1 MINISTRY OF LOCAL GOVERNMENT AND RURAL DEVELOPMENT BOSOME FREHO DISTRICT ASSEMBLY ANNUAL PPROGRESS REPORT for January –December 2016 Compiled by: District Planning & Coordination Unit February 2017

Upload: others

Post on 04-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

1

MINISTRY OF LOCAL GOVERNMENT AND RURAL DEVELOPMENT

BOSOME FREHO DISTRICT ASSEMBLY

ANNUAL PPROGRESS REPORT

for

January –December 2016

Compiled by:

District Planning & Coordination Unit

February 2017

Page 2: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

2

TABLE OF CONTENTS

Contents Page

1.1 Introduction ..................... ...................................... ....................... 1

1.1.2 District Profile........................................................... ............................. 1

1.1.3 District Governance..................... ...................................... ........... 1

1.1.4 District Assembly and its Objectives..................... ............................. 2

1.1.5 Purpose of the 2016 Annual Progress Report (APR) ................................. 2

1.2 The key M&E Objectives for the Year............................. ....................... 3

1.3 Processes Involved and Difficulties Encountered............ ....................... 4

2.1 Status of Implementation of MMTDP in 2016............................. ................. 5

2.2 M&E Activities Report............... ...................................... ....................... 11

2.2.1 Programme and Projects Status for the year 2016………....................... 11

2.3 Update of Disbursement from Funding Sources............... ....................... 26

2.3.1 The Sources of External Inflow Included...................................... ........ 26

2.3.2 Comments on the Releases of Funds.............................. ....................... 29

2.3.3 Efforts to Generate More Revenue................................. ....................... 31

2.3.4 Challenges with Regard to Disbursement....................... ....................... 32

3.1 Updates on Indicators and Targets............................... ....................... 32

3.1.1 Agriculture..................................... ................................... ....................... 32

3.1.2 Education ..................................... ................................... ....................... 34

3.1.3 Health ................................................. ................................... ....................... 38

3.1.4 Ghana Health Service Activities……………………………………………………………………….. 38

3.1.5 HIV/AIDS………………………………………………………………………………………………………… 43

3.2 Updates on Critical Development and Poverty Interventions.................... 48

3.2.1 The Livelihood Empowerment Against Poverty (LEAP) Programme.......... 48

3.2.2 Incentives for Business Development ......................... ....................... 55

3.2.4 Social Welfare ……………… ........................................ 57

Page 3: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

3

3.2.6 Poverty Status of the District.. ........................... ......................... 58

4.1 The Way Forward..................... ............................ ........................ 58

4.2 Conclusion..................................... ............................ ........................ 59

List of Tables

Table 1: Programmes Activities and Achievements for 2016......................... 05

Table 2a: District’s Development Fund (DDF) Projects................................. 11

Table 2b: District Assemblies Common Fund (DACF) Project...................... 17

Table 2c: GETFund Projects........................................................................... 20

Table 3: Revenue Mobilisation Performance as at 31st December 2016........ 27

Table 4a: Expenditure Performance………………................................. 29

Table 4b: Expenditure by Department ………………………………….. 30

Table 5: District Indicators and Parameters Agriculture ........................... 32

Table 6: Key Agriculture Outputs for 2016 ................................................ 33

Table 7: Key Activities Identified for Performance by Objectives............... 34

Table 8: District Indicators and Parameters (Education)................................ 35

Table 9: BECE Pass Rate 2011-2016…………………………………….. 36

Table 10: Key Health Outputs for 2016 ……….. ................................... 41

Table 11: District Indicators and Parameters (Health) ................................ 42

Table 12: Situation of Core Health Staff……......................................... 43

Table 13: District Indicators and Parameters (HIV )………………….. 44

Table 14: District Indicators and Parameters (Transp. & and Account Gov).......... 44

Table 15: No. of Birth Registered for 2014-2016…………...................... 45

Table 16: Training for Tradesmen……………......................................... 56

Table 17: Improving Access to Business Information........................................ 56

Table 18: Access to Safe Water and Sanitation .............................................. 57

Table 19: Categories of Disabled Persons Registered....................................... 57

Table 20: Family Welfare Cases Handled From 2009 to 2014...................... 58

Page 4: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

4

1.0 Introduction

1.1 Background

In compliance with statutory requirements for monitoring and evaluation, mechanisms are put

in place to measure progress of planned programmes and projects undertaken by the district,

the Bosome Freho District Assembly on an annual basis prepare a District Annual Progress

Report.

The Annual Progress Report for January-December 2016 was prepared within the context of

programmes and projects, which are in line with the seven thematic areas of the Medium

Term Development Plan (MTDP) as follows:

� Ensuring and sustaining macroeconomic stability

� Enhanced competitiveness of Ghana’s Private Sector

� Accelerated agricultural modernization and natural resource management

� Oil and Gas

� Infrastructure and Human settlement Development

� Human development, employment and productivity

� Transparent and accountable governance.

In addition to programmes and projects initiated at the local level, the Assembly also monitor

and report on direct national and development partner interventions on-going at the local

level and report on their status of implementation. Beside these, the Assemblies report on

Disbursement from major funding sources, status of indicators and targets set and critical

development and poverty issues which give indication to the level of welfare of the people

and therefore serve as tools of evaluation for the various poverty reduction interventions put

in place by central government and development partners at the grassroots level.

1.2 District Profile

The Bosome Freho District Assembly was established by the legislative instrument

LI 1852 of 2007 with its capital at Asiwa. The District was carved out of the former

Amansie East District.

The District is located in the central part of the Ashanti Region and shares

boundaries with the Bekwai Municipal to the West, Bosomtwi and Ejisu-Juaben

Districts to the North, Adansi South and Akyimansa Districts to the South and

Page 5: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

5

Asante-Akim South to the North-East. It is estimated to have a land area of about

630sq. km. Major settlements in the District are Asiwa, Esaase, Dompa, Anyanso,

Freso, Abosamso, Nsuaem, Tebeso I & II, Anyinase and Nsuta. The District lies

within Latitude 6°00’N and 6°26N and Longitudes 1°00W and 1˚30W.

It is drained by Pra, Fre, Sunso, Anum Rivers and the Lake Bosomtwe. The

vegetation is a moist-semi-deciduous forest predominantly covered by chronolaena

Odorata (commonly called Acheampong) shrub. It also has forest reserves along the

Lake Bosomtwe Ranges and along the borders with Adansi South. The District is

mainly under laid by three geological formations, the Birimian, Tarkwaian, and

granitic rocks.

The District experiences tropical rains with double maxima recording a monthly

average of 1600mm in June and 1800mm in October. Temperature ranges between

32°C in March and 20°C in August with Humidity moderately high during the rainy

season. It ranges between 70% and 80% in the dry season.

Based on the 2010 Population and Housing Census report, the District has a total

population of 60,397. The sex distribution of the population was composed of 29,753

males and 30,644 females. The population growth rate of the District is 2% per

annum and projected population for 2016 is about 66,684.

The District is mainly rural and farming is still the main occupation of the people.

The major cash crops produced are cocoa, citrus and oil palm. Food crops are

generally produced on subsistence basis including maize, yams, cassava and

plantain. Cabbage production is popular as a non- traditional cash crop. It is mostly

cultivated along the slopes of the Bosomtwe ranges.

Page 6: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

6

Small scale gold mining is still gaining prominent due to the discovery of alluvial

gold along the Anum and Pra rivers and their major tributaries.

Manufacturing is still virtually non-existent, except for some few individuals who

engaged in gari processing and palm oil production. Part time cottage industrial

activities such as weaving, basketry and petty trading activities are still common

among women.

Lake Bosomtwe and the surrounding meteorite crater with its associated landforms

remain a major tourist attraction in the District. There are two waterfalls in the

District namely Subrisu and Yapesa waterfalls. Efforts are being made to exploit

their potentials to generate revenue for the Assembly and to create jobs.

The greater portion of the lands in the District falls under the Kokofu Traditional

Council, the only Paramountcy in the District, though the seat of the Paramountcy is

located outside the District. Other parts of the District also belong to the Dadease

Stool which is Obrempong. Similarly the seat of the Obrempong stool is located

outside the District.

The District has forty-one (42) Pre-Schools, fifty-one (51) Primary Schools, thirty-

Five (35) JHS, one (1) Senior High/Technical school and two (2) Vocational Schools.

The teacher/pupil ratio is; Primary 1:35, JHS 1:25, SHS 1:20.

There are two Health Centres, two Clinics and 27 CHPS zones in the District serving

the District, with Doctor Patient Ratio being 0: 66,684 and Nurse Patient Ratio1:682

currently.

The District has two police stations at Asiwa and Nsuaem II with seven (7) police

personnel.

The District has one (1) Magistrate Court which was established and inaugurated on

18th May, 2015 at Asiwa to cater for the area and the adjourning towns and villages.

Page 7: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

7

1.3 District Governance

The District has 4 Area Councils made up of the following (Bosome, Bosomtwe East, Sunso

Freho and Nsuta). By the creation of more electoral areas, the District now has 21 electoral

areas. The Assembly has 21 elected members and 9 government appointees making the sum

total of 30. They with the District Chief Executive who is also an appointee of the President

and the Member of Parliament as an ex-officio member constitute the District Assembly and

perform legislative functions of the Assembly.

The District has four (4) Area Councils, namely; the Bosome, Nsuta, Sunso Freho and

Bosomtwe East. The councils has its executive members in place and the Assembly has

seconded staff from the community development to act as secretaries for the Area councils.

The Assembly has also ceded revenue items for the councils collection of which they are to

keep 50percent of total collections made. The council identify community needs and takes

steps to address them. The members assist the Assembly in project implementation and

monitoring. They also assist in the implementation of bylaws and act as liaison between the

Assembly and the local communities.

Traditionally, the District is mostly ruled by ‘Adikrofo’, most of the land belong to the

Kokofu Paramountcy and Dadease Traditional Council which is an oberempon stool.

1.4 District Assembly and its Objectives

The Assembly is the highest political and administrative body in the District and therefore

exercises deliberative, legislative and executive functions. It has the mission and

responsibility to improve the quality of life of the people through sustainable development.

To achieve this mission, the District has set itself certain objectives namely:

� To facilitate the effective functioning of the local government administration in the

District.

� To ensure efficiency and effectiveness in the use of resources of the District and the

decentralized departments.

� To monitor, co-ordinate and harmonize the implementation of development plans and

activities in district.

Page 8: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

8

� To facilitate the provision of basic social and economic infrastructure and services in

the district.

� To facilitate community based and private sector development in the district.

1.5 Purpose of the 2016 Annual Progress Report (APR)

The purpose of the 2016 Annual progress Report is to assess and evaluate the performance of

the Assembly, review and provide information on the impacts and achievements of the

district based on the objectives set –out in the Medium Term Development Plan (2014-2017)

in relation to the programmes and projects targeted for the year 2016.

This report therefore indicates the level of progress of development programmes and projects

initiated both by the District and the Government. Also the core indicator levels were

examined to access their performance. The report also accessed the medium term

development plan 2014-2017 in its first year of operation. As part of the exercise, funding

sources of revenue for project implementation were also reviewed to indicate the volume that

was made available during the period and timeliness. Critical poverty interventions being

implemented in the District were also reviewed to see their progress.

1.6 The key M&E objectives for the year

The report is to assess and evaluate the performance of the District Assembly, review and

provide information on the impacts and achievements of the District based on the objectives

for the year 2015. This was achieved by assessing and collating achievement by various

departments within the District based on the objectives set by them and the implementation of

major projects and programmes that the Assembly planned to undertake. Among the primary

objectives of the Assembly for the year were among the following;

A. Ensuring and Sustaining Macroeconomic Stability

i. Increase Internally Generated Fund by 40% by December 2017

B. Enhancing Competitiveness in Ghana’s Private Sector

• To improve upon 220 private businesses access to finance by December 2017

• To improve upon the knowledge and skills of 210 small scale business

entrepreneurs by December 2017

C. Accelerated Agricultural Modernisation and Agro-based Industrial

Development

Page 9: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

9

• To promote the adoption of modern technology among 50% of farmers within the

District by 2017.

D. Infrastructure and Human Settlements Development

• To improve access to energy supply for both domestic and commercial purposes by

23% by 2017

• To improve upon 5Key Road Networks in the District by December 2017

• To draw a comprehensive settlement scheme for ten (10) communities by Dec.

2017

• To Improve upon coverage of potable water from 35% to 45% by December 2017

• Electricity Coverage Increased by 20% in the District by 2017

E. Human Development, Productivity and Employment

• Open a register of businesses/entrepreneurs for Local firms

• Organise business development training programmes for 200 small and medium

Scale Entrepreneurs by December 2017

• Reduce diseases of public health importance by 10%

• To halt and reverse the further spread of HIV/AIDS

• Give financial support to 30 men and 10 disabled women to support their education

F. Transparent and Accountable Governance

• To strengthen the capacity of 4 Area councils by Dec. 2017

• To strengthen the capacity of the Assembly in efficient and effective service

delivery by 2017.

• To improve women’s participation in local governance from in 2009 to 45% by

2017.

1.7 Processes Involved and Difficulties Encountered.

Beside the review of major programmes and projects of the District Assembly the

Decentralised Departments also reported on their performance against set targets. Among the

key departments which reported on their performance to the Assembly were Education,

Health and Agriculture, Department of Community Development, Department of Social

Welfare and the Business Advisory Centre.

Major challenges encountered during the process of compiling the report were as follows;

� Limited funding for the implementation of programmes and projects outlined in the District annual action plan. The District relied mostly on the District Assemblies

Page 10: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

10

Common Fund and there was a huge deficit. The Internally Generated Fund (IGF) of the Assembly has been very low over the years of the Assembly’s operation.

� Excessive delay in the release of the District Assemblies Common Fund

� Inadequate logistical support for monitoring and evaluation of the Assembly activities

� Excessive delay in the release of the District Development Facility (DDF)

� Delay in the preparation and submission of reports by Departments of the District.

Page 11: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

11

2.0 Performance of Annual Action Plan 2016

2.1 Status of Implementation of the MMTDP in 2016

The Bosome Freho District Assembly is in the third year of implementing the 2014-2017

District’s Medium Term Development Plan.

In this regard the 2016 budget of the Assembly and other expenditure were prioritized in

favour of policies programmes, projects and interventions within the seven thematic areas of

the MTDP. The performance of the Assembly in terms of programmes and projects were

deduced from the 2016 Annual Action Plan and Budget.

Table 1: Programmes Activities and Achievements for 2016

S/N Activities Location Achievement Absolute Achievement Result (%)

001 Ensure efficient functioning of the General Assembly, statutory committees and sub-committees through regular meetings

Asiwa 3General Assembly meetings organised 3Executive Committee Meeting orgainsed 3 Sub-Committee meetings organised

100% 100% 100%

002 Support to DPCU activities

Asiwa Key DPCU Activities performed -4 DPCU Meetings organised -4 quarterly composite progress reports prepared -4 quarterly monitoring visits embarked - Annual Action Plan 2017 prepared - Annual Composite Progress Report 2015 prepared and submitted

100% 100% 100%

100%

003 Contract a mechanics to maintain District Assembly vehicles

Asiwa Periodic maintenance of assembly’s vehicle undertaken

100%

004 Maintain street lights on yearly basis

Districtwide Street lights maintained throughout the District

100%

005 Support to area council activities

Districtwide 4 Area Councils inaugurated, their meetings facilitated and funds transferred to them for opeartions

100%

006 Maintenance of office machines

Asiwa Assembly’s office machines serviced periodically

100%

007 Support MP's project annually

Districtwide Construction of structure for Asiwa health centre, Construction of community centre for Nsuaem II Reshaping of feeder roads Procurement of cement and roofing sheets to support community initiated projects

100%

Page 12: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

12

008 Support activities of the

District’s decentralised

departments

• BAC Supported

• Activities of District Agric Dept

Supported

• Activities of health Directorate

supported

• Activities of Dist. Educ. Office

Supported

• Activities of Works Dept.

Supported

• Activities of Finance Dept.

Supported

• Activities of Dept of Social Welfare

& Comm Devt Supported

• Activities of District Electoral

office Supported

• Activities of Physical Plann. Dept

Supported

• Activities of NADMO supported

• Activities of District Court

Supported

• Activities of District Police

Command Supported

100%

009 Organise training

workshop for 40 WATSAN

committee members

District wide 0%

010 Organise half yearly workshop for area council members

One Workshop organised for area council members

50%

011 Provide Capacity Building for newly elected Assembly-members and District Assembly staff

Asiwa Workshop organised District Assembly members

100%

012 Embark on minor maintenance on Assembly/public Buildings

Districtwide The District Court Building, Nsuaem II Police Station Building and the DCD’s Bungalow maintained. Beposo D/A Primary Rehabilitated

100%

013 Support 2 national celebrations

National Independence Day Celebrated Senior Citizen’s Day Celebrated

100%

014 Provide maintenance for grader on quarterly basis

Assemblies grader maintained 100%

015 Branding/marketing of Bosome Freho District annually

Assembly designed and operate a webpage

100%

016 Organise periodic public for a

Series of public fora organised 100%

017 Support culture and security related activities

Paramountcy programmes supported Security activities supported

100%

018 Organise half yearly pay your levy campaign

0

019 Embark on planning scheme for four communities annually

Asiwa, Bobiam, Anyinase and Anyanso

Development of town planning scheme on-going for Asiwa, Bobiam and Anyinase

75%

020 Procure and supply 300 low tension poles to support rural

Districtwide 500 wooden electricity poles supplied

166%

Page 13: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

13

electrification

021 Completion of 1No. 44 office Administration Block

Asiwa Completed 100%

022 Completion of construction of 12 Room Junior Staff Quarters

Asiwa Completed 100%

023 Completion of construction of 1No. Semi-Detached Staff bungalow (No. 4)

Asiwa Completed and handed over 100%

024 Support to Community Self Help Project

Districtwide Cement and Roofing sheet procured and supplied to communities

100%

025 Improve capacity of the revenue collectors and DPCU members

Asiwa Training Workshop organised for revenue collectors

100%

026 Strengthen the capacity of district gender desk officer

Outstanding 0

027 Create a District Education Fund

Outstanding 0

028 Completion of construction of 1No. 3Unit Classroom Block

Supom Completed and in use 100%

029 Construction of 1No. 3Unit Classroom Block with Office and Store

Amomorso Project just awarded 0

030 Construction of 1No. 3Unit Classroom Block with Office and Store

Kwaku mensahkrom

Plastering completed 100%

031 Cladding of 1No. 6-unit

pavilion block

Beposo Project completed 100%

032 Completion of construction of D/A Model School

Asiwa Project completed 100%

033 Support to School Feeding programme

Ongoing 100%

034 Support to Sport Development

Districtwide Sport equipment procured and supplied to sporting clubs

100%

035 Support to District Immunisation Campaign

Disstrictwide Immunisation programmes supported 100%

036 Support to Malaria Control Programmes

Districtwide Malaria Control Programmes supported

100%

037 Organise Educational Campaign on HIV/AIDS

Districtwide HIV/AIDS programmes supported 100%

038 Organise behavioural Change communication Campaign in mining communities

Districtwide BCC campaigns organised 100%

039 Organise programmes to improve upon maternal health

Districtwide Maternal health programmes supported

100%

040 Construction of Two (2) CHIPS Compounds

Freso and Duase

Project at Freso completed and project at Anomawobi is at painting

100%

Page 14: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

14

level

041 Support District Sanitation programmes

Districtwide Activities of Zoomlion and environmental health unit supported

100%

042 Collect data on water and sanitation facilities

Districtwide Outstanding 0

043 Embark on District-wide Cocoa Spraying Exercise

Districtwide Programme organised 100%

044 Maintain Office facilities Asiwa Office equipment repaired 100%

045 Organise fire fighting campaign

Asiwa fire prevention activities supported through District Agric Department and NADMO

100%

046 Organise National Farmers Day

To be determined

National Farmers Day organised at Nyamebekyere

100%

047 Support to Disabled persons

Districtwide Activities of disabled person supported through Dept. of Soc. Welfare and Community Development

100%

048 Support to Districtwide Tree Planting Exercise

District wide Tree planting exercise launched. Trees planted at Asiwa, Anyanso etc. Mango plantation established at Tweapease

70%

049 Reclamation of degraded lands

Anum/ Fre Vallies

Outstanding 0

050 Establishment of Mango and Cocoa Plantation

Tweapease Project ongoing 50%

051 Rehabilitation of Anwiaso-Owhimase Feeder Road

Anwhiaso-Owhimase

Project ongoing 5%

052 Maintenance of Feeder Road

District wide Anyanso-Tweapease, Nsuaem II-Nsutem-Tebeso II, Kwamentow-Appiahkrom, Dagyanso-Adumasa-Japandu feeder roads rehabilitated among others

100%

053 Support to Disaster Management

Asiwa Activities of NADMO supported 100%

054 Furnishing of newly constructed District Administration Block

Asiwa District Administration Block furnished

100%

Tree Planting Exercise to commence Opemsuor Festival

Anyanso, Asiwa, Bobiam, Anumso, Anyinase

800 tree seedlings planted in 5communities

100%

Page 15: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

15

2.2 M&E Activities Report

2.2.1 Programme / Project status for the year 2016

During the year under review the District Worked on about thirty-one (31) infrastructural projects. About half of the projects (15) of them were

projects which were started earlier whilst the other 50% were started in the year. At the close of the year the projects were at various level of

completion as indicated from the tables below. Among the sources of funding for the projects were the District Assemblies Common Fund

(DACF), Districts Development Fund (DDF), Community Based Development Project (CBRDP) and the Ghana Education Trust Fund

(GETFund).

Reporting Period: January – December 2016

Table 2a: District’s Development Fund (DDF) Projects

No

.

Project Title Location Funding

Source

Contractor Contra

ct Sum

(Gh¢)

Rev.

Contr

act

Sum

Payment

To Date

Award

Date

Start

Date

Expected

Completi

on

Actual

Compl.

Status Stage

(%)

22 Construction of

1No. 3Unit

Classroom

Block with

Office and Store

Kwamento

wkrom

DDF Panquit

Company

Limited

131,724

.69

115,099.

43

08/09/1

5

08/01/16 2/9/201

6

Project

completed

100%

23 Cladding of

2No. 3Unit

Pavillion

Classroom and

Beposo DDF Obeline

Company

Limited

74,833.

86

67,349.3

7

08/09/1

5

08/01/16 Project

Completed

100%

Page 16: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

16

Construction of

Office and Store

24 Construction of

6Unit 1st floor

Stores for the

completion of

Anyanso Market

Anyanso DDF M/S Osbel

Enterprise

limited

100,000

.00

76,900.8

2

08/09/1

5

08/01/16 Project

completed

100%

25 Construction of

1No. 3Unit

Classroom

Block with

Office and Store

Supom DDF ASCOTUR

K Company

Limited

130,149

.36

117,134 08/09/1

5

08/01/16 Project

completed

100%

26 Construction of

1 no 3units

classroom block

with office and

store

Dajanso DDF Grotoso

enterprise

185,286

,20

19/12/1

6

19/07/20

17

Site

preparation

and block

mudding is

in progress

27 Construction of

1 no 3units

classroom block

with office and

store

amomorso DDF Osbel

Enterprise

Ltd

176,473

.86

19/12/1

6

19/07/20

17

Site

preparation

and block

mudding is

in progress

28 Construction of

1 no 3units

classroom block

with office and

store

ohwimase DDF K.Kumi 187,380

.60

19/12/1

6

19/07/20

17

Site

preparation

and block

mudding is

in progress

Page 17: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

17

Table 2b: Project: District Assemblies Common Fund (DACF)

No. Project Title Location Funding

Source

Contractor Contract

Sum

Rev.

Contra

ct Sum

Payment

To Date

Award

Date

Start

Date

Expecte

d Compl.

Actual

Compl.

Status Stage

(%)

12 Construction of 2-

Storey 44-Offices

Administration

Block

Asiwa DACF M/S Osbel

Enterprise

limited

863,613 1,573,

322.58

1539995.6

4

21/01/11 26/01/11 26/07/12 2/01/16 Project completed 100%

14 Construction of

1No. 12-Room

Nurses Quarters

Asiwa DACF M/S Osbel

Enterprise Ltd.

400,000 587,43

3.72

415509.46 08/10/13 07/10/13 08/10/14 Project Completed 95%

15 Construction of

1No. Semi

Detached Staff

Quarters No. 3

Asiwa DACF Obeline

Company Ltd

356,343.35 382,777.58 15/05/20

14

28/05/20

14

15/05/20

15

12/10/

15

Works completed 100%

17 Construction of

1No. 6Unit

Classroom Block

with Office, Store

and Library with

Sanitary Facilities

(Model School)

Asiwa DACF True Engineers

Const. Ltd.

342,739.77 399822.16 30/09/15 27/10/20

15

15/08/20

16

12/08/

16

Project completed 100%

18 Construction of

1No. 3-Unit

Classroom Block

with Office and

Store

Kwakum

ensahkro

m

DACF M/S Grotoso

Enterprise

169,580.40 126,454.50 22/04/16 22/04/16 21/10/16 Plastering and

screeding

completed

80%

Page 18: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

18

19 Construction of

CHPS Compound

Anomaw

obi

DACF True Engineers

Const. Ltd.

85,213.96 66,931.85 29/09/15 29/09/15 29/09/16 Painting is in

Progress

90%

20 Construction of

CHPS Compound

Freso DACF/DD

F

K.Kumi

Enterprise

149,000 133,897.4 30/03/16 12/04/16 21/10/16 Septem

ber

2016

Project completed 100%

21 Construction of

Fencewall for

Bosome Senior

High Technical

School

Asiwa DACF Ascoturk 169,497.00 63424.69 30/03/16 22/4/16 21/10/16 Work is at the

painting level

85%

22 Completion of

Area Council

Block

Nsuta DACF Works dept

(Force

Account)

30,000 31,796.00 Painting is in

progress

95%

23 Construction of

pavilion structure

for Asiwa Health

Centre

Asiwa MPs Fund (Force

Account)

35,725.00 Work is the

painting level

90%

24 Rehabilitation of

DCD’s Bungalow

Asiwa DACF Works Dept

(Force

Account)

18,018.00 Works Completed 100%

Page 19: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

19

Table 2c: GETFund Project

No. Project Title Location Funding

Source

Contractor Contract

Sum

Rev.

Contract

Sum

Payment

To Date

Award

Date

Start

Date

Expected

Completion

Actual

Compl.

Status Stage

(%)

07 Construction of 1No.

6Unit Classroom

Block with office

store and library

Nsuaem

II

GETFund M/S Amfrank

Company Ltd

181,447.63 39,815.4

4

7/10/20

11

14/10

/11

14/06/12 Project

abundant

70%

08 Construction of 1No.

6Unit Classroom

Block with office

store and library

Duase GETFund F-Nyark

Enterprise

181,350.54 39,815.4

4

07/10/1

1

14/10

/11

14/06/12 Project

abundant

65%

11 Construction of

District Education

Office Block for

Bosome Freho

District Assembly

Anyinase DANIDA M/S Okorogya

Enterprise Ltd

Works

completed

100%

Table d: Other Projects

No. Project Title Location Funding

Source

Contractor Contract

Sum (Gh¢)

Rev.

Contract

Sum

Payment

To Date

Award

Date

Start

Date

Expected

Compl.

Actual

Compl.

Status Stage

(%)

03 Partial

Reconstruction of

Bomfa Jn.-Asiwa

Road (km 0.0-26.2

Bomfa

Junction

Asiwa

GoG Ussuya Gh.

Ltd.

Construction of

Culverts

Completed.

Bitumen sealing

has been

Page 20: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

20

completed

04 Rehabilitation of

Bekwai (Amoaful)

Ampah – Asiwa

Road

Amoaful –

Ampaha –

Asiwa

GoG Surfacing is

almost

completed

leaving a

distance of 7km

between

kokobin and

abosoma

05 Construction and

bituminous sealing

of Gyimakyi –

Abosamso Highway

Gyimakyi-

Abosamso

GoG Cymain Co.

Ltd.

- - - - - - - ongoing

06 Construction and

bituminous sealing

of Abosamso –

Nsuaem II

Highway

Abosamso –

Nsuaem II

GoG Cymain

Company

Ltd

- - - 2012 - - - - Ongo

ing

07 Construction and

bituminous sealing

of Anumso –

Anyanso,

Anyinase-Ofoase

feeder Road

Anumso –

Anyanso,

Anyinase-

Ofoase

GoG Edmac Co.

Ltd

- - - 2015 - - - - Ongo

ing

08 Construction and

bituminous sealing

of Peminase-

Beposo-Ankaase

Peminase-

Beposo-

Ankaase

GoG Edmac Co.

Ltd

- - - 2015 - - - - Ongo

ing

Page 21: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

21

feeder Road

09 Rehabilitation of

(3.6km)

Semdadieso Tebeso

No 2 Feeder Road

Tebeso No 2

–Semddieso

GSOP Grand

Shelter Co.

Ltd

204,061.78 26/04/16 26/04

/16

26/09/16 Project

abundant

5%

10 Rehabilitation of

Anhwiaso –

Ohwimase Feeder

Road

Anhwiaso-

Ohwimase

GSOP Skill Link

Company

Ltd

228,460.94 - - 04/05/16 04/05

/16

4/10/16 Project

abandoned

_

11 Construction of

2No. 3-Unit Aqua

Privy Toilet

Tebeso II &

Nsuaem II

GPEG M/S Ofei

Brothers

Const.

Works

38,728.73 33,196.0

5

16/07/20

13

20/08

/2013

7/10/20

13

Project

completed

100%

12 Construction of

2No. 3-Unit Aqua

Privy Toilet

Anyinase &

Dunkuraa

GPEG M/S Ofei

Brothers

Const.

Works

38,623.73 33,106.0

5

16/07/20

13

20/08

/2013

7/10/20

13

Project

completed

100%

13 Construction of

100No. 20-Seater

W/C Toilet Facility

Districtwide GoG M/S Oliton

Ghana Ltd.

- - - 14/05/16 20/08

/2013

7/10/20

13

Project

completed

100%

Page 22: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

22

2.3 Update of Disbursement from Funding Sources

The Assembly has two major sources of revenue for its programmes and projects.

These are the Internally Generated Funds (IGF) and External Inflows

Sources of Internally Generated Funds for the Assembly are;

� Rates

� Lands Revenue

� Fees and Fines

� Licenses

� Rent

� Investment income

� Miscellaneous

2.3.1 The Sources of External Inflow included;

� District Assembly Common Fund

� GOG Grants (GETFUND, MP’s Common Fund etc.)

� Development Partners Grant (GSOP, DDF, Funding through NGO’s etc.)

During the year under review revenues accruing to the Bosome Freho District Assembly was

as follows;

Page 23: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

23

Table 3: Revenue Mobilisation Performance of Major Items as at 31st December 2016

Revenue Source

2014 2015 2016

Approved

Estimate

2014

Actual

Performance

2014

%

2014

Approved

Estimate

2015

Actual

Performanc

e 2015

%

2015

Approved

Estimate

2016

Actual

Performance

2016

%

Achievem

ent 2016

DACF 2,638,330.00

914,682.40 34.67 2,880,682.00 2,295,425.16 76.68 3,440,914.00 1,897,367.80 55.14

GoG /

(Goods &

Services)

46,716.24 0.00 0 42,445.00 0.00 0 46,859.00 9,291.00 19.83

ASSETS

TRANSFER

39,189.22 0.00 0 39,189.00 0.00 0 0.00 0.00 0

IGF 234,490.00 158,891.00 67.76 242,145.32 234,033.73 82 246,214.00 241,343.00 98.02

MSHAP - - 50,000.00 8,164.75 163

CBRDP/

GSOP

- - 51,522.00 5,012.50 9.73

GSFP 441,285.00 801,950.69 441,285.00 417,265.00 94 1,596,504.00 1,158,155.00 72.54

DDF 594,476.50 563,288.67 640,296.00 254,284.25 9 605,269.00 722,387.00 119.34

Disability - 21,402.06 48,684.00 34,064.43 69

Other

Transfers

298,370.00 21,412.06 541,991.00 97,105.04 559,892.00 135,583.50 24.21

Source: District Finance Office, (BFDA) January 2016

Page 24: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

24

Fig 1: Graphical presentation of Key Revenue Sources

Source DPCU 2016

From the table above, it could be realized that, the Assembly could not achieve its target

under any of the revenue source. Yet the performance under District Development Facility

(DDF) was very encouraging. The funding proved to be the most reliable, receiving as much

as 93% of expected revenue. This was followed by the DACF which could manage barely

40%. The District received a negligible 2% of expected revenue from Government of Ghana

GoG source. This leaves much to be desired because government is expected to be the main

contributor to investment funding under the decentralisation programme. After transferring

responsibility the Assemblies it is expected that government should make resources available

to fund investment on public infrastructure. The centre holding on to statutory transfers defeat

the purpose of fiscal decentralisation which is a key element of making the districts

functional.

The Assembly’s situation is worsened by low internally generated fund mobilisation, the

District could manage only

0.00

500,000.00

1,000,000.00

1,500,000.00

2,000,000.00

2,500,000.00

year

2009year

2010year

2011year

2012year

2013year

2014year

2015year

2016

DACF

IGF

DDF

GSFP

Other

Transfers

Page 25: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

25

2.3.2 Comments on the Releases of Funds

The District Assembly Common Fund remains the singular major source of funds for

investment to the District Assembly. The problem with this fund is the high statutory

deductions made at source which at times are not planned at the District level. Also there has

been shortfall in the District’s allocation in the fund in recent years which makes it

impossible for the District to implement all its planed programmes and projects for the year.

With the challenges aside, released for the year was encouraging, the Assembly received 3

quarters of the year in addition to the 4th quarter arrears for 2015. The introduction of the

District Development Facility (DDF) has supplement the common fund to finance investment

activities in the District though the releases per year is not comparable in value to that of the

common Fund. Yet it has been very reliable. The District’s Internally Generated Fund (IGF)

sources were also limited which made it difficult to finance the Assembly’s recurrent

expenditure solely from IGF sources.

Table 4a: Expenditure Performance

S/No. Item 2016 Budget (GH₵)

Actual Exp. As at June 2016

% Spent

01 Compensation of Employees

1,183,874.00 869,210.88 73%

02 Goods and Services

3,836,471.00 1,747,172.98 46%

03 Assets 2,659,181.00 2,416,954.32 91% 04 Total 7,679,526.00 5,033,338.18 66%

The Assembly’s total expenditure for the quarter amounted to under a fifth of the budgeted

expenditure for the year. This is mainly explained by restricted inflows to the Assembly from

our major revenue sources. The low expenditure by the Assembly may translate in to non-

performance of key functions and excessive delay on project implementation as payments

may be long over-due and contractors may abandon site. This has resulted in increasing

project cost due to delays in payment for work done which has given rise to frequent demand

for upward review of contract sum.

Page 26: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

26

Table 4b: Expenditure by Departments

DEPARTMENT IGF(GH₵) GOG(GH₵) DACF(GH₵) Total Exp %

Exp.

Central

Administration

44,013.88 775,256.57 819,270.45 65.8

Agriculture 1,500 4,000.00 5,500 0.44 Social welfare &

Com Devt.

2,000.00 44,890.00 46,890 3.77

Physical Planning 1,000.00 1,000 0.08 Birth & Death Works 5,000.00 56,504.00 61,504 4.94 Finance Trade & Industry 2,000.00 9,000.00 11,000.00 0.88 Disaster Prevention

& Mgt

2,500.00 2,500 0.2

Education 3,000.00 244,139.75 247,139.75 19.85 Health 1,000.00 36,000.00 37,000 2.97 Others (NCCE, EC,

Police)

3,000.00 10,000 13,000 1.04

Total 65,014.00 44,890 1,134,900.00 1,244,804 100

Source: Finance Office January 2017

Fig 2: Expenditure by Department by Funding Sources

0.00 500,000.00 1,000,000.001,500,000.002,000,000.00

Central Administration

Agriculture

Social welfare & Com Devt.

Physical Planning

Birth & Death

Works

Finance

Trade & Industry

Disaster Prevention & Mgt

Education

Health

Others (NCCE, EC, Police)

IGF(GH₵)

GOG(GH₵)

DACF(GH₵)

Total Exp

Page 27: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

27

Fig. 3: Departmental Share of Total Expenditure

By the figure above its apparent the Central administration is the main expenditure unit under

the Assembly yet it is worthy of notice that most departments especially health, agriculture

and Education has other key funding sources for operations and management which is never

declared to the Assembly for it to be subjected to monitoring by the Assembly. Hence the

above situation is quiet elusive yet its significance is that it gives an indication of the sectors

where the little that passes through the Assembly is spent.

2.3.3 Efforts to Generate More Revenue

The Assembly was not able to generate enough revenue to meet its recurrent expenditure let

alone get additional funds for capital projects. Strategies adopted to improve collection of

IGF would include the following:

� Widen the revenue base to bring in more revenue items which were not covered

previously

� Engage more commission revenue collectors to work in communities where there

are no collectors

� Continued and sustained tax education

� Motivating hard-working collectors and supervisors

Central

Administration

Agriculture

Social welfare &

Com Devt.

Physical

Planning

Works

Trade & Industry

Disaster

Prevention &

Mgt

Education

HealthOthers (NCCE, EC,

Police)

Total Exp

Central Administration

Agriculture

Social welfare & Com Devt.

Physical Planning

Birth & Death

Works

Finance

Trade & Industry

Disaster Prevention & Mgt

Education

Page 28: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

28

� Improving the data base of the district, by enumeration of the rateable population

and the preparation of valuation list of all properties?

� Formation of revenue mobilization task force to improve the IGF

� Motivating hard-working collectors and supervisors to improve the IGF

� Ceding certain revenue items to the Area councils for collection.

2.3.4 Challenges with Regard to Disbursement.

� Inadequate funding for programmes and projects

� Delays in the release of funds which affect project implementation.

� Difficulty in extraction of information for report writing � Difficulty in tracking funds from GOG paid direct to beneficiaries without ,

records to the Assembly.(e.g. GETFUND, Donor funds etc)

S/No. Activity Performed Location Output Remarks

01 Promote tree planting in the District

Anyanso, Asiwa, Bobiam, tweapease, Anyinase

1,300 seedlings planted

02 Carry out anti-bush and domestic fire campaign

Districtwide 30 communities

03 Promote HIV/AIDS Behavioural Change Communication and prevention activities among the central administration and other departments

Brofoyedru ,

Morontuo, Dunkuraa,

Dagyanso, Anyanso,

Asiwa, Nsuaem II,

Danso, Anumso

Abosamso, Nsutem,

950 persons sensitised

04 Increase awareness of preventable lifestyle diseases and embark on periodic screening for diabetes, high blood pressure, hepatitis B, cancers and other communicable diseases

Asiwa Health talk on lifestyle diseases organised for 60 decentralised and non-decentralised depts. staff

05 Ensure the provision of basic facilities such as drinking water, simple cafeteria, toilet, urinals hand washing equipment etc.

Central Admin, Health, Education, Works, Finance, Soc. Welfare, BAC

Drinking water, toilet facilities, urinals and hand washing equipment provided for the District’s departments

06 Promote basic hygiene practices such as routine tidying of offices and immediate environment, removal of cobweb, mopping of floors with disinfectants

Central Admin, Health, Education, Works, Finance, Soc. Welfare, BAC

Hygiene at the offices of the Districts departmental offices improved

07 Ensure the provision of simple furnishings such as office desk, swivel chairs, air conditioner and appropriate lighting for all staff

Central Admin, Health, Education, Works, Finance, Soc. Welfare, BAC

Furniture and equipment provided for district’s departments

Page 29: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

29

Human Capacity Building

NO

TITLE OF TRAININ

G

TRAINING OBJECTIVE(

S)

TARGET GROUP

ACHIEVEMENT DURING THE YEAR

NAME OF TRAINING INSTITUTI

ON

SOURCE OF

FUNDING

1. Training in Records and Assets Management for Registry, Finance, Internal Audit, Procurement Stores and Works Staff.

To equip participants with the necessary skills and knowledge in in effective and efficient ways of keeping records and managing Assets.

Registry Officers, Finance Officers, Internal Auditors, Procurement Officers and Works Staff.

2day training organized for the Finance Officer, accountants, Planning Officers, Budget Analysts, internal auditors, procurement Officer and staff of the Works department on Records and Assets management

Ministry of Finance

GOG

2. Capacity Building training workshop for Administrative Officers and other Heads of Department on Social Accountability and Financial Management

To equip officers with the needed tools, knowledge and skills in financial management.

Administrative Officers and Head of Departments and Units

Training workshop organized for Administrative Officers and other Heads of Department on Social Accountability and Financial Management

External Consultants

DDF

3. Capacity Building workshop for District Tender Committee members and other Senior Staffs on Procurement and Contract Management

To build the capacities of the members of the tender committee with the needed skills in undertaking effective tendering processes

Procurement Officer, Tender Committee members and other Senior Staff.

Training workshop organized for District Tender Committee members and other Senior Staffs on contract management

External Consultant

DDF

Page 30: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

30

NO TITLE OF TRAINING

TRAINING OBJECTIVE(S)

OUTPUT NUMBER OF DAYS

NAME OF TRAINING

INSTITUTION

1 Capacity Building workshop on ICT (Microsoft Office) for Department of Social Welfare and Community Development Staff

To build the capacities of the staff of the department on ICT to enhance their work delivery.

A 3day training programme organized for Department of Social Welfare and Community Development Staff

3 days External Consultant

2 Capacity Building workshop on Safe driving practices and vehicle management for the District Assembly Drivers

To equip drivers with the needed skills in safe driving practices and vehicle management.

A two days capacity building training organsied for drivers in the District Assembly

2 days External Consultant

3 Capacity Building Training in advance secretarial skills and administrative assistance

To equip officers with skills and knowledge in advance secretarial and administrative assistance.

A 3day training programme organized for secretaries in the District Assembly

3 months External Consultant

3.1 UPDATES ON CORE INDICATORS AND TARGETS

3.1.1 Agriculture

Agriculture is the single most important sector of the District Economy. It’s the major

employer and as such the main activity that provides the people with income. The bane to

development of the sector is that it still characterised by traditional practices in face of

modernity which has greatly limit productivity across the value chain.

During the year under review, the season remained wet and dry. There was moderate rainfall

during the first half of the year coupled with intermittent sunny conditions. The weather

pattern was a little better as compare to year 2015. Performance of crops was general

satisfactory.

Page 31: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

31

Table 5: District Indicators and Parameters Agriculture

District Indicators and Parameters

2014 Indicator Level

2015 Indicator Level

2016 Target 2016 Achievement

1. Percentage (%) increase in yield of selected crops, livestock and fish Staples

i. Maize ii. Cassava iii. Rice iv. Plantain v. Yam vi. Cocoyam

Vegetables

i. Cabbage ii. Garden Eggs

Livestock

i. Sheep/Goats

12,668.00

136,817 985

12,675 93,277

741 296

220.5

12794.68

150,498.70 985

13,942.50 97,940.85

844.74 298

244.4

13,640.12 155,378

1,050.00 14,751.16

100,112.00 900 356

265.8

Table 6: Key Agriculture Outputs for 2016

No. Activities Outputs

01 WAAPP Project Five (5) demonstration farms established with 25acres

seed multiplication farm planted

02 Farmer

registration

6000 farmers registered pending planting

03 Value addition The department has taken delivery 6 equipment for the

Gari processing. Palm kernel oil, palm oil and pastries

confectionery and proposals has been submitted for the

setting up

04 Input supply Department has in stock fertilisers at the following prices

NPK (Chemical) GH₵ 85 per bag

UREA (Chemical) GH₵ 80 per bag

Compost (organic) GH₵ 10 per 50kgbag

05 Climate Change

Monitoring

The department has taken delivery of meteorological

equipment for the establishment of weather station to

monitor changes in major climatic variables and the

equipment to test soil fertility levels in the district has also

been provided.

Page 32: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

32

06 Other Agric

Related activities

The department has taken steps to assist the farmers on

post-harvest technology to help them to store maize;

Modern cribs to store maize, rice and cowpea. Save use of

agrochemicals training has also been conducted to help

farmers to know how to use the land and water

management interventions, for sustainable soil fertility

level for crop production and water conservation. The use

improved varieties fertilizer application has also been

done during this quarter.

x. Cocoa Diseases and Pest Control (CODAPEC) programme

CAPSID Control

There has been a major shift in the implementation of the CODAPEC programme since 2015.

Unfortunately the District now does not have a central store or input distribution point.

Communities in the Bosome and Bosomtwe East Area councils access inputs from Bekwai

cocoa district, whilst those from Sunso Freho are zoned for Adansi-Brofoyedru cocoa district

in the Adansi North District. Communities in the Nsuta Area Council are now part of the

New Edubiase (Adansi South) Cocoa District.

This situation has resurfaced the myriad of problems the programme faced when the District

was first created when the project was managed in a similar arrangement. The programme is

thus fraught with a lot of challenges among which are non-supply of inputs to many farmers

who continuously complain to the Assembly which has virtually no clout to resolve them.

It was therefore difficult to get statistics of the programme as part of this report because the

District Agric Development Unit could not provide a report on the project.

xii. Challenges of the District Agric Sector

i. Lack of irrigation facility

ii. High cost of labour

iii. Poor road network

iv. Activities of illegal mining

v. Lack of staff accommodation

vi. Inadequate office accommodation

vii. High cost of agricultural inputs

viii. Unreliable rainfall pattern

Page 33: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

33

3.1.2 Education

1 Overview of Directorate

The District is divided into Six (6) Circuits which are supervised by Six Circuit Supervisors.

The Circuits are; Asiwa, Abosamso, Dunkura, Dompa, Nsuaem, and Nsuta. The District has

fifty-six (58) kindergartens, fifty-five (55) Primary Schools, thirty-eight (38) Junior High

Schools, one (1) Senior High School at Asiwa.

The directorate performed creditably well in all the key activity indicators. As shown below

1.0 Key activities identified for performance during the period

Table 7: Key Activities identified for performance by objectives

Strategic

Key

objective

Activity/ Project Implemented Funding

source

Unit/Department/A

gency responsible

Access -Organized a sensitization durbar on GPASS Scholarship Scheme - embarked on enrolment drive in communities - organized a SPAM at Esaase Basic School and community

DFID Girls’ Education Unit HRMD Unit

Gender - Performed a yearly harvest of schools and communities

- Distributed GPASS Scholarship packages - A talk show on girls on the need to appreciate

the GPASS packages

DFID Girls’ Education Unit

Special

Education

Quality - Attended the planning meeting at the regional and district levels on the activities of the year.

Girls’ Education Unit

Manageme

nt

- Interviewed 74 Head Teachers in the district with the view of reassessing their management prowess.

GPEG Management Unit

BECE

2015

- Organization of mock examination for BECE candidates help improved the District’s performance

District Assembly, Hon. Member of Parliament.

Examination Unit

Page 34: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

34

Table 8: District Indicators and Parameters (Education)

No.

District Indicators and Parameters

2014 Indicator Level 2015 Achievement 2016 Target 2016 Achievement

1 Gross Enrolment Rate (indicates the number of pupils/ students at a given level of schooling-regardless of age – as proportion of the number of children in the relevant age group)

- Pre-School - Primary - JHS - SHS

Net Admission Rate in primary Schools (indicates primary one enrolment pupils aged 6 years)

134.2 98.6 71.8 19.5 84.2

138.8% 85.8 66.2 14.3 45.8

134.3% 102.0 76.8 27.1 46.1

152.9 96.8 67.1 17.2 46.1

2 Gender Parity Index (ratio between girls and boys enrolment rate, the balance of parity is 1.00)

- Preschool - Primary - JHS - SHS

1.12 1.03 0.87 1.06

0.96 0.88 0.78 0.81

1.11 1.09 0.94 1.16

1.01 0.96 0.99 0.99

3 BECE Pass Rate - JHS - SHS

29.07 82.9

87.7 92.3

31.6 88.6

38.0 82.8

4 Improvement in Pupils / Teachers Ratio:

� Pre-school � Primary � JHS

26:1 23:1 12:1

22 23 10

29:1 25:1 16:1

30:1 27:1 11:1

5 Increase in % of Trained and untrained Teachers Ratio:

� Pre-school � Primary � JHS

24.8 47.5 63.4

60.65 6.8 24

77:1 46:1 22:1

47:1 46:1 11:1

Page 35: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

35

Table 9: BECE Pass Rate 2011-2016

Year Enrolment Registered Candid. Candidates Sitting Exams

Candidates Passing Rate

Male Fem. Total Male Fem Total Male Fem. Total Male Fem To

tal

%

2011 541 293 834 541 293 834 540 293 833 315 171 171

58.3

2012 530 376 906 530 376 906 527 322 899 243 147 390

43

2013 486 307 793 486 307 793 486 301 793 331 201 532

67

2014 502 390 892 515 392 907 513 387 900 150 114 264

29.07

2015 477 380 857 447 380 857 474 379 853 425 323 748

87.7

2016 556 435 991 552 429 981 549 423 972 496 385 881

90.6

Fig 4: The trend of BECE performance 2011-2016

Generally the pass rate has been unpredictable being a little high initially dipping in 2012

rising in 2013 and falling in 2014 again. Over the past five years the results in 2015 was the

best. Rising as high as 87%. Mechanism should therefore be put in place to ensure

consistency in the pupils’ performance.

From the table above it has been shown that number of girls completing JHS 3 has been

increasing steadily. However girls registering for BECE exams and passing showed a

downward trend. From all indications the statistics is getter better in the sense that total

number of JHS leavers has been consistently increasing since 2011 with a dip in only 2014

which incidentally recorded the lowest pass rate. Female candidates sitting for exams and

passing has also been on the increase over the period.

Capitation Grant

Reg . Cand

Cand. Passing0

200

400

600

800

1000

2011 yr 2012yr2013yr

2014yr2015yr

2016yr

Reg . Cand

Cand. Passing

Page 36: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

36

Table 10: Capitation Grant Received for the period of 2013 – 2016

S/No. Year Amount received ( GH¢) % Increase

1 2013 50,019.75 -

2 2014 52,491.00 4.94

3 2015 75,491.50 43.82

4 2016 100,301.04 32.86

Total 278,303.29

Fig 5: Capitation Grant Received by Years

The increase in capitation grant over the past three years has been consistent and significant.

The onus now lie on the education directorate to ensure its judicious use by heads of

institutions to make it impact felt among the populace.

vi. Challenges to Education Service Delivery in the District

� Large proportion of untrained teaching staff in the classrooms

� Lack of ICT infrastructure

� Inadequate permanent structures for KGs

� Inadequate store room for the Education directorate

� High incidence of child labour

� Low pass BECE pass rate

vii. The way forward

� Upgrade the knowledge and skill of untrained teachers through the UTDBE

programme

� Strengthen supervision

2013 yr , 50,019.75

2014 yr,

52,491.00

2015 yr, 75,491.50

2016yr, 100,301.04

Amount received ( GH¢)

2013 yr

2014 yr

2015 yr

2016yr

Page 37: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

37

� Provide logistics for technical education

3.1.3 Health

3.1.4 Ghana Health Service Activities

The department carried out sensitisation on teenage pregnancy, maternal health and also

promoted HIV/AIDS Behavioural Change Communication and prevention activities among

the central administration and other departments. There was also an increased awareness of

preventable lifestyle diseases and embarked on periodic screening for diabetes, high blood

pressure, hepatitis B, cancers and other communicable diseases.

The department of health service embarked on Oncho Drug Distribution in Communities. To

attain high geographic and therapeutic drug distribution coverage of above 80% the

department organised telemedicine training for health staff in the District to sensitise them on

modalities and skills in teleconsultation. Facilitative Supervision aim at accessing the

level of understanding of sub-districts and CHPS Zones were also embarked upon.

Other activities undertaken by the department includes:

i. Training of CHWs to equip them with knowledge competent service

delivery.

ii. organise orientation for

iii. organise durbar in honour of Prof. Jeffery Sachs

iv. roll-out CHW and solicit for the views of key stakeholders

v. School deworming exercise

Public Health Interventions Activities Carried Out

1. Malaria Care

a. Onsite Training and Supportive Supervision (OTSS)

b. Continuous Distribution of Long Lasting Insecticide Nets to pregnant women

and children receiving measles 2 antigen.

c. Malaria case management training for some health staff

2. Integrated child and maternal outreach services

a. Integrated outreach services on ANC, PNC, immunization, growth monitoring

and promotion, Vit. A dosing, Family planning etc.

Page 38: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

38

b. Outreach mobile laboratory services to support pregnant women during

antenatal

c. Home visit

d. Public education on sanitation

e. Mass school and community deworming exercise with Albendazole and

Praziquantel tablet was carried out in the district with 79.1% coverage.

f. Active integrated case search was conducted in the district in collaboration with

the Ghana Leprosy Control Programme where 3 cases of leprosy were detected

and put on treatment and the general public educated.

3. Nutrition services:

a. Day care surveillance

b. Iodated salt survey

4. Onchocerciasis Control Programme: The district carried out Ivermectin drug distribution

under the onchocerciasis control programme within the four hyper-endemic sub-

districts namely; Asiwa, Nsuaem, Nsuta and Tebeso. The mass campaign achieved a

geographical coverage of 100% with 82.5% therapeutic coverage.

5. The HIV/AIDS control programme also received a boost through staff trainings,

establishment of ART centre at Asiwa Health Centre and PMTCT sites in all health

facilities in the district. Public education and awareness campaign was also organized

during the quarter.

6. Family planning awareness and promotion campaign was embarked upon to increase

access in the quarter. Major achievement of the exercise was 692 women who benefited

from free long-term and permanent family planning services and a man who also had

free vasectomy service.

Staff Training/HR. Development

1. Community case management of malaria, Respiratory tract infections, Diarrhoea and

malnutrition management training for sub-district staff

2. Community Health Officers (CHO) training on Community Health Worker (CHW)

activities supervision

Page 39: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

39

3. Training of head teachers and execution of School Deworming exercise for pupils in

111 schools and out of school children

4. Telemedicine training for 43 selected staff

5. Training and Community Drug Distribution for Onchocerciasis control

6. Training of 71 CHWs, 4 Health Technical Assistants and 27 CHOs and 3 DHD staff

on C-tracker for comcare reporting of health service delivery

On-going Infrastructure Projects

1. Construction of Shed at Anyanso CHPS Compound for CWC and maternal health

activities.

2. Construction of 4 rooms with an open shed at Nsuaem clinic.

3. Construction 2 rooms office with shed for mental health and laboratory services at

Asiwa Health Centre

4. Construction of CHPS compound at Duase.

5. Construction of 2 CHPS compounds at Fereso and Anomawobi

Table 10: Key Health Outputs for 2016

No. Activity Output

01 Clinical Care Immunisation and Prevention of mother to child

transmission of HIV/AIDS carried out. 2 ART

centres are operational (Asiwa, and Dunkura)

02 CHPS Roll Out All CHPS zones are operational, zones are

equipped with computer and accessories to

report their activities. Also during the half year

the Apewu CHPS Compound, Nsutem, Ampento

Mmorontuo CHPS compounds were

commissioned

03 MCHMP The programme has been introduced to maternal

and child health as a means of ensuring access to

universal health care.

04 Infrastructure

development

Construction of CHPS compound at Freso and

Anomawobi and construction of pavilion blocks

Page 40: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

40

for Anyanso and Asiwa health centre were

ongoing

05 Service

improvement

mental health cli, administration of ART Services

for PLHIV & AIDS and Laboratory services has

been introduced at Asiwa and Dunkura health

centres

Challenges

1. Inadequate means of transport for service delivery, monitoring and supportive

supervision at District and Sub-district level.

2. No store room at District Health Directorate to keep logistics

3. Inadequate fund for embarking on monitoring and supportive supervision

Staff accommodation at District and Sub-district level still remain a challenge,

communities have provided accommodation for staff in CHPS zones

The situation of key health indicators in the district is as presented below;

Table 11: District Indicators and Parameters (Health)

No. DISTRICT INDICATORS AND PARAMETERS

2014 Performan

ce

2015 Performance

Target

2016

Achievement 2016

1 No. of ANC registrants 1332 1392 70% of 2835

1211

2 No. of clients making 4+ visits 914 992 706

3 ANC registrants receiving IPT 1 534 654 815

4 ANC registrants receiving IPT 2 238 460 669

5 ANC registrants receiving IPT 3 139 185 495

6 No. of pregnant women receiving TT2 + 1078 110 1056

7 Total Deliveries 953 983 601

8 No. of deliveries by skilled attendants 602 630 50% of 2835

438

9 No. of deliveries by TBAs 351 329 163 10 No. of maternal deaths (institutional) 1 0

11 Institutional Maternal Mortality Ratio (per 100,000)

118 0

12 No. of institutional maternal deaths 1 0

Page 41: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

41

audited

13 Total number of still births 6 4 5

14 Total Number of fresh still births 2 3 4

115 No of PNC registrants 1468 1300 873

16 No. of family planning acceptors 2784 2890 3006

17 % WIFA accepting family planning 15.5 14 17.8% 18 Total couple years of protection (CYP) 2080.5 1704 4702.5

19 No. of institutional infants deaths 0 0 0

20 No. of infants admission 0 0 0

21 Clients (15-24yrs) who accepted FP Service

504 612 591

22 No. of pregnant women sleeping under ITN

350 123 1453

23 No. of Children immunized OPV 1 2155 1940 2143

24 No. of Children immunized OPV 3 2094 1850 2095

25 No. of children immunized measles 2073 1900 2087

26 No. of children immunized yellow fever 2073 1890 2003

27 No. of Children receiving at least one dose of Vitamin A

1748 1790 2122

28 No. of children immunized by age 1 (BCG)

1983 1901 2008

29 No. of children immunized Penta 1 2155 2207 2143

30 No. of children immunized Penta 3 2094 2120 2095

31 No. of Non polio AFP detected 2 2 2

32 No. of Leprosy cases 2 1 6

33 No. of OPD cases due to malaria 13413 1550 14277

34 Total no. of OPD cases that is lab confirmed (Mic. & RDT)

8388 8930 8601

35 No. of TB cases notified 9 8 10

36 No. of TB cases cured (sputum microscopy)

2 2 9

37 No. of TB cases completing treatment 3 2 0

Table 12: Situation of Core Health Staff

S/No. Indicator 2012 Indicator

2013 Indicator

2014 Indicator

2015 Indicator

Target 2016

2016 Indicator

01 Doctor 0 0 0 0 1 0

02 No. of Med. Assistants 2 2 2 3 3 2

03 No. of Nurses (all categories)

57 92 91 83 90 87

04 No. of midwives 3 6 8 11 21 15

3.1.5 HIV/AIDS

The District monitoring of HIV/ AIDS cases is hampered by lack of a hospital. Also the

District do not have a sentinel site hence it difficult to calculate the prevalence rate. The only

indicator used is the numbers of people who tested positive during the District know your

status campaign. In 2009 during the District-wide know your status campaign, forty-five (45)

adults between the ages of 15-49 years of age whilst in 2010, one hundred and fifteen (115)

Page 42: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

42

persons in the same age bracket tested positive. However in 2011, only twenty-four (24) out

of three thousand, two hundred and forty-nine tested positive. In 2012 through ‘know your

status campaign’ and prevention of mother to child transmission programme 68 cases were

diagnosed.

Table 13: District Indicators and Parameters (HIV)

HIV / AIDS HIV/AID Cases

2014 2015 2016

Male Female Total Male Female Total Male Female Total

No. of HIV positive

diagnosed

7 11 18 8 14 22 1 24 25

No. of HIV+ cases

receiving ARV

therapy

3 5 8 4 8 12 0 0 0

No. Tested (PMTT) - 702 702 41 816 830 0 1068 1068

No. HIV+ (PMTCT) - - - 1 2 3 0 11 11 No. Tested (HIV

Know Your Status

Campaign)

128 182 310 496 864 1360 0 0 0

No. HIV+ ( KYSK) - - - 13 18 31 0 0 0

Table 14: District Indicators and Parameters (Transparent and Accountable Governance)

No District Indicators and Parameters

2014 Indicator Level

2015 Indicator Level

Target 2016 Achievement 2016

01 Total amount of internally generated revenue

158,891.00 234,033.73 246,214.00 241,343.00

02 Amount of Development Partners and NGO funds contribution to DMTDP implementation

563,288.67 254,284.25 605,269.00 722,387.00

03 % of DA expenditure within the DMTDP budget (how much of DA’s expenditure was not in the annual budget?)

78%

80%

90%

04 Number of reported cases of abuse (children, women and men)

- -

05 Police citizen ratio. 1:8712 1:8,578 1:500 1:8,336

The District’s revenue situation improved consistently over the past three years. The amount

of support from development partners towards the implementation of planed programmes and

projects in the district reduced had reduced drastically for 2015 but picked up in 2016. es had

Birth and Death Registry

The registry exists to register compile data on all births and deaths for planning purposes.

Though it is evident that not all births and deaths are registered in the district, the following

the data captured for the District for from January – December 2013

Page 43: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

43

Table15: No. of Births Registered for 2014-2016

Month New Births Late Registration

2015 2016 2015 2016 Mal

e Fem

Total

Male Fem

Total

Male

Fem

Total

Male

Fem Total

Januar

y

9 10 19 36 42 78 6 6 12 2 5 8

Februa

ry

81 73 154 61 59 120 5 2 7 5 2 7

March 30 29 59 76 77 153 1 4 5 6 3 9

April 29 28 57 39 40 79 5 1 6 5 3 8

May 87 91 178 36 26 62 1 7 8 9 6 15 June 51 55 106 42 25 67 6 4 10 10 9 19

July 15 8 23 11 5 16 4 1 5 6 3 9

August 74 62 136 29 40 69 7 1 8 5 - 5

Septem

ber

43 38 81 85 78 163 2 - 2 13 3 16

Octobe

r

29 26 55 61 37 98 5 4 9 2 1 3

Novem

ber

99 113 212 176 153 329 12 6 18 - - -

Decem

ber

41 63 104 81 83 164 5 1 6 23 14 37

Total 588 596 1184 733 665 1398

59 37 96 87 49 136

Deaths Registered Month 2014 2015 2016

Male Female Total Male Female Total Male Female Total

January 1 2 3 6 6 12 1 - 1 February 1 1 2 5 2 7 2 3 5 March 1 1 2 1 4 5 1 - 1 April 1 1 2 5 1 6 - - - May 2 - 2 1 7 8 5 1 6 June - - - 6 4 10 4 2 6 July 2 1 3 4 1 5 4 1 5 August - 2 2 7 1 8 2 1 3 September 1 1 2 2 - 2 1 - 1 October - - - 5 4 9 - 1 1 November 1 1 2 12 6 18 - 1 1 December - - - 5 1 6 1 1 2 Total 10 10 20 59 37 96 21 11 32

Challengers of the Registry

i. The CBS volunteers find it difficult to refer people to the district capital to register

Page 44: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

44

their births.

ii. Most of the inhabitants of the District register their birth and death in other districts

such as Bekwai Municipal, Asante Akim South, Bosomtwe and Adansi South

Districts due to limited accessibility and their proximity to these places.

The Way Forward

i. The registry intends to liaise with midwives and CBS volunteers in the District to help

offer door to door services to the new born in other to improve the number of new

born registered

ii. The registry will also embark on intensive and extensive education campaign through

the District Information Services Department on the importance of registering births

and deaths especially in the districts where they occur.

National Disaster Management Organisation

Staff Strength

Area

Year

Secretariat Zonal Office Total Staff

2013 7 10 17

2014 6 8 14

2015 5 10 15

2016 5 9 14

Key Activities Performed

• Anti-Bushfire campaign

• Formation and revitalization of DVGs

• Windstorm/Flood alert

• Field visit to selected Medical centers

• Assessment on Safety of Schools and Health Facilities

• Radio talk shows on bush fire prevention

• Formation of anti-disaster fun club

Year Disaster

Occurrence

Location Affected

Persons

Relieve items

supplied

Quantity Number of Beneficiaries

Males Female Total

2013 Rainstorm Tebeso I 17 Rice 6 bags 7 10 17

Sugar 4bags 17

2014 Rainstorm Tebeso I (

R/C Primary)

150 Roofing Sheets

20pcs 81 69 150

Plastic cups 30pcs 81 69 150

Rainstorm Tebeso I 10 Mosquito Coil Blankets Plastic basins

5pcs 6 4 10

Bushfire Appiahkrom 24 Plastic cup Blankets Plastic Plates Plastic Basins Plastic Bucket

30pcs 20pcs 30pcs 2No 5pcs

9 15 24

Page 45: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

45

2015 Bushfire Appiahkrom 50 Students mattress

35pcs 28 22 50

Rainstorm/

Bush Fire

Nyame-

bekyere

124 Student Mattress

95pcs 59 65 124

Bushfire Nsuta 28 Rice bag Cooking Oil Rice

4bgpcs 10btls 10bgs

16 12 28

Bushfire Anhwiaso 9 Rice Cooking Oil Sugar

1bag 4bottles 1/2bag

5 4 9

Bushfire Tebeso II 38 Rice Cooking Oil

4bg 8btl

16 22 38

Bushfire Freboye 15 Rice Cooking Oil

1bag 2bottles

15

Tebeso II

Mosquito coil 1box 20

Rice 8bags 15

Cooking oil 13bottles 13

2016 Used clothing 3bales 300

Blankets 40pcs 40

Mosquito coil 30pcs 10

Mosquito net 30pcs 30

Polymath 1bandle 25

Student mattress

30pcs 30

Bucket 30pcs 30

Plate 100pcs 25

Cups 100pcs 25

Rice 7bags 50

Maize 20bags 20

Cooking oil 2ctns 24

Soap 3ctns 50

Withington boot

2ctns 15

Student mattress

30pcs 30

Page 46: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

46

3.2 Updates on Critical Development and Poverty Interventions

3.2.1 The Livelihood Empowerment against Poverty (LEAP) Programme

The LEAP programme Implementation commenced in the District during the latter

part of 2014. In all, Eight (8) communities are currently benefiting. These are Nsuta,

Nyamebekyere, Manfi, Alhajikrom, Ntowkrom, Keteke, Otoo Akura and Domkope.

Beneficiaries of the LEAP Programme are remitted electronically via their e-zwich

card. However, the District Assembly through the Social Welfare and Community

Development Department monitors and supervises each payment cycle which is

done bi-monthly.

Twenty-Three (23) Households with Sixty-Nine (69) individuals qualified in the

whole Nsuta- Area Council.

Below are details of Communities, individuals Beneficiaries, the Twenty- three (23)

Household and the amount paid to them in a household.

COMMUNITIES PERSONS QUALIFIED IN HHS

MEMBER(S)/ BENEFICIARIES AMOUNT GHȻ

Male Female Total

Keteke 7 7 11 18 586.00

Tumfourkrom 3 2 2 4 204.00

Ntowkrom 4 10 6 16 382.00

Nsuta 2 2 2 4 152.00

Nyamebekyere 2 3 4 7 194.00

Alhajikrom 1 2 2 76.00

Manfi 2 4 6 10 212.00

Otoo-Akura (

Aboabo)

2 5 3 8 182.00

Total 23 33 36 69 1,988.00

A motor bike has been provided by the Ministry of Gender and Social Protection to

enhance the implementation the LEAP Programme and activities in the District.

A major disturbing feature about the programme is that it is concentrated in

geographical area. Although poverty concentration is highest in this area, there are

other zones too where poverty is endemic but area left out of the programme. It is

therefore recommended that consideration should be given to people that are hard

core poor but not located in the officially designated poverty endemic areas.

Page 47: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

47

People with Disabilities Fund (PWDS Fund)

The District Disability Common Fund which is 2% of the District’s allocation of the

District Assemblies Common Fund is managed by the District Disability Fund

Management committee. The committee approves and disburses applications from

individual persons with disability for financial support in order to better their lots.

Membership of the Committee

1. Chairman Of Social Services Sub-Committee

2. Representative-Ghana Society Of The Blind

3. Representative- Ghana Federation Of Disabled

4. District Director- Social Welfare And Community Development

5. A Co-Opted Member

The disability Fund Management committee, based on the release of the fund within

a particular quarter as per the application from the individuals and groups and

persons with disability support all the PWDs in the areas of;

The same funds are used in support of both Regional and National Conference of the

three (3) divisions within the Federations of Disable namely;

1. Visually impaired

2. Physically challenged

3. Difficulty- hearing and speaking

The School Feeding Programme

The Ghana School Feeding Programme (GSFP) is a special programme which seeks

to provide one square meal for school pupils from kindergarten to the primary level.

The programme started off in the District in 2008 with one school but increased to 4

in 2008. The number was increased to 10 schools in the 2010/2011 academic year and

in 2011/2012 the number was increased to 25 schools.

The table below shows the number of schools under the GSFP within the District

and their corresponding enrolment figures from 2013 to 2016.

Page 48: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

48

List of Schools under the GSFP and Corresponding Enrolment Figures for 2013-

2016

S/N Name Of School 2013

Enrolment

2014

Enrolment

2015

Enrolment

2016 Enrolment

Male Female

Total

1 Adeito D/A Prim. 258 345 345 85 218 303

2 Ampento D/A Prim 258 280 283 94 199 293

3 Ankaase D/A Prim 278 280 250 67 177 244

4 Anomawobi D/A Prim.

348 427 420 190 214 404

5 Anumso Meth. Prim

208 310 301 85 190 275

6 Anwiaso Meth. Prim.

278 406 480 199 286 485

7 Anyanso Amadiya Prim

368 375 369 140 284 424

8 Anyanso Meth. Prim.

449 450 430 160 240 400

9 Anyinase D/A Prim.

305 363 341 81 213 294

10 Asamama Presby Prim.

378 380 490 167 309 476

11 Asanso Damascus D/A Prim.

272 502 472 143 207 350

12 Asiwa Presby Prim.

419 415 295 92 218 310

13 Bobiam D/A Prim. 249 285 308 125 225 350

14 Danso Meth. Prim. 308 387 402 151 260 411

15 Freso R/C Prim. 308 300 240 117 138 255

16 Freso Sda Prim. 298 315 350 99 193 292

17 Korkyikrom Sda Prim.

258 300 391 166 220 386

18 Kwame Ntowkrom Prim.

306 331 329 90 180 275

19 Morontuo D/A Prim. & K.G

244 236 200 55 150 205

20 Nsuaem D/A Prim 354 390 390 182 250 432

21 Nsuta D/A Prim. 474 470 475 134 335 469

22 Nsutaem Ahwiaso D/A Prim

268 329 377 172 234 406

23 Tebeso I R/C Prim. 549 575 585 169 332 501

24 Tebeso II Presby Prim.

459 587 590 151 459 610

25 Yapesa Kokoben Meth. Prim.

274 276 390 154 268 422

Total 8168 9314 9503 3,268 6,004 9272

Total Enrolment Levels 2013-2016

Page 49: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

49

After a sharp rise in the pupils population in 2015 over 2014 academic year, there

was a marginal rise of 2.03 percent in 2015 after which there has been an appreciable

fall of 2.43 percent in 2006. In spite of the marginal rise in 2015 about 48percent of

schools dropped in their enrolment figures which is about half of the schools

benefiting from the programme and the same percentage of schools dropped in

enrolment. The only difference between 2015 and 2016 is that the fall in enrolment

in the 48 percent school were compensated for by more than proportionate rise in

enrolment in the remaining 52percent schools. And also the rate of fall in enrolment

in the 48 percent of the beneficiary schools were higher as compared to those in 2015.

2013 2014 2015 2016

Payment As At

December

Payment As At

December

Payment As At

December

Payment As At

December

277,989.00 801,953.00 417,265.00 1,158,155.00

Plans are underway to expand the programme to cover 15 additional schools in the

district.

Major challenges to the efficient running of the programme in the District are;

7500

8000

8500

9000

9500

10000

Enrolement

2013

Enrolment 2014 Enrolement

2015

Enrolment 2016

Series1

Page 50: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

50

i. Excessive delay in the release of grants to caterers.

Beside the feeding grant being low, the release is always overly delayed which further

burden the caterers by payment of high interest on loans secured to run the

programme.

ii. Payment of Taxes on grant

The five percent tax deducted on the 80p grant further worsen the woes of caterers

operating under the programme

Youth Employment Agency (YEA) Programme

At the creation of the District in 2008 the District’s programme was under the office

of the Bekwai Municipal. The District office was set up in 2009 and the Agency run

three programmes, Health Extension Workers (HEW), Community Police Assistants

(CPA), and Community Education Teaching Assistants (CETA). One Hundred and

Forty Three (143) were engaged across the programmes by 2013.

No. Programme Beneficiaries

Male Female Total 01 Health Extension Workers 48 32 80

02 Community Police Assistants 3 0 3

03 Community Education Teaching

Assistants

28 32 60

In the year 2014 and 2015, the Agency did not run any activities even though the

Agency was in existence.

In the 2016 year, the Agency resumed massive business by rolling out many

modules. Among these were, Community Police Assistants (CPA), Youth in Fire

Service (YIFS), Community Health Workers (CHW), E-Health, Community

Page 51: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

51

Education Teaching Assistants (CETA), Youth in Arabic Teaching, Environmental

Protection Officers and Youth in Coastal Sanitation.

The Youth Employment Agency in the 2016 year recruited a total of two hundred

and seventy three (273) youth across the district under the above programmes.

S/No Programme Beneficiar

y 2011

Beneficiar

y 2012

Beneficiaries 2013 Beneficiaries 2016

Total Total Male Fem Total Male Fem Total

01 Community Police Assistants (CPA)

4 4 4 - 4 22

02 Youth in Fire Service (YIFS)

- - - - - 6

3 Community Health Workers (CHW)

80 80 80 71

04 E-Health - - - - - 5

05 Community Education Teaching Assistants (CETA)

78 78 60 100

06 Youth in Arabic Teaching

- - - - - 5

07 Environmental Protection Officers

- - - - - 4

08 Youth in Coastal Sanitation.

- - - - - 60

Total 162 162 - - 143 273

District YEA office January 2016

Report of National Health Insurance Scheme (NHIS)

The report covers the period of 2013 – 2016 and is combination of Amanse East

(Bekwai) and Bosome Freho (Asiwa) Assemblies. Below are the details of

membership and claims.

Membership of the Amansie East National Health Insurance Scheme

Year NEW RENEWAL Total

Male Female Male Female

2013 4,549 5,753 11,832 18,560 40,694

Page 52: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

52

2014 6,954 8,544 16,824 25,805 58,127

2015 11,112 13,942 13,284 21,075 59,413

2016 6,815 8,319 14,624 22,762 52,520

Source: Amansie East National Health Insurance Scheme January 2016

Claims for 2013-2016

Year Number of claims Submission Deductions Payments Outstanding

2013 203,284 4,764,494.02 84,746.46 4,679,747.56 Nil

2014 174,511 3,939,961.09 84,583.54 3,855,377.55 Nil

2015 152,844 3,857,424.53 157,370.76 3,700,053.77 Nil

2016 134,554 3,915,898.29 168,568.50 908,967.14 2,838,362.25 Total 665,193 16,477,777.93 495,269.26 13,144,146.02 2,838,362.25

Source: Amansie East National Health Insurance Scheme January 2016

NB: the payment for 2016 is covering January to March and April to December are

outstanding.

3.2.2 Incentives for Business Development

i. Employment Generation and Business Development

The level of commercial activities in the District is very low. The major occupation in the

District is farming, which engages about 80% of the population. The farming system is

mainly subsistence with the exception of some cocoa farmers whose activity is for

commercial purpose. Vegetable farming is gaining popularity with emphasis on cabbage

production. This account for mass exodus of the youth who are not interested in farming to

urban centres such as Bekwai, Obuasi, Konongo, Kumasi, Cape Coast, Takoradi and Accra

after they complete basic education. The recent emergence of alluvial gold mining saw laour

movement to small scale artisanal mining but farming remains the main stay of the people.

Department of Trade and Industry

The Rural Enterprises Programme

In an attempt to diversify the economy, the District in 2010 established District Business

Advisory Centre to promote skill training and small and medium scale businesses

development. The Rural Enterprises Project which was the financier of the activities of the

Business Advisory Centre ended in December 2011, fortunately the programme was re-

launched in 2012 and implementation continued through to 2016. In the year under review

the centre continued to monitor the groups trained and formed new groups. The emphasis of

the second phase of the programme is on mushroom production, improving palm oil

production and cassava processing.

Page 53: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

53

The detail of activities organised with support from Sinapi Aba Trust were as

follows;

Table 16: Training for Tradesmen

S/N Activity Date Community No. of Beneficiaries

Male Female Total

01 Trade show 4th October,

2016

accra 1 5 6

02 Business Counselling 5th-10th

November,

2016

Yapesa 1 15 16

03 Business Counselling 12th -17th

November,

2016

Asiwa 8 21 28

04 Business Counselling 24th-29th

November,

2016

Amomorso 3 20 23

05 Soap Making 2nd-7th Dec.

2016

Bobiam 4 11 15

06 Apprentice Training 4th-12th

August, 2016.

Asiwa and

Bobiam

- 48 48

Total 17 120 137

Table17: Improving Access to Business Information

Focus Areas No. Persons Requesting Information

Male Female Total

Business registration 0 0 0

Business counselling 6 15 16

Information on marketing 8 23 31

Financial assistance 0 0 0

Training 0 0 0

General Business management 1 62 63

Needs assessment 11 48 59

Equipment support 4 0 4

NVTI Proficiency Test 0 0 0

Total 25 86 173

Page 54: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

54

v. Water and Sanitation

Water and sanitation coverage in the district is not the best. Over the years the people’s

access to potable water and approved sanitation facilities is worsening. This might be due to

lack of interventions in this sector. Prior to the creation of the district communities had

benefited from development partners and government of Ghana interventions such as the

CWSP 1 & II, RWSP 1V & and its addendum but since 2011 there had not been any

intervention in the water and sanitation sector the drilling of 10No. Boreholes.

Another contributing factor to the problem has been poor maintenance of existing water and

sanitation facilities on the part of communities who own the water points and toilet facilities.

This has led to the breakdown of many boreholes, this coupled with increase in population

from natural factors and the influx of small scale miners in most communities in the district

has contributed to reducing access and coverage of potable water.

Table 18: Access to Safe Water and Sanitation

No. District Indicators and

Parameters

2013

Indicator

Level

2014

Indicator

Level

2015

Indicator

20116

Target

20116

Achievement

1 Percentage of population

with sustainable access to

safe water sources

40% 47% 52.13% 75% 23.47%

2 % of population with access

to improved sanitation

(flash toilet, KVIPs,

households latrine)

8% 10% 22.95% 35.20% 12.25%

3.2.6 Poverty Status of the District

Poverty in the district manifests in its agrarian economy. Agricultural production is mainly on

subsistence level and food crop production is key. Farm sizes has also diminished greatly

which implies that output from household food crop producers cannot feed themselves and

leave an adequate surplus for marketing.

Another dimension of poverty that is exhibited in the District is inadequate social and

economic infrastructure such as schools, health facilities, banking, and telephone facilities.

The key District specific poverty indicators are poor food and nutritional status, poor

infrastructural facilities and low school enrolment rates in these areas, low employment and

income levels, water and sanitation problems which affects the quality of life of the people.

This manifestation is prevalent in the remote communities which are characterized by low

Page 55: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

55

incomes, limited accessibility by road and generally poor living condition in areas such as

Ohwimase, Anwiaso, Nsuta, Simedadieso, Fereso, Yapesa and Tebeso.

The Nsuta Area Council, which is farthest from the District Capital and has the poorest road

network, happens to be the most poverty stricken area of the District. Similarly, the District

part of the lake Bosomtwe basin which happens to be the next most poverty endemic zone at

the same time have major poverty problems.

4.1 The Way Forward

Giving the persistent weak financial position of the Assembly the District’s top priority

remains improving internal revenue mobilisation by embarking on an intensive revenue

mobilisation campaign. The Assembly shall strengthen its task force to educate the people

and enforce the payment of levies to support the Assembly. Effort shall also be made to

collect property rates and building permits where very small amount was collected during the

previous years.

The Assembly will continue to collaborate with other institutions, support departments like

the District Education Office, District Agric Development Unit, District Health Management

Unit, District Department of Social Welfare and Community Development among others.

The Assembly shall also concentrate on completion of the construction of Junior Staff

Quarters to improve housing situation for staff.

Attention will also be given to the operationalization of the four Area Councils, Revenue

items shall be ceded for the councils and community development officers placed within the

area councils. There is the need then to give them further training, encouragement and

motivation for them to do their work and generate revenue to support their operation. The

statutory allocation from the District Assemblies Common Fund will also be used to provide

logistical support and capacity building for the newly elected members.

To realise her major aspirations, the District envisage the need to receive the backing of

governmental institutions like the Ministry of Local Government Rural Development and

Environment, Energy, Works and Housing, Community Water and Sanitation Agency, Head

of Local Government Service, Finance and Economic Planning among others. As institutions

of governance these shall provide the broader policy framework within which the Assembly’s

initiatives shall conform to receive support from the broader national development agenda.

With this mind set the Assembly’s priorities shall be in conformity with national priorities in

order for her programmes and project to conform to national objectives.

4.2 Conclusion

Page 56: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

56

With the coming into being of a new administration, It is highly advocated that for the

Assembly to fulfil its core mandate of bringing development to the people, there is the need

to pursue policies that will trigger sustainable economic activities which will empower the

local people and improve upon their livelihoods. This is in line with the incoming

administration’s commitment to promote local economic activities in other to create jobs

through the establishment of one factory for each and District and supporting each

constituency with One Million US Dollars (US$1,000,000.00). Skill upgrading for tradesmen

such as carpenters, mechanics, weavers, food processors and small scale manufacturers of

industrial products such as soap, powder etc should still be given the relevant attention.

Also, the Assembly should not relent on her efforts to improve upon second cycle education

and continue with the previous administration’s quest to establish additional second cycle

institution to improve BECE leavers access to second cycle education. With the incoming

current government’s policy to make secondary school education free from paying fees this

should be given much attention to help absorb the teaming prospective candidates that may

be seeking admission to second cycle education. The administration must continue to

provide social infrastructure such as markets, water and sanitation facilities, electricity and

improve the road system because this forms the basis for industrial development.

The Assembly should last but not the least support agricultural production especially in the

food crop production sector. Major rivers in the District such as the Anum, Pra and the Fre

has wide flood plains that are suitable for rice cultivation, cabbage production along the

slopes and valleys of the Bosomtwe ranges had also proved very profitable. Citrus and oil

palm production are also major potentials of the district beside cocoa. The Assembly should

therefore liaise with the District Agric Development Unit to come up with interventions to

support production of these crops which has ready market and has proved profitable.

Page 57: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

60

Appendix

Table 2a: District’s Development Fund (DDF) Projects

No

.

Project Title Location Funding

Source

Contractor Contra

ct Sum

(Gh¢)

Rev.

Contr

act

Sum

Payment

To Date

Award

Date

Start

Date

Expected

Completi

on

Actual

Compl.

Status Stage

(%)

01 Supply of 1,000

Dual Desk

Districtwi

de

DDF Anapim

Company

Limited

69,000.

00

69,000

25/10/1

0

15/11/

10

28/02/20

11

13/12/

2010

1,000 pcs of

furniture

supplied

100%

02 Cladding of 2

No. 3-Unit

Classroom

Block with

office and store

Anyanso DDF Mountplex

Limited

52,838.

73

51,612.0

0

28/10/1

0

15/11/

10

28/02/20

11

02/03/ 2

011

Project

Completed

100%

03 Construction of

1 No. 12 Seater

Aqua Privy

Toilet and

Urinal

Nsuta DDF Gyensuaa

Company

Limited

44,932.

23

43,851.6

0

25/10/1

0

12/11/

2010

25/02/20

11

14/03/2

011

Project

Completed

100%

04 Construction of

2 No. 10- Unit

Market Stalls

Nsuta DDF Anapim

Company

Limited

44,988.

93

40,487 25/10/1

0

12/11/

2010

25/02/20

11

28/01/

2011

Project

Completed

100%

Page 58: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

61

05 Construction of

1 No. 3- Unit

Classroom

Block with

Office and Store

Esaase DDF Gafak Elect.

And Const.

Works

55,505.

47

54,007.9 28/10/1

0

12/11/

2010

12/03/20

11

20/06/

2011

Project

Completed

100%

06 Construction of

6-Unit Market

Stores and

Banking Hall

Asiwa DDF Ernboat

Const. and

Trading Ent.

123,813

.80

123,735.

08

28/10/1

0

12/11/

2010

28/04766

76yt/201

1

06/04/

2011

Project

Completed

100%

07 Cladding of 1

No. 6-Unit

Classroom

Block with

Office and Store

Korkyekro

m

DDF Oppong

Kwabia

Enterprise

53,243.

40

49,227.5 28/10/1

0

12/11/

2010

28/02/20

11

25/05/

2011

Project

Completed

100%

08 Construction of

3-unit Market

Stores, 10Unit

Mkt Stalls and

Banking Hall

Asiwa DDF Ernboat

Const. and

Trading Ent.

118,307

.75

118,547.

5

07/03/1

2

15/03/

12

15/09/12 9/07/12 Project

Completed

100%

09 Construction of

7Unit Market

Stores with

Police Post

attached

Nsuta DDF Osbel

Enterprise

Ltd.

129,791

.20

123,197.

90

07/03/1

2

13/03/

12

13/11/12 26/10/

12

Project

Completed

100%

10 Rehabilitation of

1No. 4Unit

Anyanso DDF Osbel

Enterprise

39,907. 37,803.4 07/03/1 14/02/ 14/06/12 19/09/1 Project 100%

Page 59: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

62

Classroom

Block for

Ahmadiyya JHS

Ltd. 01 0 2 12 2 Completed

11 Construction of

1No. 3Unit

Classroom

Block for

Freboye D/A

JHS

Freboye DDF Osorommoa

Constructio

n Ltd.

69,985.

30

66,373.6

5

07/03/1

2

14/03/

12

14/07/12 10/07/1

2

Project

Completed

100%

12 Construction of

2No. 2Unit

Kindergarten

Blocks

Awheaso

and

Ampaha

DDF Illimitable

Ghana Co.

Ltd.

69,897.

30

69,897.0

0

07/3/12 15/3/1

2

15/8/12 13/8/12 Project

Completed

100%

13 Clearing of

Ankaase-

Mmorontuo

feeder road

Mmorontu

o –

Ankaase

DDF Works

Dept(Direct

Labor)

15,000 15,000 Project

Completed

100%

14 Construction of

50-Unit Market

Stalls

Anyanso DDF M/S Osbel

Limited

189,789

.00

- 186,739 08/02/1

3

08/10/20

13

18/06/2

013

Works

Completed

100%

15 Construction of

1No. 2-Unit KG

Block with

Office and Store

Danso DDF Panquit 40,222.

35

- 39,987.0

0

25/02/1

3

27/05/20

13

4/07/13

Project

Completed

100%

16 Construction of

1No. 12-Seater

Aqua Privy

Nyamebek

yere

DDF Ernboat

Const. and

Trading Ent.

70,289.

52

- 63,655 08/02/1

3

10/06/20

13

22/5/13 Project

Completed

100%

Page 60: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

63

Toilet

17 Rehabilitation of

2No. 3Unit

Classroom

Block with

Office and Store

for Methodist

Prim. School

Ankaase DDF Ernboat

Const. and

Trading Ent.

113,581

.47

- 79,696.5

0

08/02/1

3

10/06/20

12

22/5/13 Works

Completed

100%

18 Construction of

1No. 3Unit

Classroom

Block

Nsuaem I DDF Almay

Constructio

n Limited

125,111

.36

- 87,101.3

9

19/06/1

4

19/09/14 27/10/2

0 /14

Project

completed

handed over

and is in use

100%

19 Construction of

6Units Lockable

Stores

Anyanso DDF OSBEL

ENT. LTD.

156,895

.09

88,372.7

1

19/06/1

4

19/09/14 12/08/1

4

Project

completed

100%

20 Construction of

1No 12-Seater

Aqua Privy

Toilet

Anyinase DDF Amenfi

Building &

Trad. Ent.

72,104.

23

64,893.8

1

19/06/1

4

31/12/14 22/12/1

4

Project

Completed

100%

21 Construction of

1No 12-Seater

Aqua Privy

Toilet

Dunkuraa DDF Panquit

Company

Limited

72,150.

78

64,935.8

8

19/06/1

4

19/09/14 23/12/1

4

Works

completed

100%

22 Construction of

1No. 3Unit

Classroom

Block with

Kwamento

wkrom

DDF Panquit

Company

Limited

131,724

.69

115,099.

43

08/09/1

5

08/01/16 2/9/201

6

Project

completed

100%

Page 61: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

64

Office and Store

23 Cladding of

2No. 3Unit

Pavillion

Classroom and

Construction of

Office and Store

Beposo DDF Obeline

Company

Limited

74,833.

86

67,349.3

7

08/09/1

5

08/01/16 Project

Completed

100%

24 Construction of

6Unit 1st floor

Stores for the

completion of

Anyanso Market

Anyanso DDF M/S Osbel

Enterprise

limited

100,000

.00

76,900.8

2

08/09/1

5

08/01/16 Project

completed

100%

25 Construction of

1No. 3Unit

Classroom

Block with

Office and Store

Supom DDF ASCOTUR

K Company

Limited

130,149

.36

117,134 08/09/1

5

08/01/16 Project

completed

100%

26 Construction of

1 no 3units

classroom block

with office and

store

Dajanso DDF Grotoso

enterprise

185,286

,20

19/12/1

6

19/07/20

17

Site

preparation

and block

mudding is

in progress

27 Construction of

1 no 3units

classroom block

with office and

store

amomorso DDF Osbel

Enterprise

Ltd

176,473

.86

19/12/1

6

19/07/20

17

Site

preparation

and block

mudding is

in progress

Page 62: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

65

28 Construction of

1 no 3units

classroom block

with office and

store

ohwimase DDF K.Kumi 187,380

.60

19/12/1

6

19/07/20

17

Site

preparation

and block

mudding is

in progress

Table 2b: Project: District Assemblies Common Fund (DACF)

Table 2b: Project: District Assemblies Common Fund (DACF)

No. Project Title Location Funding

Source

Contractor Contract

Sum

Rev.

Contra

ct Sum

Payment

To Date

Award

Date

Start

Date

Expecte

d Compl.

Actual

Compl.

Status Stage

(%)

02 Construction of

1No. 3Unit

Classroom Block

Appiah

krom

DACF M/S 49,986.55 45,035.17 09/05/07 9/6/2007 09/09/07 15/6/20

09

Project Completed 100%

03 Construction of

1No. 3-Unit

Dormitory Block

with Sanitary

House, Kitchen

and Dining Hall

and 1No. 6Unit

Classroom Block

for Bosome Freho

Secondary School

Asiwa DACF M/S Ernogyan

Company Ltd

301,92.08 124,757.96 26/07/07 30/08/07 10/04/08 Nov.

2011

Works Completed.

Const. of Kitchen

and Dining Hall

terminated

100%

Page 63: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

66

04 Construction of

1No. 2-Bedroom

Semi Detached

Staff Bungalow

(No. 1)

Asiwa DACF M/S Philip

Duba Co. Ltd

62,599.29 61,549.92 22/02/08 10/10/09 25/10/08 Feb.

2010

Project Completed 100%

05 Construction of

1No. 3-Bedroom

Staff Quarters

Asiwa DACF M/S Edu-K 75,048.82 90,915.

46

90,915.46 25/01/08 25/07/08 25/10/08 July

2010

Project Completed 100%

06 Construction of

Executive

Bungalow

Asiwa DACF Ernogyan

Company Ltd.

115,709.05 115,709.05 25/01/08 22/02/08 25/10/08 July

2009

Project Completed 100%

07 Completion of

Const. of

Enhanced Rural

Clinic

Nsuta DACD/SIF M/S Obodantwi

Const. Ltd.

49,598.79 49,598.79 10/11/08 10/11/08 05/02/09 25/03 /

09

Work Completed 100%

08 Construction of

1No. 2 Bedroom

Staff Bungalow at

Asiwa (No. 2)

Asiwa DACF M/S Nickseth

Construction

Co. Ltd

83,011.40 82,136.50 30/09/09 1/9/09 5/4/10 24/03/1

0

Project Completed 100%

09 Construction of

1No. 3-Unit

Classroom Block

with Office, Store

and Sanitary

Facility for

Presby Primary

Asiwa DACF M/S Nickseth

Construction

Co. Ltd

55,877.08 53,298.29 14/10/09 20/10/09 15/04/10 13/10/2

010

Project Completed 100%

10 Construction of 1

No. 12 Seater

Aqua Privy Toilet

Asiwa

Health

Center

DACF M/S Opong

Kwabia

Enterprise

32,046.10 32,046.10 14/10/09 20/10/09 15/04/10 10/6/10 Project

Completed

100%

11 Construction of 1

No. 12 Seater

Ankaase DACF M/S

Boakyewah

30,982.46 30,981,.49 14/01/10 18/01/10 18/04/20 17/05/1 Project Completed 100%

Page 64: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

67

Aqua Privy Toilet Enterprise 10 0

12 Construction of 2-

Storey 44-Offices

Administration

Block

Asiwa DACF M/S Osbel

Enterprise

limited

863,613 1,573,

322.58

1539995.6

4

21/01/11 26/01/11 26/07/12 2/01/16 Project completed 100%

13 Fencing of DCE’s

Bungalow

Asiwa DACF M/S Opong

Kwabia

Enterprise

65,374.10 35,181.73 22/2/12 02/03/12 22/2/213 Contract

Terminated

70%

14 Construction of

1No. 12-Room

Nurses Quarters

Asiwa DACF M/S Osbel

Enterprise Ltd.

400,000 587,43

3.72

415509.46 08/10/13 07/10/13 08/10/14 Project Completed 95%

15 Construction of

1No. Semi

Detached Staff

Quarters No. 3

Asiwa DACF Obeline

Company Ltd

356,343.35 382,777.58 Works completed 100%

16 Construction of

3room office

with store and

sanitary facility

for District

Electoral Office

Asiwa DACF Direct Labour 29,000 30,000 04/08/14 04/01/15 Works completed 100%

17 Construction of

1No. 6Unit

Classroom Block

Asiwa DACF True Engineers

Const. Ltd.

342,739.77 399822.16 29/09/15 12/08/16 Project completed 100%

Page 65: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

68

with Office, Store

and Library with

Sanitary Facilities

(Model School)

18 Construction of

1No. 3-Unit

Classroom Block

with Office and

Store

Kwakum

ensahkro

m

DACF M/S Grotoso

Enterprise

169,580.40 126,454.50 22/04/16 22/04/16 21/10/16 Plastering and

screeding

completed

80%

19 Construction of

CHPS Compound

Anomaw

obi

DACF True Engineers

Const. Ltd.

85,213.96 66,931.85 29/09/15 29/09/15 29/09/16 Painting is in

Progress

90%

20 Construction of

CHPS Compound

Freso DACF/DD

F

K.Kumi

Enterprise

149,000 133,897.4 30/03/16 12/04/16 21/10/16 Project completed 100%

21 Construction of

Fencewall for

Bosome Senior

High Technical

School

Asiwa DACF Ascoturk 169,497.00 63424.69 30/03/16 22/4/16 21/10/16 Work is at the

painting level

85%

22 Completion of

Area Council

Block

Nsuta DACF Works dept

(Force

Account)

30,000 31,796.00 Painting is in

progress

95%

23 Construction of

pavilion structure

for Asiwa Health

Centre

Asiwa MPs Fund (Force

Account)

35,725.00 Work is the

painting level

90%

24 Rehabilitation of Asiwa DACF Works Dept

(Force

18,018.00 Works Completed 100%

Page 66: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

69

DCD’s Bungalow Account)

Table 2c: GETFund Project

No. Project Title Location Funding

Source

Contractor Contract

Sum

Rev.

Contract

Sum

Payment

To Date

Award

Date

Start

Date

Expected

Completion

Actual

Compl.

Status Stage

(%)

01 Construction of 1No.

6Unit Classroom

Block with office

store and library

Morontu

o

GETFund 110,000 01/04/0

8

01/04

/08

01/12/08 28/11/1

3

Works

Completed

100%

02 Construction of 1No.

6Unit Classroom

Block with office

store and library

Dagyans

o

GETFund 110,000 01/04/0

8

01/04

/08

01/12/08 01/03/1

1

Project

Completed

100%

03 Construction of 1No.

6Unit Classroom

Block with office

store and library

Anoma-

wobi

GETFund Ernboat Const.

and Trading

Ent.

156,891.02 135,770.

71

26/07/1

0

17/04/2011 14/12/1

1

Project

Completed

100%

Page 67: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

70

04 Construction of 1No.

6Unit Classroom

Block with office

store and library

Semdadi

e -so

GETFund Osrommoa

Const.

Company

156,644.62 149,034.

35

26/07/

2010

12/04/2011 14/12/1

1

Project

Completed

100%

05 Construction of

2Storey Dormitory

Block for Bosome

Senior High

Technical School

Asiwa

GETFund

Invergold

Construction

Company Ltd.

353,337 353,337 7/11/07 7/11/

07

24/03

/11

Completed

and

Inaugurated

100%

06 Construction of 1No.

3-Unit Classroom

Block with Office

and Store

Yapesa MP’s

GETFund

Kwamok

Enterprise

45,895.30 49,613.6

0

13/05/

2010

21/05

/2010

21/09/2010 17/09/2

010

Project

Completed

100%

07 Construction of 1No.

6Unit Classroom

Block with office

store and library

Nsuaem

II

GETFund M/S Amfrank

Company Ltd

181,447.63 39,815.4

4

7/10/20

11

14/10

/11

14/06/12 Project

abundant

70%

08 Construction of 1No.

6Unit Classroom

Block with office

store and library

Duase GETFund F-Nyark

Enterprise

181,350.54 39,815.4

4

07/10/1

1

14/10

/11

14/06/12 Project

abundant

65%

09 Construction of 1No.

6Unit Classroom

Block with Office,

Store and Sanitary

Facilities

Ampento GETFund Project

Completed

100%

Page 68: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

71

10 Construction of 1No.

6Unit Classroom

Block with Office,

Store and Sanitary

Facilities

Freso GETFund Project

Completed

100%

11 Construction of

District Education

Office Block for

Bosome Freho

District Assembly

Anyinase DANIDA M/S Okorogya

Enterprise Ltd

Works

completed

100%

Table d: Other Projects

No. Project Title Location Funding

Source

Contractor Contract

Sum (Gh¢)

Rev.

Contract

Sum

Payment

To Date

Award

Date

Start

Date

Expected

Compl.

Actual

Compl.

Status Stage

(%)

01 Rehabilitation of

Asiwa Health

Centre

Asiwa NHIS/MPs M/S K.

KUMI

56,283.51 _ 39,398 30/03/11 15/04

/11

1/08/11 March2

013

Project

completed 100%

02 Extension of

Electricity

Brofoyedru,

Ampantubuo

m, Yapesa,

Kokoben,

Adeito,

Anumso,

Freboye,

Nsutem

GOG Project

Completed

100%

03 Partial

Reconstruction of

Bomfa Jn.-Asiwa

Bomfa

Junction

Asiwa

GoG Ussuya Gh.

Ltd.

Construction of

Culverts

Completed.

Bitumen sealing

Page 69: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

72

Road (km 0.0-26.2 has been

completed

04 Rehabilitation of

Bekwai (Amoaful)

Ampah – Asiwa

Road

Amoaful –

Ampaha –

Asiwa

GoG Surfacing is

almost

completed

leaving a

distance of 7km

between

kokobin and

abosoma

05 Construction and

bituminous sealing

of Gyimakyi –

Abosamso Highway

Gyimakyi-

Abosamso

GoG Cymain Co.

Ltd.

- - - - - - - ongoing

06 Construction and

bituminous sealing

of Abosamso –

Nsuaem II

Highway

Abosamso –

Nsuaem II

GoG Cymain

Company

Ltd

- - - 2012 - - - - Ongo

ing

07 Construction and

bituminous sealing

of Anumso –

Anyanso,

Anyinase-Ofoase

feeder Road

Anumso –

Anyanso,

Anyinase-

Ofoase

GoG Edmac Co.

Ltd

- - - 2015 - - - - Ongo

ing

08 Construction and

bituminous sealing

of Peminase-

Peminase-

Beposo-

Ankaase

GoG Edmac Co.

Ltd

- - - 2015 - - - - Ongo

ing

Page 70: Annual Progress Report 2016€¦ · Small scale gold mining is still gaining prominent due to the discovery of alluvial gold along the Anum and Pra rivers and their major tributaries

73

Beposo-Ankaase

feeder Road

09 Rehabilitation of

(3.6km)

Semdadieso Tebeso

No 2 Feeder Road

Tebeso No 2

–Semddieso

GSOP Grand

Shelter Co.

Ltd

204,061.78 26/04/16 26/04

/16

26/09/16 Project

abundant

5%

10 Rehabilitation of

Anhwiaso –

Ohwimase Feeder

Road

Anhwiaso-

Ohwimase

GSOP Skill Link

Company

Ltd

228,460.94 - - 04/05/16 04/05

/16

4/10/16 Project

abandoned

_

11 Construction of

2No. 3-Unit Aqua

Privy Toilet

Tebeso II &

Nsuaem II

GPEG M/S Ofei

Brothers

Const.

Works

38,728.73 33,196.0

5

16/07/20

13

20/08

/2013

7/10/20

13

Project

completed

100%

12 Construction of

2No. 3-Unit Aqua

Privy Toilet

Anyinase &

Dunkuraa

GPEG M/S Ofei

Brothers

Const.

Works

38,623.73 33,106.0

5

16/07/20

13

20/08

/2013

7/10/20

13

Project

completed

100%

13 Construction of

100No. 20-Seater

W/C Toilet Facility

Districtwide GoG M/S Oliton

Ghana Ltd.

- - - 14/05/16 20/08

/2013

7/10/20

13

Project

completed

100%