A.P. TELECOM CIRCLECM-PLANNING WING
WELCOME
DEVELOPMENT MEETING WITH UNIONS/ASSOCIATIONS
06-08-2015.
PHASE VII PROJECT STATUS
• The Phase VII GSM expansion project of 31.5 lakhs lines capacity has been completed.
• All the planned 1748 BTSs & 1800 Node Bs radiated.• 3G facility was provided for 450 Cities/Towns in A.P.Circle (against the earlier 29
towns/cities in Phase V) as part of the Phase VII project.• BTSs of ZTE make were installed in 6 SSAs (Hyderabad, Vijayawada Urban, Guntur,
Nalgonda, Medak Urban& Mahaboobnagar SSAs).• 3G Node Bs of ZTE make were installed in the 14 SSAs(Full - HTD, KRI, NGD, GTR &
MBN SSAs. Partial SSAs - RR, MDK, WL, ADB, KHM, CTR, KNL,CDP, PKM).• The data volumes have been increased drastically from the earlier 6 TB to 21 TB
per day after the roll out of the phase VII project.• High capacity MSCs/MGWs ( Each 40 Lakhs BHCA & 40K Erlangs) commissioned at
Saifabad, Patny Centre & Guntur. • High capacity SGSNs (Each of 4 GBPS throughput capacity) at Saifabad &
Vijayawada.• At the end of Phase VII project the number of 2G BTSs working is 7527 & 3G Node
Bs is 3089. .
2
Phase VII + Project at a glance Corporate office has placed an Advance Purchase Order for the Phase VII+ project
and Circles will be authorized for placing the Purchase Orders shortly. Net capacity to added in the net work : 7.25 Lakh lines. The data speeds will be increased from 14.4 Mbps to 21.6 Mbps in the Circle.
The proposed procurement in this phase are:
Total No. of MSCs expansions : 2 Total No. of MGWs : 3 (VM, KNL & WL) Total No. of BSCs : 6 Total No. of RNCs : 8 Total No. of 2G BTSs : 660 (For replacement of
MOTOROLA Ph I to III+ BTSs in WL, CDP, KNL, ADB & PKM SSAs)
Total no. of 3G Node Bs : 1450
3