aoi case-study presentation - asset office...

23
PROJECT EXPERIENCE

Upload: others

Post on 14-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

PROJECT EXPERIENCE

Page 2: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Nortel

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Strip back to shell & core of a 1980’s building and open up in order to improve natural light into the large footplates.

Regional Headquaters building

8,500 m2

Major Projects

Construction of a new atrium with architectural stairs and opened floor-slabs.

Fit out of Regional Corporate headquarters with executive office facilities, break- out areas, conference rooms (including sophisticated AV and networked Video Conference facilities.

Installation of Datacomms systems around the building and, through a Network Operations Centre, to the other offices in the UK & Europe.

Page 3: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Complete demolition of interior back to grey box including finishes, structural floors main staircase and central core Installation of structural floors, walls and new lift shaft and riser core

Retail Shop fit-out

Major Projects

Design and installation of 6 storey internal metal staircase and 3 story Monumental staircase. Restoration of historical features including plaster mouldings and timber mouldings.

Design and installation of sales floor passenger lift and DDA lift. Design, Supply and install Mechanical, Electrical and Data services.

Complete interior fit-out including Millwork, Doors, Panelling and Floor finished

[BRIEF]

[PROJECT]

[OUR TEAM]

[FEATURES]

Abercrombie & Fitch

Page 4: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

City Park Restaurant

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Refurbishment of a factory building to create a commercial restaurant facility within multi-tenanted office building.

Restaurant Facility

2,000 m2

Major Projects

The facility provides approximately 140 covers plus Private Dining rooms.

The catering environment includes specialist ‘Pod-Constructed’ cold stores and pantries installed for speed and in order to maintain the integrity of the environment.

Specialist ceiling and lighting systems were designed to be able to alter the general arrangement of the space and create mood-effects so that the opened-out space could be multi functional and available for corporate events as well as general catering.

Page 5: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Dell Computers

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Strip back to shell & core, and refurbish to provide HQ Campus facilities in Southern England and Glasgow.

Multiple Projects from minor refurbishments to UK HQ Campus fit-out, Bracknell

500 - 24,000 m2

Major Projects, Special Works & Furniture

Complete reorganisation of the M&E / life-safety systems.

Installation of diverse / redundant supplies to support new computer rooms, data labs and a European Broadcast Centre.

Supply & installation of approximately 3,000 workstations to Corporate, Administration and Help-Desk staff.

Page 6: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Dell Computers

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Fast track fit-out from shell & core of new HQ building.

UK HQ Campus

11,000 m2

Major Projects

Complete reorganisation of the base build M&E systems to accommodate a cellular environment, installation of new executive suites and a conference centre.

A combination of bespoke and contemporary partitioning and ceiling systems were used around the building to create a variety of different environments.

Page 7: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

DSC Inc

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Numerous fit-out and refurbishment projects throughout England, Scotland & Ireland.

Multiple Projects from minor refurbishments to UK HQ Campus fit-out

500 - 24,000 m2

Major Projects, Special Works & Furniture

Re-organisation of office and conference facilities in multiple buildings, providing full Datacomms infrastructure.

3 major dining / staff canteen facilities.

Supply / coordination / installation of more than 3,500 workstations, construction of a European Broadcast Centre, creating laboratory / test and workshop facilities.

Page 8: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Electrolux

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Strip out and refurbishment of all M&E systems as well as interior fixtures and some structural walls to create a new HQ building and corporate facilities.

UK Headquarters Refurbishment

11,000 m2

Major Projects

Open plan spaces, cellular offices, meeting rooms, break-out areas training facilities with full audio-visual, a fully operational restaurant and reception lobbies.

A new roof, window / curtain-wall refurbishment, upgraded common parts and replacement of central services.

Page 9: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Fujitsu Siemens

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Refurbishment of an existing 1980’s campus-style office building to create the UK Headquarters of a new joint venture business between Fujitsu and Siemens.

New UK Headquarters Building, Bracknell

9,000 m2

Major Projects

New reception area, completely reconfiguring the existing office and workplace facilities.

Upgrade to the Capital Plant at roof level. Re organisation of all on-floor HVAC installations.

Construction of a new staff restaurant for 750 staff.

Creation of new conference facilities and executive offices.

A computer laboratory facility was constructed and a high redundancy Data Centre with appropriate, sophisticated fire suppression, security and control systems installed.

Page 10: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

GlaxoSmithKline

[BRIEF]

New Kitchen & Restaurant Facility [PROJECT]

420 m2 [SIZE]

Major Projects [OUR TEAM]

[FEATURES]

A complex project to enlarge and refurbish the existing staff restaurant.

Full replacement of the existing catering facility.

Interior works included feature ceilings, glazed front entrance partitions, specialist floor finishes, specialist joinery and furniture.

New air conditioning and fire suppression systems.

Page 11: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

McQueen

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Fast-Track fit out from Cat A finish to create a new Regional Head Office for a well established Hedge Fund Manager.

Detail & Construction of an Office Facility

600 m2

Special Works

New flooring, feature ceilings, partitioning, interior finishes and specialist joinery.

The existing Mechanical & Electrical systems were substantially reconfigured and enhanced to accommodate the new layout.

Installed all Voice & Data systems, video conference and meeting room facilities as well as the construction of a new independently served Computer Room.

Page 12: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Information Research Inst.

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Fit out of a traditional office building to create an international Research Facility.

New Library & Research Centre

6,000 m2

Major Projects

Specialist ceiling and lighting systems were installed.

Highly engineered cooling, ventilation and humidity control in order to create a space that could be used by subscribers for extended periods, but provided an appropriate environment to protect the books and research materials.

Specialist joinery, display systems and networked webcam/video-conference installations were incorporated into the furniture and storage equipment.

Page 13: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Kingfisher

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Extremely fast-track fit out of new building in order to allow Client to take advantage of the sale of their existing facility for redevelopment.

UK headquarters building

3,500 m2

Major Projects

Replacement of all internal architectural finishes, installation of new offices, meeting rooms and conference facilities.

Significant reorganisation of the Base-Build M&E and Life-safety systems. All

facilities were supported by a secure on-site Data Centre with appropriate diversity and redundancy of equipment.

Our role also included the full coordination and installation of all Datacomms and

furniture systems throughout the building.

Page 14: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Kleinwort Benson

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Refurbish part of an occupied, previously dilapidated cigarette factory (historically Listed building structure) to create a contemporary but functional investment

property.

Rolling refurbishment of Investment Property & tenant fit-outs

8,000 - 36,000 m2

Major Projects

Upgrade of the roof and basement plant in order to provide enhanced supplies for the tenants. Installation of on-floor mechanical, electrical, life-safety, alarm and BMS systems.

Refurbishment of lift cores and main lobbies including specialist ceilings and

feature lighting, new stonework and flooring finishes, creation of visitor area

receptions and a retail refreshment area.

Page 15: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

NHS Berkshire West

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Refurbishment of an existing shell and core space (previously 3 retail units) for a new GP centre, consisting of 10 Consulting Rooms, Triage Room, Meeting

Rooms, Offices, Staff Facilities, Toilets and Waiting Area.

GP Walk-In Centre, Broad Street Mall, Reading.

900m2

Major Projects

Works included, New Partitions, Ceilings, Doors / Joinery, Shop Front, Fire Screens, Finishes, HTM HBN compliant Fittings and Fixtures including Sanitaryware, Drainage, HVAC, Electrical Distribution and Services, Sprinkler System, Fire Detection, Data Services.

Page 16: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Optimax

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Strip back to shell and core of a dilapidated retail outlet and create a state-of-the- art laser surgery and manufacturing facility

Detail & Construct of High-Tech Retail Outlet

1,480 m2

Special Works

A complete opening up of the structure.

Installation of ‘Clinical’ M&E systems and a total building refurbishment to create more useable facilities.

Glass shop front and showroom front-of-house.

Creation of sterile, clean and dirty room environments, consulting rooms, staff facilities, computer room, lab manufacturing room and kitchen areas.

Page 17: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Renault F1 Team

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]600 - 1,600 m2

[FEATURES]

Update areas of this purpose-built 16 acre site which has been designed to accommodate the specialist engineering facility of the Renault Formula 1

headquarters.

Multiple Projects including Wind Tunnel Building, workshops, laboratories & office facilities

Special Works & Major Projects Extension to purpose-built wind tunnel building to create CAD facility.

Refurbishment of the Research & Development laboratory. Fit-out of the

administration block and sports facility. General construction and refurbishment of the admin & general office areas

Construction of the CAD engineering suites, etc.

New main gas & ancillary supplies brought into the site, new drainage and waste systems, cooling systems and back-up electrical systems.

Page 18: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Senator International

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Convert a derelict building into a contemporary London HQ.

Major structural refurbishment, extension & fit-out

2,600 m2

Major Projects

Strip building back to steels. Completely replace facade, curtain walling, all windows and balconies.

Full height extension to rear of the building. Additional planar-glazed storey added to the building at roof level.

Creation of 4-storey atrium, relocation of lift core and staircase.

Contemporary interior finishes and M&E services installations.

Page 19: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Schneider

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Strip back to shell and core of a previously occupied Administration / Back-office facility and conversion into a new Front-of-House Representative Office for a Hedge Fund Manager.

Detail & Construct of Corporate Office

1,750 m2

Major Projects

Complete upgrading of all M&E systems, Life-Safety systems and the installation of a new Computer Room / Data Centre with redundant and diverse supplies.

All flooring and decorative finishes within the space were replaced; new feature wall & partition systems installed; existing standard ceiling systems were refurbished and enhanced with feature panels and feature areas. Full voice & data and networked Audio Visual systems installed.

Page 20: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Sofitel Spa

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Conversion of dilapidated Grade 11 listed banking hall to create a contemporary, luxury spa as an addition to the 5 star SOFITEL hotel in St James’ London.

Major Structural Refurbishment & Specialist Fit-out

2, 600 m2

Major Projects

Works included removal of banking vaults and basements to provide a series of Hammam treatment rooms, solaria, massage facilities, steam rooms and retail areas.

Many specialist lighting, glazing and water features were installed throughout the public areas and extensive shower, relaxation and changing facilities.

Specialist finishes included gold leaf, fusion glazing and in excess of £1 million pounds of bespoke joinery. New M&E systems were installed throughout the space within restricted voids to provide a 1st class environment for guests and deal with the sophisticated water treatment requirements of the spa rooms themselves.

Page 21: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

TT International

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Strip dilapidated building back to shell & core and refurbish to provide a sophisticated London HQ environment for an international financial institution.

New Corporate Head Office

1,475 m2

Major Projects

Creation of a contemporary reception area with adjacent meeting facilities and a contemporary intercommunicating staircase between floors.

Partitioning systems, specialist joinery, lighting and soft finishes were detailed to create a minimalist feel to the space and to enhance the limited natural light to the building.

Page 22: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Anchorage House

[BRIEF]

[PROJECT]

[OUR TEAM]

FEATURES]

Refurbishment of the atria within Anchorage House on behalf of Criterion Capital. Decorations and strip out of concrete planters including lighting up-grade was all completed in accordance to a fast-track programme which required flexibility to accommodate out of hours and weekend work. Major Projects Works including the demolition of existing reception structures, new DDA compliant access arrangements and reception areas improved appearance of the ground floor and upper levels whilst working at considerable height in a fully occupied building.

Page 23: AOI Case-Study Presentation - Asset Office Interiorsassetofficeinteriors.co.uk/.../08/AOI-Case-Study-Presentation-FINAL.pdf · Abercrombie & Fitch. City Park Restaurant [BRIEF] [PROJECT]

Aberdeen Asset Management, Potters Bar

[BRIEF]

[PROJECT]

[SIZE]

[OUR TEAM]

[FEATURES]

Refurbishment of an existing Warehouse facility creating two separate units and two floors

of office space.

Major Structural refurbishment and fit out including extensive external works.

60,000 sq ft.

Major Projects

Complete re-roofing and cladding of the entire building providing new loading docks and ramps.

Construction of a new reception area and interconnecting staircase.

Refurbishing existing office space to ground floor, and constructing new office suite to first floor.

Construction of a new block and jumbo stud party wall with foundations.

New façade fencing throughout the facility with the installation of electronically operated steel security gates to both entrances.