antenna installation engineering
DESCRIPTION
Applied for 2G & 3G networks roll-out.TRANSCRIPT
1
WIRELESS COMMUNICATION’S PROJECT
ANTENNA INSTALLATION ENGINEERING
Giáo viên hướng dẫn: Hà Hoàng Kha
Học viên thực hiện: Nguyễn Hồ Bá Hải
Nguyễn Phạm Viết Nhã
HO CHI MINH CITY UNIVERSITY of TECHNOLOGY
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 2
EPS Architecture
Radio Network Overview
Core Network Other
managementsystems
TEMS
OSS-RC
NetworkManagementEnvironment
Mun
Mur
Mut
Mub
lu
lur
RNC
Hub RBS or RXI
RBS
lubOSS-RC: Operations Support System Radio & Core
User Equipment
Radio AccessNetwork
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 3
RADIO BASE STATION
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 4
AN RBS FOR EVERY APPLICATION
RBS 6201 RBS 6101
RBS 6301
RBS 6302
RBS 6601
RBS 6102
RBS 6202
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 5
Different Cell Structures
RBS with one omni-directional antenna
covering 360o
RBS with three antennas each covering one sector,
(120o) – longer range
120o
Depending on RBS-type we can have up to 6 sectors in a cell
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 6
ANTENNA SYSTEM DIAGRAM
½ Jumper Cable
`Existing GSM Antenna 1800Mhz
Sector A
½ Jumper Cable
Existing GSM Antenna 1800Mhz
Existing GSM Antenna 1800Mhz`
Sector B
Sector C
Feeder Cable 7/8 or 1 5/8
RBS6201 (V2)
Feeder Cable 7/8 or 1 5/8
`` ``
Feeder Cable 7/8 or 1 5/8
½ Jumper Cable ½ Jumper Cable
½ Jumper Cable ½ Jumper Cable ½ Jumper Cable
½ Jumper Cable
½ Jumper Cable
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 7
ANTENNA SYSTEM DIAGRAM (with EHCU)
`Existing GSM Antenna 1800Mhz
Sector A
Jumper Cable
Feeder Cable 7/8 or 1 5/8
RBS6201 (V2)
Jumper Cable
EHCU
`Existing GSM Antenna 1800Mhz
Sector B
Jumper Cable
Re-used existing Feeder Cable 7/8 or 1 5/8
Jumper Cable
EHCU
`Existing GSM Antenna 1800Mhz
Sector C
Jumper Cable
Feeder Cable 7/8 or 1 5/8
Jumper Cable
EHCU
½ Jumper Cable½ Jumper Cable
½ Jumper Cable
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 8
RRU 1 RRU 2 RRU 3
MU
FILTER 1 FILTER 2 FILTER 3
OIL 1,2,3
RET Cable RET Cable RET Cable
Jumper Cables Jumper CablesJumper Cables
ANT 1 ANT 2 ANT 3
MU-RRU AND ANTENNA CONNECTIONS
Sector 1 Sector 2 Sector 3
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 9
GENERAL ANTENNA
1. Antenna 2. Down tilt kit 3. Mounting for F Panel 4. Clamp for F Panel
11
22
44
33
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 10
GENERAL ANTENNA
Antenna Dimensions
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 11
GENERAL ANTENNAAntennas mounted according to Standard Procedures and Site Specific Documents
- M Tilt : Mechanical Down Tilt.
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 12
- E Tilt : Electrical Down Tilt.
Electrical tilting angle checked according to Final Site Configuration
GENERAL ANTENNA
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 13
Remote Electrical Tilt - RET
RET system is designed to meet the high requirements for reliability, flexibility and efficiency in remote control of tower-mounted telecommunication equipment.
Optimize network in real time, saving time and costly site visits.
Respond quickly to changing traffic needs. Experience higher tilt possibility compared to
mechanical tilt. Reduces human error with accurate mechanical
control. No specialized manpower or equipment needed. Ideal for isolated or difficult-to-access sites.
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 14
Single Band RET Connections
RRU 1 RRU 2 RRU 3
MU
FILTER 1 FILTER 2 FILTER 3
OIL 1,2,3
RET Cable RET Cable RET Cable
Jumper Cables Jumper CablesJumper Cables
ANT 1 ANT 2 ANT 3
Sector 1 Sector 2 Sector 3
(I): ALD Control Interface2 x 8 pin connector according IEC 60130-9, female/male
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 15
Kathrein’s Remote Electrical Tilt
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 16
Attaching Single Band RET
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 17
Attaching Triple Band RET
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 18
External Hybrid Combiner Unit (ECHU)
ECHU is designed for high power combining and distribution.
When the need for traffic capacity grows, the EHCU allows a doubling of the number of carriers without adding antennas or antenna feeders. Hardware as well as installation and site fee costs can therefore be kept at a minimum.
The EHCU can also be used for in-building distributed antenna systems.
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 19
External Hybrid Combiner Unit (ECHU)
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 20
Tower-Mounted Amplifier (TMA)
The Tower-Mounted Amplifier (TMA) filters and amplifies Radio Frequency (RF) signals received by the antenna before being sent to the RBS.
Transmission (TX) signals from the RBS are filtered but not amplified before being sent to the antenna.
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 21
Tower-Mounted Amplifier (TMA)
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 22
Tower-Mounted Amplifier (TMA)
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 23
Repeater Solution
With the ever increasing focus of cost vs returns in wireless networks, repeaters (cell extenders) offer a cost effective solution to operators to provide coverage at a fraction of standard BTS site costs. Repeaters are ideal in scenarios where coverage is the prime objective.
These repeaters are ideally suited for use as a Gap-Filler to optimise network coverage.
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 24
Repeater Solution
Tapper
Only 1 feed is shown for the example
Donor 1 Link
Mainant
Repeaterant
AVITEC
REP
XXX
XXX
Flexi BTS
Tower equipment
Floor equipmentTapper connected directly to surge at feeder
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 25
Repeater Solution
RRUS
Tapper
Only 1 feed is shown for the example
Donor 1 Link
Mainant
Repeaterant
REP
XXX
XXX
Tower equipment
Floor equipment
RBS6601
OIL & DC
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 26
Repeater Setup
Power – Donor 1 & 2 - Link
Tappers
Repeater
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 27
Repeater Solution
Repeat Antenna
A
B
C
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 28
Repeater Solution
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 29
9
0
o
3
3
o 3
3
o
Antenna Beam
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 30
H-Beam = 330
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 31
H-Beam = 900
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 32
Smart Radio Concept – SRC 4 Way Receiver Diversity
The SRC solution is to cover large rural areas with low capacity coverage therefore cutting costs of building new sites to complete the RF plan.
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 33
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 34
RRUS
Tx/Rx Rx
X X
X X
X X
X X
X X
X X
RRUS
Tx/Rx Rx
60W 60W
* note: Max output power for a single RRU trx is currently 60W
2trx 60W - 4 way Rx Div – 2 Ant
Trx #1 Trx #2
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 35
RRUS
Tx/Rx Rx
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
RRUS
Tx/Rx Rx
RRUS
Tx/Rx Rx
RRUS
Tx/Rx Rx
60W 60W 60W 60W
Trx #1 Trx #2 Trx #3 Trx #4
4trx 60W - 4 way Rx Div – 4 Ant
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 36
IN - BUILDING
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 37
IN - BUILDING
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 38
IN - BUILDING
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 39
TMTMTMTM
RUS
DUG
44 43
RUS
RUS
RUS
RUS
DUG
RUS
RUS
43
RBS 6201 12+4+12+7
DAS
B
In-Building Solution
37.8
DAS
C
NSN Ultrasite 3+3+8+3
DAS
A
DAS
B
42 37.5
AA
DAS
C
38.5
37.5
BBCC
DD
38.2
DAS
D
HC
DA
S A
DA
S A
MCM
RUS
uLAB
RUS 80W
RUS 80W RUS 80W
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 40
In-Building Solution
RBS 6201 12+7+4
TMTMTMTM
DUG
RUS
RUS
RUS
RUS
RUS
RUS
RUS
DUG
43
36.8
RUS
39.536.8
MCM
RUS
NSN Configuration 5+4+3
BB
CC
DAS
B
DAS
C
37.537.542
DAS
A
AA
MCM
DA
S 1
DA
S 1
DA
S 2
DA
S 3
DA
S 1
4343
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 41
IN - BUILDING
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 42
Metro SiteMetro Site
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 43
Metro Site Antenna CS 72454.0Metro Site Antenna CS 72454.0
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 44
Metro Site Antenna Kathrein 739 489Metro Site Antenna Kathrein 739 489
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 45
Metro SiteMetro Site
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 46
Problems of Technology
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 47
NEW GENERATION NEW GENERATIONTechnology Technology + +
NaturalNatural
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 48
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 49
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 50
Phi Phi Island, Krabi.
25-Oct-13 WIRELESS COMMUNICATION PROJECT 2013 51
Thank You & Questions