annual progress report 2016€¦ · small scale gold mining is still gaining prominent due to the...
TRANSCRIPT
1
MINISTRY OF LOCAL GOVERNMENT AND RURAL DEVELOPMENT
BOSOME FREHO DISTRICT ASSEMBLY
ANNUAL PPROGRESS REPORT
for
January –December 2016
Compiled by:
District Planning & Coordination Unit
February 2017
2
TABLE OF CONTENTS
Contents Page
1.1 Introduction ..................... ...................................... ....................... 1
1.1.2 District Profile........................................................... ............................. 1
1.1.3 District Governance..................... ...................................... ........... 1
1.1.4 District Assembly and its Objectives..................... ............................. 2
1.1.5 Purpose of the 2016 Annual Progress Report (APR) ................................. 2
1.2 The key M&E Objectives for the Year............................. ....................... 3
1.3 Processes Involved and Difficulties Encountered............ ....................... 4
2.1 Status of Implementation of MMTDP in 2016............................. ................. 5
2.2 M&E Activities Report............... ...................................... ....................... 11
2.2.1 Programme and Projects Status for the year 2016………....................... 11
2.3 Update of Disbursement from Funding Sources............... ....................... 26
2.3.1 The Sources of External Inflow Included...................................... ........ 26
2.3.2 Comments on the Releases of Funds.............................. ....................... 29
2.3.3 Efforts to Generate More Revenue................................. ....................... 31
2.3.4 Challenges with Regard to Disbursement....................... ....................... 32
3.1 Updates on Indicators and Targets............................... ....................... 32
3.1.1 Agriculture..................................... ................................... ....................... 32
3.1.2 Education ..................................... ................................... ....................... 34
3.1.3 Health ................................................. ................................... ....................... 38
3.1.4 Ghana Health Service Activities……………………………………………………………………….. 38
3.1.5 HIV/AIDS………………………………………………………………………………………………………… 43
3.2 Updates on Critical Development and Poverty Interventions.................... 48
3.2.1 The Livelihood Empowerment Against Poverty (LEAP) Programme.......... 48
3.2.2 Incentives for Business Development ......................... ....................... 55
3.2.4 Social Welfare ……………… ........................................ 57
3
3.2.6 Poverty Status of the District.. ........................... ......................... 58
4.1 The Way Forward..................... ............................ ........................ 58
4.2 Conclusion..................................... ............................ ........................ 59
List of Tables
Table 1: Programmes Activities and Achievements for 2016......................... 05
Table 2a: District’s Development Fund (DDF) Projects................................. 11
Table 2b: District Assemblies Common Fund (DACF) Project...................... 17
Table 2c: GETFund Projects........................................................................... 20
Table 3: Revenue Mobilisation Performance as at 31st December 2016........ 27
Table 4a: Expenditure Performance………………................................. 29
Table 4b: Expenditure by Department ………………………………….. 30
Table 5: District Indicators and Parameters Agriculture ........................... 32
Table 6: Key Agriculture Outputs for 2016 ................................................ 33
Table 7: Key Activities Identified for Performance by Objectives............... 34
Table 8: District Indicators and Parameters (Education)................................ 35
Table 9: BECE Pass Rate 2011-2016…………………………………….. 36
Table 10: Key Health Outputs for 2016 ……….. ................................... 41
Table 11: District Indicators and Parameters (Health) ................................ 42
Table 12: Situation of Core Health Staff……......................................... 43
Table 13: District Indicators and Parameters (HIV )………………….. 44
Table 14: District Indicators and Parameters (Transp. & and Account Gov).......... 44
Table 15: No. of Birth Registered for 2014-2016…………...................... 45
Table 16: Training for Tradesmen……………......................................... 56
Table 17: Improving Access to Business Information........................................ 56
Table 18: Access to Safe Water and Sanitation .............................................. 57
Table 19: Categories of Disabled Persons Registered....................................... 57
Table 20: Family Welfare Cases Handled From 2009 to 2014...................... 58
4
1.0 Introduction
1.1 Background
In compliance with statutory requirements for monitoring and evaluation, mechanisms are put
in place to measure progress of planned programmes and projects undertaken by the district,
the Bosome Freho District Assembly on an annual basis prepare a District Annual Progress
Report.
The Annual Progress Report for January-December 2016 was prepared within the context of
programmes and projects, which are in line with the seven thematic areas of the Medium
Term Development Plan (MTDP) as follows:
� Ensuring and sustaining macroeconomic stability
� Enhanced competitiveness of Ghana’s Private Sector
� Accelerated agricultural modernization and natural resource management
� Oil and Gas
� Infrastructure and Human settlement Development
� Human development, employment and productivity
� Transparent and accountable governance.
In addition to programmes and projects initiated at the local level, the Assembly also monitor
and report on direct national and development partner interventions on-going at the local
level and report on their status of implementation. Beside these, the Assemblies report on
Disbursement from major funding sources, status of indicators and targets set and critical
development and poverty issues which give indication to the level of welfare of the people
and therefore serve as tools of evaluation for the various poverty reduction interventions put
in place by central government and development partners at the grassroots level.
1.2 District Profile
The Bosome Freho District Assembly was established by the legislative instrument
LI 1852 of 2007 with its capital at Asiwa. The District was carved out of the former
Amansie East District.
The District is located in the central part of the Ashanti Region and shares
boundaries with the Bekwai Municipal to the West, Bosomtwi and Ejisu-Juaben
Districts to the North, Adansi South and Akyimansa Districts to the South and
5
Asante-Akim South to the North-East. It is estimated to have a land area of about
630sq. km. Major settlements in the District are Asiwa, Esaase, Dompa, Anyanso,
Freso, Abosamso, Nsuaem, Tebeso I & II, Anyinase and Nsuta. The District lies
within Latitude 6°00’N and 6°26N and Longitudes 1°00W and 1˚30W.
It is drained by Pra, Fre, Sunso, Anum Rivers and the Lake Bosomtwe. The
vegetation is a moist-semi-deciduous forest predominantly covered by chronolaena
Odorata (commonly called Acheampong) shrub. It also has forest reserves along the
Lake Bosomtwe Ranges and along the borders with Adansi South. The District is
mainly under laid by three geological formations, the Birimian, Tarkwaian, and
granitic rocks.
The District experiences tropical rains with double maxima recording a monthly
average of 1600mm in June and 1800mm in October. Temperature ranges between
32°C in March and 20°C in August with Humidity moderately high during the rainy
season. It ranges between 70% and 80% in the dry season.
Based on the 2010 Population and Housing Census report, the District has a total
population of 60,397. The sex distribution of the population was composed of 29,753
males and 30,644 females. The population growth rate of the District is 2% per
annum and projected population for 2016 is about 66,684.
The District is mainly rural and farming is still the main occupation of the people.
The major cash crops produced are cocoa, citrus and oil palm. Food crops are
generally produced on subsistence basis including maize, yams, cassava and
plantain. Cabbage production is popular as a non- traditional cash crop. It is mostly
cultivated along the slopes of the Bosomtwe ranges.
6
Small scale gold mining is still gaining prominent due to the discovery of alluvial
gold along the Anum and Pra rivers and their major tributaries.
Manufacturing is still virtually non-existent, except for some few individuals who
engaged in gari processing and palm oil production. Part time cottage industrial
activities such as weaving, basketry and petty trading activities are still common
among women.
Lake Bosomtwe and the surrounding meteorite crater with its associated landforms
remain a major tourist attraction in the District. There are two waterfalls in the
District namely Subrisu and Yapesa waterfalls. Efforts are being made to exploit
their potentials to generate revenue for the Assembly and to create jobs.
The greater portion of the lands in the District falls under the Kokofu Traditional
Council, the only Paramountcy in the District, though the seat of the Paramountcy is
located outside the District. Other parts of the District also belong to the Dadease
Stool which is Obrempong. Similarly the seat of the Obrempong stool is located
outside the District.
The District has forty-one (42) Pre-Schools, fifty-one (51) Primary Schools, thirty-
Five (35) JHS, one (1) Senior High/Technical school and two (2) Vocational Schools.
The teacher/pupil ratio is; Primary 1:35, JHS 1:25, SHS 1:20.
There are two Health Centres, two Clinics and 27 CHPS zones in the District serving
the District, with Doctor Patient Ratio being 0: 66,684 and Nurse Patient Ratio1:682
currently.
The District has two police stations at Asiwa and Nsuaem II with seven (7) police
personnel.
The District has one (1) Magistrate Court which was established and inaugurated on
18th May, 2015 at Asiwa to cater for the area and the adjourning towns and villages.
7
1.3 District Governance
The District has 4 Area Councils made up of the following (Bosome, Bosomtwe East, Sunso
Freho and Nsuta). By the creation of more electoral areas, the District now has 21 electoral
areas. The Assembly has 21 elected members and 9 government appointees making the sum
total of 30. They with the District Chief Executive who is also an appointee of the President
and the Member of Parliament as an ex-officio member constitute the District Assembly and
perform legislative functions of the Assembly.
The District has four (4) Area Councils, namely; the Bosome, Nsuta, Sunso Freho and
Bosomtwe East. The councils has its executive members in place and the Assembly has
seconded staff from the community development to act as secretaries for the Area councils.
The Assembly has also ceded revenue items for the councils collection of which they are to
keep 50percent of total collections made. The council identify community needs and takes
steps to address them. The members assist the Assembly in project implementation and
monitoring. They also assist in the implementation of bylaws and act as liaison between the
Assembly and the local communities.
Traditionally, the District is mostly ruled by ‘Adikrofo’, most of the land belong to the
Kokofu Paramountcy and Dadease Traditional Council which is an oberempon stool.
1.4 District Assembly and its Objectives
The Assembly is the highest political and administrative body in the District and therefore
exercises deliberative, legislative and executive functions. It has the mission and
responsibility to improve the quality of life of the people through sustainable development.
To achieve this mission, the District has set itself certain objectives namely:
� To facilitate the effective functioning of the local government administration in the
District.
� To ensure efficiency and effectiveness in the use of resources of the District and the
decentralized departments.
� To monitor, co-ordinate and harmonize the implementation of development plans and
activities in district.
8
� To facilitate the provision of basic social and economic infrastructure and services in
the district.
� To facilitate community based and private sector development in the district.
1.5 Purpose of the 2016 Annual Progress Report (APR)
The purpose of the 2016 Annual progress Report is to assess and evaluate the performance of
the Assembly, review and provide information on the impacts and achievements of the
district based on the objectives set –out in the Medium Term Development Plan (2014-2017)
in relation to the programmes and projects targeted for the year 2016.
This report therefore indicates the level of progress of development programmes and projects
initiated both by the District and the Government. Also the core indicator levels were
examined to access their performance. The report also accessed the medium term
development plan 2014-2017 in its first year of operation. As part of the exercise, funding
sources of revenue for project implementation were also reviewed to indicate the volume that
was made available during the period and timeliness. Critical poverty interventions being
implemented in the District were also reviewed to see their progress.
1.6 The key M&E objectives for the year
The report is to assess and evaluate the performance of the District Assembly, review and
provide information on the impacts and achievements of the District based on the objectives
for the year 2015. This was achieved by assessing and collating achievement by various
departments within the District based on the objectives set by them and the implementation of
major projects and programmes that the Assembly planned to undertake. Among the primary
objectives of the Assembly for the year were among the following;
A. Ensuring and Sustaining Macroeconomic Stability
i. Increase Internally Generated Fund by 40% by December 2017
B. Enhancing Competitiveness in Ghana’s Private Sector
• To improve upon 220 private businesses access to finance by December 2017
• To improve upon the knowledge and skills of 210 small scale business
entrepreneurs by December 2017
C. Accelerated Agricultural Modernisation and Agro-based Industrial
Development
9
• To promote the adoption of modern technology among 50% of farmers within the
District by 2017.
D. Infrastructure and Human Settlements Development
• To improve access to energy supply for both domestic and commercial purposes by
23% by 2017
• To improve upon 5Key Road Networks in the District by December 2017
• To draw a comprehensive settlement scheme for ten (10) communities by Dec.
2017
• To Improve upon coverage of potable water from 35% to 45% by December 2017
• Electricity Coverage Increased by 20% in the District by 2017
E. Human Development, Productivity and Employment
• Open a register of businesses/entrepreneurs for Local firms
• Organise business development training programmes for 200 small and medium
Scale Entrepreneurs by December 2017
• Reduce diseases of public health importance by 10%
• To halt and reverse the further spread of HIV/AIDS
• Give financial support to 30 men and 10 disabled women to support their education
F. Transparent and Accountable Governance
• To strengthen the capacity of 4 Area councils by Dec. 2017
• To strengthen the capacity of the Assembly in efficient and effective service
delivery by 2017.
• To improve women’s participation in local governance from in 2009 to 45% by
2017.
1.7 Processes Involved and Difficulties Encountered.
Beside the review of major programmes and projects of the District Assembly the
Decentralised Departments also reported on their performance against set targets. Among the
key departments which reported on their performance to the Assembly were Education,
Health and Agriculture, Department of Community Development, Department of Social
Welfare and the Business Advisory Centre.
Major challenges encountered during the process of compiling the report were as follows;
� Limited funding for the implementation of programmes and projects outlined in the District annual action plan. The District relied mostly on the District Assemblies
10
Common Fund and there was a huge deficit. The Internally Generated Fund (IGF) of the Assembly has been very low over the years of the Assembly’s operation.
� Excessive delay in the release of the District Assemblies Common Fund
� Inadequate logistical support for monitoring and evaluation of the Assembly activities
� Excessive delay in the release of the District Development Facility (DDF)
� Delay in the preparation and submission of reports by Departments of the District.
11
2.0 Performance of Annual Action Plan 2016
2.1 Status of Implementation of the MMTDP in 2016
The Bosome Freho District Assembly is in the third year of implementing the 2014-2017
District’s Medium Term Development Plan.
In this regard the 2016 budget of the Assembly and other expenditure were prioritized in
favour of policies programmes, projects and interventions within the seven thematic areas of
the MTDP. The performance of the Assembly in terms of programmes and projects were
deduced from the 2016 Annual Action Plan and Budget.
Table 1: Programmes Activities and Achievements for 2016
S/N Activities Location Achievement Absolute Achievement Result (%)
001 Ensure efficient functioning of the General Assembly, statutory committees and sub-committees through regular meetings
Asiwa 3General Assembly meetings organised 3Executive Committee Meeting orgainsed 3 Sub-Committee meetings organised
100% 100% 100%
002 Support to DPCU activities
Asiwa Key DPCU Activities performed -4 DPCU Meetings organised -4 quarterly composite progress reports prepared -4 quarterly monitoring visits embarked - Annual Action Plan 2017 prepared - Annual Composite Progress Report 2015 prepared and submitted
100% 100% 100%
100%
003 Contract a mechanics to maintain District Assembly vehicles
Asiwa Periodic maintenance of assembly’s vehicle undertaken
100%
004 Maintain street lights on yearly basis
Districtwide Street lights maintained throughout the District
100%
005 Support to area council activities
Districtwide 4 Area Councils inaugurated, their meetings facilitated and funds transferred to them for opeartions
100%
006 Maintenance of office machines
Asiwa Assembly’s office machines serviced periodically
100%
007 Support MP's project annually
Districtwide Construction of structure for Asiwa health centre, Construction of community centre for Nsuaem II Reshaping of feeder roads Procurement of cement and roofing sheets to support community initiated projects
100%
12
008 Support activities of the
District’s decentralised
departments
• BAC Supported
• Activities of District Agric Dept
Supported
• Activities of health Directorate
supported
• Activities of Dist. Educ. Office
Supported
• Activities of Works Dept.
Supported
• Activities of Finance Dept.
Supported
• Activities of Dept of Social Welfare
& Comm Devt Supported
• Activities of District Electoral
office Supported
• Activities of Physical Plann. Dept
Supported
• Activities of NADMO supported
• Activities of District Court
Supported
• Activities of District Police
Command Supported
100%
009 Organise training
workshop for 40 WATSAN
committee members
District wide 0%
010 Organise half yearly workshop for area council members
One Workshop organised for area council members
50%
011 Provide Capacity Building for newly elected Assembly-members and District Assembly staff
Asiwa Workshop organised District Assembly members
100%
012 Embark on minor maintenance on Assembly/public Buildings
Districtwide The District Court Building, Nsuaem II Police Station Building and the DCD’s Bungalow maintained. Beposo D/A Primary Rehabilitated
100%
013 Support 2 national celebrations
National Independence Day Celebrated Senior Citizen’s Day Celebrated
100%
014 Provide maintenance for grader on quarterly basis
Assemblies grader maintained 100%
015 Branding/marketing of Bosome Freho District annually
Assembly designed and operate a webpage
100%
016 Organise periodic public for a
Series of public fora organised 100%
017 Support culture and security related activities
Paramountcy programmes supported Security activities supported
100%
018 Organise half yearly pay your levy campaign
0
019 Embark on planning scheme for four communities annually
Asiwa, Bobiam, Anyinase and Anyanso
Development of town planning scheme on-going for Asiwa, Bobiam and Anyinase
75%
020 Procure and supply 300 low tension poles to support rural
Districtwide 500 wooden electricity poles supplied
166%
13
electrification
021 Completion of 1No. 44 office Administration Block
Asiwa Completed 100%
022 Completion of construction of 12 Room Junior Staff Quarters
Asiwa Completed 100%
023 Completion of construction of 1No. Semi-Detached Staff bungalow (No. 4)
Asiwa Completed and handed over 100%
024 Support to Community Self Help Project
Districtwide Cement and Roofing sheet procured and supplied to communities
100%
025 Improve capacity of the revenue collectors and DPCU members
Asiwa Training Workshop organised for revenue collectors
100%
026 Strengthen the capacity of district gender desk officer
Outstanding 0
027 Create a District Education Fund
Outstanding 0
028 Completion of construction of 1No. 3Unit Classroom Block
Supom Completed and in use 100%
029 Construction of 1No. 3Unit Classroom Block with Office and Store
Amomorso Project just awarded 0
030 Construction of 1No. 3Unit Classroom Block with Office and Store
Kwaku mensahkrom
Plastering completed 100%
031 Cladding of 1No. 6-unit
pavilion block
Beposo Project completed 100%
032 Completion of construction of D/A Model School
Asiwa Project completed 100%
033 Support to School Feeding programme
Ongoing 100%
034 Support to Sport Development
Districtwide Sport equipment procured and supplied to sporting clubs
100%
035 Support to District Immunisation Campaign
Disstrictwide Immunisation programmes supported 100%
036 Support to Malaria Control Programmes
Districtwide Malaria Control Programmes supported
100%
037 Organise Educational Campaign on HIV/AIDS
Districtwide HIV/AIDS programmes supported 100%
038 Organise behavioural Change communication Campaign in mining communities
Districtwide BCC campaigns organised 100%
039 Organise programmes to improve upon maternal health
Districtwide Maternal health programmes supported
100%
040 Construction of Two (2) CHIPS Compounds
Freso and Duase
Project at Freso completed and project at Anomawobi is at painting
100%
14
level
041 Support District Sanitation programmes
Districtwide Activities of Zoomlion and environmental health unit supported
100%
042 Collect data on water and sanitation facilities
Districtwide Outstanding 0
043 Embark on District-wide Cocoa Spraying Exercise
Districtwide Programme organised 100%
044 Maintain Office facilities Asiwa Office equipment repaired 100%
045 Organise fire fighting campaign
Asiwa fire prevention activities supported through District Agric Department and NADMO
100%
046 Organise National Farmers Day
To be determined
National Farmers Day organised at Nyamebekyere
100%
047 Support to Disabled persons
Districtwide Activities of disabled person supported through Dept. of Soc. Welfare and Community Development
100%
048 Support to Districtwide Tree Planting Exercise
District wide Tree planting exercise launched. Trees planted at Asiwa, Anyanso etc. Mango plantation established at Tweapease
70%
049 Reclamation of degraded lands
Anum/ Fre Vallies
Outstanding 0
050 Establishment of Mango and Cocoa Plantation
Tweapease Project ongoing 50%
051 Rehabilitation of Anwiaso-Owhimase Feeder Road
Anwhiaso-Owhimase
Project ongoing 5%
052 Maintenance of Feeder Road
District wide Anyanso-Tweapease, Nsuaem II-Nsutem-Tebeso II, Kwamentow-Appiahkrom, Dagyanso-Adumasa-Japandu feeder roads rehabilitated among others
100%
053 Support to Disaster Management
Asiwa Activities of NADMO supported 100%
054 Furnishing of newly constructed District Administration Block
Asiwa District Administration Block furnished
100%
Tree Planting Exercise to commence Opemsuor Festival
Anyanso, Asiwa, Bobiam, Anumso, Anyinase
800 tree seedlings planted in 5communities
100%
15
2.2 M&E Activities Report
2.2.1 Programme / Project status for the year 2016
During the year under review the District Worked on about thirty-one (31) infrastructural projects. About half of the projects (15) of them were
projects which were started earlier whilst the other 50% were started in the year. At the close of the year the projects were at various level of
completion as indicated from the tables below. Among the sources of funding for the projects were the District Assemblies Common Fund
(DACF), Districts Development Fund (DDF), Community Based Development Project (CBRDP) and the Ghana Education Trust Fund
(GETFund).
Reporting Period: January – December 2016
Table 2a: District’s Development Fund (DDF) Projects
No
.
Project Title Location Funding
Source
Contractor Contra
ct Sum
(Gh¢)
Rev.
Contr
act
Sum
Payment
To Date
Award
Date
Start
Date
Expected
Completi
on
Actual
Compl.
Status Stage
(%)
22 Construction of
1No. 3Unit
Classroom
Block with
Office and Store
Kwamento
wkrom
DDF Panquit
Company
Limited
131,724
.69
115,099.
43
08/09/1
5
08/01/16 2/9/201
6
Project
completed
100%
23 Cladding of
2No. 3Unit
Pavillion
Classroom and
Beposo DDF Obeline
Company
Limited
74,833.
86
67,349.3
7
08/09/1
5
08/01/16 Project
Completed
100%
16
Construction of
Office and Store
24 Construction of
6Unit 1st floor
Stores for the
completion of
Anyanso Market
Anyanso DDF M/S Osbel
Enterprise
limited
100,000
.00
76,900.8
2
08/09/1
5
08/01/16 Project
completed
100%
25 Construction of
1No. 3Unit
Classroom
Block with
Office and Store
Supom DDF ASCOTUR
K Company
Limited
130,149
.36
117,134 08/09/1
5
08/01/16 Project
completed
100%
26 Construction of
1 no 3units
classroom block
with office and
store
Dajanso DDF Grotoso
enterprise
185,286
,20
19/12/1
6
19/07/20
17
Site
preparation
and block
mudding is
in progress
27 Construction of
1 no 3units
classroom block
with office and
store
amomorso DDF Osbel
Enterprise
Ltd
176,473
.86
19/12/1
6
19/07/20
17
Site
preparation
and block
mudding is
in progress
28 Construction of
1 no 3units
classroom block
with office and
store
ohwimase DDF K.Kumi 187,380
.60
19/12/1
6
19/07/20
17
Site
preparation
and block
mudding is
in progress
17
Table 2b: Project: District Assemblies Common Fund (DACF)
No. Project Title Location Funding
Source
Contractor Contract
Sum
Rev.
Contra
ct Sum
Payment
To Date
Award
Date
Start
Date
Expecte
d Compl.
Actual
Compl.
Status Stage
(%)
12 Construction of 2-
Storey 44-Offices
Administration
Block
Asiwa DACF M/S Osbel
Enterprise
limited
863,613 1,573,
322.58
1539995.6
4
21/01/11 26/01/11 26/07/12 2/01/16 Project completed 100%
14 Construction of
1No. 12-Room
Nurses Quarters
Asiwa DACF M/S Osbel
Enterprise Ltd.
400,000 587,43
3.72
415509.46 08/10/13 07/10/13 08/10/14 Project Completed 95%
15 Construction of
1No. Semi
Detached Staff
Quarters No. 3
Asiwa DACF Obeline
Company Ltd
356,343.35 382,777.58 15/05/20
14
28/05/20
14
15/05/20
15
12/10/
15
Works completed 100%
17 Construction of
1No. 6Unit
Classroom Block
with Office, Store
and Library with
Sanitary Facilities
(Model School)
Asiwa DACF True Engineers
Const. Ltd.
342,739.77 399822.16 30/09/15 27/10/20
15
15/08/20
16
12/08/
16
Project completed 100%
18 Construction of
1No. 3-Unit
Classroom Block
with Office and
Store
Kwakum
ensahkro
m
DACF M/S Grotoso
Enterprise
169,580.40 126,454.50 22/04/16 22/04/16 21/10/16 Plastering and
screeding
completed
80%
18
19 Construction of
CHPS Compound
Anomaw
obi
DACF True Engineers
Const. Ltd.
85,213.96 66,931.85 29/09/15 29/09/15 29/09/16 Painting is in
Progress
90%
20 Construction of
CHPS Compound
Freso DACF/DD
F
K.Kumi
Enterprise
149,000 133,897.4 30/03/16 12/04/16 21/10/16 Septem
ber
2016
Project completed 100%
21 Construction of
Fencewall for
Bosome Senior
High Technical
School
Asiwa DACF Ascoturk 169,497.00 63424.69 30/03/16 22/4/16 21/10/16 Work is at the
painting level
85%
22 Completion of
Area Council
Block
Nsuta DACF Works dept
(Force
Account)
30,000 31,796.00 Painting is in
progress
95%
23 Construction of
pavilion structure
for Asiwa Health
Centre
Asiwa MPs Fund (Force
Account)
35,725.00 Work is the
painting level
90%
24 Rehabilitation of
DCD’s Bungalow
Asiwa DACF Works Dept
(Force
Account)
18,018.00 Works Completed 100%
19
Table 2c: GETFund Project
No. Project Title Location Funding
Source
Contractor Contract
Sum
Rev.
Contract
Sum
Payment
To Date
Award
Date
Start
Date
Expected
Completion
Actual
Compl.
Status Stage
(%)
07 Construction of 1No.
6Unit Classroom
Block with office
store and library
Nsuaem
II
GETFund M/S Amfrank
Company Ltd
181,447.63 39,815.4
4
7/10/20
11
14/10
/11
14/06/12 Project
abundant
70%
08 Construction of 1No.
6Unit Classroom
Block with office
store and library
Duase GETFund F-Nyark
Enterprise
181,350.54 39,815.4
4
07/10/1
1
14/10
/11
14/06/12 Project
abundant
65%
11 Construction of
District Education
Office Block for
Bosome Freho
District Assembly
Anyinase DANIDA M/S Okorogya
Enterprise Ltd
Works
completed
100%
Table d: Other Projects
No. Project Title Location Funding
Source
Contractor Contract
Sum (Gh¢)
Rev.
Contract
Sum
Payment
To Date
Award
Date
Start
Date
Expected
Compl.
Actual
Compl.
Status Stage
(%)
03 Partial
Reconstruction of
Bomfa Jn.-Asiwa
Road (km 0.0-26.2
Bomfa
Junction
Asiwa
GoG Ussuya Gh.
Ltd.
Construction of
Culverts
Completed.
Bitumen sealing
has been
20
completed
04 Rehabilitation of
Bekwai (Amoaful)
Ampah – Asiwa
Road
Amoaful –
Ampaha –
Asiwa
GoG Surfacing is
almost
completed
leaving a
distance of 7km
between
kokobin and
abosoma
05 Construction and
bituminous sealing
of Gyimakyi –
Abosamso Highway
Gyimakyi-
Abosamso
GoG Cymain Co.
Ltd.
- - - - - - - ongoing
06 Construction and
bituminous sealing
of Abosamso –
Nsuaem II
Highway
Abosamso –
Nsuaem II
GoG Cymain
Company
Ltd
- - - 2012 - - - - Ongo
ing
07 Construction and
bituminous sealing
of Anumso –
Anyanso,
Anyinase-Ofoase
feeder Road
Anumso –
Anyanso,
Anyinase-
Ofoase
GoG Edmac Co.
Ltd
- - - 2015 - - - - Ongo
ing
08 Construction and
bituminous sealing
of Peminase-
Beposo-Ankaase
Peminase-
Beposo-
Ankaase
GoG Edmac Co.
Ltd
- - - 2015 - - - - Ongo
ing
21
feeder Road
09 Rehabilitation of
(3.6km)
Semdadieso Tebeso
No 2 Feeder Road
Tebeso No 2
–Semddieso
GSOP Grand
Shelter Co.
Ltd
204,061.78 26/04/16 26/04
/16
26/09/16 Project
abundant
5%
10 Rehabilitation of
Anhwiaso –
Ohwimase Feeder
Road
Anhwiaso-
Ohwimase
GSOP Skill Link
Company
Ltd
228,460.94 - - 04/05/16 04/05
/16
4/10/16 Project
abandoned
_
11 Construction of
2No. 3-Unit Aqua
Privy Toilet
Tebeso II &
Nsuaem II
GPEG M/S Ofei
Brothers
Const.
Works
38,728.73 33,196.0
5
16/07/20
13
20/08
/2013
7/10/20
13
Project
completed
100%
12 Construction of
2No. 3-Unit Aqua
Privy Toilet
Anyinase &
Dunkuraa
GPEG M/S Ofei
Brothers
Const.
Works
38,623.73 33,106.0
5
16/07/20
13
20/08
/2013
7/10/20
13
Project
completed
100%
13 Construction of
100No. 20-Seater
W/C Toilet Facility
Districtwide GoG M/S Oliton
Ghana Ltd.
- - - 14/05/16 20/08
/2013
7/10/20
13
Project
completed
100%
22
2.3 Update of Disbursement from Funding Sources
The Assembly has two major sources of revenue for its programmes and projects.
These are the Internally Generated Funds (IGF) and External Inflows
Sources of Internally Generated Funds for the Assembly are;
� Rates
� Lands Revenue
� Fees and Fines
� Licenses
� Rent
� Investment income
� Miscellaneous
2.3.1 The Sources of External Inflow included;
� District Assembly Common Fund
� GOG Grants (GETFUND, MP’s Common Fund etc.)
� Development Partners Grant (GSOP, DDF, Funding through NGO’s etc.)
During the year under review revenues accruing to the Bosome Freho District Assembly was
as follows;
23
Table 3: Revenue Mobilisation Performance of Major Items as at 31st December 2016
Revenue Source
2014 2015 2016
Approved
Estimate
2014
Actual
Performance
2014
%
2014
Approved
Estimate
2015
Actual
Performanc
e 2015
%
2015
Approved
Estimate
2016
Actual
Performance
2016
%
Achievem
ent 2016
DACF 2,638,330.00
914,682.40 34.67 2,880,682.00 2,295,425.16 76.68 3,440,914.00 1,897,367.80 55.14
GoG /
(Goods &
Services)
46,716.24 0.00 0 42,445.00 0.00 0 46,859.00 9,291.00 19.83
ASSETS
TRANSFER
39,189.22 0.00 0 39,189.00 0.00 0 0.00 0.00 0
IGF 234,490.00 158,891.00 67.76 242,145.32 234,033.73 82 246,214.00 241,343.00 98.02
MSHAP - - 50,000.00 8,164.75 163
CBRDP/
GSOP
- - 51,522.00 5,012.50 9.73
GSFP 441,285.00 801,950.69 441,285.00 417,265.00 94 1,596,504.00 1,158,155.00 72.54
DDF 594,476.50 563,288.67 640,296.00 254,284.25 9 605,269.00 722,387.00 119.34
Disability - 21,402.06 48,684.00 34,064.43 69
Other
Transfers
298,370.00 21,412.06 541,991.00 97,105.04 559,892.00 135,583.50 24.21
Source: District Finance Office, (BFDA) January 2016
24
Fig 1: Graphical presentation of Key Revenue Sources
Source DPCU 2016
From the table above, it could be realized that, the Assembly could not achieve its target
under any of the revenue source. Yet the performance under District Development Facility
(DDF) was very encouraging. The funding proved to be the most reliable, receiving as much
as 93% of expected revenue. This was followed by the DACF which could manage barely
40%. The District received a negligible 2% of expected revenue from Government of Ghana
GoG source. This leaves much to be desired because government is expected to be the main
contributor to investment funding under the decentralisation programme. After transferring
responsibility the Assemblies it is expected that government should make resources available
to fund investment on public infrastructure. The centre holding on to statutory transfers defeat
the purpose of fiscal decentralisation which is a key element of making the districts
functional.
The Assembly’s situation is worsened by low internally generated fund mobilisation, the
District could manage only
0.00
500,000.00
1,000,000.00
1,500,000.00
2,000,000.00
2,500,000.00
year
2009year
2010year
2011year
2012year
2013year
2014year
2015year
2016
DACF
IGF
DDF
GSFP
Other
Transfers
25
2.3.2 Comments on the Releases of Funds
The District Assembly Common Fund remains the singular major source of funds for
investment to the District Assembly. The problem with this fund is the high statutory
deductions made at source which at times are not planned at the District level. Also there has
been shortfall in the District’s allocation in the fund in recent years which makes it
impossible for the District to implement all its planed programmes and projects for the year.
With the challenges aside, released for the year was encouraging, the Assembly received 3
quarters of the year in addition to the 4th quarter arrears for 2015. The introduction of the
District Development Facility (DDF) has supplement the common fund to finance investment
activities in the District though the releases per year is not comparable in value to that of the
common Fund. Yet it has been very reliable. The District’s Internally Generated Fund (IGF)
sources were also limited which made it difficult to finance the Assembly’s recurrent
expenditure solely from IGF sources.
Table 4a: Expenditure Performance
S/No. Item 2016 Budget (GH₵)
Actual Exp. As at June 2016
% Spent
01 Compensation of Employees
1,183,874.00 869,210.88 73%
02 Goods and Services
3,836,471.00 1,747,172.98 46%
03 Assets 2,659,181.00 2,416,954.32 91% 04 Total 7,679,526.00 5,033,338.18 66%
The Assembly’s total expenditure for the quarter amounted to under a fifth of the budgeted
expenditure for the year. This is mainly explained by restricted inflows to the Assembly from
our major revenue sources. The low expenditure by the Assembly may translate in to non-
performance of key functions and excessive delay on project implementation as payments
may be long over-due and contractors may abandon site. This has resulted in increasing
project cost due to delays in payment for work done which has given rise to frequent demand
for upward review of contract sum.
26
Table 4b: Expenditure by Departments
DEPARTMENT IGF(GH₵) GOG(GH₵) DACF(GH₵) Total Exp %
Exp.
Central
Administration
44,013.88 775,256.57 819,270.45 65.8
Agriculture 1,500 4,000.00 5,500 0.44 Social welfare &
Com Devt.
2,000.00 44,890.00 46,890 3.77
Physical Planning 1,000.00 1,000 0.08 Birth & Death Works 5,000.00 56,504.00 61,504 4.94 Finance Trade & Industry 2,000.00 9,000.00 11,000.00 0.88 Disaster Prevention
& Mgt
2,500.00 2,500 0.2
Education 3,000.00 244,139.75 247,139.75 19.85 Health 1,000.00 36,000.00 37,000 2.97 Others (NCCE, EC,
Police)
3,000.00 10,000 13,000 1.04
Total 65,014.00 44,890 1,134,900.00 1,244,804 100
Source: Finance Office January 2017
Fig 2: Expenditure by Department by Funding Sources
0.00 500,000.00 1,000,000.001,500,000.002,000,000.00
Central Administration
Agriculture
Social welfare & Com Devt.
Physical Planning
Birth & Death
Works
Finance
Trade & Industry
Disaster Prevention & Mgt
Education
Health
Others (NCCE, EC, Police)
IGF(GH₵)
GOG(GH₵)
DACF(GH₵)
Total Exp
27
Fig. 3: Departmental Share of Total Expenditure
By the figure above its apparent the Central administration is the main expenditure unit under
the Assembly yet it is worthy of notice that most departments especially health, agriculture
and Education has other key funding sources for operations and management which is never
declared to the Assembly for it to be subjected to monitoring by the Assembly. Hence the
above situation is quiet elusive yet its significance is that it gives an indication of the sectors
where the little that passes through the Assembly is spent.
2.3.3 Efforts to Generate More Revenue
The Assembly was not able to generate enough revenue to meet its recurrent expenditure let
alone get additional funds for capital projects. Strategies adopted to improve collection of
IGF would include the following:
� Widen the revenue base to bring in more revenue items which were not covered
previously
� Engage more commission revenue collectors to work in communities where there
are no collectors
� Continued and sustained tax education
� Motivating hard-working collectors and supervisors
Central
Administration
Agriculture
Social welfare &
Com Devt.
Physical
Planning
Works
Trade & Industry
Disaster
Prevention &
Mgt
Education
HealthOthers (NCCE, EC,
Police)
Total Exp
Central Administration
Agriculture
Social welfare & Com Devt.
Physical Planning
Birth & Death
Works
Finance
Trade & Industry
Disaster Prevention & Mgt
Education
28
� Improving the data base of the district, by enumeration of the rateable population
and the preparation of valuation list of all properties?
� Formation of revenue mobilization task force to improve the IGF
� Motivating hard-working collectors and supervisors to improve the IGF
� Ceding certain revenue items to the Area councils for collection.
2.3.4 Challenges with Regard to Disbursement.
� Inadequate funding for programmes and projects
� Delays in the release of funds which affect project implementation.
� Difficulty in extraction of information for report writing � Difficulty in tracking funds from GOG paid direct to beneficiaries without ,
records to the Assembly.(e.g. GETFUND, Donor funds etc)
S/No. Activity Performed Location Output Remarks
01 Promote tree planting in the District
Anyanso, Asiwa, Bobiam, tweapease, Anyinase
1,300 seedlings planted
02 Carry out anti-bush and domestic fire campaign
Districtwide 30 communities
03 Promote HIV/AIDS Behavioural Change Communication and prevention activities among the central administration and other departments
Brofoyedru ,
Morontuo, Dunkuraa,
Dagyanso, Anyanso,
Asiwa, Nsuaem II,
Danso, Anumso
Abosamso, Nsutem,
950 persons sensitised
04 Increase awareness of preventable lifestyle diseases and embark on periodic screening for diabetes, high blood pressure, hepatitis B, cancers and other communicable diseases
Asiwa Health talk on lifestyle diseases organised for 60 decentralised and non-decentralised depts. staff
05 Ensure the provision of basic facilities such as drinking water, simple cafeteria, toilet, urinals hand washing equipment etc.
Central Admin, Health, Education, Works, Finance, Soc. Welfare, BAC
Drinking water, toilet facilities, urinals and hand washing equipment provided for the District’s departments
06 Promote basic hygiene practices such as routine tidying of offices and immediate environment, removal of cobweb, mopping of floors with disinfectants
Central Admin, Health, Education, Works, Finance, Soc. Welfare, BAC
Hygiene at the offices of the Districts departmental offices improved
07 Ensure the provision of simple furnishings such as office desk, swivel chairs, air conditioner and appropriate lighting for all staff
Central Admin, Health, Education, Works, Finance, Soc. Welfare, BAC
Furniture and equipment provided for district’s departments
29
Human Capacity Building
NO
TITLE OF TRAININ
G
TRAINING OBJECTIVE(
S)
TARGET GROUP
ACHIEVEMENT DURING THE YEAR
NAME OF TRAINING INSTITUTI
ON
SOURCE OF
FUNDING
1. Training in Records and Assets Management for Registry, Finance, Internal Audit, Procurement Stores and Works Staff.
To equip participants with the necessary skills and knowledge in in effective and efficient ways of keeping records and managing Assets.
Registry Officers, Finance Officers, Internal Auditors, Procurement Officers and Works Staff.
2day training organized for the Finance Officer, accountants, Planning Officers, Budget Analysts, internal auditors, procurement Officer and staff of the Works department on Records and Assets management
Ministry of Finance
GOG
2. Capacity Building training workshop for Administrative Officers and other Heads of Department on Social Accountability and Financial Management
To equip officers with the needed tools, knowledge and skills in financial management.
Administrative Officers and Head of Departments and Units
Training workshop organized for Administrative Officers and other Heads of Department on Social Accountability and Financial Management
External Consultants
DDF
3. Capacity Building workshop for District Tender Committee members and other Senior Staffs on Procurement and Contract Management
To build the capacities of the members of the tender committee with the needed skills in undertaking effective tendering processes
Procurement Officer, Tender Committee members and other Senior Staff.
Training workshop organized for District Tender Committee members and other Senior Staffs on contract management
External Consultant
DDF
30
NO TITLE OF TRAINING
TRAINING OBJECTIVE(S)
OUTPUT NUMBER OF DAYS
NAME OF TRAINING
INSTITUTION
1 Capacity Building workshop on ICT (Microsoft Office) for Department of Social Welfare and Community Development Staff
To build the capacities of the staff of the department on ICT to enhance their work delivery.
A 3day training programme organized for Department of Social Welfare and Community Development Staff
3 days External Consultant
2 Capacity Building workshop on Safe driving practices and vehicle management for the District Assembly Drivers
To equip drivers with the needed skills in safe driving practices and vehicle management.
A two days capacity building training organsied for drivers in the District Assembly
2 days External Consultant
3 Capacity Building Training in advance secretarial skills and administrative assistance
To equip officers with skills and knowledge in advance secretarial and administrative assistance.
A 3day training programme organized for secretaries in the District Assembly
3 months External Consultant
3.1 UPDATES ON CORE INDICATORS AND TARGETS
3.1.1 Agriculture
Agriculture is the single most important sector of the District Economy. It’s the major
employer and as such the main activity that provides the people with income. The bane to
development of the sector is that it still characterised by traditional practices in face of
modernity which has greatly limit productivity across the value chain.
During the year under review, the season remained wet and dry. There was moderate rainfall
during the first half of the year coupled with intermittent sunny conditions. The weather
pattern was a little better as compare to year 2015. Performance of crops was general
satisfactory.
31
Table 5: District Indicators and Parameters Agriculture
District Indicators and Parameters
2014 Indicator Level
2015 Indicator Level
2016 Target 2016 Achievement
1. Percentage (%) increase in yield of selected crops, livestock and fish Staples
i. Maize ii. Cassava iii. Rice iv. Plantain v. Yam vi. Cocoyam
Vegetables
i. Cabbage ii. Garden Eggs
Livestock
i. Sheep/Goats
12,668.00
136,817 985
12,675 93,277
741 296
220.5
12794.68
150,498.70 985
13,942.50 97,940.85
844.74 298
244.4
13,640.12 155,378
1,050.00 14,751.16
100,112.00 900 356
265.8
Table 6: Key Agriculture Outputs for 2016
No. Activities Outputs
01 WAAPP Project Five (5) demonstration farms established with 25acres
seed multiplication farm planted
02 Farmer
registration
6000 farmers registered pending planting
03 Value addition The department has taken delivery 6 equipment for the
Gari processing. Palm kernel oil, palm oil and pastries
confectionery and proposals has been submitted for the
setting up
04 Input supply Department has in stock fertilisers at the following prices
NPK (Chemical) GH₵ 85 per bag
UREA (Chemical) GH₵ 80 per bag
Compost (organic) GH₵ 10 per 50kgbag
05 Climate Change
Monitoring
The department has taken delivery of meteorological
equipment for the establishment of weather station to
monitor changes in major climatic variables and the
equipment to test soil fertility levels in the district has also
been provided.
32
06 Other Agric
Related activities
The department has taken steps to assist the farmers on
post-harvest technology to help them to store maize;
Modern cribs to store maize, rice and cowpea. Save use of
agrochemicals training has also been conducted to help
farmers to know how to use the land and water
management interventions, for sustainable soil fertility
level for crop production and water conservation. The use
improved varieties fertilizer application has also been
done during this quarter.
x. Cocoa Diseases and Pest Control (CODAPEC) programme
CAPSID Control
There has been a major shift in the implementation of the CODAPEC programme since 2015.
Unfortunately the District now does not have a central store or input distribution point.
Communities in the Bosome and Bosomtwe East Area councils access inputs from Bekwai
cocoa district, whilst those from Sunso Freho are zoned for Adansi-Brofoyedru cocoa district
in the Adansi North District. Communities in the Nsuta Area Council are now part of the
New Edubiase (Adansi South) Cocoa District.
This situation has resurfaced the myriad of problems the programme faced when the District
was first created when the project was managed in a similar arrangement. The programme is
thus fraught with a lot of challenges among which are non-supply of inputs to many farmers
who continuously complain to the Assembly which has virtually no clout to resolve them.
It was therefore difficult to get statistics of the programme as part of this report because the
District Agric Development Unit could not provide a report on the project.
xii. Challenges of the District Agric Sector
i. Lack of irrigation facility
ii. High cost of labour
iii. Poor road network
iv. Activities of illegal mining
v. Lack of staff accommodation
vi. Inadequate office accommodation
vii. High cost of agricultural inputs
viii. Unreliable rainfall pattern
33
3.1.2 Education
1 Overview of Directorate
The District is divided into Six (6) Circuits which are supervised by Six Circuit Supervisors.
The Circuits are; Asiwa, Abosamso, Dunkura, Dompa, Nsuaem, and Nsuta. The District has
fifty-six (58) kindergartens, fifty-five (55) Primary Schools, thirty-eight (38) Junior High
Schools, one (1) Senior High School at Asiwa.
The directorate performed creditably well in all the key activity indicators. As shown below
1.0 Key activities identified for performance during the period
Table 7: Key Activities identified for performance by objectives
Strategic
Key
objective
Activity/ Project Implemented Funding
source
Unit/Department/A
gency responsible
Access -Organized a sensitization durbar on GPASS Scholarship Scheme - embarked on enrolment drive in communities - organized a SPAM at Esaase Basic School and community
DFID Girls’ Education Unit HRMD Unit
Gender - Performed a yearly harvest of schools and communities
- Distributed GPASS Scholarship packages - A talk show on girls on the need to appreciate
the GPASS packages
DFID Girls’ Education Unit
Special
Education
Quality - Attended the planning meeting at the regional and district levels on the activities of the year.
Girls’ Education Unit
Manageme
nt
- Interviewed 74 Head Teachers in the district with the view of reassessing their management prowess.
GPEG Management Unit
BECE
2015
- Organization of mock examination for BECE candidates help improved the District’s performance
District Assembly, Hon. Member of Parliament.
Examination Unit
34
Table 8: District Indicators and Parameters (Education)
No.
District Indicators and Parameters
2014 Indicator Level 2015 Achievement 2016 Target 2016 Achievement
1 Gross Enrolment Rate (indicates the number of pupils/ students at a given level of schooling-regardless of age – as proportion of the number of children in the relevant age group)
- Pre-School - Primary - JHS - SHS
Net Admission Rate in primary Schools (indicates primary one enrolment pupils aged 6 years)
134.2 98.6 71.8 19.5 84.2
138.8% 85.8 66.2 14.3 45.8
134.3% 102.0 76.8 27.1 46.1
152.9 96.8 67.1 17.2 46.1
2 Gender Parity Index (ratio between girls and boys enrolment rate, the balance of parity is 1.00)
- Preschool - Primary - JHS - SHS
1.12 1.03 0.87 1.06
0.96 0.88 0.78 0.81
1.11 1.09 0.94 1.16
1.01 0.96 0.99 0.99
3 BECE Pass Rate - JHS - SHS
29.07 82.9
87.7 92.3
31.6 88.6
38.0 82.8
4 Improvement in Pupils / Teachers Ratio:
� Pre-school � Primary � JHS
26:1 23:1 12:1
22 23 10
29:1 25:1 16:1
30:1 27:1 11:1
5 Increase in % of Trained and untrained Teachers Ratio:
� Pre-school � Primary � JHS
24.8 47.5 63.4
60.65 6.8 24
77:1 46:1 22:1
47:1 46:1 11:1
35
Table 9: BECE Pass Rate 2011-2016
Year Enrolment Registered Candid. Candidates Sitting Exams
Candidates Passing Rate
Male Fem. Total Male Fem Total Male Fem. Total Male Fem To
tal
%
2011 541 293 834 541 293 834 540 293 833 315 171 171
58.3
2012 530 376 906 530 376 906 527 322 899 243 147 390
43
2013 486 307 793 486 307 793 486 301 793 331 201 532
67
2014 502 390 892 515 392 907 513 387 900 150 114 264
29.07
2015 477 380 857 447 380 857 474 379 853 425 323 748
87.7
2016 556 435 991 552 429 981 549 423 972 496 385 881
90.6
Fig 4: The trend of BECE performance 2011-2016
Generally the pass rate has been unpredictable being a little high initially dipping in 2012
rising in 2013 and falling in 2014 again. Over the past five years the results in 2015 was the
best. Rising as high as 87%. Mechanism should therefore be put in place to ensure
consistency in the pupils’ performance.
From the table above it has been shown that number of girls completing JHS 3 has been
increasing steadily. However girls registering for BECE exams and passing showed a
downward trend. From all indications the statistics is getter better in the sense that total
number of JHS leavers has been consistently increasing since 2011 with a dip in only 2014
which incidentally recorded the lowest pass rate. Female candidates sitting for exams and
passing has also been on the increase over the period.
Capitation Grant
Reg . Cand
Cand. Passing0
200
400
600
800
1000
2011 yr 2012yr2013yr
2014yr2015yr
2016yr
Reg . Cand
Cand. Passing
36
Table 10: Capitation Grant Received for the period of 2013 – 2016
S/No. Year Amount received ( GH¢) % Increase
1 2013 50,019.75 -
2 2014 52,491.00 4.94
3 2015 75,491.50 43.82
4 2016 100,301.04 32.86
Total 278,303.29
Fig 5: Capitation Grant Received by Years
The increase in capitation grant over the past three years has been consistent and significant.
The onus now lie on the education directorate to ensure its judicious use by heads of
institutions to make it impact felt among the populace.
vi. Challenges to Education Service Delivery in the District
� Large proportion of untrained teaching staff in the classrooms
� Lack of ICT infrastructure
� Inadequate permanent structures for KGs
� Inadequate store room for the Education directorate
� High incidence of child labour
� Low pass BECE pass rate
vii. The way forward
� Upgrade the knowledge and skill of untrained teachers through the UTDBE
programme
� Strengthen supervision
2013 yr , 50,019.75
2014 yr,
52,491.00
2015 yr, 75,491.50
2016yr, 100,301.04
Amount received ( GH¢)
2013 yr
2014 yr
2015 yr
2016yr
37
� Provide logistics for technical education
3.1.3 Health
3.1.4 Ghana Health Service Activities
The department carried out sensitisation on teenage pregnancy, maternal health and also
promoted HIV/AIDS Behavioural Change Communication and prevention activities among
the central administration and other departments. There was also an increased awareness of
preventable lifestyle diseases and embarked on periodic screening for diabetes, high blood
pressure, hepatitis B, cancers and other communicable diseases.
The department of health service embarked on Oncho Drug Distribution in Communities. To
attain high geographic and therapeutic drug distribution coverage of above 80% the
department organised telemedicine training for health staff in the District to sensitise them on
modalities and skills in teleconsultation. Facilitative Supervision aim at accessing the
level of understanding of sub-districts and CHPS Zones were also embarked upon.
Other activities undertaken by the department includes:
i. Training of CHWs to equip them with knowledge competent service
delivery.
ii. organise orientation for
iii. organise durbar in honour of Prof. Jeffery Sachs
iv. roll-out CHW and solicit for the views of key stakeholders
v. School deworming exercise
Public Health Interventions Activities Carried Out
1. Malaria Care
a. Onsite Training and Supportive Supervision (OTSS)
b. Continuous Distribution of Long Lasting Insecticide Nets to pregnant women
and children receiving measles 2 antigen.
c. Malaria case management training for some health staff
2. Integrated child and maternal outreach services
a. Integrated outreach services on ANC, PNC, immunization, growth monitoring
and promotion, Vit. A dosing, Family planning etc.
38
b. Outreach mobile laboratory services to support pregnant women during
antenatal
c. Home visit
d. Public education on sanitation
e. Mass school and community deworming exercise with Albendazole and
Praziquantel tablet was carried out in the district with 79.1% coverage.
f. Active integrated case search was conducted in the district in collaboration with
the Ghana Leprosy Control Programme where 3 cases of leprosy were detected
and put on treatment and the general public educated.
3. Nutrition services:
a. Day care surveillance
b. Iodated salt survey
4. Onchocerciasis Control Programme: The district carried out Ivermectin drug distribution
under the onchocerciasis control programme within the four hyper-endemic sub-
districts namely; Asiwa, Nsuaem, Nsuta and Tebeso. The mass campaign achieved a
geographical coverage of 100% with 82.5% therapeutic coverage.
5. The HIV/AIDS control programme also received a boost through staff trainings,
establishment of ART centre at Asiwa Health Centre and PMTCT sites in all health
facilities in the district. Public education and awareness campaign was also organized
during the quarter.
6. Family planning awareness and promotion campaign was embarked upon to increase
access in the quarter. Major achievement of the exercise was 692 women who benefited
from free long-term and permanent family planning services and a man who also had
free vasectomy service.
Staff Training/HR. Development
1. Community case management of malaria, Respiratory tract infections, Diarrhoea and
malnutrition management training for sub-district staff
2. Community Health Officers (CHO) training on Community Health Worker (CHW)
activities supervision
39
3. Training of head teachers and execution of School Deworming exercise for pupils in
111 schools and out of school children
4. Telemedicine training for 43 selected staff
5. Training and Community Drug Distribution for Onchocerciasis control
6. Training of 71 CHWs, 4 Health Technical Assistants and 27 CHOs and 3 DHD staff
on C-tracker for comcare reporting of health service delivery
On-going Infrastructure Projects
1. Construction of Shed at Anyanso CHPS Compound for CWC and maternal health
activities.
2. Construction of 4 rooms with an open shed at Nsuaem clinic.
3. Construction 2 rooms office with shed for mental health and laboratory services at
Asiwa Health Centre
4. Construction of CHPS compound at Duase.
5. Construction of 2 CHPS compounds at Fereso and Anomawobi
Table 10: Key Health Outputs for 2016
No. Activity Output
01 Clinical Care Immunisation and Prevention of mother to child
transmission of HIV/AIDS carried out. 2 ART
centres are operational (Asiwa, and Dunkura)
02 CHPS Roll Out All CHPS zones are operational, zones are
equipped with computer and accessories to
report their activities. Also during the half year
the Apewu CHPS Compound, Nsutem, Ampento
Mmorontuo CHPS compounds were
commissioned
03 MCHMP The programme has been introduced to maternal
and child health as a means of ensuring access to
universal health care.
04 Infrastructure
development
Construction of CHPS compound at Freso and
Anomawobi and construction of pavilion blocks
40
for Anyanso and Asiwa health centre were
ongoing
05 Service
improvement
mental health cli, administration of ART Services
for PLHIV & AIDS and Laboratory services has
been introduced at Asiwa and Dunkura health
centres
Challenges
1. Inadequate means of transport for service delivery, monitoring and supportive
supervision at District and Sub-district level.
2. No store room at District Health Directorate to keep logistics
3. Inadequate fund for embarking on monitoring and supportive supervision
Staff accommodation at District and Sub-district level still remain a challenge,
communities have provided accommodation for staff in CHPS zones
The situation of key health indicators in the district is as presented below;
Table 11: District Indicators and Parameters (Health)
No. DISTRICT INDICATORS AND PARAMETERS
2014 Performan
ce
2015 Performance
Target
2016
Achievement 2016
1 No. of ANC registrants 1332 1392 70% of 2835
1211
2 No. of clients making 4+ visits 914 992 706
3 ANC registrants receiving IPT 1 534 654 815
4 ANC registrants receiving IPT 2 238 460 669
5 ANC registrants receiving IPT 3 139 185 495
6 No. of pregnant women receiving TT2 + 1078 110 1056
7 Total Deliveries 953 983 601
8 No. of deliveries by skilled attendants 602 630 50% of 2835
438
9 No. of deliveries by TBAs 351 329 163 10 No. of maternal deaths (institutional) 1 0
11 Institutional Maternal Mortality Ratio (per 100,000)
118 0
12 No. of institutional maternal deaths 1 0
41
audited
13 Total number of still births 6 4 5
14 Total Number of fresh still births 2 3 4
115 No of PNC registrants 1468 1300 873
16 No. of family planning acceptors 2784 2890 3006
17 % WIFA accepting family planning 15.5 14 17.8% 18 Total couple years of protection (CYP) 2080.5 1704 4702.5
19 No. of institutional infants deaths 0 0 0
20 No. of infants admission 0 0 0
21 Clients (15-24yrs) who accepted FP Service
504 612 591
22 No. of pregnant women sleeping under ITN
350 123 1453
23 No. of Children immunized OPV 1 2155 1940 2143
24 No. of Children immunized OPV 3 2094 1850 2095
25 No. of children immunized measles 2073 1900 2087
26 No. of children immunized yellow fever 2073 1890 2003
27 No. of Children receiving at least one dose of Vitamin A
1748 1790 2122
28 No. of children immunized by age 1 (BCG)
1983 1901 2008
29 No. of children immunized Penta 1 2155 2207 2143
30 No. of children immunized Penta 3 2094 2120 2095
31 No. of Non polio AFP detected 2 2 2
32 No. of Leprosy cases 2 1 6
33 No. of OPD cases due to malaria 13413 1550 14277
34 Total no. of OPD cases that is lab confirmed (Mic. & RDT)
8388 8930 8601
35 No. of TB cases notified 9 8 10
36 No. of TB cases cured (sputum microscopy)
2 2 9
37 No. of TB cases completing treatment 3 2 0
Table 12: Situation of Core Health Staff
S/No. Indicator 2012 Indicator
2013 Indicator
2014 Indicator
2015 Indicator
Target 2016
2016 Indicator
01 Doctor 0 0 0 0 1 0
02 No. of Med. Assistants 2 2 2 3 3 2
03 No. of Nurses (all categories)
57 92 91 83 90 87
04 No. of midwives 3 6 8 11 21 15
3.1.5 HIV/AIDS
The District monitoring of HIV/ AIDS cases is hampered by lack of a hospital. Also the
District do not have a sentinel site hence it difficult to calculate the prevalence rate. The only
indicator used is the numbers of people who tested positive during the District know your
status campaign. In 2009 during the District-wide know your status campaign, forty-five (45)
adults between the ages of 15-49 years of age whilst in 2010, one hundred and fifteen (115)
42
persons in the same age bracket tested positive. However in 2011, only twenty-four (24) out
of three thousand, two hundred and forty-nine tested positive. In 2012 through ‘know your
status campaign’ and prevention of mother to child transmission programme 68 cases were
diagnosed.
Table 13: District Indicators and Parameters (HIV)
HIV / AIDS HIV/AID Cases
2014 2015 2016
Male Female Total Male Female Total Male Female Total
No. of HIV positive
diagnosed
7 11 18 8 14 22 1 24 25
No. of HIV+ cases
receiving ARV
therapy
3 5 8 4 8 12 0 0 0
No. Tested (PMTT) - 702 702 41 816 830 0 1068 1068
No. HIV+ (PMTCT) - - - 1 2 3 0 11 11 No. Tested (HIV
Know Your Status
Campaign)
128 182 310 496 864 1360 0 0 0
No. HIV+ ( KYSK) - - - 13 18 31 0 0 0
Table 14: District Indicators and Parameters (Transparent and Accountable Governance)
No District Indicators and Parameters
2014 Indicator Level
2015 Indicator Level
Target 2016 Achievement 2016
01 Total amount of internally generated revenue
158,891.00 234,033.73 246,214.00 241,343.00
02 Amount of Development Partners and NGO funds contribution to DMTDP implementation
563,288.67 254,284.25 605,269.00 722,387.00
03 % of DA expenditure within the DMTDP budget (how much of DA’s expenditure was not in the annual budget?)
78%
80%
90%
04 Number of reported cases of abuse (children, women and men)
- -
05 Police citizen ratio. 1:8712 1:8,578 1:500 1:8,336
The District’s revenue situation improved consistently over the past three years. The amount
of support from development partners towards the implementation of planed programmes and
projects in the district reduced had reduced drastically for 2015 but picked up in 2016. es had
Birth and Death Registry
The registry exists to register compile data on all births and deaths for planning purposes.
Though it is evident that not all births and deaths are registered in the district, the following
the data captured for the District for from January – December 2013
43
Table15: No. of Births Registered for 2014-2016
Month New Births Late Registration
2015 2016 2015 2016 Mal
e Fem
Total
Male Fem
Total
Male
Fem
Total
Male
Fem Total
Januar
y
9 10 19 36 42 78 6 6 12 2 5 8
Februa
ry
81 73 154 61 59 120 5 2 7 5 2 7
March 30 29 59 76 77 153 1 4 5 6 3 9
April 29 28 57 39 40 79 5 1 6 5 3 8
May 87 91 178 36 26 62 1 7 8 9 6 15 June 51 55 106 42 25 67 6 4 10 10 9 19
July 15 8 23 11 5 16 4 1 5 6 3 9
August 74 62 136 29 40 69 7 1 8 5 - 5
Septem
ber
43 38 81 85 78 163 2 - 2 13 3 16
Octobe
r
29 26 55 61 37 98 5 4 9 2 1 3
Novem
ber
99 113 212 176 153 329 12 6 18 - - -
Decem
ber
41 63 104 81 83 164 5 1 6 23 14 37
Total 588 596 1184 733 665 1398
59 37 96 87 49 136
Deaths Registered Month 2014 2015 2016
Male Female Total Male Female Total Male Female Total
January 1 2 3 6 6 12 1 - 1 February 1 1 2 5 2 7 2 3 5 March 1 1 2 1 4 5 1 - 1 April 1 1 2 5 1 6 - - - May 2 - 2 1 7 8 5 1 6 June - - - 6 4 10 4 2 6 July 2 1 3 4 1 5 4 1 5 August - 2 2 7 1 8 2 1 3 September 1 1 2 2 - 2 1 - 1 October - - - 5 4 9 - 1 1 November 1 1 2 12 6 18 - 1 1 December - - - 5 1 6 1 1 2 Total 10 10 20 59 37 96 21 11 32
Challengers of the Registry
i. The CBS volunteers find it difficult to refer people to the district capital to register
44
their births.
ii. Most of the inhabitants of the District register their birth and death in other districts
such as Bekwai Municipal, Asante Akim South, Bosomtwe and Adansi South
Districts due to limited accessibility and their proximity to these places.
The Way Forward
i. The registry intends to liaise with midwives and CBS volunteers in the District to help
offer door to door services to the new born in other to improve the number of new
born registered
ii. The registry will also embark on intensive and extensive education campaign through
the District Information Services Department on the importance of registering births
and deaths especially in the districts where they occur.
National Disaster Management Organisation
Staff Strength
Area
Year
Secretariat Zonal Office Total Staff
2013 7 10 17
2014 6 8 14
2015 5 10 15
2016 5 9 14
Key Activities Performed
• Anti-Bushfire campaign
• Formation and revitalization of DVGs
• Windstorm/Flood alert
• Field visit to selected Medical centers
• Assessment on Safety of Schools and Health Facilities
• Radio talk shows on bush fire prevention
• Formation of anti-disaster fun club
Year Disaster
Occurrence
Location Affected
Persons
Relieve items
supplied
Quantity Number of Beneficiaries
Males Female Total
2013 Rainstorm Tebeso I 17 Rice 6 bags 7 10 17
Sugar 4bags 17
2014 Rainstorm Tebeso I (
R/C Primary)
150 Roofing Sheets
20pcs 81 69 150
Plastic cups 30pcs 81 69 150
Rainstorm Tebeso I 10 Mosquito Coil Blankets Plastic basins
5pcs 6 4 10
Bushfire Appiahkrom 24 Plastic cup Blankets Plastic Plates Plastic Basins Plastic Bucket
30pcs 20pcs 30pcs 2No 5pcs
9 15 24
45
2015 Bushfire Appiahkrom 50 Students mattress
35pcs 28 22 50
Rainstorm/
Bush Fire
Nyame-
bekyere
124 Student Mattress
95pcs 59 65 124
Bushfire Nsuta 28 Rice bag Cooking Oil Rice
4bgpcs 10btls 10bgs
16 12 28
Bushfire Anhwiaso 9 Rice Cooking Oil Sugar
1bag 4bottles 1/2bag
5 4 9
Bushfire Tebeso II 38 Rice Cooking Oil
4bg 8btl
16 22 38
Bushfire Freboye 15 Rice Cooking Oil
1bag 2bottles
15
Tebeso II
Mosquito coil 1box 20
Rice 8bags 15
Cooking oil 13bottles 13
2016 Used clothing 3bales 300
Blankets 40pcs 40
Mosquito coil 30pcs 10
Mosquito net 30pcs 30
Polymath 1bandle 25
Student mattress
30pcs 30
Bucket 30pcs 30
Plate 100pcs 25
Cups 100pcs 25
Rice 7bags 50
Maize 20bags 20
Cooking oil 2ctns 24
Soap 3ctns 50
Withington boot
2ctns 15
Student mattress
30pcs 30
46
3.2 Updates on Critical Development and Poverty Interventions
3.2.1 The Livelihood Empowerment against Poverty (LEAP) Programme
The LEAP programme Implementation commenced in the District during the latter
part of 2014. In all, Eight (8) communities are currently benefiting. These are Nsuta,
Nyamebekyere, Manfi, Alhajikrom, Ntowkrom, Keteke, Otoo Akura and Domkope.
Beneficiaries of the LEAP Programme are remitted electronically via their e-zwich
card. However, the District Assembly through the Social Welfare and Community
Development Department monitors and supervises each payment cycle which is
done bi-monthly.
Twenty-Three (23) Households with Sixty-Nine (69) individuals qualified in the
whole Nsuta- Area Council.
Below are details of Communities, individuals Beneficiaries, the Twenty- three (23)
Household and the amount paid to them in a household.
COMMUNITIES PERSONS QUALIFIED IN HHS
MEMBER(S)/ BENEFICIARIES AMOUNT GHȻ
Male Female Total
Keteke 7 7 11 18 586.00
Tumfourkrom 3 2 2 4 204.00
Ntowkrom 4 10 6 16 382.00
Nsuta 2 2 2 4 152.00
Nyamebekyere 2 3 4 7 194.00
Alhajikrom 1 2 2 76.00
Manfi 2 4 6 10 212.00
Otoo-Akura (
Aboabo)
2 5 3 8 182.00
Total 23 33 36 69 1,988.00
A motor bike has been provided by the Ministry of Gender and Social Protection to
enhance the implementation the LEAP Programme and activities in the District.
A major disturbing feature about the programme is that it is concentrated in
geographical area. Although poverty concentration is highest in this area, there are
other zones too where poverty is endemic but area left out of the programme. It is
therefore recommended that consideration should be given to people that are hard
core poor but not located in the officially designated poverty endemic areas.
47
People with Disabilities Fund (PWDS Fund)
The District Disability Common Fund which is 2% of the District’s allocation of the
District Assemblies Common Fund is managed by the District Disability Fund
Management committee. The committee approves and disburses applications from
individual persons with disability for financial support in order to better their lots.
Membership of the Committee
1. Chairman Of Social Services Sub-Committee
2. Representative-Ghana Society Of The Blind
3. Representative- Ghana Federation Of Disabled
4. District Director- Social Welfare And Community Development
5. A Co-Opted Member
The disability Fund Management committee, based on the release of the fund within
a particular quarter as per the application from the individuals and groups and
persons with disability support all the PWDs in the areas of;
The same funds are used in support of both Regional and National Conference of the
three (3) divisions within the Federations of Disable namely;
1. Visually impaired
2. Physically challenged
3. Difficulty- hearing and speaking
The School Feeding Programme
The Ghana School Feeding Programme (GSFP) is a special programme which seeks
to provide one square meal for school pupils from kindergarten to the primary level.
The programme started off in the District in 2008 with one school but increased to 4
in 2008. The number was increased to 10 schools in the 2010/2011 academic year and
in 2011/2012 the number was increased to 25 schools.
The table below shows the number of schools under the GSFP within the District
and their corresponding enrolment figures from 2013 to 2016.
48
List of Schools under the GSFP and Corresponding Enrolment Figures for 2013-
2016
S/N Name Of School 2013
Enrolment
2014
Enrolment
2015
Enrolment
2016 Enrolment
Male Female
Total
1 Adeito D/A Prim. 258 345 345 85 218 303
2 Ampento D/A Prim 258 280 283 94 199 293
3 Ankaase D/A Prim 278 280 250 67 177 244
4 Anomawobi D/A Prim.
348 427 420 190 214 404
5 Anumso Meth. Prim
208 310 301 85 190 275
6 Anwiaso Meth. Prim.
278 406 480 199 286 485
7 Anyanso Amadiya Prim
368 375 369 140 284 424
8 Anyanso Meth. Prim.
449 450 430 160 240 400
9 Anyinase D/A Prim.
305 363 341 81 213 294
10 Asamama Presby Prim.
378 380 490 167 309 476
11 Asanso Damascus D/A Prim.
272 502 472 143 207 350
12 Asiwa Presby Prim.
419 415 295 92 218 310
13 Bobiam D/A Prim. 249 285 308 125 225 350
14 Danso Meth. Prim. 308 387 402 151 260 411
15 Freso R/C Prim. 308 300 240 117 138 255
16 Freso Sda Prim. 298 315 350 99 193 292
17 Korkyikrom Sda Prim.
258 300 391 166 220 386
18 Kwame Ntowkrom Prim.
306 331 329 90 180 275
19 Morontuo D/A Prim. & K.G
244 236 200 55 150 205
20 Nsuaem D/A Prim 354 390 390 182 250 432
21 Nsuta D/A Prim. 474 470 475 134 335 469
22 Nsutaem Ahwiaso D/A Prim
268 329 377 172 234 406
23 Tebeso I R/C Prim. 549 575 585 169 332 501
24 Tebeso II Presby Prim.
459 587 590 151 459 610
25 Yapesa Kokoben Meth. Prim.
274 276 390 154 268 422
Total 8168 9314 9503 3,268 6,004 9272
Total Enrolment Levels 2013-2016
49
After a sharp rise in the pupils population in 2015 over 2014 academic year, there
was a marginal rise of 2.03 percent in 2015 after which there has been an appreciable
fall of 2.43 percent in 2006. In spite of the marginal rise in 2015 about 48percent of
schools dropped in their enrolment figures which is about half of the schools
benefiting from the programme and the same percentage of schools dropped in
enrolment. The only difference between 2015 and 2016 is that the fall in enrolment
in the 48 percent school were compensated for by more than proportionate rise in
enrolment in the remaining 52percent schools. And also the rate of fall in enrolment
in the 48 percent of the beneficiary schools were higher as compared to those in 2015.
2013 2014 2015 2016
Payment As At
December
Payment As At
December
Payment As At
December
Payment As At
December
277,989.00 801,953.00 417,265.00 1,158,155.00
Plans are underway to expand the programme to cover 15 additional schools in the
district.
Major challenges to the efficient running of the programme in the District are;
7500
8000
8500
9000
9500
10000
Enrolement
2013
Enrolment 2014 Enrolement
2015
Enrolment 2016
Series1
50
i. Excessive delay in the release of grants to caterers.
Beside the feeding grant being low, the release is always overly delayed which further
burden the caterers by payment of high interest on loans secured to run the
programme.
ii. Payment of Taxes on grant
The five percent tax deducted on the 80p grant further worsen the woes of caterers
operating under the programme
Youth Employment Agency (YEA) Programme
At the creation of the District in 2008 the District’s programme was under the office
of the Bekwai Municipal. The District office was set up in 2009 and the Agency run
three programmes, Health Extension Workers (HEW), Community Police Assistants
(CPA), and Community Education Teaching Assistants (CETA). One Hundred and
Forty Three (143) were engaged across the programmes by 2013.
No. Programme Beneficiaries
Male Female Total 01 Health Extension Workers 48 32 80
02 Community Police Assistants 3 0 3
03 Community Education Teaching
Assistants
28 32 60
In the year 2014 and 2015, the Agency did not run any activities even though the
Agency was in existence.
In the 2016 year, the Agency resumed massive business by rolling out many
modules. Among these were, Community Police Assistants (CPA), Youth in Fire
Service (YIFS), Community Health Workers (CHW), E-Health, Community
51
Education Teaching Assistants (CETA), Youth in Arabic Teaching, Environmental
Protection Officers and Youth in Coastal Sanitation.
The Youth Employment Agency in the 2016 year recruited a total of two hundred
and seventy three (273) youth across the district under the above programmes.
S/No Programme Beneficiar
y 2011
Beneficiar
y 2012
Beneficiaries 2013 Beneficiaries 2016
Total Total Male Fem Total Male Fem Total
01 Community Police Assistants (CPA)
4 4 4 - 4 22
02 Youth in Fire Service (YIFS)
- - - - - 6
3 Community Health Workers (CHW)
80 80 80 71
04 E-Health - - - - - 5
05 Community Education Teaching Assistants (CETA)
78 78 60 100
06 Youth in Arabic Teaching
- - - - - 5
07 Environmental Protection Officers
- - - - - 4
08 Youth in Coastal Sanitation.
- - - - - 60
Total 162 162 - - 143 273
District YEA office January 2016
Report of National Health Insurance Scheme (NHIS)
The report covers the period of 2013 – 2016 and is combination of Amanse East
(Bekwai) and Bosome Freho (Asiwa) Assemblies. Below are the details of
membership and claims.
Membership of the Amansie East National Health Insurance Scheme
Year NEW RENEWAL Total
Male Female Male Female
2013 4,549 5,753 11,832 18,560 40,694
52
2014 6,954 8,544 16,824 25,805 58,127
2015 11,112 13,942 13,284 21,075 59,413
2016 6,815 8,319 14,624 22,762 52,520
Source: Amansie East National Health Insurance Scheme January 2016
Claims for 2013-2016
Year Number of claims Submission Deductions Payments Outstanding
2013 203,284 4,764,494.02 84,746.46 4,679,747.56 Nil
2014 174,511 3,939,961.09 84,583.54 3,855,377.55 Nil
2015 152,844 3,857,424.53 157,370.76 3,700,053.77 Nil
2016 134,554 3,915,898.29 168,568.50 908,967.14 2,838,362.25 Total 665,193 16,477,777.93 495,269.26 13,144,146.02 2,838,362.25
Source: Amansie East National Health Insurance Scheme January 2016
NB: the payment for 2016 is covering January to March and April to December are
outstanding.
3.2.2 Incentives for Business Development
i. Employment Generation and Business Development
The level of commercial activities in the District is very low. The major occupation in the
District is farming, which engages about 80% of the population. The farming system is
mainly subsistence with the exception of some cocoa farmers whose activity is for
commercial purpose. Vegetable farming is gaining popularity with emphasis on cabbage
production. This account for mass exodus of the youth who are not interested in farming to
urban centres such as Bekwai, Obuasi, Konongo, Kumasi, Cape Coast, Takoradi and Accra
after they complete basic education. The recent emergence of alluvial gold mining saw laour
movement to small scale artisanal mining but farming remains the main stay of the people.
Department of Trade and Industry
The Rural Enterprises Programme
In an attempt to diversify the economy, the District in 2010 established District Business
Advisory Centre to promote skill training and small and medium scale businesses
development. The Rural Enterprises Project which was the financier of the activities of the
Business Advisory Centre ended in December 2011, fortunately the programme was re-
launched in 2012 and implementation continued through to 2016. In the year under review
the centre continued to monitor the groups trained and formed new groups. The emphasis of
the second phase of the programme is on mushroom production, improving palm oil
production and cassava processing.
53
The detail of activities organised with support from Sinapi Aba Trust were as
follows;
Table 16: Training for Tradesmen
S/N Activity Date Community No. of Beneficiaries
Male Female Total
01 Trade show 4th October,
2016
accra 1 5 6
02 Business Counselling 5th-10th
November,
2016
Yapesa 1 15 16
03 Business Counselling 12th -17th
November,
2016
Asiwa 8 21 28
04 Business Counselling 24th-29th
November,
2016
Amomorso 3 20 23
05 Soap Making 2nd-7th Dec.
2016
Bobiam 4 11 15
06 Apprentice Training 4th-12th
August, 2016.
Asiwa and
Bobiam
- 48 48
Total 17 120 137
Table17: Improving Access to Business Information
Focus Areas No. Persons Requesting Information
Male Female Total
Business registration 0 0 0
Business counselling 6 15 16
Information on marketing 8 23 31
Financial assistance 0 0 0
Training 0 0 0
General Business management 1 62 63
Needs assessment 11 48 59
Equipment support 4 0 4
NVTI Proficiency Test 0 0 0
Total 25 86 173
54
v. Water and Sanitation
Water and sanitation coverage in the district is not the best. Over the years the people’s
access to potable water and approved sanitation facilities is worsening. This might be due to
lack of interventions in this sector. Prior to the creation of the district communities had
benefited from development partners and government of Ghana interventions such as the
CWSP 1 & II, RWSP 1V & and its addendum but since 2011 there had not been any
intervention in the water and sanitation sector the drilling of 10No. Boreholes.
Another contributing factor to the problem has been poor maintenance of existing water and
sanitation facilities on the part of communities who own the water points and toilet facilities.
This has led to the breakdown of many boreholes, this coupled with increase in population
from natural factors and the influx of small scale miners in most communities in the district
has contributed to reducing access and coverage of potable water.
Table 18: Access to Safe Water and Sanitation
No. District Indicators and
Parameters
2013
Indicator
Level
2014
Indicator
Level
2015
Indicator
20116
Target
20116
Achievement
1 Percentage of population
with sustainable access to
safe water sources
40% 47% 52.13% 75% 23.47%
2 % of population with access
to improved sanitation
(flash toilet, KVIPs,
households latrine)
8% 10% 22.95% 35.20% 12.25%
3.2.6 Poverty Status of the District
Poverty in the district manifests in its agrarian economy. Agricultural production is mainly on
subsistence level and food crop production is key. Farm sizes has also diminished greatly
which implies that output from household food crop producers cannot feed themselves and
leave an adequate surplus for marketing.
Another dimension of poverty that is exhibited in the District is inadequate social and
economic infrastructure such as schools, health facilities, banking, and telephone facilities.
The key District specific poverty indicators are poor food and nutritional status, poor
infrastructural facilities and low school enrolment rates in these areas, low employment and
income levels, water and sanitation problems which affects the quality of life of the people.
This manifestation is prevalent in the remote communities which are characterized by low
55
incomes, limited accessibility by road and generally poor living condition in areas such as
Ohwimase, Anwiaso, Nsuta, Simedadieso, Fereso, Yapesa and Tebeso.
The Nsuta Area Council, which is farthest from the District Capital and has the poorest road
network, happens to be the most poverty stricken area of the District. Similarly, the District
part of the lake Bosomtwe basin which happens to be the next most poverty endemic zone at
the same time have major poverty problems.
4.1 The Way Forward
Giving the persistent weak financial position of the Assembly the District’s top priority
remains improving internal revenue mobilisation by embarking on an intensive revenue
mobilisation campaign. The Assembly shall strengthen its task force to educate the people
and enforce the payment of levies to support the Assembly. Effort shall also be made to
collect property rates and building permits where very small amount was collected during the
previous years.
The Assembly will continue to collaborate with other institutions, support departments like
the District Education Office, District Agric Development Unit, District Health Management
Unit, District Department of Social Welfare and Community Development among others.
The Assembly shall also concentrate on completion of the construction of Junior Staff
Quarters to improve housing situation for staff.
Attention will also be given to the operationalization of the four Area Councils, Revenue
items shall be ceded for the councils and community development officers placed within the
area councils. There is the need then to give them further training, encouragement and
motivation for them to do their work and generate revenue to support their operation. The
statutory allocation from the District Assemblies Common Fund will also be used to provide
logistical support and capacity building for the newly elected members.
To realise her major aspirations, the District envisage the need to receive the backing of
governmental institutions like the Ministry of Local Government Rural Development and
Environment, Energy, Works and Housing, Community Water and Sanitation Agency, Head
of Local Government Service, Finance and Economic Planning among others. As institutions
of governance these shall provide the broader policy framework within which the Assembly’s
initiatives shall conform to receive support from the broader national development agenda.
With this mind set the Assembly’s priorities shall be in conformity with national priorities in
order for her programmes and project to conform to national objectives.
4.2 Conclusion
56
With the coming into being of a new administration, It is highly advocated that for the
Assembly to fulfil its core mandate of bringing development to the people, there is the need
to pursue policies that will trigger sustainable economic activities which will empower the
local people and improve upon their livelihoods. This is in line with the incoming
administration’s commitment to promote local economic activities in other to create jobs
through the establishment of one factory for each and District and supporting each
constituency with One Million US Dollars (US$1,000,000.00). Skill upgrading for tradesmen
such as carpenters, mechanics, weavers, food processors and small scale manufacturers of
industrial products such as soap, powder etc should still be given the relevant attention.
Also, the Assembly should not relent on her efforts to improve upon second cycle education
and continue with the previous administration’s quest to establish additional second cycle
institution to improve BECE leavers access to second cycle education. With the incoming
current government’s policy to make secondary school education free from paying fees this
should be given much attention to help absorb the teaming prospective candidates that may
be seeking admission to second cycle education. The administration must continue to
provide social infrastructure such as markets, water and sanitation facilities, electricity and
improve the road system because this forms the basis for industrial development.
The Assembly should last but not the least support agricultural production especially in the
food crop production sector. Major rivers in the District such as the Anum, Pra and the Fre
has wide flood plains that are suitable for rice cultivation, cabbage production along the
slopes and valleys of the Bosomtwe ranges had also proved very profitable. Citrus and oil
palm production are also major potentials of the district beside cocoa. The Assembly should
therefore liaise with the District Agric Development Unit to come up with interventions to
support production of these crops which has ready market and has proved profitable.
60
Appendix
Table 2a: District’s Development Fund (DDF) Projects
No
.
Project Title Location Funding
Source
Contractor Contra
ct Sum
(Gh¢)
Rev.
Contr
act
Sum
Payment
To Date
Award
Date
Start
Date
Expected
Completi
on
Actual
Compl.
Status Stage
(%)
01 Supply of 1,000
Dual Desk
Districtwi
de
DDF Anapim
Company
Limited
69,000.
00
69,000
25/10/1
0
15/11/
10
28/02/20
11
13/12/
2010
1,000 pcs of
furniture
supplied
100%
02 Cladding of 2
No. 3-Unit
Classroom
Block with
office and store
Anyanso DDF Mountplex
Limited
52,838.
73
51,612.0
0
28/10/1
0
15/11/
10
28/02/20
11
02/03/ 2
011
Project
Completed
100%
03 Construction of
1 No. 12 Seater
Aqua Privy
Toilet and
Urinal
Nsuta DDF Gyensuaa
Company
Limited
44,932.
23
43,851.6
0
25/10/1
0
12/11/
2010
25/02/20
11
14/03/2
011
Project
Completed
100%
04 Construction of
2 No. 10- Unit
Market Stalls
Nsuta DDF Anapim
Company
Limited
44,988.
93
40,487 25/10/1
0
12/11/
2010
25/02/20
11
28/01/
2011
Project
Completed
100%
61
05 Construction of
1 No. 3- Unit
Classroom
Block with
Office and Store
Esaase DDF Gafak Elect.
And Const.
Works
55,505.
47
54,007.9 28/10/1
0
12/11/
2010
12/03/20
11
20/06/
2011
Project
Completed
100%
06 Construction of
6-Unit Market
Stores and
Banking Hall
Asiwa DDF Ernboat
Const. and
Trading Ent.
123,813
.80
123,735.
08
28/10/1
0
12/11/
2010
28/04766
76yt/201
1
06/04/
2011
Project
Completed
100%
07 Cladding of 1
No. 6-Unit
Classroom
Block with
Office and Store
Korkyekro
m
DDF Oppong
Kwabia
Enterprise
53,243.
40
49,227.5 28/10/1
0
12/11/
2010
28/02/20
11
25/05/
2011
Project
Completed
100%
08 Construction of
3-unit Market
Stores, 10Unit
Mkt Stalls and
Banking Hall
Asiwa DDF Ernboat
Const. and
Trading Ent.
118,307
.75
118,547.
5
07/03/1
2
15/03/
12
15/09/12 9/07/12 Project
Completed
100%
09 Construction of
7Unit Market
Stores with
Police Post
attached
Nsuta DDF Osbel
Enterprise
Ltd.
129,791
.20
123,197.
90
07/03/1
2
13/03/
12
13/11/12 26/10/
12
Project
Completed
100%
10 Rehabilitation of
1No. 4Unit
Anyanso DDF Osbel
Enterprise
39,907. 37,803.4 07/03/1 14/02/ 14/06/12 19/09/1 Project 100%
62
Classroom
Block for
Ahmadiyya JHS
Ltd. 01 0 2 12 2 Completed
11 Construction of
1No. 3Unit
Classroom
Block for
Freboye D/A
JHS
Freboye DDF Osorommoa
Constructio
n Ltd.
69,985.
30
66,373.6
5
07/03/1
2
14/03/
12
14/07/12 10/07/1
2
Project
Completed
100%
12 Construction of
2No. 2Unit
Kindergarten
Blocks
Awheaso
and
Ampaha
DDF Illimitable
Ghana Co.
Ltd.
69,897.
30
69,897.0
0
07/3/12 15/3/1
2
15/8/12 13/8/12 Project
Completed
100%
13 Clearing of
Ankaase-
Mmorontuo
feeder road
Mmorontu
o –
Ankaase
DDF Works
Dept(Direct
Labor)
15,000 15,000 Project
Completed
100%
14 Construction of
50-Unit Market
Stalls
Anyanso DDF M/S Osbel
Limited
189,789
.00
- 186,739 08/02/1
3
08/10/20
13
18/06/2
013
Works
Completed
100%
15 Construction of
1No. 2-Unit KG
Block with
Office and Store
Danso DDF Panquit 40,222.
35
- 39,987.0
0
25/02/1
3
27/05/20
13
4/07/13
Project
Completed
100%
16 Construction of
1No. 12-Seater
Aqua Privy
Nyamebek
yere
DDF Ernboat
Const. and
Trading Ent.
70,289.
52
- 63,655 08/02/1
3
10/06/20
13
22/5/13 Project
Completed
100%
63
Toilet
17 Rehabilitation of
2No. 3Unit
Classroom
Block with
Office and Store
for Methodist
Prim. School
Ankaase DDF Ernboat
Const. and
Trading Ent.
113,581
.47
- 79,696.5
0
08/02/1
3
10/06/20
12
22/5/13 Works
Completed
100%
18 Construction of
1No. 3Unit
Classroom
Block
Nsuaem I DDF Almay
Constructio
n Limited
125,111
.36
- 87,101.3
9
19/06/1
4
19/09/14 27/10/2
0 /14
Project
completed
handed over
and is in use
100%
19 Construction of
6Units Lockable
Stores
Anyanso DDF OSBEL
ENT. LTD.
156,895
.09
88,372.7
1
19/06/1
4
19/09/14 12/08/1
4
Project
completed
100%
20 Construction of
1No 12-Seater
Aqua Privy
Toilet
Anyinase DDF Amenfi
Building &
Trad. Ent.
72,104.
23
64,893.8
1
19/06/1
4
31/12/14 22/12/1
4
Project
Completed
100%
21 Construction of
1No 12-Seater
Aqua Privy
Toilet
Dunkuraa DDF Panquit
Company
Limited
72,150.
78
64,935.8
8
19/06/1
4
19/09/14 23/12/1
4
Works
completed
100%
22 Construction of
1No. 3Unit
Classroom
Block with
Kwamento
wkrom
DDF Panquit
Company
Limited
131,724
.69
115,099.
43
08/09/1
5
08/01/16 2/9/201
6
Project
completed
100%
64
Office and Store
23 Cladding of
2No. 3Unit
Pavillion
Classroom and
Construction of
Office and Store
Beposo DDF Obeline
Company
Limited
74,833.
86
67,349.3
7
08/09/1
5
08/01/16 Project
Completed
100%
24 Construction of
6Unit 1st floor
Stores for the
completion of
Anyanso Market
Anyanso DDF M/S Osbel
Enterprise
limited
100,000
.00
76,900.8
2
08/09/1
5
08/01/16 Project
completed
100%
25 Construction of
1No. 3Unit
Classroom
Block with
Office and Store
Supom DDF ASCOTUR
K Company
Limited
130,149
.36
117,134 08/09/1
5
08/01/16 Project
completed
100%
26 Construction of
1 no 3units
classroom block
with office and
store
Dajanso DDF Grotoso
enterprise
185,286
,20
19/12/1
6
19/07/20
17
Site
preparation
and block
mudding is
in progress
27 Construction of
1 no 3units
classroom block
with office and
store
amomorso DDF Osbel
Enterprise
Ltd
176,473
.86
19/12/1
6
19/07/20
17
Site
preparation
and block
mudding is
in progress
65
28 Construction of
1 no 3units
classroom block
with office and
store
ohwimase DDF K.Kumi 187,380
.60
19/12/1
6
19/07/20
17
Site
preparation
and block
mudding is
in progress
Table 2b: Project: District Assemblies Common Fund (DACF)
Table 2b: Project: District Assemblies Common Fund (DACF)
No. Project Title Location Funding
Source
Contractor Contract
Sum
Rev.
Contra
ct Sum
Payment
To Date
Award
Date
Start
Date
Expecte
d Compl.
Actual
Compl.
Status Stage
(%)
02 Construction of
1No. 3Unit
Classroom Block
Appiah
krom
DACF M/S 49,986.55 45,035.17 09/05/07 9/6/2007 09/09/07 15/6/20
09
Project Completed 100%
03 Construction of
1No. 3-Unit
Dormitory Block
with Sanitary
House, Kitchen
and Dining Hall
and 1No. 6Unit
Classroom Block
for Bosome Freho
Secondary School
Asiwa DACF M/S Ernogyan
Company Ltd
301,92.08 124,757.96 26/07/07 30/08/07 10/04/08 Nov.
2011
Works Completed.
Const. of Kitchen
and Dining Hall
terminated
100%
66
04 Construction of
1No. 2-Bedroom
Semi Detached
Staff Bungalow
(No. 1)
Asiwa DACF M/S Philip
Duba Co. Ltd
62,599.29 61,549.92 22/02/08 10/10/09 25/10/08 Feb.
2010
Project Completed 100%
05 Construction of
1No. 3-Bedroom
Staff Quarters
Asiwa DACF M/S Edu-K 75,048.82 90,915.
46
90,915.46 25/01/08 25/07/08 25/10/08 July
2010
Project Completed 100%
06 Construction of
Executive
Bungalow
Asiwa DACF Ernogyan
Company Ltd.
115,709.05 115,709.05 25/01/08 22/02/08 25/10/08 July
2009
Project Completed 100%
07 Completion of
Const. of
Enhanced Rural
Clinic
Nsuta DACD/SIF M/S Obodantwi
Const. Ltd.
49,598.79 49,598.79 10/11/08 10/11/08 05/02/09 25/03 /
09
Work Completed 100%
08 Construction of
1No. 2 Bedroom
Staff Bungalow at
Asiwa (No. 2)
Asiwa DACF M/S Nickseth
Construction
Co. Ltd
83,011.40 82,136.50 30/09/09 1/9/09 5/4/10 24/03/1
0
Project Completed 100%
09 Construction of
1No. 3-Unit
Classroom Block
with Office, Store
and Sanitary
Facility for
Presby Primary
Asiwa DACF M/S Nickseth
Construction
Co. Ltd
55,877.08 53,298.29 14/10/09 20/10/09 15/04/10 13/10/2
010
Project Completed 100%
10 Construction of 1
No. 12 Seater
Aqua Privy Toilet
Asiwa
Health
Center
DACF M/S Opong
Kwabia
Enterprise
32,046.10 32,046.10 14/10/09 20/10/09 15/04/10 10/6/10 Project
Completed
100%
11 Construction of 1
No. 12 Seater
Ankaase DACF M/S
Boakyewah
30,982.46 30,981,.49 14/01/10 18/01/10 18/04/20 17/05/1 Project Completed 100%
67
Aqua Privy Toilet Enterprise 10 0
12 Construction of 2-
Storey 44-Offices
Administration
Block
Asiwa DACF M/S Osbel
Enterprise
limited
863,613 1,573,
322.58
1539995.6
4
21/01/11 26/01/11 26/07/12 2/01/16 Project completed 100%
13 Fencing of DCE’s
Bungalow
Asiwa DACF M/S Opong
Kwabia
Enterprise
65,374.10 35,181.73 22/2/12 02/03/12 22/2/213 Contract
Terminated
70%
14 Construction of
1No. 12-Room
Nurses Quarters
Asiwa DACF M/S Osbel
Enterprise Ltd.
400,000 587,43
3.72
415509.46 08/10/13 07/10/13 08/10/14 Project Completed 95%
15 Construction of
1No. Semi
Detached Staff
Quarters No. 3
Asiwa DACF Obeline
Company Ltd
356,343.35 382,777.58 Works completed 100%
16 Construction of
3room office
with store and
sanitary facility
for District
Electoral Office
Asiwa DACF Direct Labour 29,000 30,000 04/08/14 04/01/15 Works completed 100%
17 Construction of
1No. 6Unit
Classroom Block
Asiwa DACF True Engineers
Const. Ltd.
342,739.77 399822.16 29/09/15 12/08/16 Project completed 100%
68
with Office, Store
and Library with
Sanitary Facilities
(Model School)
18 Construction of
1No. 3-Unit
Classroom Block
with Office and
Store
Kwakum
ensahkro
m
DACF M/S Grotoso
Enterprise
169,580.40 126,454.50 22/04/16 22/04/16 21/10/16 Plastering and
screeding
completed
80%
19 Construction of
CHPS Compound
Anomaw
obi
DACF True Engineers
Const. Ltd.
85,213.96 66,931.85 29/09/15 29/09/15 29/09/16 Painting is in
Progress
90%
20 Construction of
CHPS Compound
Freso DACF/DD
F
K.Kumi
Enterprise
149,000 133,897.4 30/03/16 12/04/16 21/10/16 Project completed 100%
21 Construction of
Fencewall for
Bosome Senior
High Technical
School
Asiwa DACF Ascoturk 169,497.00 63424.69 30/03/16 22/4/16 21/10/16 Work is at the
painting level
85%
22 Completion of
Area Council
Block
Nsuta DACF Works dept
(Force
Account)
30,000 31,796.00 Painting is in
progress
95%
23 Construction of
pavilion structure
for Asiwa Health
Centre
Asiwa MPs Fund (Force
Account)
35,725.00 Work is the
painting level
90%
24 Rehabilitation of Asiwa DACF Works Dept
(Force
18,018.00 Works Completed 100%
69
DCD’s Bungalow Account)
Table 2c: GETFund Project
No. Project Title Location Funding
Source
Contractor Contract
Sum
Rev.
Contract
Sum
Payment
To Date
Award
Date
Start
Date
Expected
Completion
Actual
Compl.
Status Stage
(%)
01 Construction of 1No.
6Unit Classroom
Block with office
store and library
Morontu
o
GETFund 110,000 01/04/0
8
01/04
/08
01/12/08 28/11/1
3
Works
Completed
100%
02 Construction of 1No.
6Unit Classroom
Block with office
store and library
Dagyans
o
GETFund 110,000 01/04/0
8
01/04
/08
01/12/08 01/03/1
1
Project
Completed
100%
03 Construction of 1No.
6Unit Classroom
Block with office
store and library
Anoma-
wobi
GETFund Ernboat Const.
and Trading
Ent.
156,891.02 135,770.
71
26/07/1
0
17/04/2011 14/12/1
1
Project
Completed
100%
70
04 Construction of 1No.
6Unit Classroom
Block with office
store and library
Semdadi
e -so
GETFund Osrommoa
Const.
Company
156,644.62 149,034.
35
26/07/
2010
12/04/2011 14/12/1
1
Project
Completed
100%
05 Construction of
2Storey Dormitory
Block for Bosome
Senior High
Technical School
Asiwa
GETFund
Invergold
Construction
Company Ltd.
353,337 353,337 7/11/07 7/11/
07
24/03
/11
Completed
and
Inaugurated
100%
06 Construction of 1No.
3-Unit Classroom
Block with Office
and Store
Yapesa MP’s
GETFund
Kwamok
Enterprise
45,895.30 49,613.6
0
13/05/
2010
21/05
/2010
21/09/2010 17/09/2
010
Project
Completed
100%
07 Construction of 1No.
6Unit Classroom
Block with office
store and library
Nsuaem
II
GETFund M/S Amfrank
Company Ltd
181,447.63 39,815.4
4
7/10/20
11
14/10
/11
14/06/12 Project
abundant
70%
08 Construction of 1No.
6Unit Classroom
Block with office
store and library
Duase GETFund F-Nyark
Enterprise
181,350.54 39,815.4
4
07/10/1
1
14/10
/11
14/06/12 Project
abundant
65%
09 Construction of 1No.
6Unit Classroom
Block with Office,
Store and Sanitary
Facilities
Ampento GETFund Project
Completed
100%
71
10 Construction of 1No.
6Unit Classroom
Block with Office,
Store and Sanitary
Facilities
Freso GETFund Project
Completed
100%
11 Construction of
District Education
Office Block for
Bosome Freho
District Assembly
Anyinase DANIDA M/S Okorogya
Enterprise Ltd
Works
completed
100%
Table d: Other Projects
No. Project Title Location Funding
Source
Contractor Contract
Sum (Gh¢)
Rev.
Contract
Sum
Payment
To Date
Award
Date
Start
Date
Expected
Compl.
Actual
Compl.
Status Stage
(%)
01 Rehabilitation of
Asiwa Health
Centre
Asiwa NHIS/MPs M/S K.
KUMI
56,283.51 _ 39,398 30/03/11 15/04
/11
1/08/11 March2
013
Project
completed 100%
02 Extension of
Electricity
Brofoyedru,
Ampantubuo
m, Yapesa,
Kokoben,
Adeito,
Anumso,
Freboye,
Nsutem
GOG Project
Completed
100%
03 Partial
Reconstruction of
Bomfa Jn.-Asiwa
Bomfa
Junction
Asiwa
GoG Ussuya Gh.
Ltd.
Construction of
Culverts
Completed.
Bitumen sealing
72
Road (km 0.0-26.2 has been
completed
04 Rehabilitation of
Bekwai (Amoaful)
Ampah – Asiwa
Road
Amoaful –
Ampaha –
Asiwa
GoG Surfacing is
almost
completed
leaving a
distance of 7km
between
kokobin and
abosoma
05 Construction and
bituminous sealing
of Gyimakyi –
Abosamso Highway
Gyimakyi-
Abosamso
GoG Cymain Co.
Ltd.
- - - - - - - ongoing
06 Construction and
bituminous sealing
of Abosamso –
Nsuaem II
Highway
Abosamso –
Nsuaem II
GoG Cymain
Company
Ltd
- - - 2012 - - - - Ongo
ing
07 Construction and
bituminous sealing
of Anumso –
Anyanso,
Anyinase-Ofoase
feeder Road
Anumso –
Anyanso,
Anyinase-
Ofoase
GoG Edmac Co.
Ltd
- - - 2015 - - - - Ongo
ing
08 Construction and
bituminous sealing
of Peminase-
Peminase-
Beposo-
Ankaase
GoG Edmac Co.
Ltd
- - - 2015 - - - - Ongo
ing
73
Beposo-Ankaase
feeder Road
09 Rehabilitation of
(3.6km)
Semdadieso Tebeso
No 2 Feeder Road
Tebeso No 2
–Semddieso
GSOP Grand
Shelter Co.
Ltd
204,061.78 26/04/16 26/04
/16
26/09/16 Project
abundant
5%
10 Rehabilitation of
Anhwiaso –
Ohwimase Feeder
Road
Anhwiaso-
Ohwimase
GSOP Skill Link
Company
Ltd
228,460.94 - - 04/05/16 04/05
/16
4/10/16 Project
abandoned
_
11 Construction of
2No. 3-Unit Aqua
Privy Toilet
Tebeso II &
Nsuaem II
GPEG M/S Ofei
Brothers
Const.
Works
38,728.73 33,196.0
5
16/07/20
13
20/08
/2013
7/10/20
13
Project
completed
100%
12 Construction of
2No. 3-Unit Aqua
Privy Toilet
Anyinase &
Dunkuraa
GPEG M/S Ofei
Brothers
Const.
Works
38,623.73 33,106.0
5
16/07/20
13
20/08
/2013
7/10/20
13
Project
completed
100%
13 Construction of
100No. 20-Seater
W/C Toilet Facility
Districtwide GoG M/S Oliton
Ghana Ltd.
- - - 14/05/16 20/08
/2013
7/10/20
13
Project
completed
100%