H
EPS
In this document, the
equipment appearance is forreference only. The actual
equipment may differ from
what is shown in the figures.
Base
Pole
Base
APM30H
APM30Hor
TMC11H
IBBS200Dor
IBBS200T
IBBS200D
APM30Hor
TMC11H
Wall
APM30Hor
TMC11H
APM30HAPM30HAPM30Hor
TMC11H
IBBS200Dor
IBBS200T
IBBS200Dor
IBBS200T
IBBS200Dor
IBBS200T
IBBS200Dor
IBBS200T
IBBS200Dor
IBBS200T
IBBS200Dor
IBBS200T
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
5/394
Installation Tools
Insulated screwdriver Diagonal pliersScrewdriver
(M3 to M6)
Torque wrenchSocket wrench
Wrench
(32 mm capacity)
Crimping pliers forpower cables RJ-45 crimping pliers Wire cutter
Rubber hammer Iron Wire stripper
Percussion drill (16) Heat gun Level bar
Long measuring tape Cleaner Multimeter
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
6/395
1 Installation Procedure
Start
Install the Cabinets
on the Base
Install the Cabinets on the
Metal Pole
Install the Cabinets on
the Wall
Earth Grounding the
Cabinets
Install the Optional Modules
Install the Cables
Seal the Cable Holes
Install the Batteries and
their Cables
End
Checking the Power-On
Status
Checklist for the Installation
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
7/396
Installation the Cabinets on the Base
2 Installing the Cabinets
600 600 600
480
> 800
> 300
> 60
> 300
40 40
52-60 mm
90
16
Cast a concrete plinth.
Mark the anchor points for the base. Use a hammer drill to drill holes.
Maximum
120
Cabinet dimensions and clearance requirements (unit: mm)
Concrete plinth
The height of the concrete plinth must meet the heat-dissipation and waterproofing requirements of the cabinet.The concrete plinth must be 200 mm higher than the ground, and the horizontal error must be within 5 mmwhen the plinth is cast.
Do not use the hammer drill to drillholes on the concrete plinth through the holes on the base.
In this way, the paint on the base may be damaged.
Concreteplinth
1. Install the base.
Cabinet Cabinet Cabinet
The values in the figure are not for the concrete plinth.
The recommended distance between the cabinets is40 mm, and the maximum distance between the cabinets
is 150 mm.
If the Noise Reduction Module (NRM) is installed, thedistance between the cabinets is 150 mm.
Install the expansion bolt assemblies.
Spring washer 12
M1260 bolt
Expansion tube
Rubbermallet
Remove the spring washer,flat washer, and bolt.
Flat washer 12
unit: mm
434 352
19
600
516
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
8/397
Installation the Cabinets on the Base
2 Installing the Cabinets
Remove the front cover plate.
Check the base level.
Tighten the bolts.
Install the bolt with the spring washerand flat washer.
Adjust the base level by adding adjusting pads to thebolts between the base and the concrete plinth.
Remove the baffle plates from bothsides of the base (by removing the plateon the left as an example).
Remove the baffle pieces from the backof the base.
All the three cable holes on the base can be used for cabling.You can use the cable holes based on actual requirements.
10
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
9/398
Installation the Cabinets on the Base
2 Installing the Cabinets
2. Move the cabinet onto the base.
Install the lifting lugs. Install the ropes.
Do not damage plastic screws. Reserve them for later use.
Maximum 90
Plasticscrew
Liftinglug
Move the cabinet onto the base. Remove the ropes and install the plasticscrews.
Before installing the plastic screws, clean the mounting holes to prevent scrap iron from entering.
Choose the appropriate method to move the cabinets according to the condition on site. Here take the crane as an example.
M1230 Bolt4
By attaching the IBBS200D as an example,attaching the APM30H or the TMC11H or theIBBS200T to the base is the same.
Gasket with anoblong hole
Gasket with anoblong hole
3. Secure the cabinet onto the base.
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
10/399
Installation the Cabinets on the Base
2 Installing the Cabinets
4. (Optional) Stacking two cabinets.
Remove the plastic
screws (x4) from the topof the lower cabinet.
M12x30 Blot (x4)
Remove the cover plates (2)
from the top of the lowercabinet.
Stack the cabinets, andattach the cabinets with
the bolts(4).
To ensure the waterproof
performance of the cabinet, keepwell the cover plates for the round
hole of the cabinet.
Cover plate
Gasket with an oblong hole
Gasket with anoblong hole
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
11/3910
Installation the Cabinets on the Metal Pole
2 Installing the Cabinets
5. Install the U-shaped piece.
3. Install the fastening bar.
4. Move the cabinet on to thetrapezoidal rack and attach themwith the bolts.
1. Installing the trapezoidal rack. 2. Remove the plastic screws (2).
Pole
Trapezoidal rack
Fastening bar
M12x30Blot (x4)
Gasket withan oblonghole
Gasket withan oblonghole
When the APM30H is installed on a metal pole, grease must be covered. For details, see Appendix e onpage 35.
Springwasher
Flat washer
Hold the cabinet when opening the door to prevent the cabinet from tipping over.
M1230 Bolt2
M12
60 Bolt
4
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
12/3911
c
Installing the Cabinets on the Wall
2 Installing the Cabinets
3. Installing the trapezoidal rack.
Drawingtemplate
1. Marking the anchor points 2. Install the expansion boltassemblies.
Unit: mm
766
138
250
280
500
Anchorpoints (6)
5. Install the fastening bar.
Fastening bar
4. Remove the plastic screws (2).
Bolt
Spring washer
Flat washer
Expansion tube
Trapezoidalrack
M1260 Bolt4
Wall
6. Attach the trapezoidal rack andthe cabinet.
M12x30Blot (x4)
Gasket withan oblonghole
Hold the cabinet when opening the door to prevent thecabinet from tipping over.
M1230 Bolt2
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
13/3912
7. Attach the fastening bar and wall.
The PGND cables and signal cables cannot be bound or entangled. A certain distance must
be reserved between them to prevent interference from each other.
Principles for routing the PGND cables and the equipotential cables
About the principles for earth grounding the cabinets,takes the following scenario as example.
Fastening bar
c
Installing the Cabinets on the Wall
2 Installing the Cabinets
3 Earth Grounding the Cabinets
Principles for earth grounding the cabinets:
The upper cabinets are connected to the lowercabinets with the equipotential cables.
The lower cabinets are connected with theequipotential cables.
The cabinet below the APM30H is connected to thegrounding busbar with PGND cables.
APM30H
Equipotentialcable (16 mm2)
PGND cable(16 mm2)
Grounding busbar
Wiring copperbar
M1230 Bolt2
Equipotentialcable (16 mm2)
Equipotentialcable (16 mm2)
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
14/3913
4 Installing the Optional Modules
Installing the SOU in the APM30H
1. Specification of the SOU.
3. Install the power cable for the SOU.2. Install the SOU.
Americanstandard
Europeanstandard
Multi-purpose UKstandard
Configured with the following four outlet types, the cabinets support different SOU types of different countries.
The SOU is preferably installed in the bottom 1 U space of the cabinet.
L2
PGND
N2
SOU
1. Install the Heater. 2. Install the power cable for the heater.
L0 N0
If both the SOU and the heaterare installed in the cabinet, theheater is installed above theSOU, that is, in the 1 U spacenext to the SOU.
The heater is preferablyinstalled in the bottom 1 Uspace of the cabinet.
See Installing the Heater in the APM30H .
Installing the Heater in the APM30H
c
Installing the Heater in the TMC11H
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
15/3914
4 Installing the Optional Modules
d
Installing the EMUA in the APM30H
e
Installing the EMUA in the TMC11H
1. Install the EMUA.
M6
3. Install the signal cable for the EMUA.
2. Install the power cable for the EMUA.
EMUA
BBU
Either the EMUA or the SLPU is installed.
Information about the BBU, see BBU InstallationGuide.
LOAD7
PWR1
RS485
COM OUT
See Installing the EMUA in the APM30H .
PWR1
LOAD7 RS485COM OUT
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
16/3915
4 Installing the Optional Modules
f
Installing the SLPU in the APM30H
Either the EMUA or the SLPU is installed.
Information about the BBU, see BBU InstallationGuide.
1. Install the SLPU.
M6
3. Install the external dry contact
monitoring and alarm signal cable
2. Install the internal monitoringtransfer cable for the SLPU.
SLPU
BBU
EXT-ALM0
OUT0
Internal monitoring transfer cable
connections:
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
17/3916
5 Installing the Cables
Installing the Power Cables
(-48 V DC)Installing the Power Cables
(+24 V DC)
NEG(-)
Connect the power cables.
Recover the protecting cap.
+
-
Install the input power cable for the TMC11H Install the input power cable for the APM30H
In this chapter, the color or the appearance of the equipment are for reference onlyThe actual equipment may differ from
what is shown in the figures.
The bending radius of the cable is not less than five times of the diameter of the cable.5
The cables of different types must be routed in parallel or separated by special objects.4
Different types of cables must be separately routed and cannot be bound in the same bundle. Cables in
each bundle or any two bundles cannot be entangled.
1
The cables must be bundled tightly and neatly. The jackets of the cables are not damaged.2
Labels or nameplates must be attached to the cables after they are installed.3
If the length of the power cable is insufficient, replace the cable rather than adding connectors or soldering
joints to lengthen the cable.
6
General pri nciples for routing the cables
If the TMC11H (-48 V DC) is not configured, skip the section. If the TMC11H (+24 V DC) is not configured, skip the section.
RTN(+)
Remove the protecting cap of the power box of theDCDU-03.
Connect the power cables.
Recover the protecting cap.
Remove the protecting cap of the power box of theEPS48100D.
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
18/3917
c Installing the Power Cables (AC Power Supply Scenario)
5 Installing the Cables
L1
PE
Move theshort-
circuiting bar
L2
L3
N
PE
L2
N
PE
L1
Power cable for the junction boxPower cables for the TMC11H
TMC
RTN(+)
NEG(-) L3N3L N
Connect the power cables.
1. Install the input power cable for the APM30H
Remove the AC protecting cap, open the AC input power box.
L
NPE
200V Signal-phase AC
mode
200V Three-phase AC
mode110V AC mode
2. APM30H-TMC11H
Recover the AC protecting cap, close the AC input power box.
Short-
circuitingbar
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
19/3918
c Installing the Power Cables (AC Power Supply Scenario)
5 Installing the Cables
3. APM30H - IBBS200D/IBBS200T
Either the IBBS200D orthe IBBS200T is installed.
LOAD3
For details on how toassemble the easy power
receptacle (pressfit type)
connector, see "Appendix b"on page 32.
Easy powerreceptacle (pressfittype) connector
Power series 120
connector
Add the power series 120
connector. For details, see
"Appendix a" on page 31.
APM30H:IBBS=1:2
2. Power cables for the fan in the IBBS200D
1. Power cables for the IBBS200D/IBBS200T
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
20/3919
c Installing the Power Cables (AC Power Supply Scenario)
5 Installing the Cables
LOAD2LOAD3
From LOAD2
From L1/N1
From L2/N2
L1 N1
L2
N2
3. APM30H - IBBS200D/IBBS200T
Must route the power cables for the heating films in the IBBS200Ds into the power boxof the heating film from the top down.
The power box of the
heating film
Prevent the wires from exposing out
of the power box of the heating film.
The power box of theheating film
From LOAD3
If the LOAD2 is alreadyoccupied, it is recommended
that the fuse for the LOAD4terminals be changed to meet
the output MCB requirements
for the IBBS. For details, see
"Appendix c" on page 33.
3. Power cables for the heating films in the IBBS200D
4. Power cables for the TEC in the IBBS200T
APM30H:IBBS=1:2
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
21/3920
Either the IBBS200D or the IBBS200Tis installed.
APM30H:IBBS=1:1
2. Power cables for the fan in the
IBBS200D / the TEC in the
IBBS200T
LOAD3
For details on how to assemble theeasy power receptacle (pressfit type)
connector, see "Appendix b" on page 32.
Easy power receptacle(pressfit type) connector
Power series 120connector
Add the power series 120 connector.For details, see "Appendix a" on page 31.
1. Power cables for the IBBS200D/IBBS200T
c Installing the Power Cables (AC Power Supply Scenario)
5 Installing the Cables
3. APM30H - IBBS200D/IBBS200T
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
22/3921
L1 N1
L2
N2
3. APM30H - IBBS200D/IBBS200T
3. Power cables for the heating films in the
IBBS200D
Must route the power cables for the heating films in theIBBS200D into the power box of the heating film from the top
down.
The power box ofthe heating film
Prevent the wires from exposing out of the power box of theheating film.
APM30H:IBBS=1:1
c Installing the Power Cables (AC Power Supply Scenario)
5 Installing the Cables
The power box of the
heating film
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
23/3922
d Installing the Monitoring Signal Cables
5 Installing the Cables
When the signal cable is routed between cabinets, coil the extra length of the cable in thebase if the cable is redundant.
Principles for routing the monitoring signal cables
1. APM30H+IBBS200D/IBBS200T
APM30H+IBBS200D APM30H+IBBS200T
COM_OUT
COM_485
COM_IN
COM_485
COM_IN
COM_OUT
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
24/3923
d Installing the Monitoring Signal Cables
5 Installing the Cables
2. APM30H+2 IBBS200D/IBBS200T
APM30H+2 IBBS200D
APM30H+2 IBBS200T
COM_485
COM_OUT
COM_INCOM_IN
COM_485
COM_IN
COM_OUT
COM_IN
COM_OUT
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
25/3924
d Installing the Monitoring Signal Cables
5 Installing the Cables
3. 2 APM30H+2 IBBS200D/IBBS200T2 APM30H+2 IBBS200D
2 APM30H+2 IBBS200T
COM_IN
COM_485
UEIU
MON0
COM_IN
COM_OUT
COM_IN
COM_485
UEIU
MON0
COM_IN
COM_OUT
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
26/3925
d Installing the Monitoring Signal Cables
5 Installing the Cables
UEIU
COM_485
COM_IN
COM_IN
MON0
4. APM30H+2 IBBS200D/IBBS200T+TMC11HAPM30H+2 IBBS200D+TMC11H
APM30H+2 IBBS200T+TMC11H
COM_OUT
COM_IN
COM_OUT
UEIU
COM_485
MON0
COM_IN
COM_IN
COM_OUT
COM_IN
COM_OUT
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
27/3926
Sealing the Cable Holes in the Cabinets
6 Sealing the Cable Holes
The cable module for the IBBS200D, IBBS200T, or APM30H is the same as that for the TMC11H.
When two IBBS200Ds or two IBBS200Ts are installed in stack mode, the installation of the cable module in the uppercabinet is not required.
Lead the cable through the cable hole with an aperture matching the cross-sectional area of the cable in order that the
sealing is effective.
2. Seal the cable holes with fi reproofclay.
Baffle piece
Fireproof clayBaffle plate PVC corrugated
pipe
Fireproofclay
Fireproofclay
1. Close the cable holes on bothsides and at the rear of the base.
3. Install the front panel on the front of the base.
Check whether the paint on the cabinet surface is damaged. If the paint is damaged, repair the damaged paint, readpage 34.
The PVC corrugated pipe is recommended for the cable led out of the cabinet.
Baffle plate
The fireproof clay can be used to seal the cable holesof the base. It cannot be used to seal the cable holes
of the cabinet.
Sealing the Cable Holes in the Base
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
28/3927
Installing the Batteries
7 Installing the Batteries and their Cables
Battery MCB labeled BATEPS
Before installing the batteries, set the battery MCB labeled BAT to OFF to
disconnect the equipment from the battery. Finish the installation, set theBAT to ON.
During the installation of the batteries, use insulated tools such aswrenches and screwdrivers, and do not reversely connect the positive and
negative poles. Otherwise, the batteries may burn, and the operations may
cause human injuries.
Push the baffleplate upwardsuntil it is
contact with
the screws,and then
tighten thescrews.
Remove theprotecting hood.
Install the copper bar forseries connections.
Install the negativecable.
Install the positivecable.
Recover theprotecting hood.
Recover theprotecting hood.
Installing the Power Cables for the Batteries
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
29/3928
8 Checklist for the Installation
All the bolts are tightened, especially for electrical connections. The flat washers and
spring washers are completely and properly installed.
6
All the labels are complete, correct, and legible.11
The space reserved for the user devices is covered by a filler panel.9
The cabinet is neat and clean.7
The cabinet door and the lock are functional. The gag lever post is tightened.10
The installation position of the cabinet strictly comply with the engineering design.1
When the cabinet is mounted on a wall, the holes of the mounting ears are aligned withthe bolt holes. The mounting ears are placed against the wall securely.2
When the cabinet is mounted on a metal pole, the pole fixtures are secure and reliable.3
When the APM30 is installed on the floor, the base is securely installed.4
The horizontal error of the cabinet is less than 3 mm and the vertical error is not greater
than 3 mm.5
The paint on the surface of the cabinet is satisfactory.8
The redundant part of the power cable or PGND cable is stripped off rather than coiled.3
All self-made PGND cables are copper-based and have proper wire diameters. No
breaking device such as the switch and fuse is allowed for the electrical connection of the
grounding system, and no short circuit is allowed.
1
According to wiring diagram of the power system, check whether the PGND cables are
securely connected, whether the AC lead-in cables and internal cables are properly
connected, and whether the screws are tightened. Ensure that no short circuit occurs in
output and input cables.
2
The lugs at both ends of the power cable or the PGND cable are securely soldered orcrimped.
4
Checklist for the Cabinet Installation
c Checklist for the Electrical Connections
There are no fingerprints or other smears on the surface of the cabinet.1
There are no unnecessary adhesive tapes or cable ties on the cables.2
There are no adhesive tapes, cable ties, wastepaper, or packing bags around the cabinet.3
All the stuff around the cabinet is neat, clean, and intact.4
Checklist for the Field Cleanliness
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
30/3929
8 Checklist for the Installation
c Checklist for the Electrical Connections
The pressure relief valve of the battery is not transformed, and no liquid leaks.10
The fans work properly.
The fan in the IBBS200D rotates in a low speed in a normal situation.
The outer air circulation fan in the IBBS200T stops in a normal situation (with the ambient
temperature of lower than 30C), and the inner air circulation fan rotates in a high speed.
The outer air circulation fan in the APM30H stops in a normal situation (with the ambienttemperature of lower than 35C), and the inner air circulation fan rotates in a low speed.
13
The power cables for the batteries are connected to the positive and negative polarities
correctly.
11
The exposed wires at the wiring terminals and the lug handles are insulated by theinsulating tape or heat-shrinkable tube.
5
The flat washers and spring washers are well mounted to all wiring terminals.6
The exterior of the battery is intact without any scratch, dent, or crack.7
The shell of the battery is clean without any leakage trace.8
The wiring post on the battery stands properly without any damage, and the post is not
covered with any acid substances.
9
The voltage of the battery is normal.
The voltage of a 2 V battery cell ranges from 1.8 V to 2.35 V.
The voltage of a 12 V battery cell ranges from 10.8 V to 14.1 V.
The total voltage of the batteries ranges from 43.2 V to 56.4 V.
12
The idle port that no cable is connected to is properly protected.7
The cables are distributed in a way to facilitate maintenance and capacity expansion.4
Both ends of each cable are legible. That is, both ends of the cable are labeled.5
According to the APM30H capacity, ensure that all the MCBs are in normal status and the
MCBs for the batteries are set to ON. When the mains works without voltage or with undervoltage, the batteries can provide backup power for the APM30H.
8
The connectors of each cable are securely connected, especially those at the bottom of
the cabinet.
1
All cables are neatly bound with cable ties, and arranged at even intervals, to proper
tightness, and in the same direction.
2
The power cable and PGND cable are routed separately from other cables.3
Extra cable ties are stripped off. All cuts are smooth without sharp projections.6
d Checklist for the Cable Installation
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
31/3930
9 Checking the Power-On Status
Tighten the screw to fix thelocking piece to prevent thelock from rusting.
Lock
Locking piece
AC Power Supply Scenario -48 V DC Power Supply Scenario
c
Close the Door of the Cabinets
The normal voltage range of the DC output pow er to theDCDU-03 is from:
-43.2 V DC ~ -57 V DC The normal status of the indicators on the CMUA:
RUN indicator: BlinkingALM indicator: OFF
The normal status of the indicators on the PMU:RUN indicator: Blinking
ALM indicator: OFF The normal status of the indicators on the PSU:Power indicator: Steady green
Protection indicator: OFF
Fault indicator: OFF The normal voltage range of the output power to theEPS is from:
-43.2 V DC ~ -57 V DC The normal status of the indicators on the CMUA:
RUN indicator: BlinkingALM indicator: OFF
Start
Power on the APM30H
Are the LEDs
on the PSU/PMU
normal?
Is the
voltage of the
EPS output power
normal?
Are the LEDs
on the CMUA normal?
End
Clear the fault
Start
Power on the TMC11H Clear the fault
Is the
voltage of the
DCDU-03 output powernormal?
Are the LEDs
on the CMUA normal?
End
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
32/3931
10 Appendix
L3
L3
Assembling the Power Series 120 Connector
L2
L1=23~25 mm
Use the crimping tool to press the end of thecontact terminal on the conductor.
Use the heat gun to heat the heat-shrinkable tube.
Link the contact terminal to the power series120 connector.
L3=15~16 mm
L1
The heat-shrinkable tube cannot be exposed
outside the power series 120 connector.
Conductor
Contact terminal
Crimping tool
Heatgun
power series 120 connector
Power series 120connector
Heat-shrinkabletube
Contactterminal
Retaining spring
1. Material: power series 120 connector, contact terminal, heat-shrinkable tube, and cable.
2. Procedure for adding the contact terminal
Strip a part of the jacket off the cable so thatthe conductor with a length of L1 is exposed.
When stripping the jacket off the cable, do not damage the metal
conductor of the cable.
Lead the cable through the heat-shrinkable tube, and then place thecontact terminal on the exposedconductor.
When placing the contact terminal on the conductor
closely to the end of the jacket, ensure that the L2part of the conductor which sticks out of the contactterminal should not exceed 2 mm.
The contact terminal should contact the end of thejacket of the cable.
heat-shrinkabletube
heat-shrinkabletube
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
33/3932
1. Material:Easy Power Receptacle (Pressfit Type) Connector, contact terminal, heat-shrinkable tube, and cable
2. Procedure for adding the contact terminal
Strip the jacket off the cable according tothe scale on the equipment.
Ensure that the edge of the wire is not split.
Use a screwdriver to push the sliding blockuntil the in-position mark is completelyexposed.
Insert the conductors into the holes. Thatis, insert the red cable connected to thepositive pole into hole 1 and blue cableconnected to the negative pole into hole 2.
The conductor should be in thecenter of the holes.
Push back the sliding blocks until they are
in position. Then, check whether theconductors are secure by gently pullingthe cables.
7.5 +0.5
.0
Wire of theconductor
Scale
Hole for the conductor
In-position mark
Sliding block
If the conductor slides outwardor the wire of the conductor isexposed outside the hole for the conductor, remove the
conductor, cut the split wires, and then strip the jacket andinstall the conductor again.
10 Appendix
Assembling the Easy Power Receptacle (Pressfit Type) Connector
The conductor isnot perpendicularto the hole.
The conductor is deviated fromthe center of the hole.
The conductor isnot perpendicularto the hole.
The depth of the
conductor into thehole should be not
less than 11 mm.
The conductor should beperpendicular to the holes.
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
34/3933
c Replacing the Fuse
1. Remove the extraction tool.
2. Obtain the fuse from the case. 3. Replace the fuse by using theextraction tool.
EPS
EPS
Remove the fuse
by using theextraction tool
Align thebulge on
theextractiontool withthe hole onthe fuse
Fuse
10 Appendix
Fuse
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
35/3934
10 Appendix
d Repairing the Damaged Paint
1. Codes of color samples
YB030
YB026
Huawei ColorCode
3010 light grey
RAL7035
Color Name
Base
Cabinets (including APM30H, RFC,
TMC11H, IBBS200D and IBBS200T)
Object
Pontone 422U
RAL7035
InternationalColor Code
2. Operation of descript ion
The color of the surface of the repair area should be consistent with that of the surroundingarea, without obvious edges and bulge. Scratches and damages should be covered
properly. There should not be dropped paint.
Polishing
In case the damaged area is stained or there is rust on the materials, the following step
must be applied: Fine sand paper should be applied to polish the damaged area in order
to remove the stain or rust.
Cleaning
Clean cotton cloth can be used to rub the stain or dust on the surface of the area to be
polished or repaired.
Paint repair
Brushing paint of corresponding color should be applied according to the original coating.
Prior to the repair, the paint should be shaken well. After that, use the small brush insidethe bottle to absorb paint and evenly spread on the damaged area till the scratch/damage
is covered. Note that the paint coating applied should be as thin as possible. Paint coating
should not reveal any drops. The surface should be kept smooth.
Drying
The surface of the repair paint should be placed in indoor temperature for 30 minutes.
After that, subsequent operations can proceed.
Quality
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
36/3935
10 Appendix
e Covering the Equipment with Grease
1. Install the cable frame in the APM30H.
2. Before installing the rubber blocks for leading out the cables, cover thesurface and gaps of the blocks wi th grease evenly, and then insert the threeblocks into the cable frame.
3. Insert the rubber caps into the cablemodule after covering the caps with grease,and then cover the jackets of the cables withgrease before leading the cable through thecable module.
Grease When the APM30H is installed on a metalpole or on the wall, grease should also becovered around the four bolts which areused to attach the cabinet and trapezoidalrack.
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
37/3936
10 Appendix
f Checking the DIP Switches
Check whether the PMU DIP status is correct.
When the two PMUs are in the same monitoring line (MON0 or MON1), the monitoring address of the PMUs must be set to 3
and 4.
PMU
The monitoring address of the PMU is set to 3.
The monitoring address of the PMU is set to 4.
This describes the changes in theAPM30H&TMC11H&IBBS200D&IBBS200T(Ver.B) Installation
Guide.
11 Change History
06 (2010-03-15)This is the fifth commercial release.
Compared V200R003_06 with V200R003_05,Update the information about how to install the cabinets.
07 (2010-04-10)This is the sixth commercial release.
08 (2010-05-05)This is the seventh commercial release.
Compared V200R003_08 with V200R003_07,Update the information about the bolts which are used to install the cabinets.
09 (2010-06-30)
Compared 09 with 08,Add the specifications of the bolts in the chapter ofInstalling the Cabinets.
This is the eighth commercial release.
10 (2010-07-15)
Compared 10 with 09,1. Add the scenarios of the cabinets in the chapter ofInstallation Scenarios.2. Add the scenarios of the power cables between the APM30H and IBBS200D or IBBS200T in the chapter of
Installing the Power Cables (AC Power Supply Scenario)3. Add the scenarios of the cabinets in the chapter ofInstalling the Monitoring Signal Cables.4. Update the checklist for the installation.
This is the ninth commercial release.
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
38/3937
11 Change History
03 (2009-12-30)
This is the second commercial release.
Compared V200R003_03 with V200R003_02,Update the information about how to install the cabinets.
02 (2009-09-30)
This is the first commercial release.
01 (2009-08-10)
This is the draft release.
04 (2010-01-15)This is the third commercial release.
Compared V200R003_04 with V200R003_03,Add the information about the SOU and the heater.
05 (2010-02-25)
This is the fourth commercial release.
Compared V200R003_05 with V200R003_04,Add the information about SLPU.
-
7/23/2019 Apm30h&Tmc11h&Ibbs200d&Ibbs200t(Ver.b) Installation Guide-(10)
39/39
HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang
Shenzhen 518129