antonio allan mendoza resume 11.24.15

Download Antonio Allan Mendoza resume 11.24.15

If you can't read please download the document

Upload: allan-mendoza

Post on 07-Feb-2017

296 views

Category:

Documents


2 download

TRANSCRIPT

Copyright @ 2014 JobStreet.com

Antonio Allan MendozaSenior Project Manager for Visayas Mindanao at Johndorf Ventures Corporation 7th Floor FGU Building, Cebu Business Park, Ayala Cebu City

09176879422 [email protected]| 49 years old | Manila, National Capital Reg

Experience27 years

PreviousProject ManagerMakati Development Corporation

EducationAteneo De ManilaMBA, Masters Degree in Business AdministrationPolytechnic University of the Philppines, ManilaMasters Degree in Construction Management

Technological Institute of the PhilippinesB.S in Civil Engineering (1988)

NationalityPhilippines

ExperienceFeb 2015 - Present

Division Manager of CMD, Construction Management Division Visayas Mindanao areaJohndorf Ventures Corporation7th Floor FGU Building, Cebu Business Park, Ayala Cebu City

Copyright @ 2014 JobStreet.comSHAPE \* MERGEFORMAT

Copyright @ 2014 JobStreet.comINCLUDEPICTURE "blob:https://mail.google.com/6951c5e7-cf8b-4ae3-95e9-ad6746310a17" \* MERGEFORMATINET

Copyright @ 2014 JobStreet.comThe PortvilleDavaoSHAPE \* MERGEFORMAT

Copyright @ 2014 JobStreet.comThe Navona CebuManaging the full Construction of All Projects including Property Management namely:Cebu: Astana SubdivisionNavona SubdivisionPortville Prime SubdivisionHanniyah 1 & 2 Subdivision.148 Residences (12 Storey residential condo building)And other projects within cebu area under rectification works

Cagayan De Oro:Granvia Suites CondoMontierra Subdivision

IliganDominique Square

DavaoPortville with 370 Units at 2.7 hectares

Feb 2014 January 2015

Avida Towers Cebu

July 2013 Jan. 2014

Project Manager for Visayas Mindanao areaMakati Development Corporation, an Ayala Corporation.14th Floor FGU Building, Cebu Business Park, Ayala Cebu City

Managed Avida Twin Towers Cebu, 26th Storey with 512 Units and a Podium, also managed Avida Riala 5 Towers with 36th Storey with Also appointed as Head of Quick Response Team within I.T. Park area.Managed 2 Project In Charge, 2 Project Superintendents, TSD, MEPFS Team and 20 Technical Staff including the Project Admin Team.

Avida Towers Riala

Project DirectorDUOTAL, Inc.Rockwell Building, Pasig City

Copyright @ 2014 JobStreet.com

Managed the Construction of the Manila Bay Resort located at Marina, Paranaque City.I have 120 Professional Staff with different Disciplines.The Project is worth Php 50 Billion. The Projectare composed of a world class Casino Tower 15 Storey, a Dome, a 3 Level Podium and a Tunnel.Currently the Operations is in Slow Down due to financial matters of the Client and Unfortunately I was included in Retrenchment (can provide you a supporting documents)

January 2011 June 2013

Area ManagerMegawide Construction CorporationManaged the construction of 14 Storey Commercial Building located at 1 Coral Street, Macapagal Avenue, Manila, Spearheaded the propose Public Private Partnership of DEP ED School Buildings, Luzon Wide and NHA Mid Rise Condos at Smokey and Camarin Areas. My Technical team is 50 composing of Office Engineers with different discipline as well as security and maintenance team, while the construction workers are 250 personnel for OCW Project Only.Awarded as Best in HSE for attaining 500,000.00 man hour without any major and minor accident, given last Feb. 6, 2015

Nov. 2005 to Dec. 2010Building & Grounds ManagerMonark Caterpillar/Nissan Ortigas/Nissan Quezon Avenue and Club 360Libis, Quezon CityManage all properties from Luzon, Visayas and Mindanao including the yard of Heavy Equipment and all Branch Offices, Maintenance, Safety and Security.

August 1998 Oct. 2005

Proprietor/General Manager Allan Mendoza ConstructionHas Managed Own Construction Firm, monitoring operations on site, design and implements in house and clients requirements/designs and other Technical Works.Previous Clients:Mapua Institute of Technology, RCBC, Jollibee Antipolo, La Salle High School Antipolo, Cherryville Subdivision, Tokyo Marine Insurance, Cuatro Eres Development Corp., Creamship Corp. Malayan College.And other private owner.

Nov. 1988 July 1998

Project EngineerArch Builders and Development CorporationManaged Private and Government Projects:Purefoods Plant at Marikina CityPhil. National Bank at UP-PGH Branch, Taft Avenue Manila and at Candon Ilocos sur.Convention hall of Department Hotel at San Lazaro Hospital, Manila.Philippine General Hospital Building in Manila.Road concreting at Philppine Air Force, Villamor Airbase and Sangley Point, Cavite City

Education1988Technological Institute of the PhilippinesManilaBachelor of Science in Civil EngineeringConsistent Scholar

2010Ateneo De ManilaLoyola Heights, Quezon CityMBA, Masters in Business Administration

Polytechnic University of the PhilippinesManila.1994Masters Degree in Construction Management.

Skills:

Project Management (Horizontal and Vertical) from project planning to hand-over.Property Management from Maintenance to Security.Can drive with drivers license, computer literate

President:SJMHS Alumni Association 2005-2007Cherryville Home Owners Association, 2003-2005

Member:San Juan Pinaglabanan Jaycees, Inc.Philippine Association of Building AdministratorBuilding Owners Managers Association of the PhilippinesPurchasing Materials Management Association of the Philippines

Character References:

Regie AlabePro development-Director

Avida Land an Ayala Land Corporation09175708465

Renato BarcelonaHSE-Vice President

Megawide Construction Corporation09273571424

Ariel De La CruzStructural Engineer

09176308884