The Capacity Allocation & Congestion Management Network Code: the way forward for IEM target model implementation EWEA 2012 Copenhagen 18 April 2012. Antonio Lopez-Nicolas Manager - Markets. Mandate for network codes and ten-year plans in Reg. 714/2009 41 TSOs from 34 countries - PowerPoint PPT PresentationTRANSCRIPT
The Capacity Allocation & Congestion Management Network
Code: the way forward for IEM target model implementation
EWEA 2012
Copenhagen 18 April 2012
Antonio Lopez-Nicolas
Manager - Markets
The role of TSOs – ENTSO-E
• Mandate for network codes and ten-year plans in Reg. 714/2009
• 41 TSOs from 34 countries
• Fully operational since July 2009
• A trans-European network
• 530 million citizens served
• 910 GW generation• 300,000 km of transmission lines• 3,400 TWh/year demand• 380 TWh/year exchanges
• Replaced former TSO organisations: ATSOI,
BALTSO, RTSO, NORDEL, UCTE, UKTSOA
System Development
System Operation
Electricity Market
Research and Development
Antonio Lopez-Nicolas | 18 April 2012 | Page 2
CA
CM
FG
A set of network codes & framework guidelines in ... 2014 … A set of network codes & framework guidelines in ... 2014 …
Antonio Lopez-Nicolas | 18 April 2012 | Page 3
2010 205020302020
TYNDPNSCOGI
E-Highways
Planned projectsEnvisaged projects
Possible projects
2050 Energy Pathways (National analysis)FP7 Projects (Susplan, Realisegrid, Twenties, Optimate,…..)….
TSOs PlanEU Policies
Time
Possibilities
ENTSO-E modeling shows 38% of ENTSO-E modeling shows 38% of E-demand could be met by RES in 2020E-demand could be met by RES in 2020
… … as RES meets more & more of the electricity demand …as RES meets more & more of the electricity demand …
Antonio Lopez-Nicolas | 18 April 2012 | Page 4
…and the generation mix changes fundamentally…
Large varying flows all over EU
wind Source: Energinet.dk 2010
Thousands of small power plants
Denmark
Antonio Lopez-Nicolas | 18 April 2012 | Page 5
Implicit allocation
Price coupling
Continuous Implicit
allocation
Physical and/or Financial
Transmission Rights
TSO-TSObalancing
modelCap
acity
al
loca
tion
Tim
e fr
ame
Long-term market
Day-aheadmarket
Intradaymarket
Balancingmarket
Coordinated available transmission capacity (ATC)
Flow based approach (FB)
Cap
acity
calc
ulat
ion
The IEM Target model for 2014The IEM Target model for 2014
Antonio Lopez-Nicolas | 18 April 2012 | Page 6
Capacity Allocation
and Congestion
Management
Day Ahead Markets
Day Ahead Markets
IntradayMarketsIntradayMarkets
ForwardMarkets
The network codes that will enshrine the target model into European legislation
Balancing FWGL
Capacity CalculationCapacity
Calculation
Balancing NC
Antonio Lopez-Nicolas | 18 April 2012 | Page 7
The CACM network code :
-Day ahead target model for market coupling.
-Intra-day target model of implicit continuous trading.
-Rules for calculating capacity and defining bidding zones.
-General sections on definitions, firmness, and cost recovery
The CACM network code :
-Day ahead target model for market coupling.
-Intra-day target model of implicit continuous trading.
-Rules for calculating capacity and defining bidding zones.
-General sections on definitions, firmness, and cost recovery
The Capacity Allocation & Congestion Management network codeThe Capacity Allocation & Congestion Management network code
EC official request to draft the NC received on 19 Sep 2011CACM NC to be delivered by 30 September 2012
Antonio Lopez-Nicolas | 18 April 2012 | Page 8
CACM network code: How are stakeholders involved?
Antonio Lopez-Nicolas | 18 April 2012 | Page 9
Public consultation launched on 23 March
The public consultation also includes a supporting document:
•Attempts to explain the code in a clear way and to aid transparency.
•Tries to meet the obligations placed on ENTSO-E by the EC.
• And demonstrate the FWGL is met.
The public consultation also includes a supporting document:
•Attempts to explain the code in a clear way and to aid transparency.
•Tries to meet the obligations placed on ENTSO-E by the EC.
• And demonstrate the FWGL is met.
The public consultation will be open until 23 MayAn open workshop will be held in Brussels on 7 May
Antonio Lopez-Nicolas | 18 April 2012 | Page 10
CACM Network Code – Next steps
Antonio Lopez-Nicolas | 18 April 2012 | Page 11
A combination of a bottom up and a top down approach is essential
Network codes and implementation projects are
compliments.
Experience gained via projects is reflected in the codes and the codes facilitate the projects.
Both are important for the delivery of the Internal Electricity Market
by 2014
A robust governance framework which complements the CACM
code is a must to ensure EU Wide implementation
Network codes and implementation projects are
compliments.
Experience gained via projects is reflected in the codes and the codes facilitate the projects.
Both are important for the delivery of the Internal Electricity Market
by 2014
A robust governance framework which complements the CACM
code is a must to ensure EU Wide implementation
Antonio Lopez-Nicolas | 18 April 2012 | Page 12
13
2300 TWh
The Nordic market – 2000
Central West Europe – 2010
ITVC – 2011
North West Europe – 2012
… … with a regional approach … stepwise …with a regional approach … stepwise …
Antonio Lopez-Nicolas | 18 April 2012 | Page 13
14
The Nordic market – 2000
Central West Europe – 2010
ITVC – 2011
North West Europe – 2012
European solution – 2014
3200 TWh
… … towards a pan-European day-ahead market …towards a pan-European day-ahead market …
Antonio Lopez-Nicolas | 18 April 2012 | Page 14
Efficient framework for facilitating infrastructure investments:
• Lengthy permitting procedures (+10 years)
• Insufficient political coherence and will
• Lack of public acceptance
Recent cold wave has shown that the power system has reached its limit in several places for both transmission capacity and generation flexibility
•Already today some lines and substations can hardly be taken out for servicing
•Wind and solar to be curtailed on an increasing number of days
But … IEM “software” cannot work without an adequate European gridBut … IEM “software” cannot work without an adequate European grid
Antonio Lopez-Nicolas | 18 April 2012 | Page 15
The scale of the challenge… build / replace more than 50000 km of gridThe scale of the challenge… build / replace more than 50000 km of grid
Antonio Lopez-Nicolas | 18 April 2012 | Page 16
Developing transparent & stable rules - what is a network code?
The process of developing network codes
Development of a FrameworkGuideline
Development of A NetworkCode
Network Code Status Update Next steps
Requirements for Generators Currently being consulted on. Public consultation closed on 20 March.
Capacity Allocation & Congestion Management
Draft developed, receiving internal approvals
Submitted for on 23 March, deadline 23 May. Public workshop 7 May.
Demand Connection Code Mandate letter received on 5 January 2012. Drafting work taking place within ENTSO-E
Public workshop on 18 April 2012.
Forward Markets ENTSO-E undertaking scoping work.
Official start date 1 October.
Balancing Markets ACER is work on a framework guideline
Consultation on the FWGL expected in April
Operational Security ENTSO-E began formal work on 1 March 2012
Internal development of drafts
Operational Planning & Scheduling ENTSO-E formal work expected to begin on 1 April 2012
Internal development of drafts
Load Frequency Control & Reserves Formal work expected to begin on 1 July 2012
Internal development of drafts
Summary - The status of the network codes