ANNUAL PROGRESS REPORT ON THE MARKETING INFRASTRUCTURE
PROGRAMME– 2015/16
DIRECTORATE: MARKETING
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 2 of 25
CONTENTS
ACRONYMS ........................................................................................................................................................... 3
1. INTRODUCTION AND BACKGROUND ........................................................................................................ 4
1.1 Definition of agricultural marketing infrastructure ........................................................................... 4
1.1 Problem statement ..................................................................................................................... 5
1.2 Interventions by the Department of Agriculture, Forestry and Fisheries (DAFF) ................................ 5
2. STATUS OF THE MARKETING INFRASTRUCTURE INVESTMENTS – 2015/16 ....................................... 6
2.1 Criteria for funding ...................................................................................................................... 6
2.2 Funding administration and implementation .................................................................................. 6
2.3 2015/16 marketing infrastructure investments’ progress report ....................................................... 7
3. SUCCESSFUL BUSINESS CASES ............................................................................................................ 10
3.1 Cortina Farm – Western Cape Province ..................................................................................... 10
3.2 Solly’s Boerdery – Limpopo Province ......................................................................................... 11
4. MONITORING AND EVALUATION MECHANISMS.................................................................................... 13
5. PROGRESS ON PENDING APPLICATIONS .............................................................................................. 13
6. PLANS FOR THE 2016/17 FINANCIAL YEAR ........................................................................................... 14
APPENDIX: CONSTRUCTION WORK AT CORTINA FARMS AND SOLLY’S BOERDERY....................... 15
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 3 of 25
ACRONYMS
ABSA : Allied Banks of South Africa
AgriBEE : Agricultural Broad-Based Economic Empowerment
CA : Controlled Atmosphere
CC : Close Corporation
DAFF : Department of Agriculture, Forestry and Fisheries
D: CED : Directorate: Cooperatives and Enterprise Development
EC: DRDAR : Eastern Cape: Department of Rural Development and Agrarian Reform
GDARD : Gauteng Department of Agriculture and Rural Development
Land Bank : Land and Agricultural Development Bank of South Africa
MoA : Memorandum of Agreement
(Pty) Ltd : Proprietary Limited
PDAs : Provincial Departments of Agriculture
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 4 of 25
1. INTRODUCTION AND BACKGROUND
1.1 Definition of agricultural marketing infrastructure
The Integrated Marketing Strategy for Agriculture, Forestry and Fisheries Products in the Republic of
South Africa defined marketing infrastructure for agriculture, forestry and fisheries as:
Agricultural marketing infrastructure: any facility or tool that can be used by producers and
traders to facilitate trade, transform raw agricultural products into value-added products through
processing and packaging, storing agricultural products to smooth out supply and fulfil demand,
transporting agricultural products to satisfy demand, collecting, collating, synthesising and
disseminating market related information. Among other things, marketing infrastructure comprises
of the following: storage units, including cold storage and regular ambient storage, ripening
chambers and ice plants, grading facilities for specific qualities of produce , facilities for washing
(cleaning) of fruit and vegetables, communication facilities (telephones, faxes, internet access,
etc.), abattoirs and other processing facilities, livestock auctioneering facilities, wool shearing,
cleaning and grading sheds, loading pens or ramps, marketing information accumulation and
dissemination facilities such as computers and any other relevant facility required by farmers and
traders for marketing purposes.
Marketing infrastructure for fisheries and forestry products: any tool or facility that can be used
by producers and traders to facilitate the marketing and trading of raw fisheries and forestry
products and products derived from them from the points of production and/or processing up until
they are finally utilised by final consumers or industrial users. Such infrastructure may, in the case
of fisheries products, include storage, packaging, processing and distribution equipment and
facilities. In the forestry subsector, critical marketing infrastructure includes value adding and
processing equipment and facilities such as pole treatment plants, furniture manufacturing plants,
extraction and bottling equipment for honey, processing plants for processing activities and fibre
production and the subsequent distribution of the final products to the relevant markets at the right
time, in required quantities and at the right price.1
Source: An integrated marketing strategy for agriculture, forestry and fisheries products in the Republic of South Africa
(2012).
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 5 of 25
1.1 Problem statement
Commercial trading of agriculture, forestry and fisheries’ products and bi-products has over the years
undergone various rapid developments. From the supply side, producers are facing stringent market
requirements from the markets and consumers to produce, package and supply good quality products
that meet the minimum food quality and safety requirements. To respond to these modern demands,
established commercial producers made massive investments in their marketing infrastructure
(packaging, branding, storage and transport facilities), research and development and other modern
farming technologies.
As a result of the above mentioned developments, smallholder producers as well as the previously
disadvantaged individuals generally find it difficult to supply the markets with produce that meet these
modern demands. The Department of Agriculture, Forestry and Fisheries (DAFF) has over the years
identified access to agricultural marketing support services such as agricultural marketing infrastructure
and agro-logistics, agricultural marketing information, agricultural marketing skills, agricultural marketing
institutions and agricultural marketing finance as key constraints limiting smallholder producers to enter
the mainstream agricultural marketing and trading environment.2
1.2 Interventions by the Department of Agriculture, Forestry and Fisheries (DAFF)
To address the above mentioned challenges faced by smallholder producers, the Department of
Agriculture, Forestry and Fisheries (DAFF) undertook the following initiatives:
Developed an Integrated Marketing Strategy for Agriculture, Forestry and Fisheries Products
(2012). The strategy identifies certain impediments constraining smallholder producers from
accessing mainstream agricultural markets such as agricultural marketing infrastructure.
The Directorate: Marketing initiated a process of developing the National Guidelines (Norms and
Standards) for Public Investment in the Establishment of Agricultural Marketing Infrastructure.
These National Guidelines are primarily aimed at facilitating and directing the establishment of
agricultural marketing infrastructure, thereby ensuring that the impact of this market access barrier
are softened or minimised.
Introduced a funding programme for Small and Medium Enterprises (SMEs) falling within the
agriculture, forestry and fisheries sectors named the AgriBEE Fund. The fund is targeting previously
marginalized SMEs who are willing to acquire equity/shareholding in existing commercially viable
2 Source: Agricultural Marketing Policy for the Republic of South Africa
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 6 of 25
and sustainable agri-businesses. The fund also focuses on enterprise development by funding of
SMEs willing to venture into agro-processing and value adding activities.
2. STATUS OF THE MARKETING INFRASTRUCTURE INVESTMENTS – 2015/16
2.1 Criteria for funding
For any business proposal to be considered, the following basic criterion must be met:
The applicant must be black and the entity applying be 100% black owned;
The business must be registered as a legal entity;
A detailed business plan with clear investment requirements must be submitted;
The business must have clear indications for sustainability; and
To enhance commitment and optimal utilization of the fund by the applicants, a minimum own
contribution of 10% is required for investments up to the value of R5 million. For investments above
R5 million, a minimum of 20% own contribution is required from the applicants.
2.2 Funding administration and implementation
To ensure efficiency in the administration and the implementation of the Fund, the Department of
Agriculture Forestry and Fisheries (DAFF) appointed the Land and Agricultural Development Bank
(Land Bank) of South Africa to be the Fund Manager. As a key specialist financial institution for the
sector, the Land Bank is tasked to ensure that the AgriBEE funds are disbursed according to the
approved specifications and guidelines provided for in the Memorandum of Agreement (MoA) for the
Fund. Amongst other responsibilities, the Land Bank is also tasked to conduct feasibility and viability
studies and due diligence on businesses recommended for funding before any financial commitments
can be made.
At a technical level, DAFF works closely with the Provincial Departments of Agriculture (PDAs),
Commodity Associations and other relevant industry stakeholders to identify potential SMEs to benefit
from the fund. Coordination of the selection process is undertaken through the Marketing Forum chaired
by the Director: Marketing. During its sittings, the Forum reviews applications from various stakeholders
and provides inputs and preliminary recommendations for funding of potential business cases.
Recommended business cases are therefore referred to the Directorate: Cooperatives and Enterprise
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 7 of 25
Development (D: CED) for preliminary assessment before they can be submitted to the Land Bank for
further processing.
2.3 2015/16 marketing infrastructure investments’ progress report
For the period ending in March 2016, the Department of Agriculture, Forestry and Fisheries (DAFF)
through the Marketing Forum managed to receive, examine and recommend ten (10) business cases
for marketing infrastructure funding with the total required funds amounting to R 63 707 000. This figure
excludes equity and agro-processing funding applications. Of the recommended ten (10) business
cases, two (2) cases with the total value of R 13 626 000 have been finalized and massive construction
work has been undertaken on site and are in the last phase of finalization. The remaining eight (8)
business cases are currently undergoing internal assessment processes within DAFF and the Land
Bank. Table 1 below highlights an overview of marketing infrastructure business cases handled during
2015/16.
Table 1: Summary of business cases submitted to DAFF for marketing infrastructure funding
NO. BUSINESS
NAME
PROVINCE INVESTMENT
VALUE
INVESTMENT
REQUIREMENTS
STATUS
1 Starking Fruit
Packers CC
t/a Cortina
Farms
Western
Cape
R 5, 430 000 Expansion of fruits
(apples and pears)
packaging facilities;
Construction of 3
Controlled Atmosphere
(CA) rooms; and
Procurement of 1 000
fruit bins for the CA
rooms.
Funding approved and
construction is currently in
the final stage of being
completed.
2 Kaapschon
Boerdery 35
(Pty) Ltd
Western
Cape
R 5 000 000 Renovation and
equipping of existing
packaging facility,
Construction and
equipping of 2
Controlled Atmosphere
(CA) rooms; and
Procurement of 1 000
Application was assessed
by DAFF and is currently
with the Land Bank for
due diligence.
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 8 of 25
NO. BUSINESS
NAME
PROVINCE INVESTMENT
VALUE
INVESTMENT
REQUIREMENTS
STATUS
fruit bins for the CA
rooms.
3 D&M Fresh
Products CC
Western
Cape
R 5 000 000 Revamping, expansion
and equipping of the
current packaging
facility; and
Procurement of plastic
fruit bins.
Application was assessed
by DAFF and is currently
with the Land Bank for
due diligence.
4 La Ric Mal
CC
Western
Cape
R3, 660 000 Purchasing of bottling
and branding machine;
and
Purchasing of wine
storing tanks.
Business proposal is
currently undergoing
internal assessments
within DAFF and will be
submitted to Land Bank
as soon as all documents
are received and
assessed.
5 Siyavuselela
Agricultural
Cooperative
Eastern
Cape
R6, 900 000 Construction and
equipping of a tomato
packhouse; and
Procurement of a
refrigerated truck.
20% contribution was
provided by the EC:
DRDAR on behalf of the
cooperative.
Production tunnels
damaged by hailstorm.
Land Bank can only
commence with the
disbursement of funds
once production issues
are resolved (tunnels
repaired) and risk
mitigation strategies are in
place.
6 Ripplemead
Citrus Farm
Eastern
Cape
R 18,500 000 Construction and
equipping of citrus
packhouse facility and;
Procurement of a
The Province submitted a
revised proposal with
project cost escalations
from R 18, 5 M to R39, 4
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 9 of 25
NO. BUSINESS
NAME
PROVINCE INVESTMENT
VALUE
INVESTMENT
REQUIREMENTS
STATUS
refrigerated truck. M.
The province was
requested to forward
revised construction
quotations to justify the
cost escalations.
20% contribution to be
provided by the EC:
DRDAR behalf of the
cooperative.
7 Mystic Blue
Trading 164
(Pty) Ltd
KwaZulu
Natal
R 3, 260 000 Purchasing of 3 delivery
trucks to deliver
produce from
packhouse to harbour
and juice factory.
Business proposal is
currently undergoing
internal assessments
within DAFF and will be
submitted to Land Bank
as soon as all documents
are received and
assessed.
8 Moradu
Farming
Enterprise
Limpopo R 5, 785 000 Construction and
equipping of a
packhouse facility with
cold storage;
Purchase of a
temperature controlled
transport.
Business proposal is
currently undergoing
internal assessments
within DAFF and will be
submitted to Land Bank
as soon as all documents
are received and
assessed.
9 Solly’s
Boerdery
(Pty) Ltd
Limpopo R8, 196 000 Construction of
packhouse with potato
washing, grading,
sorting and packaging
equipment; and
Purchasing of
refrigeration and
aeration systems.
Funding approved and
construction is currently in
the final stage of being
completed.
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 10 of 25
NO. BUSINESS
NAME
PROVINCE INVESTMENT
VALUE
INVESTMENT
REQUIREMENTS
STATUS
10 Korema
Primary
Cooperative
Gauteng R 1, 976 000 Expansion and
equipping of existing
packhouse facility with
cold storage;
Purchase of a
temperature controlled
transport.
The funding is approved
by DAFF and Land Bank.
Funds to be disbursed
after GDARD has
completed the
construction of the
packhouse to be
equipped.
Total investment required R63, 707 000
As highlighted in Table 1 above, 8 (eight) business cases are currently being assessed by DAFF and
the Land Bank. (2) Two business cases have received funding and construction is currently in the last
phase of completion. For the coming financial year, DAFF, the Land Bank and other relevant
stakeholders will continue with the processing of other business cases.
3. SUCCESSFUL BUSINESS CASES
3.1 Cortina Farm – Western Cape Province
Covering a total area of 54 hactares, Cortina Farm is situated in the Vyeboom area, between Grabouw
and Villiersdorp. The property is described as Portion 26 of the farm Fortuin Nr.83, falling within the
Overberg Region of the Western Cape Province.The farm is 100% black owed by the W&R Myburgh
Trust.
The farm was purchased in 2001 by means of a mortgage loan which was acquired from ABSA. The
Myburgh family has however settled the mortgage in 2009 and has not received any assistance with the
settlement of the mortgage. Mr. Richard Myburgh has more than 40 years experience in the marketing
and distribution of deciduous fruits for the domestic and export market. The farm employs approximately
75 employees (15 permanent and 60 on seasonal basis).
The farm produces apples and pears on 32 hectares. 32 % of the produce is sold domestically, 60% is
exported while the remaining 8% is supplied to local juice manufacturers. Locally, the fruit is sold at
Johannesburg, Pretoria, Pietermaritzburg, Bloemfontein and Klerksdorp Fresh Produce Markets through
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 11 of 25
the family owned Starking Fruit Packers CC while Melsetter Group (Groupways) is used as a channel
for export markets.
Cortina Farm applied for funding to expand fruit packaging facilities through the construction of three
Controlled Atmosphere (CA) cold rooms3, purchasing of 1 000 wooden bins for packing of fruits,
revamping the roof ceiling of the existing packhouse and painting of the pack house floor. The total
amount for this investment was R5 431 970.00. As stipulated in the AgriBEE operational manual, W&R
Myburgh Trust had to contribute 20% of the investment (R1 086 394.00) whereas the R4 345 576.00
was paid by DAFF through the AgriBEE fund. There has been progress in the implementation of the
project. The savings that were made on the Controlled Atmosphere (CA) cold rooms were used to
procure extra 1000 plastic bins and the revamping of the existing packhouse (See pictorial material
from page 15). The funding was allocated as shown in Table 2 below:
Table 2: Breakdown of Cortina Farm funding
Item Cost
Wooden bins for packing x 1000 R672 600.00
Controlled Atmosphere (CA) cold rooms x 3 R4 218 000.00
Ceiling for existing pack house R461 370.00
Paint for packhouse floor R80 000.00
20% contribution from W&R Trust R1 086 394.00
Total amount from AgriBEE Fund R4 345 576.00
Total investment R5 431 970.00
Investments made in Cortina Farm are already yielding positive outcomes. Through the construction of
the Controlled Atmosphere (CA) cold rooms, the farm can now supply the market with apples
throughout the year at good prices during off-season while the competitors are out of stock. Cash flow in
the farm also remains consistent as a result of consistent supply of the apples to the market. Some of
the casual employees can also be retained in the farm due to consistent supply of produce.
3.2 Solly’s Boerdery – Limpopo Province
Owned by Mr. Solly Ratjomane, the farm is located at Sewabarwana (formerly known as Bochum) in
the Blouberg Municipality of the Capricorn District in Limpopo Province. The farm covers a total area of
3 Controlled Atmosphere (CA) cold rooms – storage method in which temperature, humidity, oxygen, carbon dioxide and nitrogen concentrations are regulated to pro-long the freshness of fruits and vegetables without the use of chemicals. With CA cold rooms, produce can be stored 2-4 times longer than usual.
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 12 of 25
1430ha and the producer grows mainly potatoes (Mondial potato variety) on 144 ha and rotates with
tomatoes (12ha), dry beans (80ha), pumpkin (+/- 50ha) and maize (52ha).
The producer also leases an additional 446ha of land (Devonia) which is near Ga-Moleele village where
additional potatoes are produced on the 80ha plot. In total, 184ha of land is used for potato production
while the remaining 40ha is used for seed production. On this farm there is also a livestock segment
which comprises of 242 Bonsmara and 78 Simbra cattle. Currently, the farmer contributes immensely to
job creation where 48 people are permanently employed and seasonally an additional 150 people are
employed on the farms.
To enhance potato production and packaging on the farm, Mr. Ratjomane submitted an application for
marketing infrastructure funding to DAFF. In the application, he indicated his desire to have a well-
equipped packhouse to the value of R 8 196 183.90 where potatoes will be washed, sorted and
packaged before being sent to various markets. Prior to applying for the fund, the producer was using
two dilapidated packhouses/sheds for sorting and packaging of his produce.
In response to Mr. Ratjomane’s application, DAFF through the Land Bank approved that the producer
receive the required amount. The producer indicated his commitment by contributing 20% of the
required amount. Table 3 below indicates how the funding was allocated:
Table 3: Breakdown of Solly’s Boerdery funding
Item Cost
Construction of a packhouse R2 123 825.00
Purchase and installation of packing lines machinery R6 072 358.20
20% contribution from Solly’s Boerdery R1 639 236.80
Total amount from AgriBEE Fund R6 556 947.20
Total investment R8 196 184.00
During the recent visit by the Department of Agriculture, Forestry and Fisheries (DAFF) to Solly’s
Boerdery, Mr. Ratjomane (the owner) indicated that with the completion of the new potato packaging
facility he will speedily pack potatoes for a number of clients such as Spar, Market agencies and others
that are distributed to the Fresh Produce Markets. The producer also indicated that he is willing to assist
neighbouring potato producers with packaging of their produce should such a need arise. This means
that there will be increased farm income and more jobs will be created for local people.
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 13 of 25
4. MONITORING AND EVALUATION MECHANISMS
To monitor and evaluate the funding process and to ensure accountability, the following mechanisms
are used:
The Directorate: Cooperatives and Enterprise Development and Directorate: Marketing, Land Bank
and Provincial Departments involved, make several visits to both farms (Cortina and Solly’s
Bordery) to ensure that the funds indicated in Tables 2 and 3 above are being utilized according to
the approved application for funding and the recommendations from all parties. Both projects are
currently in the last phase of completion and it is envisaged that they will be completed before June
2016;
Project engineers hold regular progress meetings with stakeholders to provide feedback and
progress regarding the construction;
The Land Bank receives approved construction progress reports from the service providers through
Provincial Departments and DAFF before processing any payments; and
DAFF has developed an Impact Assessment Tool to measure the impact of the marketing
infrastructure programme on funded farms. The Tool will consider variables such as: access to new
markets, changes in farm incomes and jobs creation and shall be applied over the next 3 to 5 years
to assess the impact
5. PROGRESS ON PENDING APPLICATIONS
5.1 DAFF is currently working with the Land Bank and Provincial Departments of Agriculture (PDAs) to
finalize the remaining business cases. The following key issues hinder progress in processing the
remaining proposals:
Delays in submittal of outstanding required documentation by the applicants;
Delays in sourcing of construction quotations from potential service providers to justify the funding
requirements;
Inflation of construction costs by some of the service providers; and
Inability of the applicants to raise and pay the required own contribution.
5.2 To address the above mentioned challenges the following initiatives are made:
DAFF is working closely with Provincial Departments and the Land Bank in improving the turn-
around times;
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 14 of 25
Regular updates are provided through letters to affected stakeholders; and
Some Provincial Departments made commitments to assist the producers in acquiring of the
required own contribution.
6. PLANS FOR THE 2016/17 FINANCIAL YEAR
DAFF will continue to take the lead in processing of the remaining business cases.
DAFF is currently working with the Western Cape and Limpopo Provincial Departments to arrange for
the official launches of Cortina Farms and Solly’s Boedery where the Minister will also be invited to lead
these official launches.
More applications are expected from the other provinces. Free State and North West Provinces are
amongst other provinces indicating their desire to submit proposals during 2016/17 financial year. The
Western Cape Province is also working on additional business cases. These proposals will be reviewed
in the next Marketing Forum sitting to be held in April 2016.
APPENDIX: CONSTRUCTION WORK AT CORTINA FARMS AND SOLLY’S BOERDERY
CONSTRUCTION WORK AT CORTINA FARMS – WESTERN CAPE
Picture 1: Construction of Controlled Atmosphere (CA) rooms – Cortina Farms
Picture 2: Painting work done inside the CA rooms – Cortina Farms
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 16 of 25
CONSTRUCTION WORK AT CORTINA FARMS – WESTERN CAPE
Picture 3: Equipped CA room – work in progress
Picture 4: Construction of CA rooms completed
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 17 of 25
CONSTRUCTION WORK AT CORTINA FARMS – WESTERN CAPE
Picture 5: Revamping of the packhouse ceiling
Picture 6: Revamping of the packhouse ceiling completed
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 18 of 25
CONSTRUCTION WORK AT CORTINA FARMS – WESTERN CAPE
Picture 7: Painted packhouse floor
Picture 8: Fruit storage bins inside the CA room – 1000 bins were procured
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 19 of 25
CONSTRUCTION WORK AT SOLLY’S BOERDERY – LIMPOPO
Picture 9: Previous potato packaging facility
Picture 10: Previous potato packaging line
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 20 of 25
CONSTRUCTION WORK AT SOLLY’S BOERDERY – LIMPOPO
Picture 11: Previous potato packaging line
Picture 12: Construction of the new facility commencing – site preparation
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 21 of 25
CONSTRUCTION WORK AT SOLLY’S BOERDERY – LIMPOPO
Picture 13: Construction of the new facility commencing – site preparation
Picture 14: Interior of the new packaging facility – work in progress
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 22 of 25
CONSTRUCTION WORK AT SOLLY’S BOERDERY – LIMPOPO
Picture 15: Potato packaging line being installed in the new facility
Picture 16: Newly installed potato packaging line
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 23 of 25
CONSTRUCTION WORK AT SOLLY’S BOERDERY – LIMPOPO
Picture 17: Newly installed potato packaging line
Picture 18: Mr. Solly Ratjomane making basic demonstration the for new packaging
line
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 24 of 25
CONSTRUCTION WORK AT SOLLY’S BOERDERY – LIMPOPO
Picture 19: Exterior view of the new facility
Picture 20: Exterior view of the new facility
ANNUAL PROGRESS REPORT ON MARKETING INFRASTRUCTURE PROGRAMME – 2015/16 Page 25 of 25
…………………………………………………………
Name: H.M Mamabolo
Designation: Director: Marketing
Date: