“give the operator the best tools and knowledge” · “give the operator the best tools and...
TRANSCRIPT
“Give the OPERATOR the BEST tools and knowledge”
1
Introduction Huntsman
“Give the OPERATOR the BEST tools and knowledge”
“Give the OPERATOR the BEST tools and knowledge”
POM
2
OPERATOR
TRAINING
HMI
ALARM MANAGEMENT
CONTROL
STRATEGY
“Give the OPERATOR the BEST tools and knowledge”
Topics
3
• Introduction
• Challenges Huntsman and project
• Vision / URS control strategy
• Project organisation
• Factors for success
• First results
“Give the OPERATOR the BEST tools and knowledge”
Introduction
4
Introduction
Challenges
Vision / URS
Organisation
Factors for success
First results
Jasper Rutten Sr. Process Engineer
Project rol: Sr. Process Engineer & Commissioning manager
Tom Verbruggen Project manager TA
Project rol: Lead Engineer Process Control
“Give the OPERATOR the BEST tools and knowledge”
5
Markets include:
Adhesives, Coatings
and Elastomers
Appliances
Automotive
Insulation
Composite Wood Products
Footwear
Furniture & Bedding
TPU
“Give the OPERATOR the BEST tools and knowledge”
6
“Give the OPERATOR the BEST tools and knowledge”
4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links
375 graphics
DeltaV HMI
DeltaV DCS Chrystalisers 3&4, AWZI
PROVOX DCS
PROVOX HMI
HIMA SIS
MIMIC
FIELD EQUIPMENT
VOPAK YORK compres
sor
Fire & Gas
Truck loading
HCL compres
sor
RTO QC Analy-
sers
Fire water pumps
AWZI
Start engineering – Jan. 2014
MIMIC DeltaV HMI
DeltaV DCS
HIMA SIS
VOPAK YORK compres
sor
HCL compres
sor
Turn Around – April 2015
DeltaV HMI
DeltaV SIS
Turn Around – 2017
10 DCS controllers
45 SIS Logic Solver
4 I/O-shelters
300 multicores + system cabling
“Give the OPERATOR the BEST tools and knowledge”
Challenges Huntsman
8
Introduction
Challenges
Vision / URS
Organisation
Factors for success
First results
Qualified operators
• Aging experienced operators
• Increased mobility operators
• Certification (CCR-) Operators
Process Control System
• Current system is limiting the production goals
• Aged control strategy
• EndOfLive current DCS- and SIS-system
“Give the OPERATOR the BEST tools and knowledge”
Project Challenges
9
Introduction
Challenges
Vision / URS
Organisation
Factors for success
First results
• Parallel projects Major plant revamp
Development Operator Training System (dynamic model)
• Fast track project Start engineering Jan. 2014
Turn Around Apr. 2015
• TurnAround DCS-migration
Plant modifications
Regular maintenance works
Specific plant units will stay operational
“Give the OPERATOR the BEST tools and knowledge”
10
Introduction
Challenges
Vision / URS
Organisation
Factors for success
First results
Operator knowledge
System and control strategy
Safety
Future
“Give the OPERATOR the BEST tools and knowledge”
11
User Requirement Specifications
Control strategy Support operations • 2 CCR-operators in Q2-2015; 1,5 in Q2-2016 for normal operation
• Basic control functional copy of current DCS and SIS.
• Redesign of the automated sequences.
HMI Human Centric Design • HMI Designed according ISA 101.4
• Use of latest supplier standard library comply to ASM / HCD-guidelines
“Give the OPERATOR the BEST tools and knowledge”
12
User Requirement Specifications
Alarm/trip-management Alarmreduction, -suppression, LOPA’s
• Meet EEMUA-standard
• Re-evaluate SIL - Safety provisions.
• Re-evaluate production related tripfunctionality
Operator Training System incl. dynamic plantmodel OTS
• Train operators for TA2015
• Support DCS-FAT
Phase 2:
• Advanced training and certification with high fidelity plantmodel
• Testing future modifications
“Give the OPERATOR the BEST tools and knowledge”
13
Client / End user
EPC
Delivery and configuration DCS / SIS-system
Design HCD HMI
Design control strategy
Dynamic model and Training
Alarm evaluation
“Give the OPERATOR the BEST tools and knowledge”
Factors for success (1/2)
14
Introduction
Challenges
Vision / URS
Project Organisation
Factors for success
First results
• Clear vision and user requirements
• Priority awareness At ALL participants and organisation levels
• Make choices - decisively Quick decision process
Stick to the plan
Management of expectation (documented and communicated)
“Give the OPERATOR the BEST tools and knowledge”
Factors for success (2/2)
15
Introduction
Challenges
Vision / URS
Project Organisation
Factors for success
First results
• Resource management Assure competence and knowledge
Organisation – clear accountabilities
Team motivation – eye for the invidual
Best personel for the job
• Integrated team Focus on solutions
Always looking for most effective way of working
Using expertise of all members
Pro-actively call in expertise when needed
“Give the OPERATOR the BEST tools and knowledge”
First results
16
Introduction
Challenges
Vision / URS
Project Organisation
Factors for success
First results
• URS phase 1 implemented
• Intuitive HMI design
• Control Strategy fit for purpose
• Complex dynamic plant trainingsystem accurately built in short time
• Operator training in progress
• Fast track schedule on track
“Give the OPERATOR the BEST tools and knowledge”
POM
fit for
TASKS
17
OPERATOR
CENTRIC
TRAINING
and
CERTIFICATION
HMI
fit for
TASKS
ALARM MANAGEMENT
Supply the right
information
at the right time
CONTROL
STRATEGY
Operator
always
IN CONTROL