annual progress report 2011-ifad ptcrrmp
TRANSCRIPT
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
1/66
PTCRRMP, MFARD-Sri Lanka Page i
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
TABLE OF CONTENTS
1. Introduction ...................................................................................................................... 1
1.1.Project Goals ..................................................................................................................... 11.2.Objectives .......................................................................................................................... 11.3.Target Groups ................................................................................................................... 11.4.Programme Area .............................................................................................................. 11.5.Programme components and sub-components .............................................................. 31.6.Programme Cost (Funding Details) ................................................................................ 42. Overall Performance ........................................................................................................ 5
2.1 Overall Assessment of project implementation progress ...................................................... 52.2 Financial Targets and Progress 2011 (Outputs and Outcomes) ........................................... 102.3 Physical Targets Progress (Annual and Overall) ................................................................. 112.3.1 District wise ......................................................................................................................... 14
3. Project Implementation Performance .......................................................................... 153.1. Component 1 Coastal Rehabilitation and Resource Management ....................................... 153.2. Component 1 Coastal Rehabilitation and Resource Management ....................................... 153.3. Component 2 Support to Artisanal Fishery Development ................................................... 183.3.1. Economic Infrastructure and Assets Recovery .................................................................... 203.4. Component 3 Micro Enterprises and Financial Services Development .............................. 233.4.1. Micro Enterprises Developments ........................................................................................ 303.4.2. Technical training for beneficiaries ..................................................................................... 303.4.3. Baseline Survey for Micro Enterprises Development Programme ...................................... 303.5. Component 4 Social and Economic Infrastructure .............................................................. 303.5.1. Outcomes of the social and economic infrastructure development ..................................... 323.6. Component 5 Gender, Policy Support and Programme Management ................................. 333.6.1. Gender, Policy Support........................................................................................................ 333.6.2. Programme Management ..................................................................................................... 343.6.3. Geographic Information System - Use to the Programme ................................................... 353.6.4. Knowledge Management ..................................................................................................... 35
4. Financial Progress .......................................................................................................... 374.1. Expenditure .......................................................................................................................... 384.2. Loan Details ......................................................................................................................... 404.3. Loan commitments as at 31/12/2011 ................................................................................... 40
5. Project impacts and achievements ................................................................................ 416. Sustainability ................................................................................................................... 417. Concluding remarks ....................................................................................................... 42
8. Our Team ........................................................................................................................ 43
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
2/66
PTCRRMP, MFARD-Sri Lanka Page ii
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
LIST OF TABLES
Table 1 Programme cost by loans ........................................................................................................... 4
Table 2 Satisfaction level of infrastructure development ....................................................................... 7Table 3 Overall satisfaction about Programme activities - % Beneficiary HHs ..................................... 9Table 4 Total Expenditure variation ..................................................................................................... 11Table 5 Progress on aspect of Procurement of year 2011 ..................................................................... 11Table 6 INTEGRATED REPORT ........................................................................................................ 12Table 7 Key activities and progress of community coastal resources management ............................. 15Table 8 Progress as at 31st December 2011 ........................................................................................ 29Table 9 21 Withdrawal Applications (WAs) ........................................................................................ 34Table 10 Component-wise Expenditure ................................................................................................ 38Table 11 Category-wise Expenditure .................................................................................................... 39Table 12 Loan 664 LK .......................................................................................................................... 40Table 13 Loan 693 LK .......................................................................................................................... 40
Table 14 Loan 664 LK & 693 LKUSD............................................................................................ 40
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
3/66
PTCRRMP, MFARD-Sri Lanka Page iii
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
LIST OF FIGURES
Figure 1 Project Districts under PTCRRMP ........................................................................................... 2
Figure 2 Overall Progress ....................................................................................................................... 6Figure 3 Activities Spatial Distribution .................................................................................................. 8Figure 4 Male headed house holds .......................................................................................................... 9Figure 5 Female headed house holds .................................................................................................... 10Figure 6 Financial Progress of Total Loan to Dec 2011 ....................................................................... 10Figure 7 Financial Progress of PTCRRMP Loan to Dec 2011 ............................................................. 10Figure 8 Financial Progress of CIDA Grant ......................................................................................... 10Figure 9 Financial Progress of PTCRRMP to Dec 2011 ...................................................................... 11Figure 10 Total Expenditure variation .................................................................................................. 11Figure 11 Progress on aspect of Procurement of year 2011 .................................................................. 11Figure 12 Kalutara Activity Progress.................................................................................................... 14Figure 13 Galle Activity Progress ......................................................................................................... 14
Figure 14 Matara Activity Progress ...................................................................................................... 14Figure 15 Hambantota Activity Progress .............................................................................................. 14Figure 16 Ampara Activity Progress .................................................................................................... 14Figure 17 Batticaloa Activity Progress ................................................................................................. 14Figure 18 Trincomalee Activity Progress ............................................................................................. 14Figure 19 Water Quality monitoring ..................................................................................................... 16Figure 20 Expressing the views of the community ............................................................................... 17Figure 21 District Committee members for Management of Lobster and Live ornamental fish (Matara& Galle) ................................................................................................................................................ 17Figure 22 New Regulations Published .................................................................................................. 17Figure 23 Illegal fishing during reproduction stage of lobster was taken in to custody during raidsdone by DFAR ...................................................................................................................................... 18Figure 24 Nilwella Anchorage at Matara .............................................................................................. 18Figure 25 Nilwella Anchorage and facility buildings at Matara .......................................................... 18Figure 26 Landing site in Beruwala- Maradana, Kalutara .................................................................... 19Figure 27 Fuel Storage Tank at Landing siteKaluwankerny, Batticaloa .......................................... 19Figure 28 A man carrying a boat engine to home after fishing ............................................................ 20Figure 29 A traditional landing site ...................................................................................................... 20Figure 30 Suduwella Anchorage in Matara, under construction ........................................................... 20Figure 31 Proposed Model of Trincomalee Fish Market ...................................................................... 22Figure 32 Trincomalee Fish Market under construction ....................................................................... 22Figure 33 Unloading Fish at a Landing Centre ..................................................................................... 22Figure 34 Retail Fish Purchases by Lower Income Groups .................................................................. 23
Figure 35 Wholesale Business at the old Market .................................................................................. 23Figure 36 Registered Beneficiaries Percentage (%).............................................................................. 23Figure 37 Registered Beneficiaries Gender Wise ................................................................................. 24Figure 38 Micro Enterprises Beneficiary Clusters ................................................................................ 25Figure 39 Technical training held at National Design Centre Ministry of Traditional Industries andSmall Enterprises Development ............................................................................................................ 26Figure 40 Mrs. Nandani Warusawithana with her Handicrafts products Galagoda, Hikkaduwa ......... 26Figure 41 Composition of the Clusters ................................................................................................. 27Figure 42 Fish based products at Kalmunai Kudi ................................................................................. 27Figure 43 Dry Fish Manufacturing ....................................................................................................... 27Figure 44 Coir Products Manufacturing at Galle .................................................................................. 28Figure 45 During the Entrepreneurship Training Programme .............................................................. 28
Figure 46 Some Home decorating products .......................................................................................... 28Figure 47 Foot way bridge at Hambantota............................................................................................ 31
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
4/66
PTCRRMP, MFARD-Sri Lanka Page iv
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 48 Construction of houses , Saithamaruthu, Ampara ................................................................ 31Figure 49 House constructed in Ampara ............................................................................................... 31Figure 50 Womens Community contribution on road construction in Ampara .................................. 31Figure 51 Road Construction, Batticaloa .............................................................................................. 32Figure 52 People using constructed road .............................................................................................. 32Figure 53 Raladinugama/Juisepiyagama beneficiary owns her developed kitchen .............................. 32Figure 54 Fish auction hall, Matara ...................................................................................................... 32Figure 55 Gender, Policy Support and Programme .............................................................................. 33Figure 56 marginalized women from a gender perspective. ................................................................. 33Figure 57 Radio Programme announcement sticker design distributed among districts ...................... 36Figure 58 Global Interface of PTCRRMP ............................................................................................ 37Figure 59 Component-wise Expenditure .............................................................................................. 38Figure 60 Category-wise Expenditure .................................................................................................. 39Figure 61 Our Team .............................................................................................................................. 43
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
5/66
PTCRRMP, MFARD-Sri Lanka Page v
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
LIST OF ANNEXES
Annex 1 Micro Enterprises Beneficiary Clusters - Kalutara District.................................................... 45Annex 2 Micro Enterprises Beneficiary Clusters - Galle District ......................................................... 46Annex 3 Micro Enterprises Beneficiary Clusters - Matara District ...................................................... 47Annex 4 Micro Enterprises Beneficiary Clusters -Hambantota District ............................................... 48Annex 5 Micro Enterprises Beneficiary Clusters - Ampara District .................................................... 49Annex 6 Micro Enterprises Beneficiary Clusters - Batticaloa District ................................................. 50Annex 7 Micro Enterprises Beneficiary Clusters - Trincomalee District ............................................. 51Annex 8 New Regulations Published 31st January 2012 ...................................................................... 52Annex 9 New Regulations Published 13th February 2012 .................................................................... 53Annex 10 Activity Locations - Kalutara District .................................................................................. 54Annex 11 Activity Locations -Galle District ........................................................................................ 55Annex 12 Activity Locations - Matara District..................................................................................... 56
Annex 13 Activity Locations - Hambantota District ............................................................................ 57Annex 14 Activity Locations - Batticaloa District ................................................................................ 58Annex 15 Activity Locations - Trincomalee District ............................................................................ 59
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
6/66
PTCRRMP, MFARD-Sri Lanka Page vi
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Abbreviations and Acronyms
AD Assistant Director
ADB Asian Development Bank
AWPB Annual Work Plan & Budget
CCD
CEA
Coast Conservation Department
Central Environment Authority
CFHC Ceylon Fishery Harbours Corporation
CIDA Canadian International Development Agency
DFAR Department of Fisheries and Aquatic Resources
DPMU District Programme Management Unit
ERD External Resources Department
FADs Fish Aggregation Devices
FAO Food and Agriculture OrganizationFI Fisheries Inspector
FSC Fisheries Co-operative Societies
GOSL Government of Sri Lanka
GPS Geographical Positioning System
IFAD International Fund for Agricultural Development
LKR Sri Lanka Rupees
M&E Monitoring and Evaluation
MDB Multi-Day Boats
MFARD Ministry of Fisheries and Aquatic Resources DevelopmentMOU Memorandum of Understanding
NAQDA National Aquaculture Development Authority
NARA National Aquatic Resources Research and Development Agency
NHDA National Housing Development Authority
NIFNE National Institute of Fisheries and Nautical Engineering
NPCU National Project Coordinating Unit
NPD Department of National Planning
PIAs Project Implementing Agencies
PIU Programme Implementing Unit
PTCRRMP Post Tsunami Coastal Rehabilitation and Resources Management Programme
PTLiSPP Post Tsunami Livelihood Support and Partnership Programme
RIMS
RFP
Results Based Impact Monitoring System
Request of Proposals
TEC
TORs
Technical Evaluation Committee
Terms of Reference
UDA Urban Development Authority
UNICEF United Nations International Children s Fund
UNOPS United Nations Operational and Procurement Services
UN Habitat United Nations Habitat
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
7/66
PTCRRMP, MFARD-Sri Lanka Page vii
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
NPC Message
Annual Progress Report sums up achievements and performance of
PTCRRMP in 2011, with overall physical and financial progress from
2007 to date. Activities estimated to cost Rs. 1563 mn were earmarked in
Annual budget of the programme for 2011 in the areas of coastal resources
management, artisanal fisheries, sustainable micro-enterprise and financial
services development, social and economic infrastructure development,
Gender focus, policy support and programme management.
To keep the programme in line with the targets set, we strategically
managed situations by using our teams strength to deal with the
challenges and capture more opportunities in order to deliver programme
outputs while ensuring the quality of work and financial discipline where
value for money is guaranteed. At the same time, we adopted several
measures to ensure sustainability of the projects delivered by thePTCRRMP.
During the year under consideration, the PTCRRMP was able to implement activities costing Rs. 863Mn. in
total even though a slow progress was recorded during early months of year due to various issues and
difficulties.
PTCRRMP which commenced in 2007 is now reaching its tail end. As such, our main focus on implementation
was to work on livelihood development sector among tsunami affected communities; after having provided
them with social and economic infrastructure developments. Over 2000 beneficiaries have been selected and
around 900 loans disbursed, together with grants and necessary technical training as well.
Under civil works component, most noteworthy activity was the provision of shelter for internally displaced
people by tsunami particularly at Sainthamaruthu in Ampara. As per MTR recommendation, we initiated
construction of 100 more houses in 2011 and work is nearing completion.
We believe that the experience gained throughout this programme is valuable and will help in future projects as
well. Therefore a well thought out Knowledge Management Plan was developed and approved by IFAD to
implement KM activities in order to share our experience in PTCRRMP with interested parties.
Eventually, within the past year PTCRRMP has been sensitive to the heart beat of the nation tormented by the
natural disaster, and identified their grievances and addressed them with proper need assessments to avoiddiscriminate funds utilization and to deliver the deserving people at the right time.
I would like to express my gratitude to all stakeholders who supported us in various ways to steer the project in
the right direction.
D. Prathapasinghe
National Programme Coordinator
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
8/66
PTCRRMP, MFARD-Sri Lanka Page 1
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
1. Introduction
The Post Tsunami Coastal Rehabilitation and
Resources Management Programme (PTCRRMP)
and The Post Tsunami Livelihood Support and
Partnership Programme (PTLivSPP) implemented
as a single integrated programme which is
governed by a single Appraisal Document
commenced implementation of its project
activities in 2007. Since then the programme has
achieved a remarkable progress, even though its
experienced shallow progress at some stages inexecution process of the programmes. This report
presents the both financial and physical progress
achieved by two programmes during the year 2011
and cumulative progress since 2007 (Table 1).
1.1. Project Goals
The Goal of the programmes is the sustainable
recovery of the assets of rural households directly
or indirectly affected by the tsunami and to help
them re-establish the foundation of their usual
economic activities while diversifying into other
and new, profitable income-generating activities.
1.2. Objectives
The objectives of the programmes are as follows
(a) Tsunami-affected families are provided
with essential social and economic
infrastructure, particularly housing
(b) Tsunami-affected communities are
strengthened and are sustainably
managing coastal resources
(c) Womens participation in social and
economic activities is increased.
(d) Income levels per household member
have been rising above poverty levels.
1.3. Target Groups
The programme target is poor rural communities
in the Programme Area who experienced loss of
lives of relatives and/ or loss of physical and
financial assets, and who are thereby particularly
challenged in restarting livelihood activities
1.4. Programme Area
The programme is being implemented in seven
districts of the island covering 566 GN Divisions in
36 Divisional Secretary Divisions (Figure 1). The
Programme will benefit an estimated
50 000 persons from as many households or about
42% of the population of the programme area.
With an average household size of 4.8 persons, the
total number of beneficiaries would be 239 300
persons. Some 2 000 households may be involved
in coastal resource management, 25 780 in the
support to artisanal fisheries, 16 450 in micro-enterprise and financial services, and 5 630
households in social and economic infrastructure.
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
9/66
PTCRRMP, MFARD-Sri Lanka Page 2
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 1 Project Districts under PTCRRMP
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
10/66
PTCRRMP, MFARD-Sri Lanka Page 3
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
1.5. Programme components and sub-components
In order to achieve the Programme goal and
objectives, it utilizes many diversified but
interrelated programme components. They are
broadly categorized into following five main
components, which are further divided into sub-
components.
A. Community based coastal resources
management
a. Fisheries management
b. Coastal environmental and
resource/habitats management
B. Support to artisanal fishery development
a. Economic infrastructure and
assets recovery
b. Fishery production development
c. Postharvest and marketing
development
C. Micro- enterprises and financial services
development
a. Micro-enterprise development
b. Financial services development
c. Promotion of women's savings
and credit groups
D. Social and economic infrastructure
development
a. Houses and housing amenities
b. Settlement infra-structure
c. Other infrastructure
E. Gender policy support and programme
management
a. Gender
b. Policy support
c. Programme management
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
11/66
PTCRRMP, MFARD-Sri Lanka Page 4
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
1.6.Programme Cost (Funding Details)
Table 1 Programme cost by loans
Total Programme Cost by Loans - PTCRRMP & PTL ivSPP
Programme PTCRRMP PTLivSPP Total
Loan Number 664-LK 693-LK CIDA Grant 665-LK 694-LK
Loan signing date 01.12.2005 18.04.2008 01.12.2005 18.04.2008
Allocation in US$ Mn 14.2 15.713 .975 2.4 2.45 34.763
Allocation in SDR Mn 9.4 10.95 .69 1.56 1.65 23.56
Allocation in Rs. Mn.(1US$= Rs.110)
1562.0 1728.4 107.25 259.16 260.37 3809.9
Effective Date 16-10-2006 18-09-2008 9/3/2006 18-09-2008
Completion Date 31-12-2011 31-03-2013 31.12.2009 31-03-09 30/09/2011
Loan closing date 30.06.2012 18.09.2013 30.09.2009 31.03.2012
Balance time left as fromDecember 2011. Extended tocoincide with 693lk 1 years and 9months Completed Completed Completed
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
12/66
PTCRRMP, MFARD-Sri Lanka Page 5
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
2. Overall Performance
Major outcomes anticipated in the PTCRRMP
are:
1. Coastal resources are managed by thecommunity in a sustainable manner
2. Fisheries infrastructure rehabilitated and
reconstructed
3. Fisheries related infrastructure
reconstructed
4. Enhanced income and thriftiness
5. Enhanced living conditions of the
community
6. Enhanced women participation and
maintained gender balance
The Programme is implemented through various
agencies including government, INGOs and NGOs.
The implementing partners of the Programme
include:
UN Habitat
Coastal Conservation Department (CCD)
Ceylon Fishery Harbour Corporation
(CFHC)
Department of Fisheries and Aquatic
Resources (DFAR)
Divisional Secretariat (DS)
National Aquatic Resources Research and
Development Authority (NARA)
National Aquaculture Development
Authority (NAqDA)
National Housing Development Authority
(NHDA)
National Institute of Fisheries and Nautical
Engineering (NIFNE)
Urban Development Authority (UDA)
United Nations Office for Project Services
(UNOPS)
2.1 Overall Assessment of project
implementation progress
Programme has achieved most of the targets by end
of 2011. The overall physical progress is around
80% while overall financial progress is about 65%
(Table 2). The Programme has achieved almost all
targets in implementing major activities.
Component 1;
The NARA has completed stock assessment surveys
for 6 species in South and surveys in the East are in
progress. Fishery Management plans is being
implemented in Southern districts successfully.
Community is aware and several raids on illegal
fishing have been conducted. Management
committees are established. New regulations are
enforced and gazette is published. Monitoring log
books are to be prepared.
The water quality monitoring and awareness
programmes of CCD are also almost completed.
The scope of construction works of Mangroves
rehabilitation centre is nearing completion.
Component 2:
Roads rehabilitation work targets come under this
component have been achieved. Construction work
of FI Offices and AD Offices of DFAR are almost
completed except Galle AD Office which is planned
to be completed during year 2012. Two multi day
boats have been launched while other two are under
construction.
Cluster shrimp farms project in Batticaloa
implemented by NAQDA is in progress. The state
of the art fish market in Trincomalee is nearing
completion. Construction of Nautical Engineering
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
13/66
PTCRRMP, MFARD-Sri Lanka Page 6
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Training centre for NIFNE in Batticaloa has been
commenced.
The largest activity of the project, construction of
15 landing sites and three anchorages is nearing
completion. 12 landing sites are already completed
and handed over to the community. 60 % of
construction works of anchorages have been
completed. The total investment for this activity
implemented by UNOPS is US$ 10.0 Mn.
Component 3:
The micro enterprise development activities are
being implemented forming enterprise clusters and
granting loans and start -up grants. 800 loans were
issued by end of 2011. Lending programme with
the Womens Bank has commenced. A base line
survey is being conducted for the beneficiaries of
MEDP
Component 4:
The progress of this component is tremendously
high. Large quantities of social infrastructure have
been built under this component including houses
and settlement infrastructure.
Component 5:
This component is for programme management,
policy support and gender. GIS spatial based
database is being prepared. The global interface of
web site is to be launched by March 2012 to
connect with all stakeholders international and
national context.
0
10
20
30
40
50
Total allocation Total expenditure
42
27.33 65%
US$ Mn
Figure 2 Overall Progress
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
14/66
PTCRRMP, MFARD-Sri Lanka Page 7
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Table 2 Satisfaction level of infrastructure development
Infrastructure Satisfaction level% of Beneficiary HHs (No.)
Male-headed HHs Female-headed HHs Overall HHs
Drinking water Very satisfied 63.6 (14) 33.3 (1) 60 (15)
Moderately satisfied 31.8 (7) 33.3 (1) 32 (8)
Not satisfied at all 4.5 (1) 33.3 (1) 8 (2)
Community
buildings
Very satisfied 71.7 (33) 80 (4) 72.5 (37)
Moderately satisfied 26.1 (12) 20 (1) 25.5 (13)
Not satisfied at all 2.2 (1) 0 2 (1)
CBOs formation Very satisfied 66.7 (20) 100 (3) 69.7 (23)
Moderately satisfied 30 (9) 0 27.3 (9)Not satisfied at all 3.3 (1) 0 3 (1)
Roads Very satisfied 66.7 (204) 64.9 (24) 66.5 (228)
Moderately satisfied 28.4 (87) 24.3 (9) 28 (96)
Not satisfied at all 4.9 (15) 10.8 (4) 5.5 (19)
Training on
sanitation habits
Very satisfied 90.9 (20) 75 (3) 88.5 (23)
Moderately satisfied 9.1 (2) 25 (1) 11.5 (3)
Electricity Very satisfied 85.5 (59) 61.5 (8) 81.7 (67)
Moderately satisfied 10.1 (7) 30.8 (4) 13.4 (11)Not satisfied at all 4.3 (3) 7.7 (1) 4.9 (4)
Retaining walls Very satisfied 100 (1) 0 100 (1)
Fisheries sales
outlets
Very satisfied 78.6 (33) 80 (4) 78.7 (37)
Moderately satisfied 14.3 (6) 20 (1) 14.9 (7)
Not satisfied at all 7.1 (3) 0 6.4 (3)
Children's park Very satisfied 83.3 (15) 42.9 (3) 72 (18)
Moderately satisfied 5.6 (1) 42.9 (3) 16 (4)
Not satisfied at all 11.1 (2) 14.3 (1) 12 (3)Beacon lamps Very satisfied 29.4 (10) 50 (1) 30.6 (11)
Moderately satisfied 58.8 (20) 50 (1) 58.3 (21)
Not satisfied at all 11.8 (4) 0 11.1 (4)
Drainage systems Very satisfied 58.8 (40) 42.8 (3) 57.3 (43)
Moderately satisfied 33.8 (23) 14.3 (1) 32 (24)
Not satisfied at all 7.4 (5) 42.8 (3) 10.7(8)
(Source: mid term outcome survey report)
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
15/66
PTCRRMP, MFARD-Sri Lanka Page 8
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 3 Activities Spatial Distribution
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
16/66
PTCRRMP, MFARD-Sri Lanka Page 9
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
The overall satisfaction of the beneficiary HHs in
different districts and different activities is presented in
following tables and Map (Table 2, Table 3 & Figure
3). In general, most of the HHs seem to be satisfiedwith the activities so far implemented by the
Programme (Table 3 & Table 4).
Table 3 Overall satisfaction about Programme activities - % Beneficiary HHs
DistrictsMale-headed HHs Female-headed HHs
Satisfied Can't say Unsatisfied Satisfied Can't say Unsatisfied
Ampara 87.0 9.6 3.4 93.9 6.1 0.0
Batticaloa 81.2 12.6 6.3 78.1 9.4 12.5
Trincomalee 94.3 3.8 1.9 100.0 0.0 0.0
Galle 89.6 6.5 3.9 92.3 0.0 7.7
Hambantota 94.5 5.5 0.0 100.0 0.0 0.0
Matara 92.7 5.5 1.8 100.0 0.0 0.0
Kalutara 94.6 1.8 3.6 100.0 0.0 0.0
(source: mid term outcome survey report)
Figure 4 Male headed house holds
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
17/66
PTCRRMP, MFARD-Sri Lanka Page 10
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 5 Female headed house holds
2.2 Financial Targets and Progress 2011
(Outputs and Outcomes)
In the year 2011 programme planned to spend Rs.
1563.9 Mn. Of which 863.8..has been spent by
December 2011 (Table 8). Some of the activitieswere continued to year 2012 amount to 611.0
Following graphs illustrate the financial
performance of the programme of year 2011 in
total loan, progress of PTCRRMP loan and CIDA
grant (Table 5, Table 6 & Table 7).
Figure 6 Financial Progress of Total Loan to
Dec 2011
Figure 7 Financial Progress of PTCRRMP Loan
to Dec 2011
Figure 8 Financial Progress of CIDA Grant
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
18/66
PTCRRMP, MFARD-Sri Lanka Page 11
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 9 Financial Progress of PTCRRMP to
Dec 2011
Table 4 Total Expenditure variation
Figure 10 Total Expenditure variation
Due to cash flow issues and other administrative
issues the programme experienced a slow financial
progress from January to May 2011; we used
several strategies to turn the progress in to upward
trend. As a result, we were able to spend about Rs.
746 Mn within seven months.
The above table (Table 4) and graph (Figure 10)depicts this scenario.
Procurement2011
Procurement activities implemented by the
programme in year 2011 could be categorized into
03 groups such as;
Civil works
Goods and Services
Consultancy Services
Programme had allocated Rs. 925 Mn. as
procurement budget of AWPB 2011.
The progress of procurement in category wise
could be shows as follows (Table 5 & Table 10).
Table 5 Progress on aspect of Procurement of
year 2011
CategoryExpenditure in Rs. Mn.
Planned Actual
Civil Works 811 577
Goods & Services 22 22
ConsultancyServices
92 46
Total 925 645
Figure 11 Progress on aspect of Procurement of
year 2011
2.3 Physical Targets Progress (Annual and
Overall)
The physical and financial progress of the
Programme for 2011 and cumulative figures upto
2011 given in the following table (Table 6).
Exp
Description
Jan- May
2011
Jun-Dec
2011 Total
Total
Expenditure117.547 746.23 863.8
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
19/66
PTCRRMP, MFARD-Sri Lanka Page 12
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Table 6 INTEGRATED REPORT
S.No
Activity
Unit
(Specifiy
the
mesurab
leunit)
2011 Total
Physical
Target
Physical
Progress
Financia
l
Target
Expenditure
Rs.
Physical
Target
Physical
Progress
Financia
l
Target
Expenditure
Rs.
1 Construction of Tubewells
# 0 0 0 0 63 63 4.4 4.5
2 Construction of Dugwells
# 0 81 0 3.25 331 338 15.1 15.05
3 Common Large Wells # 2 2 1 0.02 42 42 16.71 6.10
4 Provision of Septric Tanksfor toilets
# 0 45 6.02 0.99 599 421 17.93 9.45
5 Construction of IndividualToilets
# 15 115 0.52 4.03 1564 1489
52.42 47.78
6 Common Toilets # 1 0 3.1 0 15 14 8.94 4.211
7 Construction/Renovationof Kitchens
# 155 148 13.12 12.6 685 635 29.98 27.33
8 Energy saving stoves #. 0 0 0 0 600 600 0.26 0.26
9 Fishing Related Roads - km 2.686 1.89 12.07 10.33 60.70 45.24
160.3 101.4
10 Rural Roads km 3.859 3.62 21.55 14.19 44.18 42.27
105.1 90.35
11 Internal roads construction/ improvement
km 0.536 0.4 9.75 6.99 17.60 19.68
90.12 78.98
13 Pipe bone Water Supply
schemes (m)
mete
rs
35 34 2.75 1.90 1104 110
3
12.49 10.59
14 Dug well water schemes # 1 1 0.5 0.38 3 3 2.8 1.88
15 Rain water harvestingtanks
# 0 0 0 0 10 10 0.4 0.4
16 Provision of Water tanks-plasti cells
# 0 0 0 0 697 697 2.85 2.89
17 Water connection toFCS
# 1 1 0.03 0.03 2 2 0.06 0.06
19 Community Buildings # 6 5 15.9 9.14 36 28 97.13 60.81
20 Pre-Schools # 1 1 1 0.91 4 2 10.9 8.58
21 Children's Park (Play
equipment)
# 2 2 2.22 1.82 4 4 4.49 2.49
23 Provision of CompostBins
# 0 0 0 0 431 431 2.21 2.21
24 Home Gardening # 0 0 0 0 157 153 2.77 1.63
26 Self employment/ME /Vocations related training
# 3 3 0.10 0.10 117 116 5.63 4.88
27 Fishery related training # 0 0 0 0 260 256 8.62 5.88
28 Capacity building training # 0 0 0 0 19 12 9.16 2.09
29 Promotion of hygienicpracticesTraining
persons
0 0 0 0 40 40 0.12 0.12
30 Supply of beacon lamp # 0 0 0 0 25 20 5.18 4.60
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
20/66
PTCRRMP, MFARD-Sri Lanka Page 13
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
31 Renovation of Houses( Number of houses)
# 0 0 0 0 32 30 1.63 9.03
32 Housing topping up( Number of houses)
# 25 25 2.52 2.27 532 442 56.12 53.89
33 Renovation of roofs (#) # 0 0 0 0 22 21 3.5 2.7
34 Construction ofmarkets/pola /Fish out lets
# 10 6 22.7 8.72 39 30 41.65 27.93
37 Provision ofequipment/material toFishery Co-ops/banks
# 0 0 0 0 163 162 7.73 3.59
38 Equipments/materialprovided to otherCommunity orgs.)
# 0 0 0 0 17 17 1.98 1.93
39 Debris cleaning (Extent Inperch)
# 1 1 0.19 0.19 7502 6502
0.86 1.14
40 CBOs formation # 0 0 0 0 40 40 2.5 0.51
41 Sail cloth(nos) # 0 0 0 0 12 12 0.4 0.2
42 Silage plant(nos) # 1 1 1.6 1.6 2 2 9.5 5.62
43 Providing footcarts/mobile carts(nos)
# 0 0 0 0 20 10 2 0.95
45 Bio gas plants(nos) # 0 0 0 0 25 25 1.43 0.82
47 Construction of smallbridges
# 2 2 5.74 2.45 6 6 13.4 9.3
48 Construction of Culverts # 12 8 2.3 1.73 18 14 5.08 2.63
49 Construction of newhouses (DS/NHDA)
# 88 82 48.37 23.61 789 784 408.7 381.2
50 Construction of FIOffice
# 0 0 0 0 5 6 10.25 9.94
53 Providing Mobile Tent # 0 0 0 0 10 10 0.5 0.5
54 Reconstruction of IndivaraBanks/ Samurdhi BankBuildings
# 0 0 0 0 3 3 6.3 5.57
57 Provision of Spot Light toFCS
# 0 0 0 0 2 1 0.15 0.15
59 AD Office -DFAR # 0 0 0 0 2 3 12.91 10.19
60 Fish Auction hall # 1 1 2 1.35 4 4 8.35 7.32
61 Street Lamps # 0 0 0 0 525 525 2.06 2.05
63 Fish dryers # 0 0 0 0 20 26 3.6 3.54
64 Providing doors/win doors # 0 0 0 0 44 44 0.65 0.7866 Renovation of Fisheries
Inspector's Office# 0 0 0 0 1 1 0.34 0.46
68 Power supply for coldstorage
# 0 0 0 0 1 1 1.2 1.2
69 Supply of Electricity sch 4 4 0.11 0.06 5 5 0.16 0.06
70 Supply of water facilities sch 5 4 0.26 0.10 6 4 1.26 0.10
73 Fish Store Room # 1 0 0.25 0.14 2 1 1.05 0.94
74 Construction of BeachPark
# 0 0 1.83 0.40 1 1 3.03 1.57
75 Beach Park/ Play Ground # 1 1 0.5 0.46 1 1 0.5 0.46
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
21/66
PTCRRMP, MFARD-Sri Lanka Page 14
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
2.3.1 District wise
With compared to the previous years, the quantity
of civil works completed during 2011 seems to be
below the expected level. This is due to limited
funds availability of the project for civil works. The
civil works funds are already over spent with
compared to the original allocations Activity wise
progress is analysed as follows (Figure 12-18).
Figure 12 Kalutara Activity Progress
Figure 13 Galle Activity Progress
Figure 14 Matara Activity Progress
Figure 15 Hambantota Activity Progress
Figure 16 Ampara Activity Progress
Figure 17 Batticaloa Activity Progress
Figure 18 Trincomalee Activity Progress
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
22/66
PTCRRMP, MFARD-Sri Lanka Page 15
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
3. Project Implementation Performance
3.1.Component 1 Coastal Rehabilitationand Resource Management
Activities pertaining to this component wereachieved through NARA, DFAR and CCD (Table7).
3.2.Component 1 Coastal Rehabilitation and Resource Management
Table 7 Key activities and progress of community coastal resources management
Component/Output/Activity
Implementation targets/Physical progress
Appraisal Targets Achieved (Cumulative)
Conduct of awareness
programmes on habitat
conservation in 7 districts
(videos, posters, awareness
boards, booklets, pamphlets)
(CCD)
10 one day training
programmes, 5 six
day workshops
Printing and distribution of of 70,000 posters
and 218 display boards, production of one
documentary film, arrangement of exposure
visits and establishment of 8 exhibits and
hosting of 9 awareness workshops have been
completed
Monitoring of coastal water
quality in the programme area
(CCD)
13 sites Water quality tests have been conducted in 13
sites and a draft report available on Coastal
water quality management programme
Mangrove restoration (CCD) 200,000 plants
planted, 132 acres
rehabilitated
Mangrove Information Centre - Bentota
development are in progress. Works to be
completed by end of 2012
Fish stock assessment
(NARA)
Stock Assessments on 6 species have been
completed and reports on these assessments are
available.
Joint Project of IFAD and CIDA funded
Programme has completed the Sri LankaFisheries AtlasVolume 1 and it is made
available for interested parties.
Preparation of fishery
management plan (FMP) -
(NARA & DFAR)
FMPs prepared for Southern districts and being
implemented. Awareness programmes were
conducted, Fisheries Co-Management
committees have been set-up and regulations
were gazetted.
FMP in Eastern region.
Note : Implementing agencies: CCD, NARA and DFAR
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
23/66
PTCRRMP, MFARD-Sri Lanka Page 16
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
a) I nformation dissemination and awarenesscreation
This activity is almost completed. The results of the
MTO survey indicated awareness of information
disseminated by the Programme has reached the
sample beneficiary households
b) Mangroves, salt marshes and coral r eefrehabilitation
Mangroves play a vital role in protecting coastal land
from erosion, contributing to the ecological balance
of the coastal zone as well as providing various
resources to the coastal inhabitants
The target was to replant 200,000 mangrove plants
and rehabilitate 55 ha (132 acres) of mangroves
affected by tsunami. Rather than going forward with
replanting, the Programme supported establishment
of two education centres by the CCD namely: 1.
Coastal Habitat Demonstration Site in Kalamatiya
and 2. Mangrove Information Centre in Bentota.
While the former is deleted from scope, construction
of the latter is considerably completed.
c) Coastal water qual ity moni toring
Monitoring of water quality is considered vital to
formulate policy and prevent coastal water pollution
caused mainly by bad human practices (Figure 19).
Figure 19 Water Quality monitoring
The Research and Design Division of the CCD has
completed this study and the draft report on Coastal
Water Quality Management Programme has been
submitted to the relevant authorities for their perusal.
CCD wants to continue the activity.
d) Stock assessmentThe Programme funded NARA to carry out stock
assessment surveys and prepared FMPs for South.
Studies conducted and the FMPs prepared for lobster,
sea cucumber, prawns, and chank. Studies in the
East in progress.
e) Commun ity based fi shery management plansThe Programme supported NARA and DFAR in the
formulation and implementation of community based
fisheries management plans for several specialized
fisheries such as lobster, chank and Bech dMer, sea
cucumber, shrimps in order to ensure their
sustainability. DFAR has conducted awareness
programmes based on these findings (Figure 20).
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
24/66
PTCRRMP, MFARD-Sri Lanka Page 17
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 20 Expressing the views of the community
The preparation of these community based
management plans is completed. Plans implemented
in South have shown a positive impact. Several
management committees established (Figure 21).
Figure 21 District Committee members for
Management of Lobster and Live ornamental fish
(Matara & Galle)
Gazettes with regard to new regulations published
(Figure 22 and Annex 11 - 12).
Figure 22 New Regulations Published
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
25/66
PTCRRMP, MFARD-Sri Lanka Page 18
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Several raids on illegal fishing conducted on
information received. Several raids were held and
accused were taken in to custody, (Figure 23) taken
legal action against them to prevent restricted fishing
species in certain seasons and to relevant degree.
Monitoring log books are being printed.
Figure 23 Illegal fishing during reproduction stage
of lobster was taken in to custody during raids
done by DFAR
3.3. Component 2 Support to Artisanal FisheryDevelopment
The largest component of the Programme is the
Artisanal fishery Development Component. The total
allocation for this component for 2011 was Rs. Mn.
954.7. Out of this Rs. Mn 529.32 spent as at end
December 2011. All major infra-structure
development activities come under this component.
Rehabilitation of production related roads,
construction of Trincomalee fish market, construction
of landing sites and anchorages, cluster shrimp farms
in Batticaloa, AD Office and FI Offices, multi-day
boats are some of the major works being
implemented under the component. Construction of
15 landing sites and 3 anchorages is the main activity
of the Project. Twelve landing sites are already
completed while construction of two large
anchorages Nilwella (Figure 25) and Suduwella
(Figure 30).
Figure 24 Nilwella Anchorage at Matara
Figure 25 Nilwella Anchorage and facility
buildings at Matara
Two anchorages are located in Southern Matara
district of which investing more than 300 SL.Rs. Mn.
for each is also nearing completion and hope to open
by June 2012. The total investment for the completed
twelve landing sites is around SL.Rs. Mn 300 .
Landing sites have been constructed in all seven
project districts. Each landing site facilitate nearly
about 70 one day boats fitted with outboard engines.
The anchorages have facilities for anchoring
multiday boats usually length is more than 15 meters.
It is estimated that around 90 multiday boats are
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
26/66
PTCRRMP, MFARD-Sri Lanka Page 19
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
seeking anchoring facilities at each Nilwella and
Suduwella anchorages currently being constructed
(Figure 30). The total number of families being
directly benefited under this activity is more than
3000 families in minimum. Usually one day boats
provide employment for two persons and a multiday
boat for 5 persons.
Figure 26 Landing site in Beruwala- Maradana,
Kalutara
Landing sites are equipped with facilities such as, net
mending halls, engine storage rooms, toilets, meeting
rooms, resting rooms, auction halls and fuel storage
facilities. The anchorages have further marine
structures such as break waters, groynes and quay
walls. We have observed that fishermen in areas of
our landing sites are getting used to this culture and
now they use facilities provided mainly engine
storage rooms (Figure 25).
UNOPS together with the Ministry and PTCRRMP
conducted participatory community meetings at each
site during the planning process.
Construction projects were also monitored by the
CFHC, MFARD, UNOPS and programme officers.
Once the constructions are completed, projects were
handed over to DFAR. DFAR prepares sustainable
implementation plans with the fisheries community
organizations and handover the management of
landing sites to community organizations often
fisheries cooperatives.
Figure 27 Fuel Storage Tank at Landing site
Kaluwankerny, Batticaloa
One of the serious challenges met by the Ministry,
DFAR and the Programme is the fuel supply for the
landing sites where constructed fuel storage tanks as
the working capital required for this activity is very
high (Figure 27). The DFAR has helped fisheries
cooperatives to purchase fuels with local authorities
and now this barrier is getting ease.
According to surveys and studies it is revealed that
fishermen are very keen about this facility and they
are very satisfied about the facilities provided which
has created a new culture for them strengthening their
social commitments (Figure 28).
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
27/66
PTCRRMP, MFARD-Sri Lanka Page 20
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 28 A man carrying a boat engine to home
after fishing
Figure 29 A traditional landing site
DFAR has completed construction of 4 multiday
boats of which 2 boats are launched. Other 2 boats
are also almost completed and will be launched soon.
However DFAR has not done any feasibility studies
on the boats launched and therefore there is no
chance of manufacturing more boats.
Figure 30 Suduwella Anchorage in Matara, under
construction
3.3.1.Economic Infrastructure and AssetsRecovery
(a) I ntellectual and Traini ng Base of the FisheryI ndustry in Sri L anka - NI FNE
College of Fisheries and Nautical Engineering
(COFNE) destroyed by devastating Tsunami was one
of the cornerstones of the fisheries sector
development in the area. It has been decided that the
new COFNE will be constructed at the same site
(Nawaladi) with adequate facilities including
hostels, lecture rooms, library, fully equipped
workshops, residence/quarters and modern
infrastructure such as swimming pool, jetty etc,.
IFAD will fund the project cost estimated to be Rs.
40 m for the construction of a two storey building.
In the aftermath of the Tsunami, non-existence of
NIFNE was critically felt with the loss of experience
and skill with the demise of skilled fishers. Therefore
reconstruction of COFNE could fill this vacuum to a
certain extent and facilitate the achievement of the
objectives of Ten Year Development Plan and
Negenahira Navodaya Development Plan.
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
28/66
PTCRRMP, MFARD-Sri Lanka Page 21
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
The most suitable location for this construction with
enough space, calm and quiet environment for
academic background is Nawaladi where the old
COFNE stood. Its close proximity to the sea and
lagoon provides easy access to practical training. The
location being isolated from the town and situated in
a vast expanse of land with wonderful scenic beauty
provides opportunities for future expansion required
for a reputed academic institution.
The present design has been proposed with a view to
developing to the level and status of a university
especially reserved for fisheries studies. It has been
so designed that it can withstand disasters like
Tsunami that has to be anticipated in the future. The
output from this institute will undoubtedly lead to
greater efficiency and performance in fishery
industry with minimal post harvest losses and
sustainable utilization of resources.
National Institute of Fisheries and Nautical
Engineering (NIFNE) is an institution which
conducts courses designed for imparting knowledge
on fishery industry related technology. Its courses
range from Net Mending to repairing of boat engines
and the body of the vessels. This immensely
contributes to the qualitative and quantitative
increase of the fish catch while maintaining
ecological balance in marine waters. This also helps
exploit the pool of talents of the fisher community
towards the preservation of marine resources and
reaping fish harvest methodically and scientifically
such that there will be continuity in fish stocks in the
waters.
(b)National Institute of Fisheries and NauticalEngineering (NIFNE)
The National Institute of Fisheries and Nautical
Engineering (NIFNE) has had the legal acceptance
through the Act No 36 of 1999 enacted by the
Parliament. It is the only institute under the MFAR
which is responsible for formulating and conducting
the training and educational programmes to develop
the human resource base and fisher skills. Eight
regional colleges located around the coast (i.e.,
Mattakkuliya, Kalutara, Galle, Tangalle, Batticaloa,
Trincomalee, Jaffna and Negombo) are coherently
linked with the head office of NIFNE located in
Colombo to improve the skills and knowledge of the
fisher community through conducting three types of
vocational training courses such as diploma,
certificate and mobile training. In addition, two
degree programmes on Fisheries and Marine Science
and Marine Engineering are conducted under the
concept of Sagara Vishwavidyalaya for capacity
building in order to develop an effective and
sustainable utilization of marine resources.
(c) Sagara Vi shwavidyalayaSagara Vishwavidyalaya, or the Ocean University
was established in 1999 under NIFNE, recognizing
the importance of human resource development in the
fisheries sector and marine science to national
economy. Two degree programmes namely B.Sc
Degree in Fisheries and Marine Science (General and
Special), B.Sc in Marine Engineering (Special) are
being conducted at present at the Sagara Vishwa
Vidyalaya.
The main objectives of the reconstruction of COFNE
complex are;To provide sufficient space and facilities
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
29/66
PTCRRMP, MFARD-Sri Lanka Page 22
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
for training and education in fisheries industry and
marine science and nautical engineering for
sustainable utilization of fisheries and marine aquatic
resources To introduce the logistics for training
fishers which increase the number of skilled persons
engaged in fisheries industry;
To introduce the use of modern equipments and new
technology for fishing and related industries in order
to increase the fin fish and shell fish production
Utilize the resources with least damage to the
environment through application of Best
Management Practices (BMP)
To improve the quality and safety standards of fresh
fish through the training on better fish handling
practices
(d)F ish Market I s an Asset to the Countr y
Figure 31 Proposed Model of Trincomalee Fish
Market
The Wholesale Fish Market in Trincomalee was
badly damaged by the Tsunami in December, 2004. It
functioned way below the expected levels with lack
of even basic facilities like water, sanitation,
electricity etc (Figure 34). PTCRRMP rightly
identified the need for the reconstruction of this Fish
Market and offered to provide financial assistance for
this purpose. This Fish Market which stands in
Trincomalee town is a milestone in the post tsunami
and post war development of the Eastern Province. It
is an important link in the overall development in the
region.
Figure 32 Trincomalee Fish Market underconstruction
The fisheries sector in Sri Lanka suffered a huge
setback following immeasurable damage caused to
the fishing gear and infrastructure in addition to the
massive loss of life and property. Concerted efforts
by the local and international community brought
back normalcy to life in a short time, but it took a
long time for fishermen to come to terms with thedevastation.
Figure 33 Unloading Fish at a Landing Centre
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
30/66
PTCRRMP, MFARD-Sri Lanka Page 23
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 34 Retail Fish Purchases by Lower Income
Groups
Figure 35 Wholesale Business at the old Market
Fish vendors still used the old, dilapidated building
for fish trading with no electricity, water and other
sanitary standards required for food related industries
(Figure 35). Therefore, in keeping with the modern,
international trends and environmental regulations on
food hygiene, the design for the new fish market had
proper loading and unloading facilities (Figure 33),waste water and effluent treatment system, storm
water drainage system, means for systematic
cleaning, clean stalls and office rooms and cold
storage facility incorporated in it (Figure 31).
The total investment for construction of the new fish
market is 100 M Rupees (Figure 32).
3.4. Component 3 Micro Enterprises and
Financial Services Development
In order to support and rehabilitate the Tsunami
affected people, many government, non government
and private sector organizations took many
endeavours to reinstate them. Being part of the
intervention the PTCRRMP implemented Micro-
Enterprise development programme and provided
financial services to develop their livelihood in a
sustainable manner.
Altogether there are 2,183 beneficiaries registered
under the programme fulfilling the requirements
imposed by the MED Programme (Figure 36 &
Figure 37). (Annex A). It was a pre identified
requirement to provide 75% of the total benefits for
the women participants considering the gender equity
according to the Sri Lankan context. The programme
has taken necessary measures to fulfil this
requirement. Composition of number of beneficiaries
selected by December 2011 is as follows.
Figure 36 Registered Beneficiaries Percentage
(%)
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
31/66
PTCRRMP, MFARD-Sri Lanka Page 24
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 37 Registered Beneficiaries Gender Wise
It is clear that only the Batticaloa regions progress is
laying behind others regions progress. Ampara,
Matara and Hambantota leads in penetration of the
project towards the local beneficiaries.
It is clear that the Kalutara, Batticaloa and the
Trincomalee districts have reached the above need of
gender consideration of the participants already.
It has been referred 1,679 beneficiaries from entire
programme region to obtain the registration at the
Central Bank of Sri Lanka (CBSL) prior to receiving
grants and 1,320 have already registered. Out of them
871 are eligible to obtain the grants and 322 have
successfully received amounting to a total of Rs.
5,581,500/-. This is a considerable success rate
compared with the proceedings of the entire
programme. On the other hand if any one disqualifies
to receive the grants from CBSL out of the above
category, they will be guided to the Womens banks
established in the village level to facilitate themaccordingly.
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
32/66
PTCRRMP, MFARD-Sri Lanka Page 25
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 38 Micro Enterprises Beneficiary Clusters
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
33/66
PTCRRMP, MFARD-Sri Lanka Page 26
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
1,901 beneficiaries have successfully undergone the
entrepreneurship development training programmes
incorporating the adult training methodology in entire
districts and they were enabled to prepare business
plans for their future businesses in a more viable and
sustainable manner.
For the beneficiaries who already have undergone the
above entrepreneurship training will be provided the
training on technical skills training programmes to
improve their technical skills related to their business
needs (Figure 39). And 154 beneficiaries already
have been benefited through this training programme.The total cost expenditure on this technical training
was recorded to a total sum of Rs. 407,760/-.
Figure 39 Technical training held at NationalDesign Centre Ministry of Traditional Industries
and Small Enterprises Development
Ministry of Traditional Industries and Small
Enterprises Development
Yet the Social Mobilization training programmes are
to be conducted and these beneficiaries are expected
to be strengthening more towards keeping the success
levels within the dynamic and competitive
environment potentially arise in the future conditions.
Figure 40 Mrs. Nandani Warusawithana with her
Handicrafts products Galagoda, Hikkaduwa
It is also a requirement to form the clusters among
the similar kind of business ventures out of these
selected beneficiaries, to benefit them in a collective
manner as a team in the future. This will be much
helpful in the case of problematic situations that may
arise and create inevitable circumstances for the
entire industry, to come out as collective unit and
make strategic decisions. 43 clusters have been
already formed among the beneficiaries and they are
functioning very well at the current scenario (Figure
38).
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
34/66
PTCRRMP, MFARD-Sri Lanka Page 27
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Further 192 small business groups have formed for
the micro level businesses to help functioning
smoothly considering the same facts highlighted
above.
Figure 41 Composition of the Clusters
As shown above (Figure 40) the Coir industry, Fish
based products (Figure 42), Garment Industry, and
Poultry farming shows higher percentages of theclusters that have been already formed. While the
Dry fish/ Maldive fish (Figure 43), Agriculture sector
and Food products clusters show the secondary level
success percentages. And Goat farming, dairy
products, Animal husbandry and Handicrafts sector
shows the low level percentage of success to date.
But there are many other clusters being formed and
they have a better chance to compete with these
clusters as the programme proceeds (Figure 40).
PTCRRMP together with UNOPS have planned to
construct seven sales outlets in respective districts to
market their Products and Services. The estimated
amount is around Rs. 20 million for this aspect.
Some photographs taken during the field visits for
individual business premises for programme
activities are shown below (Figure 44 - Figure 46):
Figure 42 Fish based products at Kalmunai Kudi
Figure 43 Dry Fish Manufacturing
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
35/66
PTCRRMP, MFARD-Sri Lanka Page 28
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Figure 44 Coir Products Manufacturing at Galle
Figure 45 During the Entrepreneurship Training
Programme
Figure 46 Some Home decorating products
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
36/66
PTCRRMP, MFARD-Sri Lanka Page 29
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
Table 8 Progress as at 31st December 2011
Progress as at 31st
December 2011
Description Kalutara Galle Matara Hambantota. Batticaloa Ampara Trincomalee Total
No. of beneficiaries registered - Total 298 335 361 350 147 382 310 2183
- Female 216 271 327 69 105 235 222 1445
- Male 82 64 34 281 42 147 88 738
No. of Beneficiaries referred to CBSLfor registration
175 322 248 260 239 281 154 1679
No. of beneficiaries registered at CBSL 152 291 227 262 147 159 82 1320
No. of loans granted 79 223 209 184 18 115 43 871
Total Loan Amount (Rs.) 3,980,000 13,420,000 12,750,000 13,030,000 1,235,000 8,455,000 - 52,870,000
No. of grants handed over 76 68 125 53 0 0 0 322
Total Grant Amount (Rs.) 1,341,500 1,310,000 2,100,000 830,000 0 0 0 5,581,500
Grant to be handed over 3 155 84 131 18 115 43 549
No. of Social Mobilization Conducted 0 0 0 0 0 0 0 0
No of clusters formed 2 6 6 9 9 5 6 43
No. of small groups formed 10 25 39 34 48 4 32 192
No. of beneficiaries trained(Entrepreneurship Training)
175 300 305 241 239 245 396 1901
No. of business plans prepared 175 300 305 202 239 245 304 1770
No of beneficiaries trained(Technical Training)
0 0 97 57 0 0 0 154
Total Cost of the Technical
programme
0 0 155,710 252,050 0 0 0 407,60
Baseline Completed 262 262 230 332 233 305 305 1929
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
37/66
PTCRRMP, MFARD-Sri Lanka Page 30
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
3.4.1. Micro Enterprises Developments
The programme designed with and overall package
of Micro enterprise Development that consist of
financing of product and business advancement
,adopting appropriate technology and link with
profitable market. Therefore, this will be a great
opportunity that the Tsunami -affected women will
receive to develop their income status and hence an
impact on their upward social mobility.
The Programme targeted poor rural women and
men in tsunami affected communities in the
programme area. Self-targeting will be achieved
by the type and size of support (size of enterprise,
loan ceilings, etc.) and through participatory
assessments. The programme identity potential
income generating opportunities in both the
fisheries sector it self, fishery related activities and
non fishery activities in the district by obtaining
services from the qualified service providers. The
volume of loans to be covered by credit scheme
would amount to LKR 175.This Program selected
banks as the participatory financial institutions to
expedite the loan disbursement.
3.4.2.Technical training forbeneficiaries
The programme reinforced the income base of the
enterprises through focusing the business
management training coupled with the technical
and marketing aspects. To cater for more
sophisticated and larger markets through these
enterprises, the Business Development Services
providers already identified should be enabled to
create clusters of enterprises which wanted to
develop similar products and markets for more
success.
3.4.3.Baseline Survey for MicroEnterprises Development
Programme
The Base line survey was completed to understand
the prevailing situation of selected beneficiaries
with the view of planning and implementing most
suitable intervenes in terms of improving their
living conditions
Micro-enterprises are a vital part of the economic
and social structure and contribute to balanced
regional development. The sector represents 75-
85% of all enterprises, provides jobs to 20-40% ofthe total labour force in Sri Lanka and produces
about 15 - 20% of total output. Even though the
cost of creating employment in micro- and small
enterprises is relatively low, the income level
obtained from micro-enterprises is also low. About
30% of the enterprise owners have incomes below
the poverty line because they are in low entry/low
profit activities. Workers, in majority women are
poor and have less formal education than their
colleagues in larger enterprises. The output of the
small scale sector can often not compete with
trade-marked products of larger enterprises but
price-wise they often cater for the essential demand
of poorer households. Achieved progress during
2011 shows in disbursement of loans, grants,
technical training and clusters found in the
programme area (Table 8).
3.5. Component 4 Social and EconomicInfrastructure
The Programme provided support to the tsunami-
affected communities to reconstruct housing and
infrastructure with the partnership of local
authorities. The Programme, therefore, supported
the affected communities to return to their
normalcy.
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
38/66
PTCRRMP, MFARD-Sri Lanka Page 31
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
As financial and physical progress are concerned,
this component shows the highest progress as it is
anticipated that the activities are completed. A
large amount of community infrastructuredevelopment work (drainage, retention wall,
internal roads, drinking water supply, sanitation
and sewerage, solid waste disposal, street lights,
community centres, pre-school day-care centres,
etc.) has been completed under this component,
which includes the allocations of PTLivSPP as well
(Figure 47).
Figure 47 Foot way bridge at Hambantota
a) Housing
Under housing, 784 new houses collaborating with
NHDA have been constructed. In addition, topping
up grants to construct houses have been received
by 442 households (Figure 49). Financial supportto repair 30 houses, 21 roofs, and 44 doors and
windows has also been given. The allocations have
been used for owner driven construction.
Construction of 100 new houses in Ampara district
on the recommendations of the 2011 supervision
mission currently being implemented.
Owner driven method in housing and communitycontribution in most activities is a speciality in
PTCRRMP. People are more interested of what
they have been provided with. Beneficiary
satisfaction is high since people feel their
ownership when participatory approach used
(Figure 50). this helps in sustainability of thedeliverables even.
Figure 48 Construction of houses ,
Saithamaruthu, Ampara
Figure 49 House constructed in Ampara
Figure 50 Womens Community contribution on
road construction in Ampara
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
39/66
PTCRRMP, MFARD-Sri Lanka Page 32
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
b) Other inf rastructure
Under this sub-component the Programme assisted
construction and re-establishment of various social
and economic infrastructures of the people affected
by tsunami. The activities include internal roads,
bridges, drainage, retaining walls, drinking water
supply, sanitation and sewerage, solid waste
disposal, street lights, community centres, pre-
school day-care centres, etc.
Figure 51 Road Construction, Batticaloa
Figure 52 People using constructed road
3.5.1.Outcomes of the social and economicinfrastructure development
a) New houses and house improvement
The results of the MTO survey indicated that
households have benefited from rural roads,community drinking water, multipurpose
community building, fisheries bank building,
supply of electricity, establishment of Children
Park, retaining walls, drainage system, electricity,
etc (Figure 54).
Figure 53 Raladinugama/Juisepiyagama
beneficiary owns her developed kitchen
Figure 54 Fish auction hall, Matara
The construction of community roads has improved
the transportation and availability of private
transport services, accessibility to markets forbuyers and sellers, value of lands, etc (Figure 53 &
Figure 54).
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
40/66
PTCRRMP, MFARD-Sri Lanka Page 33
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
3.6. Component 5 Gender, PolicySupport and Programme
Management
3.6.1.Gender, Policy Support
Figure 55 Gender, Policy Support and
Programme
Women, in particular continue to be
disproportionately affected unless their vulnerablestatus is acknowledged, understood and addressed.
Relief efforts must aim to specifically respond to
and address womens needs. Economic insecurity,
the gendered division of domestic labour,
reproductive and health differences, exposure to
violence, disparate educational and social
opportunities, and secondary political status
combine to put women at a higher risk, particularly
those that support households alone, the aged and
disabled and those marginalised by social class,
caste or religion.
The objective of the Programme is to achieve a
situation which women in tsunami affected areas
have recovered their physical and financial assets,
have re-established their economic activities while
diversifying them in other and more profitable
income generating activities (Figure 55).
Gender relationships open up opportunity for
reducing the poverty levels of households. The
women in MED Programme have made for
strengthening promotion of women savings andcredit for economic empowerment, link with the
Sri Lanka Women Development Service
Cooperative Society (WBCC). They are
strengthening 34 women Bank branches in 7
districts, Training the relevant women members in
leadership, basic accounting and management &
any other identified sectors.
Mobilizing and capacitating at least 3400 womens
in 7 districts in savings, micro investments & credit
culture, leadership and management improving
access to micro credit by developing their own
(Figure 56).
The Management mentioned to Recruit of 08
gender focal persons from the community and
build their capacities to identify and address
specific needs of women engaged in micro
enterprises including marginalized women from a
gender perspective.
Figure 56 marginalized women from a gender
perspective.
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
41/66
PTCRRMP, MFARD-Sri Lanka Page 34
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
3.6.2.Programme Management
During the year under consideration we have
adopted several management strategies to ensure
smooth functioning of programme implementation.
This is discussed in following aspects.
Cash fl ow Problems
At one stage the project had serious cash flow
problems and there was a little money to settle
payments to the contractors and meet other
commitments. Withdrawal Applications were used
to send every two months.
It took a long time to process withdrawals since
then. Therefore our approach was to reduce the
processing time of withdrawals to ensure smooth
cash flow situation.
In this contextduring the year our strategy was to
send at least 2 applications per month to pick up
the backlog created up to mid of 2nd quarter of
2011. This worked well with the commitment of all
the staff members involved.
During the year 2011, we have submitted 21
Withdrawal Applications (WAs) to IFAD amount
to USD 5.2Mn. of which only 2 WA were
outstanding by December 2011 (Table 11).
Table 9 21 Withdrawal Applications (WAs)
Loan
No.
No. of WA
to IFAD
Value
USD Mn
Value
LKR Mn
664 LK 13 2.9 324.7
693 LK 08 2.3 259.0
TOTAL 21 5.2 583.7
The expenditure during the period spread into two
periods; Jan to May 2011 & June to December
2011. The relevant expenditure during the two
periods are Rs.117Mn & Rs.746Mn respectively.
Training
It is our view that skill development and
specialized training are closely linked to the
successful implementation of any programme.
Taking this into consideration, almost the entire
staffs in the project was given some kind of
training related to their field of specialization.
Training given to staff covered the area of project
& programme Impact Assessment, Project
Budgeting & Cost Control, Contract Management
& Disbursement Monitoring, Results Based
Management Implementation & Performance
Indicators, Procurement of Good & Services
Planning, Procurement of Goods & Services,
Advanced Purchasing Skills, Knowledge
Management, Monitoring & Evaluation and GIS.
This has paid dividends in terms of performance
and achievement of targets.
o Outsourcing Technical Officers for
Quality Assurance of Civil Works
To ensure the QA of civil works, programme hired
technical officers on the approval of SIS mission
2011. Most of the civil construction works of the
project were undertaken by implementing agencies
such as local government bodies, RDA, etc.
Supervision of these constructions was made by the
technical officers of the respective agencies.
Supervision was lax in many respects. Therefore
with the approval of mission 2011 PTCRRMP
recruited technical officers for the districts on
contract basis and from then onwards we have
witnessed a remarkable improvement in the quality
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
42/66
PTCRRMP, MFARD-Sri Lanka Page 35
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
of the work. Delays in the implementation have
also been minimized. Therefore, this strategy has
worked well for the advancement of the project.
o
Outsourcing CDOs to Expedite theMED Programme
Gender, Micro Enterprise and Rural Financial
Development manager has to deal with banks,
financial institutions, beneficiaries, service
providers and stake holders in the scope of work
assigned to him. Therefore, to avoid delays in the
selection and processing of loans, CDOs were
recruited to all district offices following anapproval from the mission 2011. The component
of micro enterprise development and gender related
activities have seen a remarkable progress since
then.
As a result of applying this strategy the programme
could accelerate the number of loans endowed
from June which was slow in progress, inter alia
we 850 loans granted from June to December 2011.
Field Visits
Senior Managers along with the manager in charge
in relevant district have made field visits for
observations and third party opinion on the
progress and other issues. This too has had an
influence on the contractors and service providers
and prompted them to speed up and complete the
works maintain quality standards.
3.6.3.Geographic Information System - Use tothe Programme
As a tool of data management and information
management GIS was applied to the project
particularly for data management and decision
making.
For this purpose, a consultant was procured to
design, develop, and installed a spatial database.
This GIS data base provides ongoing support for
process monitoring of project activities.
This database also enable store data in form of
Photos, Video Clips, and other statistical means for
easy navigation of project interventions. It also
includes locations and all relevant data of Micro
Enterprises Beneficiaries selected from each
District.
To utilize data and information in an effective way,
and to make easy to help in decision supporting for
the management, the staff was trained on GIS and
applications. This was already done from the Post
Graduated Institute of Science of University of
Peradeniya, Sri Lanka. Further, all relevant
trainings for the customized spatial database is
being done by the consultant for all project staff.
3.6.4.Knowledge Management
The PTCRRMP and PTLivSPP have gained a lot of
first hand experiences in different contexts with
different partners. The PTLivSPP is already
completed and therefore the project experiences
should now be recorded for sharing with other
communities. The PTCRRMP is still to continue
and gain more experience in a wide range of
implementation of project activities. At this stage,
it is very important to formulate a system to
capture, analyse, and store data, producing KM
materials and sharing knowledge with other
partners. This will help to perform better in our
future project activities empowering the rural poor
fisheries communities.
In PTCRRMP we have conducted radio
programmes, TV programmes, Newsletters, News
-
7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp
43/66
PTCRRMP, MFARD-Sri Lanka Page 36
Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011
paper articles, exhibits, brochures, display boards,
posters, reports and many things to disseminate the
knowledge.
It is also observed that there is a large amount oftacit knowledge is kept with our project
beneficiaries who are positively affected for their
interventions. These experiences are useful for
other project as well as the