Daily Drilling Report
APACHE CORPORATION
DATE
10-01-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 418.0 (ft) 520.0 (ft) 519.9 (ft) 6
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
4.62 (days)0.00 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
38,749TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
38,749
440,028
440,028
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM488.0 (ft) 1.26° 259.86° 13.375 in @ 520.0 ft20.000 in @ 102.0 ft
CURRENT OPERATIONS: CEMENTING 13 3/8 CASING
24 HR SUMMARY: FINISH RIGGING UP, PICK UP SURFACE BHA, SPUD IN, DRILL SURFACE FROM 102 - 520', TOH, RIG UP CASING CREW RUN 13 3/8 CASING,
RIG UP CEMENTERS
24 HR FORECAST: NIPPLE UP, TEST, PICK UP BHA, DRILL OUT CEMENT AND SHOE, START DRILLING INTERMEDIATE HOLE SECTION
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 6:00 6.00 R-MOB-DEMOB RU_RD PP NIPPLE UP FLOW LINE. DRESS OUT SHAKERS WITH 140 SHAKER SCREENS,RIG
UP PRE MIX TANK,RIG UP HYDROLIC CATWALK,FUNCTION TEST HOPPER,PRIME
MUD PUMPS AND HOOK UP PASON LINES,LOAD,STRAP AND CALIPER BHA
6:00 7:00 1.00 R-MOB-DEMOB RIGSER PP LUBRICATE TOP DRIVE AND RIG
7:00 12:00 5.00 S-DRL TRIPBHA PP STRAP AND CALIPER BHA, P/U BHA W/ QUICK SHOT TOOL
12:00 21:00 9.00 S-DRL DRLG PP ROTATE FROM 102 - 520, SPM 140, GPM 586, WOB 20,RPM 70, PUMP SWEEPS
EVERY 60' 10 BBL
12:00 12:00 0.00 S-DRL M_SPUD PP SPUD SURFACE
21:00 21:30 0.50 S-DRL CIRCT PP CIRCULATE, PUMPED 30 BBL SWEEP
21:00 21:00 0.00 S-DRL M_TDSrf PP TD SURFACE
21:30 23:00 1.50 S-DRL TRIP PP TOH FOR CASING
23:00 23:30 0.50 S-DRL TRIPBHA PP L/D DOWN BHA
23:30 0:00 0.50 S-CSG SFTY PP PJSM WITH ALL RIG HANDS AND THIRD PARTY
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00 - 01:00 RIG UP CASING CREW
01:00 - 03:00 RUN 13 JTS OF 13 3/8 CASING 48LB H-40 525 TOTAL, SET @ 520' KB
03:00 - 04:00 CIRCULATE WITH RIG PUMPS @ 53 SPM, RIG DOWN CASING CREW, HOLD PJSM WITH CREST CEMENTERS
04:00 - 06:00 RIG UP CEMENTERS, CEMENT 13 3/8 CASING, PUMP 30 BBL FRESH WATER SPACER, 129 BBLS 14.8 PPG CLASS C CEMENT,
DISPLACE 70 BBL FRESH WATER
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
1 / 1 0-0-NO-A-0-I-NO-TD102.00 / 10-01-201410x157043413Hughes17.500 HC605S
10/2/2014 6:59:52AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-01-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 418.0 (ft) 520.0 (ft) 519.9 (ft) 6
Page 2 of 3
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
1/1 /20.0 /70 586.05 774 98 9.00 418.0 46.4 9.00 418.0 46.4
MOTOR OUTPUT
RPV: TOTAL RPM: 70ROTARY CURRENT: 70
MUD PROPERTIES Freshwater GelLCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
30.00 2.00/2 3/4 8.80/0.30 0.10/0.20 2000
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 % H2O 99.009.20
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT1
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
501.10 (ft) (ft-lbf)85.0 (kip)80.0 (kip)85.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 XH6.000330.8212Drill Collar 6" DRILL COLLARS
4-1/2 XH8.0001.691Crossover Sub X/O 6 5/8 REG PIN TO 4 1/2 XH BOX
6-5/8" Reg8.000118.254Drill Collar 8" DRILL COLLARS
6-5/8" Reg8.00028.151Non-Mag Drill Collar NMDC
6-5/8" Reg8.0003.371Hang-Off Sub HANG OFF SUB
6-5/8" Reg8.00013.341Shock Sub SHOCK SUB
6-5/8" Reg8.0003.981Crossover Sub CROSS OVER
7-5/8" Reg17.5001.501PDC Bit HUGHES 17 1/2 HC605S
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.42-3.12-5.82-3.12487.91.26488.0 259.86
NORMAL 0.52-2.27-3.46-2.27380.01.44380.0 241.88
NORMAL 0.27-0.80-1.04-0.80224.00.65224.0 231.35
NORMAL 0.30-0.30-0.40-0.30138.00.42138.0 233.04
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 70.00 6.000 293.0 # 1
12.00 70.00 6.000 293.0 # 2
SPR
PPSRSPMAV(DP):
SPP: 774 (psi)
HP:
AV(DC):
0.139 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 205gal 12,077
UNITSITEM USAGE ON HAND
MATERIALS/CONSUMPTION
10/2/2014 6:59:52AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-01-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 418.0 (ft) 520.0 (ft) 519.9 (ft) 6
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/2/2014 6:59:52AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-02-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 520.0 (ft) 519.9 (ft) 7
Page 1 of 2
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
5.62 (days)0.00 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
44,225TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
44,225
484,253
484,253
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/2/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM488.0 (ft) 1.26° 259.86° 13.375 in @ 520.0 ft20.000 in @ 102.0 ft
CURRENT OPERATIONS: REPLACING BAG ON ANNULAR
24 HR SUMMARY: RUN 13 3/8 CASING,CEMENT, CUT OFF CUNDUCTOR & CASING, WELD ON WELL HEAD, NIPPLE UP, TEST BOP AND CHOKE TO 3000 PSI HIGH
AND 250 PSI LOW COMPLETED TEST-REPLACING BAG ON ANNULAR
24 HR FORECAST: REPLACE BAG ON ANNULAR, DRILL CEMENT, TEST CASING, DRILL INTERMEDIATE SECTION
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 1:00 1.00 S-CSG RU_RD PP RIG UP CASING CREW
1:00 3:00 2.00 S-CSG R_PCSG PP RUN 13 JTS OF 13 3/8 CASING 48LB H-40 525 TOTAL, SET @ 520' KB
3:00 4:00 1.00 S-CMT RURDCU PP CIRCULATE WITH RIG PUMPS @ 53 SPM, RIG DOWN CASING CREW, HOLD
PJSM WITH CREST CEMENTERS
4:00 5:30 1.50 S-CMT CMTPRI PP RIG UP CREST CEMENTERS, TEST LINES TO 2000, PUMP 30 BBL FW SPACER,
PUMP 545 SK CLASS C PREMIUM PLUS, 14.48 PPG, 1.33 YIELD,6.32 H20,
CIRCULATED 30BBLS OF CEMENT TO SURFACE 126 SKS, SHUT 2" VALVE ON
CEMENT SWEDGE WITH 200 PSI ON CASING; HAD FULL RETURNS THRUOUGHT
CEMENT JOB. JOB COMPLETE @ 05:30 10/2/2014
5:30 6:00 0.50 S-CMT RURDCU PP RIG DOWN CREST CEMENTERS
6:00 10:30 4.50 S-CMT WOC PP WAIT ON CEMENT, CLEAN PITS , CELLAR, PREPARE TO NIPPLE UP, AND TEST
BOP
10:30 14:00 3.50 S-NUP WLHEAD PP BLEED PSI OFF CASING, CUT CONDUCTOR & CASING & L/D, MAKE FINAL CUT
ON CASING, INSTALL WELLHEAD, TEST HEAD TO 1000 PSI, TEST GOOD
14:00 21:30 7.50 S-NUP WLHEAD PP INSTALL SPOOL DSA & START NIPPLE UP
21:30 22:30 1.00 S-NUP BOPS PP FUNCTION TEST BOPS RIG UP TESTER
22:30 0:00 1.50 S-NUP BOPS PP TEST CHOKE, 300 PSI HIGH, 250 LOW
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-00:30 TEST CHOKE, IBOP-3000 PSI HIGH, 250 PSI LOW
00:30-03:00 WAIT ON 13" TEST PLUG
03:00-04:30 TEST BOP--3000 PSI HIGH, 250 PSI LOW
04:30-6:00 REPLACING BAG ON ANNULAR, STARTED TO PULL TEST PLUG ANNULAR BAG DID NOT OPEN
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 547.4SURFACE
10/3/2014 6:22:43AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-02-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 520.0 (ft) 519.9 (ft) 7
Page 2 of 2
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
SPR
PPSRSPMAV(DP):
SPP:
HP:
AV(DC):
0.000 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 797gal 11,280
UNITSITEM USAGE ON HAND
DIESEL, MUD gal 657
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
10-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/3/2014 6:22:43AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-03-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 360.0 (ft) 880.0 (ft) 879.8 (ft) 8
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
6.62 (days)2.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
53,753TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
53,753
533,839
533,839
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/3/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM1,377.0 (ft) 0.28° 229.21° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @ 1673'
24 HR SUMMARY: REPLACED ANNULAR, DRILLED CEMENT, FLOAT COLLAR, TESTED CASING, DRILLING AHEAD IN INTERMEDIATE SECTION
24 HR FORECAST: DRILL AHEAD IN INTERMEDIATE SECTION
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 3:00 3.00 S-NUP RU_RD PP RIG UP GAS BUSTER LINES, RIG DOWN PICK UP LINE,INSTALL BAILS
ELEVATORS, INSTALL TURNBUCKLES ON BOP, WAIT ON 13" TEST PLUG
3:00 4:30 1.50 S-NUP BOPS PP INSTALL TEST PLUG, TEST PIPE RAMS,BLIND RAMS,HCR, INSIDE AND OUTSIDE
KILL LINE VALVE TO 3000 HIGH 250 LOW FOR 5 MIN, TEST ANNULAR 1500 HIGH
250 LOW FOR 5 MIN.
4:30 5:00 0.50 S-NUP RU_RD PP RIG DOWN TESTERS, WHILE PULLING TEST PLUG ANNULAS WOULD NOT OPEN.
5:00 7:30 2.50 S-NUP BOPS PN NIPPLE DOWN ROTATING HEAD ASSEMBELY AND REMOVEBO
7:30 9:30 2.00 S-NUP RIGSER PN SERVICE RIG WHILE WAITING ON HYDRILL RUBBERBO
9:30 14:30 5.00 S-NUP RIGSER PN REMOVE HYDRILL CAP,RUBBER, INSTALL NEW RUBBER, TIGHTEN HYDRILL
CAP, INTALL ROTATING HEAD ASSEMBELLY, FLOW LINE, MOUSE HOLE, AND
RETRIEVE TEST PLUG
BO
14:30 17:00 2.50 S-DRL TRIPBHA PP P/U BHA, MAKE UP BIT
17:00 18:30 1.50 S-DRL TRIPBHA PP TIH T/448 TAG CEMENT
18:30 19:30 1.00 S-DRL DOCMT PP DRILL CEMENT & FLOAT COLLAR F/448-T/492
19:30 20:00 0.50 S-CSG TEST PP TEST CASING TO 500 PSI FOR 30 MIN
20:00 20:30 0.50 S-DRL DOCMT PP DRILL CEMENT F/492-T/520
20:30 20:30 0.00 INT-DRL M_SINT1 PP START INTERMEDIATE 1
20:30 23:00 2.50 INT-DRL DRLG PP DRILL INTERMEDIATE F/520-T/782
23:00 23:30 0.50 INT-DRL RU_RD PP PULL TRIP NIPPLE--INSTALL ROTATING HEAD
23:30 0:00 0.50 INT-DRL DRLG PP DRILL INTERMEDIATE F/782-T/880
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-0600 DRILLING AHEAD F/880-T/1673
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 520.00 / 10-03-20147x1426921Hughes Christensen12.250 DP507X
10/4/2014 6:46:18AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-03-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 360.0 (ft) 880.0 (ft) 879.8 (ft) 8
Page 2 of 3
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/30.0 /60 586.05 1000 280 3.00 360.0 120.0 3.00 360.0 120.0
MOTOR OUTPUT
0.16rev/galRPV: TOTAL RPM: 154ROTARY CURRENT: 60
MUD PROPERTIES BrineLCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
31.00 1.00/2 1/2 0.65
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 % H2O 92.009.80
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT2 2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
596.42 (ft) (ft-lbf)97.0 (kip)95.0 (kip)102.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.0001.571Crossover Sub 4 1/2 XH TO 4 1/2 IF
4-1/2 XH6.000389.6113Drill Collar 6" DRILL COLLARS
4-1/2 XH8.0001.691Crossover Sub X/O 6 5/8 REG PIN TO 4 1/2 XH BOX
6-5/8" Reg8.000118.274Drill Collar 8" DRILL COLLARS
6-5/8" Reg8.00028.151Non-Mag Drill Collar NMDC
6-5/8" Reg8.0003.371Hang-Off Sub HANG OFF SUB
6-5/8" Reg8.00013.391Shock Sub SHOCK SUB
6-5/8" Reg6.8913-Point Reamer 12 1/8 STABILIZER
6-5/8" Reg8.00032.481Adjustable Housing 8" BICO 7/8 4.0 SET @ 1.15,RPG .16
6-5/8" Reg12.2501.001PDC Bit HUGHES 12 1/4 DP507X
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.05-5.40-18.50-5.401,376.80.281,377.0 229.21
NORMAL 0.41-4.68-17.92-4.681,184.80.281,185.0 208.55
NORMAL 0.20-4.14-16.23-4.14994.80.89995.0 264.62
NORMAL 0.11-3.98-12.69-3.98805.91.26806.0 269.55
NORMAL 0.02-3.63-8.72-3.63622.91.24623.0 260.28
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 70.00 6.000 293.0 # 1
12.00 70.00 6.000 293.0 # 2
SPR
PPSRSPMAV(DP):
SPP: 1000 (psi)
HP:
AV(DC):
0.812 (hp/in²)
10/4/2014 6:46:18AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-03-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 360.0 (ft) 880.0 (ft) 879.8 (ft) 8
Page 3 of 3
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 960gal 10,320
UNITSITEM USAGE ON HAND
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/4/2014 6:46:18AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-04-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,703.0 (ft) 2,583.0 (ft) 2,582.8 (ft) 9
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
7.62 (days)3.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
35,794TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
35,794
569,632
569,632
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/4/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM2,892.0 (ft) 0.38° 301.37° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @ 3152 WOB-30-35, SPM-140, GPM-586, SPP-1900, RPM-60, ROP-135
24 HR SUMMARY: DRILL FROM 880 TO 1820, TOH FOR MWD FAILURE, TIH WITH NEW MWD, DRILL FROM 1820' TO 2583' WOB-30-35, SPM-140, GPM-586,
RPM-60, ROP-60-170, SPP-1750
24 HR FORECAST: DRILLING AHEAD, DISPACE BRINE W/ WBM
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 7:00 7.00 INT-DRL DRLG PP DRILLING AHEAD FROM 880' TO 1820' WOB 25/30, RPM 65, SPM 140, GPM 586,
SPP 1750, ROP 134'/HR
7:00 8:30 1.50 INT-DRL RIGSER PN TROUBLE SHOOT MWD, CHANGED OUT ALL CABLES,BOX, AND CHECKED ALL
RIG SURFACE EQUIPMENT
MW
8:30 10:30 2.00 INT-DRL STRIP PN TOH FOR MWD FAILUREMW
10:30 11:00 0.50 INT-DRL STRIP PN CHANGED OUT MWD, TEST WAS GOODMW
11:00 13:30 2.50 INT-DRL STRIP PP TIH WITH NEW MWD
13:30 17:00 3.50 INT-DRL DRLG PP DRILL FROM 1820' TO 2173' WOB 30/35, RPM 65, SPM 140, GPM 586, SPP 1750,
ROP
17:00 17:30 0.50 INT-DRL RIGSER PP RIG SERVICE
17:30 0:00 6.50 INT-DRL DRLG PP DRILLING AHEAD F/2173' TO 2583' WOB-30/35, RPM 60, SPM 140, GPM 586, SPP
1750, ROP 60-170
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-06:00 DRILLING AHEAD 2583'-3152' WOB-30-35, RPM-60, SPM-140,GPM-586, SPP-1900, ROP-135
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 520.00 / 10-03-20147x1426921Hughes Christensen12.250 DP507X
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/35.0 /60 586.05 1750 291 17.00 1,703.0 100.2 20.00 2,063.0 103.1
MOTOR OUTPUT
0.16rev/galRPV: TOTAL RPM: 154ROTARY CURRENT: 60
10/5/2014 5:50:53AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-04-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,703.0 (ft) 2,583.0 (ft) 2,582.8 (ft) 9
Page 2 of 3
MUD PROPERTIES BrineLCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
32.00 4.00/6 6/9 3.93
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 % H2O 86.0010.20
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT2 2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
596.42 (ft) (ft-lbf)130.0 (kip)125.0 (kip)135.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.0001.571Crossover Sub 4 1/2 XH TO 4 1/2 IF
4-1/2 XH6.000389.6113Drill Collar 6" DRILL COLLARS
4-1/2 XH8.0001.691Crossover Sub X/O 6 5/8 REG PIN TO 4 1/2 XH BOX
6-5/8" Reg8.000118.274Drill Collar 8" DRILL COLLARS
6-5/8" Reg8.00028.151Non-Mag Drill Collar NMDC
6-5/8" Reg8.0003.371Hang-Off Sub HANG OFF SUB
6-5/8" Reg8.00013.391Shock Sub SHOCK SUB
6-5/8" Reg6.8913-Point Reamer 12 1/8 STABILIZER
6-5/8" Reg8.00032.481Adjustable Housing 8" BICO 7/8 4.0 SET @ 1.15,RPG .16
6-5/8" Reg12.2501.001PDC Bit HUGHES 12 1/4 DP507X
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.16-4.62-29.97-4.622,891.80.382,892.0 301.37
NORMAL 0.22-4.76-28.90-4.762,700.80.342,701.0 250.78
NORMAL 0.10-4.94-27.45-4.942,511.80.602,512.0 291.82
NORMAL 0.17-5.72-25.34-5.722,326.80.792,327.0 289.01
NORMAL 0.21-6.04-22.96-6.042,130.80.652,131.0 263.97
NORMAL 0.16-6.25-21.32-6.251,947.80.431,948.0 297.66
NORMAL 0.07-6.40-20.09-6.401,749.80.351,750.0 251.14
NORMAL 0.01-5.96-19.21-5.961,565.80.271,566.0 234.05
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 70.00 6.000 293.0 # 1
12.00 70.00 6.000 293.0 # 2
SPR
PPSRSPMAV(DP):
SPP: 1750 (psi)
HP:
AV(DC):
0.845 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
MATERIALS/CONSUMPTION
10/5/2014 5:50:53AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-04-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,703.0 (ft) 2,583.0 (ft) 2,582.8 (ft) 9
Page 3 of 3
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1679gal 8641
UNITSITEM USAGE ON HAND
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/5/2014 5:50:53AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-05-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 948.0 (ft) 3,531.0 (ft) 3,530.7 (ft) 10
Page 1 of 2
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
8.62 (days)4.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
36,444TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
36,444
606,076
606,076
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM3,456.0 (ft) 0.45° 358.74° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: WORKING ON MUD PUMPS
24 HR SUMMARY: DRILL FROM 2583 TO 3531, CLEAN PITS FOR DISPLACEMENT, WORK ON MUD PUMPS, TOH TO CASING SHOE, WORK ON MUD PUMPS
24 HR FORECAST: FINISH MUD PUMPS, TIH,DISPLACE BRINE W/ WBM, DRILL AHEAD
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 10:30 10.50 INT-DRL DRLG PP DRILLING AHEAD FROM 2583' TO 3531' WOB-30-35, RPM-60, SPM-140,GPM-586,
SPP-1900, ROP- 94.4
10:30 11:30 1.00 INT-DRL RIGSER PP WORK ON TRANFER PUMP
11:30 15:30 4.00 INT-DRL RIGSER PN WORK ON # 1 & # 2 PUMPS, COULD NOT KEEP CAP GASKETS IN PUMPS,
WASHED OUT MODULE ON # 1 PUMP.
MP
15:30 20:30 5.00 INT-DRL STRIP PN TOH TO CASING SHOE TO FIX PUMPSMP
20:30 0:00 3.50 INT-DRL RIGSER PN WORK ON #1 & #2 MUD PUMPS, INSTALL MODULE ON #1 & INSTALL CORRECT
CAP GASKETS ON #2
MP
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-05:00 WAITING ON NEW THREAD RING, PLUG AND CAP DUE TO NEW MODULE IS DIFFERENT STYLE
05:00-06:00 INSTALLING PARTS ON MODULE--PUMP #1
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 520.00 / 10-03-20147x1426921Hughes Christensen12.250 DP507X
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/35.0 /60 586.05 1900 257 10.50 948.0 90.3 30.50 3,011.0 98.7
MOTOR OUTPUT
0.16rev/galRPV: TOTAL RPM: 154ROTARY CURRENT: 60
MUD PROPERTIES Freshwater GelLCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
50.00 7.00/23 16/34 /34.0 9.50/0.30 0.20/0.50 12,000 280 0.40
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 % H2O 97.009.00
10/6/2014 6:53:02AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-05-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 948.0 (ft) 3,531.0 (ft) 3,530.7 (ft) 10
Page 2 of 2
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT2 2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
596.42 (ft) (ft-lbf)142.0 (kip)137.0 (kip)148.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.0001.571Crossover Sub 4 1/2 XH TO 4 1/2 IF
4-1/2 XH6.000389.6113Drill Collar 6" DRILL COLLARS
4-1/2 XH8.0001.691Crossover Sub X/O 6 5/8 REG PIN TO 4 1/2 XH BOX
6-5/8" Reg8.000118.274Drill Collar 8" DRILL COLLARS
6-5/8" Reg8.00028.151Non-Mag Drill Collar NMDC
6-5/8" Reg8.0003.371Hang-Off Sub HANG OFF SUB
6-5/8" Reg8.00013.391Shock Sub SHOCK SUB
6-5/8" Reg6.8913-Point Reamer 12 1/8 STABILIZER
6-5/8" Reg8.00032.481Adjustable Housing 8" BICO 7/8 4.0 SET @ 1.15,RPG .16
6-5/8" Reg12.2501.001PDC Bit HUGHES 12 1/4 DP507X
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.08-0.02-30.86-0.023,455.70.453,456.0 358.74
NORMAL 0.11-1.62-30.58-1.623,266.70.543,267.0 343.34
NORMAL 0.28-3.39-30.41-3.393,077.80.563,078.0 5.34
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 70.00 6.000 293.0 # 1
12.00 70.00 6.000 293.0 # 2
SPR
PPSRSPMAV(DP):
SPP: 1900 (psi)
HP:
AV(DC):
0.746 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
SDS 48.002 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 884gal 7757
UNITSITEM USAGE ON HAND
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/6/2014 6:53:02AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-06-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,418.0 (ft) 4,949.0 (ft) 4,948.7 (ft) 11
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
9.62 (days)5.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
57,822TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
57,822
663,898
663,898
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM5,165.0 (ft) 0.37° 238.33° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @ 5422' WOB-30, RPM-60, SPM-120, SPP-1560, ROP-57 , LOST RETURNS( 85 BBLS) @ 5140', REGAINED RETURNS
AND CONTINUED DRILLING
24 HR SUMMARY: WAIT ON PUMP PARTS, INSTALL PUMP PARTS PUMP #1, TIH, DISPLACE BRINE W/WBM, DRILL 3531'-4949', WOB-30-35, RPM-60, SPM-140-120,
SPP-1715, ROP-125
24 HR FORECAST: DRILLING AHEAD
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 5:00 5.00 INT-DRL RIGSER PN WAITING ON NEW THREAD RING, PLUG AND CAP FOR NEW MODULEMP
5:00 6:00 1.00 INT-DRL RIGSER PN INSTALL PARTS ON NEW MODULE, PUMP # 1MP
6:00 7:30 1.50 INT-DRL STRIP PN TIH FROM 520 TO 3531MP
7:30 9:30 2.00 INT-DRL CIRC PP CIRCULATE CHECK MUD PUMPS, DISPLACE HOLE WITH FRESH MUD
9:30 0:00 14.50 INT-DRL DRLG PP DRILL FROM 3531' TO 4949' WOB-30-35, RPM-60, SPM-120, SPP-1715 ROP-125
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-06:00 DRILLING AHEAD-4949'-5422' WOB-30-31, RPM-60 SPM-115, SPP-1510, ROP-85
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 520.00 / 10-03-20147x1426921Hughes Christensen12.250 DP507X
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/35.0 /60 502.33 1715 187 0.0 30.50 4,429.0 145.2
MOTOR OUTPUT
0.16rev/galRPV: TOTAL RPM: 140ROTARY CURRENT: 60
MUD PROPERTIES Freshwater GelLCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
54.00 9.00/16 17/24 9.70/0.90 0.30/0.40 12,000 3.16
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 % H2O 96.008.90
10/7/2014 5:53:29AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-06-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,418.0 (ft) 4,949.0 (ft) 4,948.7 (ft) 11
Page 2 of 3
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT2 2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
596.42 (ft) (ft-lbf)180.0 (kip)175.0 (kip)185.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.0001.571Crossover Sub 4 1/2 XH TO 4 1/2 IF
4-1/2 XH6.000389.6113Drill Collar 6" DRILL COLLARS
4-1/2 XH8.0001.691Crossover Sub X/O 6 5/8 REG PIN TO 4 1/2 XH BOX
6-5/8" Reg8.000118.274Drill Collar 8" DRILL COLLARS
6-5/8" Reg8.00028.151Non-Mag Drill Collar NMDC
6-5/8" Reg8.0003.371Hang-Off Sub HANG OFF SUB
6-5/8" Reg8.00013.391Shock Sub SHOCK SUB
6-5/8" Reg6.8913-Point Reamer 12 1/8 STABILIZER
6-5/8" Reg8.00032.481Adjustable Housing 8" BICO 7/8 4.0 SET @ 1.15,RPG .16
6-5/8" Reg12.2501.001PDC Bit HUGHES 12 1/4 DP507X
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.401.48-26.911.485,164.70.375,165.0 238.33
NORMAL 0.221.86-27.111.864,972.70.444,973.0 93.99
NORMAL 0.062.55-28.232.554,787.70.474,788.0 147.68
NORMAL 0.263.68-29.153.684,599.70.434,600.0 133.41
NORMAL 0.215.01-29.445.014,406.70.514,407.0 196.37
NORMAL 0.326.00-29.186.004,216.70.114,217.0 184.66
NORMAL 0.225.48-29.625.484,026.70.504,027.0 32.84
NORMAL 0.213.46-30.293.463,837.70.823,838.0 9.50
NORMAL 0.061.44-30.691.443,648.70.433,649.0 14.53
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 60.00 6.000 251.2 # 1
12.00 60.00 6.000 251.2 # 2
SPR
PPSRSPMAV(DP):
SPP: 1715 (psi)
HP:
AV(DC):
0.464 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
SDS 48.002 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1974gal 12,921
UNITSITEM USAGE ON HAND
MATERIALS/CONSUMPTION
10/7/2014 5:53:29AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-06-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,418.0 (ft) 4,949.0 (ft) 4,948.7 (ft) 11
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/7/2014 5:53:29AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-07-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,610.0 (ft) 6,559.0 (ft) 6,558.6 (ft) 12
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
10.62 (days)6.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
57,882TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
57,882
759,220
759,220
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM6,492.0 (ft) 1.10° 96.28° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: POOH
24 HR SUMMARY: DRILLING AHEAD F/4949'-6559', LOST FULL RETURNS @ 5140' PUMPED 80 BBLS W/40# PER BBL LCM PILL REGAINED FULL RETURNS
RESUMED DRILLING AHEAD W/SLIGHT LOSSES WOB-30-35, RPM-60, SPM-100-120, ROP-50-80
24 HR FORECAST: C/O BHA, TIH, DRILL AHEAD
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 17:00 17.00 INT-DRL DRLG PP DRILL F/4949'-6085' WOB-30-35,RPM-60, SPM-100-120, SPP-1500, ROP-50-80
17:00 17:30 0.50 INT-DRL RU_RD PP REPLACE TRIP NIPPLE W/ROTATING HEAD
17:30 21:00 3.50 INT-DRL DRLG PP DRILL F/6085-6369, WOB-30-35,RPM-60 SPM-120, SPP-1500, ROP-100
21:00 21:30 0.50 INT-DRL RU_RD PP C/O ROTATING HEAD
21:30 0:00 2.50 INT-DRL DRLG PP DRILL F/6369'-6559' WOB-30-35, RPM-60, SPM-120, SPP-1500, ROP-100
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-02:00 DRILL F/6559'-6671' WOB-30, RPM-60, SPM-120, SPP-1500, ROP-95, AT 6650' ROP BEGAN SLOWING DOWN AND BEGAN TORQUEING
UP, COULD NOT PUT MORE THAN 18000 WOB WITHOUT STALLING MOTOR
02:00-03:30 BUILD & SPOT 80 BBL LCM PILL, BUILD & PUMP SLUG
03:30-06:00 POOH
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 520.00 / 10-03-20147x1426921Hughes Christensen12.250 DP507X
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/35.0 /60 251.16 1500 47 23.00 1,610.0 70.0 53.50 6,039.0 112.9
MOTOR OUTPUT
0.16rev/galRPV: TOTAL RPM: 100ROTARY CURRENT: 60
MUD PROPERTIES Freshwater GelLCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
40.00 8.00/15 16/22 10.20/1.20 0.50/0.70 11,000 3.21
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 % H2O 96.008.90
10/8/2014 6:55:42AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-07-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,610.0 (ft) 6,559.0 (ft) 6,558.6 (ft) 12
Page 2 of 3
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT2 2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
596.42 (ft) (ft-lbf)208.0 (kip)200.0 (kip)215.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.0001.571Crossover Sub 4 1/2 XH TO 4 1/2 IF
4-1/2 XH6.000389.6113Drill Collar 6" DRILL COLLARS
4-1/2 XH8.0001.691Crossover Sub X/O 6 5/8 REG PIN TO 4 1/2 XH BOX
6-5/8" Reg8.000118.274Drill Collar 8" DRILL COLLARS
6-5/8" Reg8.00028.151Non-Mag Drill Collar NMDC
6-5/8" Reg8.0003.371Hang-Off Sub HANG OFF SUB
6-5/8" Reg8.00013.391Shock Sub SHOCK SUB
6-5/8" Reg6.8913-Point Reamer 12 1/8 STABILIZER
6-5/8" Reg8.00032.481Adjustable Housing 8" BICO 7/8 4.0 SET @ 1.15,RPG .16
6-5/8" Reg12.2501.001PDC Bit HUGHES 12 1/4 DP507X
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.01-4.72-21.53-4.726,491.61.106,492.0 96.28
NORMAL 0.28-4.30-25.18-4.306,301.61.126,302.0 96.80
NORMAL 0.08-3.95-27.98-3.956,112.60.596,113.0 97.75
NORMAL 0.30-3.47-29.80-3.475,923.70.565,924.0 112.24
NORMAL 0.18-2.71-30.58-2.715,733.70.255,734.0 190.45
NORMAL 0.24-1.79-29.88-1.795,543.70.495,544.0 230.52
NORMAL 0.31-0.06-28.35-0.065,354.70.925,355.0 216.97
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 60.00 6.000 251.2 # 1
SPR
PPSRSPMAV(DP):
SPP: 1500 (psi)
HP:
AV(DC):
0.058 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1368gal 11,553
UNITSITEM USAGE ON HAND
MATERIALS/CONSUMPTION
10/8/2014 6:55:42AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-07-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,610.0 (ft) 6,559.0 (ft) 6,558.6 (ft) 12
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/8/2014 6:55:42AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-08-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 471.0 (ft) 7,030.0 (ft) 7,029.5 (ft) 13
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
11.62 (days)7.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 DEWEY RISTER / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
42,348TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
42,348
804,068
804,068
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/8/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM7,156.0 (ft) 0.95° 97.25° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @ 7349'
24 HR SUMMARY: DRILL 6559'-6671', POOH, DRUG TEST, C/O BHA, TIH T/3531' DISPLACE 275 BBLS OF 9.4 PPG MUD W/8.9 PPG MUD, TIH T/6671', DRILL
6671'-7030' WOB-30-35, RPM-60, SPM-120, SPP-1775, ROP-72
24 HR FORECAST: DRILLING AHEAD TO 8064', POOH FOR INTERMEDIATE CASING OPS
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 2:00 2.00 INT-DRL DRLG PP DRILL F/6559'-6671' WOB-30, RPM-60, SPM-120, SPP-1500, ROP-95, AT 6650' ROP
BEGAN SLOWING DOWN AND BEGAN TORQUEING UP, COULD NOT PUT MORE
THAN 18000 WOB WITHOUT STALLING MOTOR
2:00 3:30 1.50 INT-DRL CIRCT PP BUILD & SPOT 80 BBL 40#/BBL LCM PILL, BUILD & PUMP SLUG
3:30 10:00 6.50 INT-DRL TRIP PP TOH
10:00 11:00 1.00 INT-DRL SFTY PP DRUG TEST
11:00 12:30 1.50 INT-DRL TRIPBHA PP C/O BIT, MOTOR
12:30 16:00 3.50 INT-DRL TRIP PP TIH T/3531'
16:00 17:00 1.00 INT-DRL DPLACE PP DISPACED 275 BBLS MUD WEIGHT 9.4 DOWN TO 8.9
17:00 19:30 2.50 INT-DRL TRIP PP TIH & WASH 90' TO BTM
19:30 0:00 4.50 INT-DRL DRLG PP DRILL F/6671'-7030' WOB-30-35, RPM-60, SPM-120, SPP-1775, ROP 72
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-0600 - DRILLF/7030-7349' WOB-30-35, RPM-60, SPM-120, SPP 1775, ROP-50-70
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
0-4-BT-S- -I-WT-TQ520.00 / 10-03-20147x1426921Hughes Christensen12.250 DP507X
- - - - - - 6,671.00 / 10-08-20147x147153388Hughes Christensen12.250 DP607X
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/35.0 /60 502.33 1775 189 9.00 471.0 52.3 9.00 471.0 52.3
MOTOR OUTPUT
0.16rev/galRPV: TOTAL RPM: 140ROTARY CURRENT: 60
10/9/2014 6:55:34AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-08-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 471.0 (ft) 7,030.0 (ft) 7,029.5 (ft) 13
Page 2 of 3
MUD PROPERTIES Freshwater GelLCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
38.00 7.00/15 10/16 10.10/1.20 0.60/0.50 15,000 2.46
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 % H2O 95.909.00
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT3 3
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
596.42 (ft) (ft-lbf)205.0 (kip)213.0 (kip)220.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
6-5/8" Reg12.2501.001PDC Bit 12 1/4-HUGHES DP607X
6-5/8" Reg8.00032.481Adjustable Housing 8" BICO 7/8 4.0 SET @ 1.15,RPG .16
6-5/8" Reg6.8913-Point Reamer 12 1/8 STABILIZER
6-5/8" Reg8.00013.391Shock Sub SHOCK SUB
6-5/8" Reg8.0003.371Hang-Off Sub HANG OFF SUB
6-5/8" Reg8.00028.151Non-Mag Drill Collar NMDC
6-5/8" Reg8.000118.274Drill Collar 8" DRILL COLLARS
4-1/2 XH8.0001.691Crossover Sub X/O 6 5/8 REG PIN TO 4 1/2 XH BOX
4-1/2 XH6.000389.6113Drill Collar 6" DRILL COLLARS
4-1/2 IF6.0001.571Crossover Sub 4 1/2 XH TO 4 1/2 IF
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.08-6.81-10.79-6.817,155.50.957,156.0 97.25
NORMAL 0.06-6.16-13.82-6.166,965.50.936,966.0 106.98
NORMAL 0.01-5.44-16.77-5.446,775.50.906,776.0 100.38
NORMAL 0.11-5.18-18.23-5.186,681.60.916,682.0 99.88
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 60.00 6.000 251.2 # 1
12.00 60.00 6.000 251.2 # 2
SPR
PPSRSPMAV(DP):
SPP: 1775 (psi)
HP:
AV(DC):
0.470 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1045gal 10,508
UNITSITEM USAGE ON HAND
MATERIALS/CONSUMPTION
10/9/2014 6:55:34AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-08-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 471.0 (ft) 7,030.0 (ft) 7,029.5 (ft) 13
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
1 INCIDENT 7:00 AM 10-8-14, GARLAND GLEGHORN HURT HIS BACK WHILE PULLING SLIPS ON TOH.
PIONEER TOOK HIM TO MIDLAND HOSP FOR CHECKUP, DIAGNOSED WITH MUSCLE STRAIN & RETURNED
TO LOCATION. WILL BE ON LIGHT DUTY THE REST OF THE HITCH TO MONDAY.
APACHE DRUG TEST & CONTRABAND SEARCH CONDUCTED FROM @ 9:00 AM TO 1:00 PM. HAD SAFETY &
PLANNING MEETING WITH DRILLING CONSULTANTS FROM 4 RIGS ,FIELD SUPTS,SAFETY REP, DRLG ENG
& C.D. KEMP @ 3:00 PM ON PATTERSON 310 LOCATION.
10/9/2014 6:55:34AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-09-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,034.0 (ft) 8,064.0 (ft) 8,063.4 (ft) 14
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
12.62 (days)8.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 DEWEY RISTER / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
103,778TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
103,778
907,846
907,846
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/8/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM7,995.0 (ft) 1.11° 90.75° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: L/D BHA
24 HR SUMMARY: DRILL F/7030'-8064', PUMP 2- 40 BBL 70+ VIS SWEEPS, SPOT 70 BBL 30# LCM PILL, SLUG, POOH
24 HR FORECAST: RUN INTERMEDIATE CASING, CEMENT
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 6:00 6.00 INT-DRL DRLG PP DRILLF/7030-7349' WOB-30-35, RPM-60, SPM-120, SPP 1775, ROP-50-70
6:00 17:00 11.00 INT-DRL DRLG PP ROTATE DRILL F/ 7349' -7990' WOB-30-35, RPM-60, SPM-130, SPP 1830, ROP-50-70
17:00 18:00 1.00 INT-DRL RIGSER PP SERVICE RIG
18:00 20:00 2.00 INT-DRL DRLG PP DRILL F/7349'-8064' WOB-30, RPM-60, SPM-130, SPP-1800, ROP-40-50
20:00 23:00 3.00 INT-DRL CIRCT PP CIRC 75-75 ST ,PUMP 2-40 BBL 70+VIS SWEEPS, BUILD AND SPOT 70 BBL 30#
LCM PILL BUILD AND PUMP SLUG
20:00 20:00 0.00 INT-DRL M_TDINT1 PP TD INTERMEDIATE @8064'
23:00 0:00 1.00 INT-DRL POOH PP POOH FOR CASING OPS
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-03:00 POOH
03:00-05:00 L/D DRILL COLLARS
05:00-06:00 L/D BHA
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
3 / 3 - - - - - - 6,671.00 / 10-08-20147x147153388Hughes Christensen12.250 DP607X
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
3/3 /30.0 /60 502.33 2000 189 19.00 1,034.0 54.4 23.50 1,393.0 59.3
MOTOR OUTPUT
0.16rev/galRPV: TOTAL RPM: 140ROTARY CURRENT: 60
10/10/2014 6:14:06AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-09-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,034.0 (ft) 8,064.0 (ft) 8,063.4 (ft) 14
Page 2 of 3
MUD PROPERTIES Freshwater GelLCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
39.00 8.00/15 12/16 10.30/1.20 0.60/1.00 12,000 3.61
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 % H2O 95.409.00
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT3 3
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
596.42 (ft) (ft-lbf)225.0 (kip)218.0 (kip)230.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF4.5006.0001.571Crossover Sub 4 1/2 XH TO 4 1/2 IF
4-1/2 XH4.5006.000389.6113Drill Collar 6" DRILL COLLARS
4-1/2 XH4.5008.0001.691Crossover Sub X/O 6 5/8 REG PIN TO 4 1/2 XH BOX
6-5/8" Reg6.6258.000118.274Drill Collar 8" DRILL COLLARS
6-5/8" Reg6.6258.00028.151Non-Mag Drill Collar NMDC
6-5/8" Reg6.6258.0003.371Hang-Off Sub HANG OFF SUB
6-5/8" Reg6.6258.00013.391Shock Sub SHOCK SUB
6-5/8" Reg6.6256.8913-Point Reamer 12 1/8 STABILIZER
6-5/8" Reg8.00032.481Adjustable Housing 8" BICO 7/8 4.0 SET @ 1.15,RPG .16
6-5/8" Reg12.2501.001PDC Bit 12 1/4-HUGHES DP607X
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.13-7.882.98-7.887,994.41.117,995.0 90.75
NORMAL 0.03-7.791.48-7.797,916.41.097,917.0 95.82
NORMAL 0.09-7.37-2.06-7.377,726.41.067,727.0 97.91
NORMAL 0.11-6.96-5.28-6.967,535.50.897,536.0 96.39
NORMAL 0.14-6.90-8.00-6.907,344.50.757,345.0 85.10
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 60.00 6.000 251.2 # 1
12.00 60.00 6.000 251.2 # 2
SPR
PPSRSPMAV(DP):
SPP: 2000 (psi)
HP:
AV(DC):
0.470 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1483gal 9025
UNITSITEM USAGE ON HAND
MATERIALS/CONSUMPTION
10/10/2014 6:14:06AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-09-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 1,034.0 (ft) 8,064.0 (ft) 8,063.4 (ft) 14
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/10/2014 6:14:06AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-10-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 8,064.0 (ft) 8,063.4 (ft) 15
Page 1 of 2
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
13.62 (days)9.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 DEWEY RISTER / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
413,716TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
413,716
1,321,562
1,321,562
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/8/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM7,995.0 (ft) 1.11° 90.75° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: PUMP ON CASING BETWEEN STGS WITH NO RETURNS,250 GPM
24 HR SUMMARY: TOH, L/D DRILL COLLARS, L/D BHA, SAFETY MEETING W/CASING CREW, RIG UP CASING, M/U FLOAT ASSEMBLY, RUN 9 5/8 CASING, PUMP
ON CASING WITH NO RETURNS @190 GPM,SAFETY MEETING, RIG UP CEMENTERS
24 HR FORECAST: FINISH CEMENTING, RIG DOWN CEMENTERS, NIPPLE DOWN & SET SLIPS, NIPPLE UP, TEST, DRILL OUT DV TOOL
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 3:00 3.00 INT-DRL TRIP PP POOH FOR CASING OPS
3:00 5:00 2.00 INT-DRL PU_LD PP L/D COLLARS
5:00 6:30 1.50 INT-DRL TRIPBHA PP L/D BHA
6:30 7:00 0.50 INT-CSG SFTY PP SAFETY MEETING W/CASING CREW
7:00 9:00 2.00 INT-CSG RU_RD PP RIG UP CASING CREW
9:00 9:30 0.50 INT-CSG RU_RD PP MAKE UP FLOAT EQUIPMENT
9:30 21:00 11.50 INT-CSG R_PCSG PP RUN 9 5/8 40# HCL-80 LTC ; SHOE SET AT 8064', FLOAT COLLAR AT 8021.82'; TOP
PACKER SET AT 4181';DV- TOOL SET AT 4178'; 193 JTS; TOTAL LENGTH 8070',
6'STICK UP
21:00 23:00 2.00 INT-CSG CIRC PP PUMP ON CASING @ 190 GPM W/ NO RETURNS
23:00 23:30 0.50 INT-CMT SFTY PP SAFETY MEETING W/CEMENTERS
23:30 0:00 0.50 INT-CMT RURDCU PP RIG DOWN CRT, RIG UP CEMENTERS
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-06:00 CEMENT 1ST STG WITH NO RETURNS,SET PACKER, DROP BOMB, OPEN DV TOOL,PUMP ON CASING WITH NO RETURNS
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
3 / 3 0-3-CT-S- -I-WT-TD6,671.00 / 10-08-20147x147153388Hughes Christensen12.250 DP607X
MOTOR OUTPUT
0.16rev/galRPV: TOTAL RPM:ROTARY CURRENT:
10/11/2014 8:09:10AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-10-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 8,064.0 (ft) 8,063.4 (ft) 15
Page 2 of 2
MUD PROPERTIES Freshwater GelLCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
39.00 8.00/15 12/16 10.30/1.20 0.60/1.00 12,000 3.61
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 % H2O 95.409.00
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT3
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
596.42 (ft) (ft-lbf) (kip) (kip) (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF4.5006.0001.571Crossover Sub 4 1/2 XH TO 4 1/2 IF
4-1/2 XH4.5006.000389.6113Drill Collar 6" DRILL COLLARS
4-1/2 XH4.5008.0001.691Crossover Sub X/O 6 5/8 REG PIN TO 4 1/2 XH BOX
6-5/8" Reg6.6258.000118.274Drill Collar 8" DRILL COLLARS
6-5/8" Reg6.6258.00028.151Non-Mag Drill Collar NMDC
6-5/8" Reg6.6258.0003.371Hang-Off Sub HANG OFF SUB
6-5/8" Reg6.6258.00013.391Shock Sub SHOCK SUB
6-5/8" Reg6.6256.8913-Point Reamer 12 1/8 STABILIZER
6-5/8" Reg8.00032.481Adjustable Housing 8" BICO 7/8 4.0 SET @ 1.15,RPG .16
6-5/8" Reg12.2501.001PDC Bit 12 1/4-HUGHES DP607X
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
SDS 48.002 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 619gal 8406
UNITSITEM USAGE ON HAND
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/11/2014 8:09:10AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-11-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 8,064.0 (ft) 8,063.4 (ft) 16
Page 1 of 2
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
14.62 (days)10.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 DEWEY RISTER / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
134,103TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
134,103
1,455,665
1,455,665
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM7,995.0 (ft) 1.11° 90.75° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: TIH TO DRILL OUT DV TOOL, FLOAT COLLAR, CEMENT
24 HR SUMMARY: RIG UP CEMENTERS, CEMENT 1ST STG WITH NO RETURNS, DROP BOMB, CIRC CASING CAP, CEMENT SECOND STAGE-NO RETURNS, RIG
DOWN CEMENTERS, ND BOP, CUT CASING NU BOP, RUN TEMPERATURE LOG, TEST BOP CHOKE MUD LINE
24 HR FORECAST: P/U CURVE ASSEMBLY, TIH, DRILL CURVE
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 3:30 3.50 INT-CMT CMTPRI PP RIG UP CREST CEMENTERS, TEST LINES TO 4230 PSI, PUMP 30 BBL FW
SPACER, PUMP 1ST STG: LEAD - 680 SK 50/50 POZ H + ADDITIVES, 291 BBL, 11.9
PPG, 2.39 YIELD. TAIL - 335 SKS CLASS H PLUS + ADDITIVES, 95 BBL, 13.2 PPG,
1.59 YIELD, DISPLCED WITH 340 BBL FW & 269 BBL MUD AT 7 BPM, FCP AT 4
BPM WAS 1300; PSI. BUMP PLUG AT 0331 AM 10/11/2014 W/ 1940 PSI, FLOATS
HELD. HAD NO RETURNS
3:30 6:30 3.00 INT-CMT CMTPRI PP PRESSURE UP & INFLATE PACKER AT 2800 PSI,PRESSURE DROPS IND PACKER
HAD INFLATED, DROP BOMB, OPEN DV TOOL,PUMP THRU DV TOOL WITH NO
RETURNS AT 6 BPM,300 PSI DECREASING TO 280 PSI
6:30 9:30 3.00 INT-CMT CMTPRI PP CREST, PUMP 30 BBL FW SPACER, PUMP 2ND STG: LEAD - 805 SK 50/50 POZ H +
ADDITIVES 347 BBL, 11.9 PPG, 2.42 YIELD. TAIL - 210 SKS CLASS C + ADDITIVES,
50 BBL, 14.8 PPG, 1.33 YIELD, DISPLCED WITH 317 BBL FW AT 5 BPM,CAUGHT
CEMENT AT 246 BBL, FCP AT 299 BBL IN AT 4 BPM WAS 400 PSI. BUMP PLUG AT
0915 AM 10/112014 W/ 2010 PSI; FLOATS HELD. NO RETURNS THRU OUT JOB.
9:30 10:00 0.50 INT-CMT RURDCU PP RIG DOWN CREST & CLEAR RIG FLOOR
10:00 11:00 1.00 INT-NUP BOPS PP ND FLO-LINES,HYD LINES ETC
11:00 13:00 2.00 INT-NUP BOPS PP PJSM WINCH & WRENCH,ND BOP, LIFT STACK, SET SLIPS/ 200K
13:00 16:00 3.00 INT-NUP BOPS PP CUT CASING & LD,REMOVE SPACER SPOOL,NU B SEC & TEST TO 1500 PSI,
FINISH NU DSA, FLO-LINE, HYD LINE.
16:00 19:00 3.00 INT-NUP BOPS PP SET BOP AND TORQUE, R/U TURN BUCKLES, KILL LINEN, RIG UP
WIRELINE,PJSM & RU, RUN TEMPERATURE LOG WITH LONE STAR
WIRELINE,EST TOP CEMENT 1650', ENG D. PETRAITIS CONTACTED RRC; RRC
WAS SATISFYED WITH CEMENT TOP.
19:00 0:00 5.00 INT-NUP BOPS PP TEST MUD LINES, CHOKE, BOP 1500 HIGH, 250 LOW, KILL LINE 5000 HIGH 250
LOW, MUD LINES 4500 HIGH 250 LOW
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-03:00 TEST MUD LINES, BOP
03:00-04:00 R/U BALES AND ELEVATORS
04:00-06:00 TIH TO DRILLOUT DV TOOL, CEMENT, FLOAT COLLAR
10/12/2014 10:06:18AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-11-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 8,064.0 (ft) 8,063.4 (ft) 16
Page 2 of 2
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
00 H-409.625 40.00 8,064.0INTERMEDIATE 1
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 556gal 7850
UNITSITEM USAGE ON HAND
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/12/2014 10:06:18AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-12-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 8,064.0 (ft) 8,062.2 (ft) 17
Page 1 of 2
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
15.62 (days)11.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
85,490TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
85,490
1,549,339
1,549,339
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM8,162.0 (ft) 5.91° 172.25° 9.625 in @ 8,090.0 ft13.365 in @ 520.0 ft
CURRENT OPERATIONS: DRILL CURVE @ 8247' WOB-17, SPM-120 SPP-2300, ROP-50--- 9' ABOVE, 4' RIGHT, DL-13.8, DLN-10.08
24 HR SUMMARY: TEST MUDLINES,FLOOR VALVES,RD TESTER,TIH ,DRILL FLT EQUIP,TEST CASING/1500,DRILL SHOE TRACK,STRAP OUT TO PU CURVE BHA,
P/U BHA #4, TIH, DISPACE WBM W/ OBM
24 HR FORECAST: DRILL CURVE AND LAND
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 3:00 3.00 INT-NUP BOPS PP TEST FLOOR VALVES,TIW,ETC,MUDLINES,HOSES, TO 250 LOW & 5000 HIGH, RIG
DOWN WINCH& WRENCH TESTER
3:00 4:00 1.00 INT-NUP RU_RD PP C/O BAILS,ELEVATORS,PREPARE FOR TRIP
4:00 5:30 1.50 INT-DRL TRIP PP MU BIT ,SUB & TIH TO 4150', BREAK CIRC ,TAG CEMENT 4160'
5:30 7:00 1.50 INT-DRL DOCMT PP DRILL CEMENT & DV TOOL
7:00 9:30 2.50 INT-DRL TRIP PP TIH & PU DRILL PIPE TO 8006'
9:30 10:30 1.00 INT-DRL DOCMT PP TAG CEMENT AT 8006', DRILL CEMENT & FLT COLLAR,15' CEMENT TO 8037'
10:30 11:30 1.00 INT-DRL DOCMT PP SHUT ANNULAR, TEST CASING TO 1500 PSI, STD PIPE GAUGE 1500,PASON 1440
PSI 30 MINS, NO DECLINE, BLEED PRESSURE THRU CHOKE
11:30 12:00 0.50 INT-DRL DOCMT PP DRILL CEMENT & SHOE AT 8064',4' FORMATION
12:00 12:30 0.50 INT-DRL CIRCT PP CIRC & PREPARE TO TOH
12:30 16:00 3.50 INT-DRL TRIP PP TRIP OUT TO PU DIRECTIONAL CURVE BHA
16:00 18:30 2.50 P-DRL TRIPBHA PP PICK UP CURVE BHA,SCRIBE HI-SIDE,SURFACE TEST MWD.
18:30 20:00 1.50 P-DRL TRIP PP TIH T/7003
20:00 21:00 1.00 P-DRL RU_RD PP C/O TRIP NIPPLE FOR ROTATING HEAD AND RUBBER
21:00 21:30 0.50 P-DRL TRIP PP TIH T/8070
21:30 0:00 2.50 P-DRL CIRC PP DISPLACE WBM W/10.8# OBM
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-00:30 C/O SHAKER SCREENS
00:30-02:00 DRILL 8064'-8125' WOB-20, RPM-60, SPM-120, SPP-2400, ROP-30-60
02:00-0600 DRILL/SLIDE CURVE WOB-17, SPM-120 SPP-2300, ROP-50--- 9' ABOVE, 4' RIGHT, DL-13.8, DLN-10.08
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 8,064.00 / 10-10-20145x2012462156Security Dbs8.500 MMD55DM
10/13/2014 5:48:09AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-12-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 8,064.0 (ft) 8,062.2 (ft) 17
Page 2 of 2
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM:ROTARY CURRENT:
MUD PROPERTIES LCM: MUD TYPE: Company:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
PP DAILY COST 0 %OILCUM COST 0 % H2O
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT4 4
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
97.12 (ft) (ft-lbf) (kip) (kip) (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 XH3.2506.1902.751Crossover Sub X/O 4.5XH-4.5IF
4-1/2 XH3.2006.13031.091Non-Mag Flex Drill Collar NMDC
4-1/2 XH3.3106.2506.191Pulser Sub PULSAR SUB
4-1/2 XH3.2506.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.50025.531Fixed Bend Housing SDI FXD 1.95; 7/8 5.0
4 1/2" REG8.5001.001PDC Bit MMD55DM
SURVEYCompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 11.86-149.0538.92-149.058,160.05.918,162.0 172.25
NORMAL 0.03-146.8338.55-146.838,128.12.148,130.0 165.29
Tie On 0.000.000.000.000.00.000.0 0.00
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
00 H-409.625 40.00 8,064.0INTERMEDIATE 1
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
SDS 48.002 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1433gal 11,166
UNITSITEM USAGE ON HAND
DIESEL, MUD gal 3157
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.DID SAFETY WALK AROUND ,SOME TRIP HAZARDS FOUND.
10/13/2014 5:48:09AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-13-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 650.0 (ft) 8,714.0 (ft) 8,588.2 (ft) 18
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
16.62 (days)12.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
66,749TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
66,749
1,616,088
1,616,088
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM8,824.0 (ft) 76.10° 181.21° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: CURVE@ 8881 6' ABOVE, 5' RIGHT, DL 14.6, PTB-81.73
24 HR SUMMARY: C/O SHAKER SCREENS, ROTATE/SLIDE-8064'-8125', START CURVE, TOH T/SHOE, WORK ON SCR HOUSE, ROTATE/SLIDE 8441'-8714' WOB
20/25, RPM 60, SPM 120, GPM 502, SPP 2480, DIFF 250-300
24 HR FORECAST: POOH TO PICK UP LATERAL ASSEMBLY
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 0:30 0.50 INT-DRL RU_RD PP C/O SHAKER SCREENS
0:30 0:30 0.00 P-DRL M_SPROD PP START PROD 1
0:30 2:00 1.50 P-DRL DRLG PP ROTATE FROM 8064' TO 8125' WOB-20, RPM-60, SPM-120, SPP-2400, ROP-30-60
2:00 2:00 0.00 P-DRL M_SHzC PP START CURVE @ 8125'
2:00 11:30 9.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 8125' TO 8441' WOB 20/25, RPM 60, SPM 120, GPM 502, SPP
2480, DIFF 200
11:30 13:00 1.50 P-DRL RIGSER PN GENERATORS KICKING OFF LINEGEN
13:00 13:30 0.50 P-DRL STRIP PN PULL TO SHOEGEN
13:30 14:30 1.00 P-DRL RIGSER PN WORK ON GENERATORS AND SCRGEN
14:30 15:00 0.50 P-DRL STRIP PN TIHGEN
15:00 19:00 4.00 P-DRL DRLG PP ROTATE/SLIDE FROM 8441' TO 8572' WOB 20/25, RPM 60, SPM 120, GPM 502,
SPP 2480, DIFF 200
19:00 20:00 1.00 P-DRL RIGSER PP REPLACE O-RING ON MUD LINE
20:00 0:00 4.00 P-DRL DRLG PP ROTATE/ SLIDE FROM 8441' TO 8714' WOB 20/25, RPM 60, SPM 120, GPM 502, SPP
2480, DIFF 200
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-06:00 ROTATE/SLIDE 8714'-8881' WOB 20/25, RPM 60, SPM 120, GPM 502, SPP 2450, DIFF 250-300 6' ABOVE, 5' RIGHT, DL-14.6, PTB-81.73
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 8,064.00 / 10-12-20145x2012462156Security Dbs8.500 MMD55DM
10/14/2014 5:58:27AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-13-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 650.0 (ft) 8,714.0 (ft) 8,588.2 (ft) 18
Page 2 of 3
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/25.0 /60 502.33 2450 108 19.00 650.0 34.2 19.00 650.0 34.2
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 201ROTARY CURRENT: 60
MUD PROPERTIES Oil (Regular)LCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
78.00 18.00/14 13/26 3.70
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 63.50 % H2O 21.5010.90
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT5 5
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
97.12 (ft) (ft-lbf)200.0 (kip)190.0 (kip)210.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 XH3.2506.1902.751Crossover Sub X/O 4.5XH-4.5IF
4-1/2 XH3.2006.13031.091Non-Mag Flex Drill Collar NMDC
4-1/2 XH3.3106.2506.191Pulser Sub PULSAR SUB
4-1/2 XH3.2506.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.50025.531Fixed Bend Housing SDI FXD 1.95; 7/8 5.0
4 1/2" REG8.5001.001PDC Bit MMD55DM
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 14.56-427.990.29-427.998,629.776.108,824.0 181.21
NORMAL 17.67-397.280.96-397.288,620.871.448,792.0 181.29
NORMAL 14.26-368.411.44-368.418,609.566.008,761.0 180.59
NORMAL 9.84-339.671.22-339.678,595.561.858,729.0 178.48
NORMAL 8.82-312.720.78-312.728,580.258.998,698.0 179.70
NORMAL 4.18-285.710.62-285.718,563.056.178,666.0 179.62
NORMAL 2.23-259.260.73-259.268,545.055.318,634.0 180.86
NORMAL 8.79-233.881.11-233.888,527.254.628,603.0 180.86
NORMAL 10.76-208.251.68-208.258,508.151.888,571.0 181.66
NORMAL 10.76-184.442.31-184.448,488.248.558,540.0 181.41
NORMAL 13.39-161.112.74-161.118,466.345.158,508.0 180.67
NORMAL 11.19-139.943.07-139.948,443.741.018,477.0 181.10
NORMAL 10.21-119.703.67-119.708,418.937.528,445.0 182.36
NORMAL 10.20-100.954.61-100.958,393.034.318,413.0 183.41
NORMAL 10.52-84.225.59-84.228,366.931.158,382.0 183.29
NORMAL 9.90-68.986.45-68.988,340.027.898,351.0 183.16
NORMAL 9.18-55.217.03-55.218,312.224.908,320.0 181.60
NORMAL 10.82-42.457.13-42.458,282.922.138,288.0 179.15
NORMAL 13.27-31.286.78-31.288,252.918.748,256.0 177.13
NORMAL 13.69-22.406.25-22.408,223.214.648,225.0 175.91
NORMAL 14.14-15.525.64-15.528,192.010.298,193.0 173.51
10/14/2014 5:58:27AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-13-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 650.0 (ft) 8,714.0 (ft) 8,588.2 (ft) 18
Page 3 of 3
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
00 H-409.625 40.00 8,064.0INTERMEDIATE 1
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 60.00 6.000 251.2 # 1
12.00 60.00 6.000 251.2 # 2
SPR
PPSRSPMAV(DP):
SPP: 2450 (psi)
HP:
AV(DC):
0.556 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
SDS 48.002 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1999gal 9167
UNITSITEM USAGE ON HAND
DIESEL, MUD 1231gal 1926
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/14/2014 5:58:27AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-14-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 221.0 (ft) 8,935.0 (ft) 8,641.9 (ft) 19
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
17.62 (days)13.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / CURTIS MINZENMAYER10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
75,578TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
75,578
1,701,915
1,701,915
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM9,068.0 (ft) 94.03° 182.56° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @ 9130' WOB-20-25, RPM-65-75, SPM-150, SPP-2500
24 HR SUMMARY: SLIDE/ROTATE 8714'-8935' LANDED CURVE, CIRCULATE, POOH, C/O LINERS-6"-5",TIH T/1500', CUT & SLIP, TIH
24 HR FORECAST: DRILLING AHEAD IN LATERAL
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 8:00 8.00 P-DRL DRLG PP ROTATE/SLIDE 8714'-8935' WOB 20/25, RPM 60, SPM 120, GPM 502, SPP 2450,
DIFF 250-300, ROP 27.62
8:00 9:30 1.50 P-DRL CIRCT PP CIRCULATE BOTTOMS UP, SHAKERS CLEAN
8:00 8:00 0.00 P-DRL M_FHzC PP LANDED CURVE
9:30 16:30 7.00 P-DRL TRIP PP TOH FOR LATERAL ASSEMBELY
16:30 18:30 2.00 P-DRL TRIPBHA PP LAY DOWN BIT AND MOTOR, PICK UP NEW BIT,MOTOR,AND STABALIZE
18:30 19:30 1.00 P-DRL RIGSER PP FINISH INSTALLING 5" LINERS #2 PUMP
19:30 20:30 1.00 P-DRL TRIP PP TIH W/ LATERAL ASSEMBLY 15 STANDS
20:30 22:30 2.00 P-DRL RIGSER PP CUT & SLIP
22:30 0:00 1.50 P-DRL TRIP PP TIH
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 00:00-01:00 TIH T/8512'
01:00-02:00 WASH & REAM F/8512'-8935'
02:00-06:00 DRILL AHEAD 8935'-9130' WOB-20-25, RPM-65-75, SPM-150, SPP-2500
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
2-2-CT-A-X-I-FC-BHA8,064.00 / 10-12-20145x2012462156Security Dbs8.500 MMD55DM
6 / 1 - - - - - - 8,935.00 / 10-14-20146x1825429Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/25.0 /60 502.33 2490 108 8.00 221.0 27.6 27.00 871.0 32.3
6/1 /25.0 /60 502.33 2450 115 8.00 221.0 27.6 8.00 221.0 27.6
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 201ROTARY CURRENT: 60
10/15/2014 5:49:35AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-14-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 221.0 (ft) 8,935.0 (ft) 8,641.9 (ft) 19
Page 2 of 3
MUD PROPERTIES Oil (Regular)LCM: MUD TYPE: HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
81.00 20.00/12 13/27 4.00
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 63.00 % H2O 21.5011.00
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT6 6
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
1,548.50 (ft) (ft-lbf)238.0 (kip)220.0 (kip)240.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.0001,418.5645Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2506.191Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81026.121Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 1.58-670.59-6.97-670.598,634.694.039,068.0 182.56
NORMAL 0.84-576.83-3.49-576.838,640.292.828,974.0 181.69
NORMAL 11.22-545.88-2.60-545.888,641.692.588,943.0 181.59
NORMAL 18.88-513.90-1.72-513.908,642.188.998,911.0 181.58
NORMAL 15.49-489.95-1.04-489.958,640.784.468,887.0 181.66
NORMAL 11.26-459.26-0.32-459.268,636.479.708,856.0 181.03
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
00 H-409.625 40.00 8,064.0INTERMEDIATE 1
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 60.00 6.000 251.2 # 1
12.00 60.00 6.000 251.2 # 2
SPR
PPSRSPMAV(DP):
SPP: 2450 (psi)
HP:
AV(DC):
0.594 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
MATERIALS/CONSUMPTION
10/15/2014 5:49:35AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-14-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 221.0 (ft) 8,935.0 (ft) 8,641.9 (ft) 19
Page 3 of 3
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1043gal 8124
UNITSITEM USAGE ON HAND
DIESEL, MUD gal 9757
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/15/2014 5:49:35AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-15-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 253.0 (ft) 9,188.0 (ft) 8,626.1 (ft) 20
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
18.62 (days)14.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
73,589TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
73,589
1,772,705
1,772,705
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/15/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM9,068.0 (ft) 94.03° 182.56° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: TIME DRILL, @8901'
24 HR SUMMARY: TIH T/8512',WASH AND REAM F/8512 - T8539,DRILL F/8539 - T/9188, CIRCULATE AND CONDITION MUD ,POOH LAY DOWN DIRECTIONAL TOOLS
F/9188 - T/BIT,MAKE UP NEW BHA & TIH
24 HR FORECAST: TRIP IN HOLE T/8900, BUILD TROUGH,AND TIME DRILL 1' AND HOUR,
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 1:00 1.00 P-DRL TRIP PP TIH T/8512'
1:00 2:00 1.00 P-DRL RMWASH PP WASH & REAM F/8512'-8935'
2:00 2:00 0.00 P-DRL M_SHzL PP START LATERAL @ 8935
2:00 8:30 6.50 P-DRL DRLG PP ROTATE/SLIDE 8935'-9188' WOB 20/25, RPM 60, SPM 85 -85, GPM 502, SPP 2250,
DIFF 250-300, ROP 38.92
8:30 11:00 2.50 P-DRL CIRCT PP CIRCULATE AND CONDITION MUD PRIOR TO TRIP
11:00 16:00 5.00 P-DRL POOH PP TOOH F/9188 - T/BIT LAYDOWN SHOCK SUB AND PULL ROTATING HEAD.
16:00 20:30 4.50 P-DRL TRIPBHA PP LAY DOWN DIRECTIONAL TOOLS MUD MOTOR & BIT.PICK UP NEW PULSER
SUB,MUD MOTOR,AND TEST MWD(OK)MAKE UP BIT ,NMDC aND CROSS OVER
SUB.
20:30 21:00 0.50 P-DRL TRIP PP 'TRIP IN HOLE F/129 - T/1546'.
21:00 21:30 0.50 P-DRL TRIP PP PICK UP SAFETY SUB AND AGITATOR
21:30 22:00 0.50 P-DRL TRIP PP PUT NEW ROTATING HEAD ON
22:00 0:00 2.00 P-DRL TRIP PP TIH. F/1546 - T/4563
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0130 TIH F/4563 - T/8900
0130 - 0500 CUT TROUGH
0500 - 0600 TIME DRILL F/8900 - 8901( TIME DRILL 1' HOUR)
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
6 / 1 0-0-NO- -0-I-NO-DTF8,935.00 / 10-14-20146x1825429Ulterra Drilling Technologies8.500 U616M
10/16/2014 5:40:28AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-15-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 253.0 (ft) 9,188.0 (ft) 8,626.1 (ft) 20
Page 2 of 3
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
6/1 /25.0 /65 494.19 2250 111 6.50 253.0 38.9 14.50 474.0 32.7
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 138ROTARY CURRENT: 0
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: HoRIZONCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
76.00 21.00/11 13/26 /5.6 3.90
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 75.00 % H2O 25.0011.00
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT6
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
1,548.50 (ft) (ft-lbf)210.0 (kip)185.0 (kip)220.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.0001,418.5645Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2506.191Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81026.121Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
00 H-409.625 40.00 8,064.0INTERMEDIATE 1
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
SPR
PPSRSPMAV(DP):
SPP: 2250 (psi)
HP:
AV(DC):
0.565 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
SDS 48.002 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 2270gal 5854
UNITSITEM USAGE ON HAND
DIESEL, MUD 91gal 9666
MATERIALS/CONSUMPTION
10/16/2014 5:40:28AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-15-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 253.0 (ft) 9,188.0 (ft) 8,626.1 (ft) 20
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/16/2014 5:40:28AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-16-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 9,188.0 (ft) 8,669.8 (ft) 21
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
19.62 (days)15.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
68,493TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
68,493
1,861,515
1,861,515
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/16/2012 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM8,887.0 (ft) 84.46° 181.66° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: TIME DRILLING @8925'
24 HR SUMMARY: TIH F/4563 - T/8900, WORKING PIPE @180 TF TO CUT TROUGH FOR OPEN HOLE SIDE TRACK,TIME DRILL AT 1'/ HR FROM 8900' TO 8918, RIG
SERVICE,TIME DRILL AT 1'/ HR FROM 8918' TO 8920',WORKING PIPE @180 TF TO CUT TROUGH FOR OPEN HOLE SIDE TRACK & TIME DRILL.
24 HR FORECAST: TIME DRILL 1'HR.
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 1:30 1.50 P-DRL TRIP PP TIH F/4563 - T/8900
1:30 5:00 3.50 P-DRL RMWASH PP WORKING PIPE @180 TF TO CUT TROUGH FOR OPEN HOLE SIDE TRACK
5:00 17:30 12.50 P-DRL DSLIDE PP TIME DRILL AT 1'/ HR FROM 8900' TO 8918' SPM 120, GPM 367, TOOL FACE @ 180
5:00 5:00 0.00 P-DRL M_KOST PP START SIDE TRACK #1
17:30 18:00 0.50 P-DRL RIGSER PP RIG SERVICE
18:00 21:00 3.00 P-DRL DSLIDE PP TIME DRILL AT 1'/ HR FROM 8918' TO 8920' SPM 120, GPM 367, TOOL FACE @ 180
21:30 23:30 2.00 P-DRL RMWASH PP WORKING PIPE @180 TF TO CUT TROUGH FOR OPEN HOLE SIDE TRACK
23:30 0:00 0.50 P-DRL PP TIME DRILL AT 1'/ HR FROM 8920' SPM 120, GPM 367, TOOL FACE @ 180
= Total Hours Today 23.50
06:00 UPDATE
0000-0600 0000 -0600 TIME DRILL AT 1'/ HR FROM 8920' TO 8925' SPM 120, GPM 367, TOOL FACE @ 180
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 8,900.00 / 10-16-20146x1825429Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/0.0 /0 348.84 1400 0 0.00 20.0 0.0 0.00 20.0 0.0
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 98ROTARY CURRENT: 0
10/17/2014 5:21:37AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-16-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 9,188.0 (ft) 8,669.8 (ft) 21
Page 2 of 3
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: 0.0HorizanCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
76.00 20.00/13 12/19 /5.2 0 4.80
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 76.00 % H2O 24.0011.00
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT7 7 RR2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
26.31 (ft) (ft-lbf) (kip)180.0 (kip)220.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.000-103.6345Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2506.191Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81026.121Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
00 H-409.625 40.00 8,064.0INTERMEDIATE 1
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 120.00 5.000 348.8 # 2
SPR
PPSRSPMAV(DP):
SPP: 1400 (psi)
HP:
AV(DC):
0.000 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 619gal 12,357
UNITSITEM USAGE ON HAND
DIESEL, MUD 648gal 9018
MATERIALS/CONSUMPTION
10/17/2014 5:21:37AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-16-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 (ft) 9,188.0 (ft) 8,669.8 (ft) 21
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/17/2014 5:21:37AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-17-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 120.0 (ft) 9,308.0 (ft) 8,663.6 (ft) 22
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
20.62 (days)16.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
61,290TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
61,290
1,922,805
1,922,805
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/17/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM9,257.0 (ft) 93.06° 181.43° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @9723'. LAST SURVEY@ 9637' INC 92.52 AZI 181.51 TVD 8655 DLS 1.88
24 HR SUMMARY: TIME DRILL AT 1'/ HR FROM 8920' TO 8925', RIG SERVICE & ROTATE/ SLIDE FROM 8925' TO 9308'.
24 HR FORECAST: DRILL 8.5 LATERAL HOLE.
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 15:00 15.00 P-DRL DRLG PP TIME DRILL AT 1'/ HR FROM 8920' TO 8925' SPM 120, GPM 367, TOOL FACE @
180, 100% DISPLACEMENT @ 8911
15:00 15:30 0.50 P-DRL RIGSER PP RIG SERVICE
15:30 0:00 8.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 8925' TO 9308' WOB 15/25, RPM 60, SPM 120, GPM 578, SPP
3050, DIFF 450
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0600 ROTATE/ SLIDE FROM 9308' TO 9723' WOB 15/25, RPM 65, SPM 120, GPM 578, SPP 3050, DIFF 450
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 8,900.00 / 10-16-20146x1825429Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/25.0 /65 494.19 3050 110 23.50 383.0 16.3 23.50 403.0 17.1
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 201ROTARY CURRENT: 63
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: HoRIZONCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
68.00 17.00/15 12/24 /5.2 5.30
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 78.00 % H2O 22.0010.90
10/18/2014 5:53:54AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-17-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 120.0 (ft) 9,308.0 (ft) 8,663.6 (ft) 22
Page 2 of 3
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT7 7 RR2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
26.31 (ft) (ft-lbf)205.0 (kip)180.0 (kip)225.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.000-103.6345Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2506.191Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81026.121Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 4.25-855.98-26.59-855.988,666.393.069,257.0 181.43
NORMAL 4.91-762.21-21.32-762.218,669.891.289,163.0 185.01
NORMAL 2.08-730.39-18.09-730.398,670.691.319,131.0 186.58
NORMAL 9.10-699.59-14.62-699.598,671.190.749,100.0 186.28
NORMAL 12.89-667.77-11.22-667.778,670.787.859,068.0 185.91
NORMAL 10.46-637.01-8.20-637.018,668.583.909,037.0 185.31
NORMAL 13.39-605.42-5.47-605.428,664.280.649,005.0 184.54
NORMAL 3.85-575.05-3.75-575.058,658.377.358,974.0 181.96
NORMAL 8.52-543.92-2.73-543.928,650.976.138,942.0 181.78
NORMAL 23.72-513.67-1.77-513.678,644.278.778,911.0 181.86
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
00 H-409.625 40.00 8,064.0INTERMEDIATE 1
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 85.00 5.000 247.1 # 1
12.00 85.00 5.000 247.1 # 2
SPR
PPSRSPMAV(DP):
SPP: 3050 (psi)
HP:
AV(DC):
0.560 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
SDS 48.002 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1992gal 10,365
UNITSITEM USAGE ON HAND
DIESEL, MUD 290gal 8728
MATERIALS/CONSUMPTION
10/18/2014 5:53:54AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-17-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 120.0 (ft) 9,308.0 (ft) 8,663.6 (ft) 22
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/18/2014 5:53:54AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-18-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 952.0 (ft) 10,260.0 (ft) 8,651.8 (ft) 23
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
21.62 (days)17.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-01-2014 12:00 COBY WILHELM / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
57,231TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
57,231
1,980,036
1,980,036
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/19/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM10,205.0 (ft) 90.47° 182.53° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: WASHING AND REAMING TO BOTTOM @ 9950
24 HR SUMMARY: ROTATE/ SLIDE FROM 9308' TO 10162, RIG SERVICE,POOH TO CASING SHOE, MUD LINE BUSTED AT WELD,WAITING ON WELDER TO FIX MUD
LINE, ANDTRIP IN HOLE FROM 8000' - TO 9596' .
24 HR FORECAST: WASH AND REAM F/ 9000' - T/10260 AND DRILL 8.5 LATERAL HOLE.
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 13:30 13.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 9308' TO 10162' WOB 15/25, RPM 65, SPM 120, GPM 578,
SPP 3050, DIFF 450, ROP 63.25
13:30 14:30 1.00 P-DRL RIGSER PP LUBRICATE TOP DRIVE AND RIG
14:30 16:30 2.00 P-DRL STRIP PN POOH TO CASING SHOE, MUD LINE BUSTED AT WELDRO
16:30 22:00 5.50 P-DRL RIGSER PN WAITING ON WELDER TO FIX MUD LINE,RO
22:00 0:00 2.00 P-DRL TRIP PN TRIP IN HOLE FROM 8000' - TO 9596'RO
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0230 TOH, HOLE STARTED TAKEING WIEGHT PUT PUMPS ON LINE HOLE STARTED PACKING OFF WASHED FROM /9596 -TO 9000'.
0230 - 0600 WASH AND REAMED FROM 9000' - TO/9950'
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 8,900.00 / 10-16-20146x1825429Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/30.0 /65 494.19 3100 113 13.50 952.0 70.5 37.00 1,355.0 36.6
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 138ROTARY CURRENT: 0
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: 0.0HoRIZONCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
76.00 21.00/14 15/31 /5.2 0 5.00
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 75.00 % H2O 25.0011.20
10/19/2014 6:55:21AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-18-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 952.0 (ft) 10,260.0 (ft) 8,651.8 (ft) 23
Page 2 of 3
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT7 7 RR2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
26.31 (ft) (ft-lbf)205.0 (kip)180.0 (kip)220.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.000-103.6345Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2506.191Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81026.121Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 3.19-1,803.48-22.20-1,803.488,652.390.4710,205.0 182.53
NORMAL 2.14-1,708.51-20.34-1,708.518,652.189.3610,110.0 179.71
NORMAL 0.39-1,613.52-21.38-1,613.528,652.791.2810,015.0 179.04
NORMAL 1.50-1,518.55-22.74-1,518.558,654.691.049,920.0 179.32
NORMAL 2.52-1,424.56-23.80-1,424.568,655.289.639,826.0 179.38
NORMAL 6.34-1,329.62-26.24-1,329.628,653.187.959,731.0 177.68
NORMAL 1.88-1,235.66-26.90-1,235.668,653.592.529,637.0 181.51
NORMAL 2.55-1,139.73-25.35-1,139.738,656.691.149,541.0 180.35
NORMAL 3.42-1,044.76-26.76-1,044.768,658.290.849,446.0 177.95
NORMAL 1.09-950.83-28.11-950.838,661.392.929,352.0 180.40
CASING
GRADEWEIGHTSIZEDESCRIPTIONS/T SETTING DEPTH
00 H-4013.375 48.00 520.0SURFACE
00 H-409.625 40.00 8,064.0INTERMEDIATE 1
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 85.00 5.000 247.1 # 1
12.00 85.00 5.000 247.1 # 2
SPR
PPSRSPMAV(DP):
SPP: 3100 (psi)
HP:
AV(DC):
0.576 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL gal 11,785
UNITSITEM USAGE ON HAND
DIESEL, MUD 900gal 7828
MATERIALS/CONSUMPTION
10/19/2014 6:55:21AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-18-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 00 952.0 (ft) 10,260.0 (ft) 8,651.8 (ft) 23
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/19/2014 6:55:21AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-19-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 445.0 (ft) 10,705.0 (ft) 10,705.0 (ft) 24
Page 1 of 2
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
22.62 (days)18.50 (days) (days)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-19-2014 05:00 DEWEY RISTER / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
60,833TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
60,833
2,040,869
2,040,869
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/19/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM0.0 (ft) 0.00° 0.00° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @10890''. LAST SURVEY@10772' INC 90.74 AZI 183.69 TVD 8652 DLS 1.29
24 HR SUMMARY: TOH, HOLE STARTED TAKING WIEGHT PUT PUMPS ON LINE HOLE STARTED PACKING OFF WASHED FROM /9596 -TO 9000'. WASH AND
REAMED FROM 9000' - TO/10260,CLEAN UP CYCLE AND ROTATE/ SLIDE FROM 10260' TO 10705
24 HR FORECAST: DRILL 8.5 LATERAL HOLE.
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 2:30 2.50 P-DRL TRIP PP TOH, HOLE STARTED TAKEING WIEGHT PUT PUMPS ON LINE HOLE STARTED
PACKING OFF WASHED FROM /9596 -TO 9000'.
2:30 9:00 6.50 P-DRL RMWASH PP WASH AND REAMED FROM 9000' - TO/10260
9:00 14:00 5.00 P-DRL CIRC PP CLEAN UP CYCLE SPM-170, GPM-520, RPM 90/95,SPP 2580 AND BRING MUD WT
UP TO 12.2
14:00 0:00 10.00 P-DRL DRLG PP ROTATE/ SLIDE FROM 10260' TO 10705' WOB 15/25, RPM 65, SPM 120, GPM 578,
SPP 3050, DIFF 450, ROP 44.50
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0100 RIG SERVICE REPAIR SHAKER SCREEN TEETH ON SHAKER CLAMP BROKE OFF
0100 -0600 ROTATE/ SLIDE FROM 10705' TO 10890' WOB 15/25, RPM 65, SPM 120, GPM 578, SPP 3050, DIFF 450, ROP 30.80
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 8,911.00 / 10-17-20146x1825429Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/35.0 /75 494.19 3200 122 10.00 445.0 44.5 43.50 1,010.0 23.2
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 208ROTARY CURRENT: 70
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: HoRIZONCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
76.00 28.00/16 17/31 /5.2 7.40
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 76.00 % H2O 24.0012.10
10/20/2014 8:13:33AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-19-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 445.0 (ft) 10,705.0 (ft) 10,705.0 (ft) 24
Page 2 of 2
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT7_01
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
26.31 (ft) (ft-lbf)202.0 (kip)175.0 (kip)225.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.000-103.6345Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2506.191Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81026.121Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.002,020.69-33.92-2,237.248,898.490.1010,639.0 182.56
NORMAL 0.581,970.34-31.46-2,182.308,898.590.1010,584.0 182.56
NORMAL 0.991,883.56-27.68-2,087.378,898.790.1010,489.0 182.01
NORMAL 3.651,797.06-24.54-1,992.438,899.691.0110,394.0 181.77
NORMAL 3.921,712.43-23.69-1,898.458,899.388.6610,300.0 179.27
NORMAL 0.00-2,629.11192.962,837.31
NORMAL 0.00-2,629.11192.962,837.31
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 85.00 5.000 247.1 # 1
12.00 85.00 5.000 247.1 # 2
SPR
PPSRSPMAV(DP):
SPP: 3200 (psi)
HP:
AV(DC):
0.622 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 3600gal 8185
UNITSITEM USAGE ON HAND
DIESEL, MUD 3807gal 4021
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/20/2014 8:13:33AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-20-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 952.0 (ft) 11,657.0 (ft) 8,893.7 (ft) 25
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
23.62 (days)19.50 (days) (days)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-19-2014 05:00 DEWEY RISTER / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
60,189TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
60,189
2,101,058
2,101,058
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/20/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM11,623.0 (ft) 90.77° 181.12° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @11867'. LAST SURVEY@11718' INC 90.44 AZI 180.94 TVD 8648 DLS 0 .40, 2' RIGHT & 1' ABOVE , TARGET TVD 8649'
24 HR SUMMARY: RIG SERVICE REPAIR SHAKER SCREEN TEETH ON SHAKER CLAMP BROKE OFF, ROTATE/ SLIDE FROM 10705' TO 11391' ,RIG SERVICE AND
ROTATE/ SLIDE FROM 11391'TO 11657'
24 HR FORECAST: DRILL 8.5 LATERAL HOLE.
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 1:00 1.00 P-DRL RIGSER PN RIG SERVICE REPAIR SHAKER SCREEN TEETH ON SHAKER CLAMP BROKE OFFRO
1:00 6:00 5.00 P-DRL DRLG PP ROTATE/ SLIDE FROM 10705' TO 10890' WOB 25, RPM 75, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH
6:00 15:30 9.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 10890'TO 11391' WOB 28, RPM 60, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 52.7
15:30 16:00 0.50 P-DRL RIGSER PP RIG SERVICE
16:00 0:00 8.00 P-DRL DRLG PP ROTATE/ SLIDE FROM 11391'TO 11657' WOB 28, RPM 60, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 33.25
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0600 ROTATE/ SLIDE FROM 11657'TO 11867' WOB 28, RPM 60, SPM 170, GPM 520, SPP 3550, DIFF 450, ROP 70-130 FPH 35.00
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 8,911.00 / 10-17-20146x1825429Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/35.0 /70 494.19 3325 123 22.50 952.0 42.3 69.50 2,471.0 35.6
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 188ROTARY CURRENT: 50
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: 0.0HoRIZONCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
82.00 30.00/14 18/31 /5.2 0 7.80
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 78.00 % H2O 22.0012.20
10/21/2014 6:08:01AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-20-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 952.0 (ft) 11,657.0 (ft) 8,893.7 (ft) 25
Page 2 of 3
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT7_01
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
26.31 (ft) (ft-lbf)200.0 (kip)185.0 (kip)220.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.000-103.6345Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2506.191Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81026.121Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 2.122,909.92-51.09-3,220.678,894.290.7711,623.0 181.12
NORMAL 0.192,825.40-50.51-3,126.678,894.489.5011,529.0 179.58
NORMAL 1.502,740.51-51.14-3,031.688,893.789.6611,434.0 179.67
NORMAL 0.692,656.92-52.62-2,937.698,893.890.4711,340.0 178.52
NORMAL 1.332,572.67-54.64-2,842.718,894.290.0711,245.0 179.04
NORMAL 1.782,487.75-55.19-2,747.728,894.289.9311,150.0 180.30
NORMAL 1.092,402.67-53.34-2,653.748,893.989.7011,056.0 181.96
NORMAL 0.672,316.05-49.91-2,558.808,894.390.7110,961.0 182.18
NORMAL 1.242,230.12-45.99-2,464.908,895.891.1810,867.0 182.60
NORMAL 1.302,142.79-40.77-2,370.068,897.490.7410,772.0 183.69
NORMAL 0.512,056.38-35.66-2,276.208,898.390.3010,678.0 182.55
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 85.00 5.000 247.1 # 1
12.00 85.00 5.000 247.1 # 2
SPR
PPSRSPMAV(DP):
SPP: 3325 (psi)
HP:
AV(DC):
0.627 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
ENVIORMENTAL DRILLING SOLUTIONS 24.002 2 48.00SDS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 2958gal 4327
UNITSITEM USAGE ON HAND
DIESEL, MUD 1298gal 3623
MATERIALS/CONSUMPTION
10/21/2014 6:08:01AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-20-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 952.0 (ft) 11,657.0 (ft) 8,893.7 (ft) 25
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
10/21/2014 6:08:01AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-21-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 963.0 (ft) 12,620.0 (ft) 8,894.6 (ft) 26
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
24.62 (days)20.50 (days) (days)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-19-2014 05:00 DEWEY RISTER / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
115,372TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
115,372
2,216,429
2,216,429
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/21/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM12,568.0 (ft) 89.60° 181.65° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @12852'. LAST SURVEY@12757' INC 91.31 AZI 181.52 TVD 8644 DLS 2.10, 5' ABOVE & ON LINE , TARGET TVD 8649'
24 HR SUMMARY: ROTATE/ SLIDE FROM 11657'TO 12241', SERVICE RIG & TOP DRIVE, ROTATE/ SLIDE FROM 12241' TO12402, CHANGE LINER AND SWAB IN #1
MUD PUMP. AND ROTATE/ SLIDE FROM 12402' TO 12620,
24 HR FORECAST: DRILL 8.5 LATERAL HOLE.
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 6:00 6.00 P-DRL DRLG PP ROTATE/ SLIDE FROM 11657'TO 11867' WOB 28, RPM 50, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 35.00
6:00 13:30 7.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 11867' TO 12241',WOB 28, RPM 50, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 50.00
13:30 14:00 0.50 P-DRL RIGSER PP SERVICE RIG & TOP DRIVE
14:00 17:30 3.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 12241' TO12402,WOB 28, RPM 50, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 46.00
17:30 19:00 1.50 P-DRL RIGSER PN CHANGE LINER AND SWAB IN #1 MUD PUMP.MP
19:00 0:00 5.00 P-DRL DRLG PP ROTATE/ SLIDE FROM 12402' TO 12620',WOB 28, RPM 50, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 43.60
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0230 ROTATE/ SLIDE FROM 12620' TO12745,WOB 28, RPM 50, SPM 170, GPM 520, SPP 3550, DIFF 450, ROP 70-130 FPH 50.00
0230 - 0400 RIG SERVICE CHANGE OUT VALVE AND SEAT IN #2 MODULE. 0N # MUD PUMP.
0400 - 0600 ROTATE/ SLIDE FROM 12745' TO12852',WOB 28, RPM 50, SPM 170, GPM 520, SPP 3550, DIFF 450, ROP 70-130 FPH 53.5
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 8,911.00 / 10-17-20146x1825429Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/35.0 /55 494.19 3700 122 20.00 963.0 48.1 89.50 3,334.0 37.3
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 193ROTARY CURRENT: 55
10/22/2014 6:44:14AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-21-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 963.0 (ft) 12,620.0 (ft) 8,894.6 (ft) 26
Page 2 of 3
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: 0.0HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
87.00 26.00/15 16/37 /4.8 0 8.70
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 77.00 % H2O 23.0012.10
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT7_01 6RR2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
1,546.14 (ft) (ft-lbf)200.0 (kip)180.0 (kip)225.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
4-1/2 XH6.81024.341Fixed Bend Housing 7/8 5.0,.28,1.75FB
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.2505.611Pulser Sub PULSER SUB
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 IF5.0001,418.5645Drill Pipe 5" DRILL PIPE
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 1.623,765.32-70.59-4,165.208,894.289.6012,568.0 181.65
NORMAL 1.523,680.36-68.99-4,071.228,893.088.8912,474.0 180.30
NORMAL 1.243,594.55-67.48-3,976.248,891.889.6612,379.0 181.52
NORMAL 2.143,507.95-64.12-3,881.318,891.790.2712,284.0 182.53
NORMAL 4.193,421.29-58.36-3,787.498,892.590.6712,190.0 184.50
NORMAL 1.653,334.32-54.04-3,692.618,892.689.4612,095.0 180.71
NORMAL 1.233,250.10-54.15-3,598.628,891.789.4012,001.0 179.16
NORMAL 1.283,166.22-55.01-3,504.628,891.590.3711,907.0 179.79
NORMAL 0.183,080.78-54.37-3,409.638,892.390.6011,812.0 180.98
NORMAL 0.402,995.82-52.80-3,315.658,893.290.4411,718.0 180.94
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 85.00 5.000 247.1 # 1
12.00 85.00 5.000 247.1 # 2
SPR
PPSRSPMAV(DP):
SPP: 3700 (psi)
HP:
AV(DC):
0.622 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
SDS 48.002 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
PIONEER DRILLING 144.0012
TOTAL PERSONNEL ON BOARD: 16
TOTAL HOURS ON BOARD: 216
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1685gal 9766
UNITSITEM USAGE ON HAND
DIESEL, MUD 2200gal 1423
MATERIALS/CONSUMPTION
10/22/2014 6:44:14AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-21-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 963.0 (ft) 12,620.0 (ft) 8,894.6 (ft) 26
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours. On safety walk around, had crews to fix some lights that were'nt
working by pipe rack,straightened up around chemical sk storage.
10/22/2014 6:44:14AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-22-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 1,251.0 (ft) 13,871.0 (ft) 8,889.7 (ft) 27
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
25.62 (days)21.50 (days) (days)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-19-2014 05:00 DEWEY RISTER / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
79,598TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
79,598
2,296,027
2,296,027
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/22/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM13,851.0 (ft) 89.33° 182.59° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: CLEAN UP CYCLE @14093'. LAST SURVEY@14040' INC 89.40 AZI 182.10 TVD 8644 DLS 1.5, 5' ABOVE & ON LINE , TARGET TVD 8642'
24 HR SUMMARY: ROTATE/ SLIDE FROM 12620' TO12745', RIG SERVICE CHANGE OUT VALVE AND SEAT IN #2 MODULE. 0N #1 MUD PUMP.ROTATE/ SLIDE FROM
12745' TO13280', CLEAN UP CYCLE,ROTATE/ SLIDE FROM 13280' TO 13469', RIG SERVICE AND ROTATE/ SLIDE FROM 13469' TO 13871'
24 HR FORECAST: DRILL 8.5 LATERAL HOLE.
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 2:30 2.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 12620' TO12745,WOB 28, RPM 50, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 50.00
2:30 4:00 1.50 P-DRL RIGSER PN RIG SERVICE CHANGE OUT VALVE AND SEAT IN #2 MODULE. 0N #1 MUD PUMP.
4:00 13:30 9.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 12745' TO13280',WOB 28, RPM 50, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 56.3 [HAD TARGET CHANGE FROM 8649' TO
8642' TVD BY GEOLOGY & ENG]
13:30 14:30 1.00 P-DRL CIRC PP CLEAN UP CYCLE SPM-170, GPM-520, RPM 90/95,SPP 3150
14:30 17:00 2.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 13280' TO13469',WOB 28, RPM 50, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 75.6
17:00 17:30 0.50 P-DRL RIGSER PP RIG SERVICE
17:30 0:00 6.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 13469' TO 13871',WOB 28, RPM 50, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 61.84
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0400 ROTATE/ SLIDE FROM 13871' TO 14093',WOB 28, RPM 50, SPM 170, GPM 520, SPP 3550, DIFF 450, ROP 70-130 FPH 55.5
0400 - 0600 CLEAN UP CYCLE SPM-170, GPM-520, RPM 90/95,SPP 3350
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
- - - - - - 8,911.00 / 10-17-20146x1825429Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/45.0 /50 494.19 13,850 123 21.00 1,251.0 59.6 112.50 4,585.0 40.8
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 188ROTARY CURRENT: 50
10/23/2014 6:04:26AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-22-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 1,251.0 (ft) 13,871.0 (ft) 8,889.7 (ft) 27
Page 2 of 3
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: HoRIZONCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
88.00 20.00/17 18/31 /4.8 2.30
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 79.00 % H2O 21.0012.20
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT7_01 6RR2
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
1,546.14 (ft) (ft-lbf)200.0 (kip)175.0 (kip)230.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.0001,418.5645Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2505.611Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81024.341Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 0.004,934.28-114.88-5,447.248,889.589.3313,851.0 182.59
NORMAL 0.874,883.92-112.40-5,392.308,888.989.3313,796.0 182.59
NORMAL 0.384,797.22-108.78-5,297.378,887.889.4313,701.0 181.77
NORMAL 0.144,711.59-105.59-5,203.438,887.089.5013,607.0 182.12
NORMAL 1.314,624.94-102.11-5,108.508,886.289.6313,512.0 182.09
NORMAL 0.894,538.84-97.78-5,014.608,886.190.2013,418.0 183.18
NORMAL 0.824,451.74-93.18-4,919.718,886.289.9713,323.0 182.37
NORMAL 1.114,365.85-89.35-4,825.798,886.890.7413,229.0 182.30
NORMAL 0.044,280.24-86.21-4,731.858,887.490.0313,135.0 181.53
NORMAL 0.934,193.98-83.69-4,636.888,887.590.0713,040.0 181.52
NORMAL 2.114,108.62-81.15-4,542.928,888.490.9412,946.0 181.57
NORMAL 2.394,022.84-79.73-4,447.948,888.789.5312,851.0 180.15
NORMAL 2.103,937.98-78.36-4,353.958,889.491.3112,757.0 181.52
NORMAL 3.393,852.14-74.55-4,260.098,892.592.4612,663.0 183.13
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 85.00 5.000 247.1 # 1
12.00 85.00 5.000 247.1 # 2
SPR
PPSRSPMAV(DP):
SPP: 13,850 (psi)
HP:
AV(DC):
0.627 (hp/in²)
10/23/2014 6:04:26AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-22-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 1,251.0 (ft) 13,871.0 (ft) 8,889.7 (ft) 27
Page 3 of 3
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
HORIZON MUD 24.001 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
SDS 48.002 12 144.00PIONEER DRILLING
TOTAL PERSONNEL ON BOARD: 17
TOTAL HOURS ON BOARD: 240
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 3597gal 6169
UNITSITEM USAGE ON HAND
DIESEL, MUD 1021gal 402
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
3000 10-03-2014 / 50010-03-2014 / 3000 10-02-2014 10-17-201410-03-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
BOP DRILL CONDUCTED AT 06:30 PM, GOOD RESPONSE. AT 1 1/4 MIN
10/23/2014 6:04:26AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-23-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 222.0 (ft) 14,093.0 (ft) 8,886.8 (ft) 28
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
26.62 (days)22.50 (days) (days)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-19-2014 05:00 DEWEY RISTER / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
86,143TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
86,143
2,382,170
2,382,170
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/24/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM13,891.0 (ft) 90.77° 181.78° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: CLEAN MUD TANKS. LAST SURVEY@ 13985' INC 89.40 AZI 182.10 TVD 8644 DLS 1.5, 1.5 BELOW, 13 TO RIGHT , TARGET TVD 8642'
24 HR SUMMARY: ROTATE/ SLIDE FROM 13871' TO 14093, CLEAN UP CYCLE, TOOH F/14093 - T/101,LAY DOWN DIRECTIONAL TOOLS MUD MOTOR & BIT,MUD
MOTOR,AND TEST MWD(OK)MAKE UP BIT ,NMDC AND CROSS OVER SUB.TIH F/130- T 14093
24 HR FORECAST: TIH F/8715 -T/8993, TOOH F/8900 - TO7993,.CLEAN MUD TANKS.TIH.DRILL 8.5 LATERAL HOLE.
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 4:00 4.00 P-DRL DRLG PP ROTATE/ SLIDE FROM 13871' TO 14093',WOB 28, RPM 50, SPM 170, GPM 520, SPP
3550, DIFF 450, ROP 70-130 FPH 55.5
4:00 9:00 5.00 P-DRL CIRC PP CLEAN UP CYCLE SPM-170, GPM-520, RPM 90/95,SPP 3350
9:00 18:00 9.00 P-DRL TRIP PP TOOH F/14093 - T/101 LAYDOWN SHOCK SUB AND PULL ROTATING HEAD.
18:00 21:30 3.50 P-DRL TRIPBHA PP LAY DOWN DIRECTIONAL TOOLS MUD MOTOR & BIT,MUD MOTOR,AND TEST
MWD(OK)MAKE UP BIT ,NMDC AND CROSS OVER SUB.
21:30 21:30 0.00 P-DRL TRIP PP TIH F/130 - T/1600.
21:30 22:00 0.50 P-DRL PU_LD PP PICK UP SAFETY SUB AND SHOCK SUB AND AGITATOR.
22:00 22:30 0.50 P-DRL RU_RD PP INSTALL WEAR BUSHING.
22:30 0:00 1.50 P-DRL TRIP PP TIH F/1600 - TO 8177. LINE UP MOTOR TO GO THRU TROUGH.
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0100 ATTEMPT TO LINE UP TO ORIENT TOOL FACE TO GO THRU TROUGH
0100 - 0200 MUD PUMP SCREENS KEPT STOPPING UP
0200 - 0230 PULL BACK INTO SHOE
0230 - 0600 CIRCULATE AND CLEAN MUD TANKS
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
1-4-WT-H-X-I-WT-DMF8,911.00 / 10-17-20146x1825429Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
/35.0 /50 494.19 3750 122 4.00 222.0 55.5 116.50 4,807.0 41.3
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 138ROTARY CURRENT: 0
10/24/2014 8:08:26AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-23-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 222.0 (ft) 14,093.0 (ft) 8,886.8 (ft) 28
Page 2 of 3
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: HoRIZONCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
94.00 20.00/17 18/32 /4.6 2 2.00
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 79.00 % H2O 21.0012.10
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT7_01
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
1,546.14 (ft) (ft-lbf) (kip) (kip) (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.0001,418.5645Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2505.611Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81024.341Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 4.134,970.78-116.41-5,487.218,889.590.7713,891.0 181.78
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
SPR
PPSRSPMAV(DP):
SPP: 3750 (psi)
HP:
AV(DC):
0.622 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
HORIZON MUD 24.001 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
SDS 48.002 12 144.00PIONEER DRILLING
TOTAL PERSONNEL ON BOARD: 17
TOTAL HOURS ON BOARD: 240
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1368gal 8460
UNITSITEM USAGE ON HAND
DIESEL, MUD 1315gal 2746
MATERIALS/CONSUMPTION
10/24/2014 8:08:26AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-23-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 222.0 (ft) 14,093.0 (ft) 8,886.8 (ft) 28
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
5000 10-12-2014 / 150010-12-2014 / 1500 10-23-2014 11-02-201410-12-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.
Safety walk around noted slick conditions due to OBM by drillers console & into door on doghouse;
cleaned up & put oilabsorb down.
10/24/2014 8:08:26AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-25-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 1,142.0 (ft) 15,320.0 (ft) 8,894.8 (ft) 30
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
28.62 (days)24.50 (days) (days)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-19-2014 05:00 DEWEY RISTER / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
57,882TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
57,882
2,488,489
2,488,489
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/26/2012 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM15,216.0 (ft) 88.39° 179.67° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: DRILLING AHEAD @14425'. LAST SURVEY@14270' INC 91.41 AZI 179.63 TVD 8642 DLS 2.10, ON LINE TVD & 14' TO RIGHT , TARGET
TVD 8642'
24 HR SUMMARY: CHANGE SWAB IN # 1MUD PUMP. ROTATE/ SLIDE FROM 14178 -' TO 14990',RIG SERVICE AND ROTATE/ SLIDE FROM 14990' - TO 15000',
24 HR FORECAST: CONTINUE TO DRILL LATERAL
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 1:00 1.00 P-DRL RIGSER PN RIG SERVICE CHANGE SWAB IN # 1MUD PUMP.MP
1:00 16:30 15.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 14178 -' TO 14994',WOB 28, RPM 50, SPM 170, GPM 500,
SPP 3950, DIFF 450, ROP 70-130 FPH 52.6
16:30 17:00 0.50 P-DRL RIGSER PP RIG SERVICE
17:00 0:00 7.00 P-DRL DRLG PP ROTATE/ SLIDE FROM 14994' - TO 15320',WOB 28, RPM 50, SPM 170, GPM 500,
SPP 3950, DIFF 450, ROP 70-130 FPH 46.5
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0600 ROTATE/ SLIDE FROM 15320' - TO 15320',WOB 28, RPM 50, SPM 170, GPM 500, SPP 3950, DIFF 450, ROP 70-130 FPH 46.5
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
7 / 1 - - - - - - 14,093.00 / 10-23-20146x2024949Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
7/1 /35.0 /65 494.19 3950 80 22.50 1,142.0 50.8 24.50 1,227.0 50.1
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 203ROTARY CURRENT: 65
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: 0.0HorizonCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
84.00 22.00/15 20/31 /5.2 0 4.90
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 81.00 % H2O 19.0012.00
10/26/2014 2:01:24AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-25-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 1,142.0 (ft) 15,320.0 (ft) 8,894.8 (ft) 30
Page 2 of 3
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT8 7
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
1,552.29 (ft) (ft-lbf)200.0 (kip)170.0 (kip)220.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.0001,418.5645Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2505.611Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81030.491Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 1.466,167.76-138.70-6,811.378,891.988.3915,216.0 179.67
NORMAL 4.206,084.07-139.95-6,717.408,890.189.4615,122.0 178.81
NORMAL 1.115,998.40-138.77-6,622.438,890.290.6415,027.0 182.62
NORMAL 1.205,912.00-133.67-6,528.578,891.090.2714,933.0 183.60
NORMAL 0.415,824.68-128.53-6,433.718,891.089.7314,838.0 182.60
NORMAL 2.285,737.56-123.90-6,338.828,890.589.7014,743.0 182.99
NORMAL 1.535,651.95-120.75-6,244.888,890.089.6614,649.0 180.85
NORMAL 2.135,566.62-120.37-6,149.898,890.090.4014,554.0 179.60
NORMAL 1.195,482.13-121.84-6,054.918,889.288.6214,459.0 178.63
NORMAL 2.845,398.31-124.77-5,959.978,887.689.4314,364.0 177.84
NORMAL 2.575,314.99-126.84-5,866.008,888.391.4114,270.0 179.63
NORMAL 2.465,229.24-125.43-5,771.048,890.591.2414,175.0 182.07
NORMAL 0.825,142.83-122.52-5,676.098,890.788.9914,080.0 181.44
NORMAL 1.505,056.41-119.59-5,581.158,889.389.4013,985.0 182.10
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
12.00 85.00 5.000 247.1 # 1
12.00 85.00 5.000 247.1 # 2
SPR
PPSRSPMAV(DP):
SPP: 3950 (psi)
HP:
AV(DC):
0.405 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
HORIZON MUD 24.001 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
SDS 48.002 12 144.00PIONEER DRILLING
TOTAL PERSONNEL ON BOARD: 17
TOTAL HOURS ON BOARD: 240
10/26/2014 2:01:24AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-25-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 1,142.0 (ft) 15,320.0 (ft) 8,894.8 (ft) 30
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
5000 10-12-2014 / 150010-12-2014 / 1500 10-23-2014 11-02-201410-12-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.RIG LOOKED GOOD ON SAFETY WALK AROUND
10/26/2014 2:01:24AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-26-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 699.0 (ft) 16,019.0 (ft) 8,891.9 (ft) 31
Page 1 of 3
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
29.62 (days)25.50 (days) (days)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-19-2014 05:00 DEWEY RISTER / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
68,800TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
68,800
2,557,289
2,557,289
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/26/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM15,958.0 (ft) 90.10° 184.77° 5.500 in @ 16,021.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: LAYING DOWN DRILLPIPE, BIT DEPTH 9300', LAST SURVEY@15958' INC 90.10 AZI 184.77 TVD 8646' DLS 0.33, 4' LOW & ON LINE LR
24 HR SUMMARY: ROTATE/ SLIDE FROM 15320' - TO 15673, CLEAN UP CYCLE, RIG SERVICE, ROTATE/ SLIDE FROM 15673' - TO 16019, AND PERFORM CLEAN UP
CYCLE, TO RUN CASING.
24 HR FORECAST: LAYDOWN DRILLPIPE AND RIG UP CASING CREW AND RUN 5.5 CASING.
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 8:00 8.00 P-DRL DRLG PP ROTATE/ SLIDE FROM 15320' - TO 15673',WOB 28, RPM 50, SPM 170, GPM 500,
SPP 3950, DIFF 450, ROP 70-130 FPH 44.1
8:00 11:00 3.00 P-DRL CIRC PP CLEAN UP CYCLE
11:00 11:30 0.50 P-DRL RIGSER PP RIG SERVICE
11:30 18:00 6.50 P-DRL DRLG PP ROTATE/ SLIDE FROM 15673' - TO 16019',WOB 28, RPM 50, SPM 170, GPM 500,
SPP 3950, DIFF 450, ROP 70-130 FPH 53.2
18:00 0:00 6.00 P-DRL CIRRUN PP PERFORM CLEAN UP CYCLE, TO RUN CASING.
18:00 18:00 0.00 P-DRL M_TDFin PP MILESTONE TD
= Total Hours Today 24.00
06:00 UPDATE
0000-0600 0000 - 0100 PERFORM CLEAN UP CYCLE PRIOR TO RUNNING CASING.
0100 -0600 PUMP SLUG AND LAY DOWN DRILL PIPE.
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
7 / 1 - - - - - - 14,093.00 / 10-23-20146x2024949Ulterra Drilling Technologies8.500 U616M
BIT OPERATIONS
HRSBIT / RUN CUM ROPCUM PROGCUM HRS24 HR ROP24 Hr PROGP BITPRESSFLOW RATERPMWOB
7/1 /40.0 /110 511.63 3825 0 14.50 699.0 48.2 39.00 1,926.0 49.4
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM: 253ROTARY CURRENT: 110
10/27/2014 9:05:00AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-26-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 699.0 (ft) 16,019.0 (ft) 8,891.9 (ft) 31
Page 2 of 3
MUD PROPERTIES OIL-BASE MUDLCM: MUD TYPE: HoRIZONCompany:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
84.00 21.00/17 20/34 /4.8 4.10
Density (ppg ) PP DAILY COST 0 %OILCUM COST 0 81.00 % H2O 19.0012.10
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT8 7
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
1,552.29 (ft) (ft-lbf)200.0 (kip)180.0 (kip)220.0 (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.0001,418.5645Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2505.611Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81030.491Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
SURVEYAPACHECompany:
TYPE MD
(ft)
AZI
(°)
V.SECT
(ft)
+E/-W
(ft)
DEG
(°)
TVD
(ft)
+N/-S
(ft)
D.L
(°/100ft)
NORMAL 1.146,837.53-149.91-7,552.948,892.090.1015,958.0 184.77
NORMAL 2.266,767.03-144.13-7,477.168,892.089.8315,882.0 183.95
NORMAL 1.206,680.78-139.39-7,383.298,891.789.8315,788.0 181.83
NORMAL 1.806,595.55-137.17-7,289.318,891.990.4415,694.0 180.88
NORMAL 1.406,509.30-136.73-7,193.328,891.789.2315,598.0 179.64
NORMAL 0.336,425.58-137.96-7,099.338,891.390.3015,504.0 178.87
NORMAL 2.156,340.28-139.64-7,003.358,891.990.5015,408.0 179.12
NORMAL 2.706,255.02-139.41-6,908.368,892.890.5415,313.0 181.16
MUD PUMPS/HYDRAULICS
FLOW RATELINERSPMSTROKE
SPR
PPSRSPMAV(DP):
SPP: 3825 (psi)
HP:
AV(DC):
0.000 (hp/in²)
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
HORIZON MUD 24.001 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
SDS 48.002 12 144.00PIONEER DRILLING
TOTAL PERSONNEL ON BOARD: 17
TOTAL HOURS ON BOARD: 240
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 2337gal 5486
UNITSITEM USAGE ON HAND
DIESEL, MUD 58gal 1926
MATERIALS/CONSUMPTION
10/27/2014 9:05:00AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-26-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 699.0 (ft) 16,019.0 (ft) 8,891.9 (ft) 31
Page 3 of 3
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
5000 10-12-2014 / 150010-12-2014 / 1500 10-23-2014 11-02-201410-12-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours. DID SAFETY WALK AROUND LOOKED GOOD.
10/27/2014 9:05:00AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-27-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 (ft) 16,019.0 (ft) 8,646.2 (ft) 32
Page 1 of 2
DOLDFSPLANNED DOWAUTH TMDFIELD NAMERIG
30.62 (days)26.50 (days) (days)16,400.00 (ft)SPRAYBERRYPIONEER 56
WB KO DATE RIG RELEASE SUPERVISOR 1 ENGINEER PBTMDWELL SPUD DATE
DUSTIN PETRAITIS10-19-2014 05:00 DEWEY RISTER / JOHNNY DENNIS10-01-2014 12:00
REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO
PERMIAN SE DISTRICT - TX CZ TEXAS REAGAN 432-242-6664
DHC:
CWC:
2,539,800
2,539,800TOTAL:
Others:
DHC:
CWC:
54,918TOTAL:
Others:
DHC:
CWC:
TOTAL:
Others:
54,918
2,612,207
2,612,207
DCC: DCC: DCC:
DESCRIPTION:
AFE COSTS CUMULATIVE COSTSDAILY COSTSAFE # 11-14-0451-DH
LAST SAFETY MEETING BLOCK BHA HRS OF SERVICETARGET FORMATIONDEFAULT DATUM / ELEVATION OCSG#
10/27/2014 WOLFCAMP (HORIZONTAL)RKB/RT / 2,665.0 (ft)
LAST CASING NEXT CASINGLAST SURVEY LAST CSG SHOE TEST (EMW)
MD INC AZM16,019.0 (ft) 90.10° 184.77° 5.500 in @ 16,019.0 ft9.625 in @ 8,064.0 ft
CURRENT OPERATIONS: LCM REPORT 10/27/14
24 HR SUMMARY: CIRC & CONDITION HOLE,SLUG PIPE, LAY DOWN DRILL STRING,DIR TOOLS.
24 HR FORECAST: LCM REPORT 10/27/14
OPERATION SUMMARY
From To HRS Op Phase ACTIVITY SUMMARYOp Code PT/NPT NPT CODES
0:00 1:00 1.00 P-DRL CIRRUN PP CIRC & WORK PIPE, CLEAN UP CYCLE,SLUG PIPE
1:00 13:30 12.50 P-DRL PU_LD PP LAY DOWN DRILL PIPE,AGITATOR,SHOCK TOOL
13:30 16:00 2.50 P-DRL TRIPBHA PP LAY DOWN DIRECTIONAL TOOLS,BIT,LOAD OUT
= Total Hours Today 16.00
06:00 UPDATE
0000-0600 LCM REPORT 10/27/14
BIT DATA
I-O-D-L-B-G-O-RBIT / RUN BIT SIZE
(in)
MANUFACTURER TYPE SERIAL
NO
JETS OR TFA DEPTH IN / DATE IN
7 / 1 2-2-BT-A-X-I-BT-TD14,093.00 / 10-23-20146x2024949Ulterra Drilling Technologies8.500 U616M
MOTOR OUTPUT
0.28rev/galRPV: TOTAL RPM:ROTARY CURRENT:
MUD PROPERTIES LCM: MUD TYPE: Company:
VIS
(s/qt )
PV/YP
(cp ) /
(lbf/100ft² )
Cl
(ppm )
Ca
(ppm )
pH/Pm Pf/Mf
(cc )
% SAND/MBT
(% )/(lbm/bbl )
OIL/WAT
(% )
FC/T.SOL
(32nd" ) / (% )
WL/HTHP
(cc/30min )
H2S
(ppm )
GELS
(lbf/100ft² )
KCL
(ppm )
LGS
(% )
PP DAILY COST 0 %OILCUM COST 0 % H2O
BHA / HOLE CONDITIONSBHA JAR S/N JAR HRS BIT8
BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH
1,552.29 (ft) (ft-lbf) (kip) (kip) (kip) (kip)
CONN TYPECONN SIZEI.DO.DLENGTHNO JTSITEM DESCRIPTIONCOMPONENT TYPE
4-1/2 IF6.38010.831Shock Sub SHOCK SUB
4-1/2 IF6.38012.981Agitator AGITATOR
10/28/2014 6:06:46AMPrinted:
Daily Drilling Report
APACHE CORPORATION
DATE
10-27-2014
WELLBORE NAME
UNIVERSITY 2303 E 5HM ST-1
REPT NOTD TVD24 HRS PROGAPI # TMD
4238338757 01 (ft) 16,019.0 (ft) 8,646.2 (ft) 32
Page 2 of 2
4-1/2 IF6.3802.501Safety Sub SAFETY SUB
4-1/2 IF5.0001,418.5645Drill Pipe 5" DRILL PIPE
4-1/2 IF6.1902.751Crossover Sub 4.5XH -4.5IF
4-1/2 XH6.13031.051Non-Mag Flex Drill Collar NMFDC
4-1/2 XH6.2505.611Pulser Sub PULSER SUB
4-1/2 XH6.25030.561Non-Mag Drill Collar NMDC
4-1/2 XH6.3805.961Integral Blade Stabilizer NORTRAK STABLIZER
4-1/2 XH6.81030.491Fixed Bend Housing 7/8 5.0,.28,1.75FB
4 1/2" REG8.5001.001PDC Bit 8 1/2-U616
PERSONNEL DATA
COMPANY COMPANY HRSQTYHRSQTY
HORIZON MUD 24.001 2 24.00ENVIORMENTAL DRILLING SOLUTIONS
SDS 48.002 12 144.00PIONEER DRILLING
TOTAL PERSONNEL ON BOARD: 17
TOTAL HOURS ON BOARD: 240
UNITSITEM USAGE ON HAND
DIESEL, RIG FUEL 1000gal 4486
UNITSITEM USAGE ON HAND
DIESEL, MUD 300gal 1626
MATERIALS/CONSUMPTION
SAFETY DRILLS
RAMS
(psi)
ABND. DRILLH2S DRILLFIRE DRILLNEXT BOP
PRESS TEST
LAST BOP
FUNCTION
CASINGANNULARS
(psi)
LAST BOP
PRESSURE TEST
5000 10-12-2014 / 150010-12-2014 / 1500 10-23-2014 11-02-201410-12-2014
INCIDENT REPORT
INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION
No incidents reported in last 24 hours.