  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    1/66

    PTCRRMP, MFARD-Sri Lanka Page i

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    TABLE OF CONTENTS

    1. Introduction ...................................................................................................................... 1

    1.1.Project Goals ..................................................................................................................... 11.2.Objectives .......................................................................................................................... 11.3.Target Groups ................................................................................................................... 11.4.Programme Area .............................................................................................................. 11.5.Programme components and sub-components .............................................................. 31.6.Programme Cost (Funding Details) ................................................................................ 42. Overall Performance ........................................................................................................ 5

    2.1 Overall Assessment of project implementation progress ...................................................... 52.2 Financial Targets and Progress 2011 (Outputs and Outcomes) ........................................... 102.3 Physical Targets Progress (Annual and Overall) ................................................................. 112.3.1 District wise ......................................................................................................................... 14

    3. Project Implementation Performance .......................................................................... 153.1. Component 1 Coastal Rehabilitation and Resource Management ....................................... 153.2. Component 1 Coastal Rehabilitation and Resource Management ....................................... 153.3. Component 2 Support to Artisanal Fishery Development ................................................... 183.3.1. Economic Infrastructure and Assets Recovery .................................................................... 203.4. Component 3 Micro Enterprises and Financial Services Development .............................. 233.4.1. Micro Enterprises Developments ........................................................................................ 303.4.2. Technical training for beneficiaries ..................................................................................... 303.4.3. Baseline Survey for Micro Enterprises Development Programme ...................................... 303.5. Component 4 Social and Economic Infrastructure .............................................................. 303.5.1. Outcomes of the social and economic infrastructure development ..................................... 323.6. Component 5 Gender, Policy Support and Programme Management ................................. 333.6.1. Gender, Policy Support........................................................................................................ 333.6.2. Programme Management ..................................................................................................... 343.6.3. Geographic Information System - Use to the Programme ................................................... 353.6.4. Knowledge Management ..................................................................................................... 35

    4. Financial Progress .......................................................................................................... 374.1. Expenditure .......................................................................................................................... 384.2. Loan Details ......................................................................................................................... 404.3. Loan commitments as at 31/12/2011 ................................................................................... 40

    5. Project impacts and achievements ................................................................................ 416. Sustainability ................................................................................................................... 417. Concluding remarks ....................................................................................................... 42

    8. Our Team ........................................................................................................................ 43

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    2/66

    PTCRRMP, MFARD-Sri Lanka Page ii

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    LIST OF TABLES

    Table 1 Programme cost by loans ........................................................................................................... 4

    Table 2 Satisfaction level of infrastructure development ....................................................................... 7Table 3 Overall satisfaction about Programme activities - % Beneficiary HHs ..................................... 9Table 4 Total Expenditure variation ..................................................................................................... 11Table 5 Progress on aspect of Procurement of year 2011 ..................................................................... 11Table 6 INTEGRATED REPORT ........................................................................................................ 12Table 7 Key activities and progress of community coastal resources management ............................. 15Table 8 Progress as at 31st December 2011 ........................................................................................ 29Table 9 21 Withdrawal Applications (WAs) ........................................................................................ 34Table 10 Component-wise Expenditure ................................................................................................ 38Table 11 Category-wise Expenditure .................................................................................................... 39Table 12 Loan 664 LK .......................................................................................................................... 40Table 13 Loan 693 LK .......................................................................................................................... 40

    Table 14 Loan 664 LK & 693 LKUSD............................................................................................ 40

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    3/66

    PTCRRMP, MFARD-Sri Lanka Page iii

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    LIST OF FIGURES

    Figure 1 Project Districts under PTCRRMP ........................................................................................... 2

    Figure 2 Overall Progress ....................................................................................................................... 6Figure 3 Activities Spatial Distribution .................................................................................................. 8Figure 4 Male headed house holds .......................................................................................................... 9Figure 5 Female headed house holds .................................................................................................... 10Figure 6 Financial Progress of Total Loan to Dec 2011 ....................................................................... 10Figure 7 Financial Progress of PTCRRMP Loan to Dec 2011 ............................................................. 10Figure 8 Financial Progress of CIDA Grant ......................................................................................... 10Figure 9 Financial Progress of PTCRRMP to Dec 2011 ...................................................................... 11Figure 10 Total Expenditure variation .................................................................................................. 11Figure 11 Progress on aspect of Procurement of year 2011 .................................................................. 11Figure 12 Kalutara Activity Progress.................................................................................................... 14Figure 13 Galle Activity Progress ......................................................................................................... 14

    Figure 14 Matara Activity Progress ...................................................................................................... 14Figure 15 Hambantota Activity Progress .............................................................................................. 14Figure 16 Ampara Activity Progress .................................................................................................... 14Figure 17 Batticaloa Activity Progress ................................................................................................. 14Figure 18 Trincomalee Activity Progress ............................................................................................. 14Figure 19 Water Quality monitoring ..................................................................................................... 16Figure 20 Expressing the views of the community ............................................................................... 17Figure 21 District Committee members for Management of Lobster and Live ornamental fish (Matara& Galle) ................................................................................................................................................ 17Figure 22 New Regulations Published .................................................................................................. 17Figure 23 Illegal fishing during reproduction stage of lobster was taken in to custody during raidsdone by DFAR ...................................................................................................................................... 18Figure 24 Nilwella Anchorage at Matara .............................................................................................. 18Figure 25 Nilwella Anchorage and facility buildings at Matara .......................................................... 18Figure 26 Landing site in Beruwala- Maradana, Kalutara .................................................................... 19Figure 27 Fuel Storage Tank at Landing siteKaluwankerny, Batticaloa .......................................... 19Figure 28 A man carrying a boat engine to home after fishing ............................................................ 20Figure 29 A traditional landing site ...................................................................................................... 20Figure 30 Suduwella Anchorage in Matara, under construction ........................................................... 20Figure 31 Proposed Model of Trincomalee Fish Market ...................................................................... 22Figure 32 Trincomalee Fish Market under construction ....................................................................... 22Figure 33 Unloading Fish at a Landing Centre ..................................................................................... 22Figure 34 Retail Fish Purchases by Lower Income Groups .................................................................. 23

    Figure 35 Wholesale Business at the old Market .................................................................................. 23Figure 36 Registered Beneficiaries Percentage (%).............................................................................. 23Figure 37 Registered Beneficiaries Gender Wise ................................................................................. 24Figure 38 Micro Enterprises Beneficiary Clusters ................................................................................ 25Figure 39 Technical training held at National Design Centre Ministry of Traditional Industries andSmall Enterprises Development ............................................................................................................ 26Figure 40 Mrs. Nandani Warusawithana with her Handicrafts products Galagoda, Hikkaduwa ......... 26Figure 41 Composition of the Clusters ................................................................................................. 27Figure 42 Fish based products at Kalmunai Kudi ................................................................................. 27Figure 43 Dry Fish Manufacturing ....................................................................................................... 27Figure 44 Coir Products Manufacturing at Galle .................................................................................. 28Figure 45 During the Entrepreneurship Training Programme .............................................................. 28

    Figure 46 Some Home decorating products .......................................................................................... 28Figure 47 Foot way bridge at Hambantota............................................................................................ 31

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    4/66

    PTCRRMP, MFARD-Sri Lanka Page iv

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 48 Construction of houses , Saithamaruthu, Ampara ................................................................ 31Figure 49 House constructed in Ampara ............................................................................................... 31Figure 50 Womens Community contribution on road construction in Ampara .................................. 31Figure 51 Road Construction, Batticaloa .............................................................................................. 32Figure 52 People using constructed road .............................................................................................. 32Figure 53 Raladinugama/Juisepiyagama beneficiary owns her developed kitchen .............................. 32Figure 54 Fish auction hall, Matara ...................................................................................................... 32Figure 55 Gender, Policy Support and Programme .............................................................................. 33Figure 56 marginalized women from a gender perspective. ................................................................. 33Figure 57 Radio Programme announcement sticker design distributed among districts ...................... 36Figure 58 Global Interface of PTCRRMP ............................................................................................ 37Figure 59 Component-wise Expenditure .............................................................................................. 38Figure 60 Category-wise Expenditure .................................................................................................. 39Figure 61 Our Team .............................................................................................................................. 43

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    5/66

    PTCRRMP, MFARD-Sri Lanka Page v

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    LIST OF ANNEXES

    Annex 1 Micro Enterprises Beneficiary Clusters - Kalutara District.................................................... 45Annex 2 Micro Enterprises Beneficiary Clusters - Galle District ......................................................... 46Annex 3 Micro Enterprises Beneficiary Clusters - Matara District ...................................................... 47Annex 4 Micro Enterprises Beneficiary Clusters -Hambantota District ............................................... 48Annex 5 Micro Enterprises Beneficiary Clusters - Ampara District .................................................... 49Annex 6 Micro Enterprises Beneficiary Clusters - Batticaloa District ................................................. 50Annex 7 Micro Enterprises Beneficiary Clusters - Trincomalee District ............................................. 51Annex 8 New Regulations Published 31st January 2012 ...................................................................... 52Annex 9 New Regulations Published 13th February 2012 .................................................................... 53Annex 10 Activity Locations - Kalutara District .................................................................................. 54Annex 11 Activity Locations -Galle District ........................................................................................ 55Annex 12 Activity Locations - Matara District..................................................................................... 56

    Annex 13 Activity Locations - Hambantota District ............................................................................ 57Annex 14 Activity Locations - Batticaloa District ................................................................................ 58Annex 15 Activity Locations - Trincomalee District ............................................................................ 59

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    6/66

    PTCRRMP, MFARD-Sri Lanka Page vi

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Abbreviations and Acronyms

    AD Assistant Director

    ADB Asian Development Bank

    AWPB Annual Work Plan & Budget

    CCD

    CEA

    Coast Conservation Department

    Central Environment Authority

    CFHC Ceylon Fishery Harbours Corporation

    CIDA Canadian International Development Agency

    DFAR Department of Fisheries and Aquatic Resources

    DPMU District Programme Management Unit

    ERD External Resources Department

    FADs Fish Aggregation Devices

    FAO Food and Agriculture OrganizationFI Fisheries Inspector

    FSC Fisheries Co-operative Societies

    GOSL Government of Sri Lanka

    GPS Geographical Positioning System

    IFAD International Fund for Agricultural Development

    LKR Sri Lanka Rupees

    M&E Monitoring and Evaluation

    MDB Multi-Day Boats

    MFARD Ministry of Fisheries and Aquatic Resources DevelopmentMOU Memorandum of Understanding

    NAQDA National Aquaculture Development Authority

    NARA National Aquatic Resources Research and Development Agency

    NHDA National Housing Development Authority

    NIFNE National Institute of Fisheries and Nautical Engineering

    NPCU National Project Coordinating Unit

    NPD Department of National Planning

    PIAs Project Implementing Agencies

    PIU Programme Implementing Unit

    PTCRRMP Post Tsunami Coastal Rehabilitation and Resources Management Programme

    PTLiSPP Post Tsunami Livelihood Support and Partnership Programme

    RIMS

    RFP

    Results Based Impact Monitoring System

    Request of Proposals

    TEC

    TORs

    Technical Evaluation Committee

    Terms of Reference

    UDA Urban Development Authority

    UNICEF United Nations International Children s Fund

    UNOPS United Nations Operational and Procurement Services

    UN Habitat United Nations Habitat

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    7/66

    PTCRRMP, MFARD-Sri Lanka Page vii

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    NPC Message

    Annual Progress Report sums up achievements and performance of

    PTCRRMP in 2011, with overall physical and financial progress from

    2007 to date. Activities estimated to cost Rs. 1563 mn were earmarked in

    Annual budget of the programme for 2011 in the areas of coastal resources

    management, artisanal fisheries, sustainable micro-enterprise and financial

    services development, social and economic infrastructure development,

    Gender focus, policy support and programme management.

    To keep the programme in line with the targets set, we strategically

    managed situations by using our teams strength to deal with the

    challenges and capture more opportunities in order to deliver programme

    outputs while ensuring the quality of work and financial discipline where

    value for money is guaranteed. At the same time, we adopted several

    measures to ensure sustainability of the projects delivered by thePTCRRMP.

    During the year under consideration, the PTCRRMP was able to implement activities costing Rs. 863Mn. in

    total even though a slow progress was recorded during early months of year due to various issues and

    difficulties.

    PTCRRMP which commenced in 2007 is now reaching its tail end. As such, our main focus on implementation

    was to work on livelihood development sector among tsunami affected communities; after having provided

    them with social and economic infrastructure developments. Over 2000 beneficiaries have been selected and

    around 900 loans disbursed, together with grants and necessary technical training as well.

    Under civil works component, most noteworthy activity was the provision of shelter for internally displaced

    people by tsunami particularly at Sainthamaruthu in Ampara. As per MTR recommendation, we initiated

    construction of 100 more houses in 2011 and work is nearing completion.

    We believe that the experience gained throughout this programme is valuable and will help in future projects as

    well. Therefore a well thought out Knowledge Management Plan was developed and approved by IFAD to

    implement KM activities in order to share our experience in PTCRRMP with interested parties.

    Eventually, within the past year PTCRRMP has been sensitive to the heart beat of the nation tormented by the

    natural disaster, and identified their grievances and addressed them with proper need assessments to avoiddiscriminate funds utilization and to deliver the deserving people at the right time.

    I would like to express my gratitude to all stakeholders who supported us in various ways to steer the project in

    the right direction.

    D. Prathapasinghe

    National Programme Coordinator

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    8/66

    PTCRRMP, MFARD-Sri Lanka Page 1

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    1. Introduction

    The Post Tsunami Coastal Rehabilitation and

    Resources Management Programme (PTCRRMP)

    and The Post Tsunami Livelihood Support and

    Partnership Programme (PTLivSPP) implemented

    as a single integrated programme which is

    governed by a single Appraisal Document

    commenced implementation of its project

    activities in 2007. Since then the programme has

    achieved a remarkable progress, even though its

    experienced shallow progress at some stages inexecution process of the programmes. This report

    presents the both financial and physical progress

    achieved by two programmes during the year 2011

    and cumulative progress since 2007 (Table 1).

    1.1. Project Goals

    The Goal of the programmes is the sustainable

    recovery of the assets of rural households directly

    or indirectly affected by the tsunami and to help

    them re-establish the foundation of their usual

    economic activities while diversifying into other

    and new, profitable income-generating activities.

    1.2. Objectives

    The objectives of the programmes are as follows

    (a) Tsunami-affected families are provided

    with essential social and economic

    infrastructure, particularly housing

    (b) Tsunami-affected communities are

    strengthened and are sustainably

    managing coastal resources

    (c) Womens participation in social and

    economic activities is increased.

    (d) Income levels per household member

    have been rising above poverty levels.

    1.3. Target Groups

    The programme target is poor rural communities

    in the Programme Area who experienced loss of

    lives of relatives and/ or loss of physical and

    financial assets, and who are thereby particularly

    challenged in restarting livelihood activities

    1.4. Programme Area

    The programme is being implemented in seven

    districts of the island covering 566 GN Divisions in

    36 Divisional Secretary Divisions (Figure 1). The

    Programme will benefit an estimated

    50 000 persons from as many households or about

    42% of the population of the programme area.

    With an average household size of 4.8 persons, the

    total number of beneficiaries would be 239 300

    persons. Some 2 000 households may be involved

    in coastal resource management, 25 780 in the

    support to artisanal fisheries, 16 450 in micro-enterprise and financial services, and 5 630

    households in social and economic infrastructure.

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    9/66

    PTCRRMP, MFARD-Sri Lanka Page 2

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 1 Project Districts under PTCRRMP

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    10/66

    PTCRRMP, MFARD-Sri Lanka Page 3

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    1.5. Programme components and sub-components

    In order to achieve the Programme goal and

    objectives, it utilizes many diversified but

    interrelated programme components. They are

    broadly categorized into following five main

    components, which are further divided into sub-

    components.

    A. Community based coastal resources

    management

    a. Fisheries management

    b. Coastal environmental and

    resource/habitats management

    B. Support to artisanal fishery development

    a. Economic infrastructure and

    assets recovery

    b. Fishery production development

    c. Postharvest and marketing

    development

    C. Micro- enterprises and financial services

    development

    a. Micro-enterprise development

    b. Financial services development

    c. Promotion of women's savings

    and credit groups

    D. Social and economic infrastructure

    development

    a. Houses and housing amenities

    b. Settlement infra-structure

    c. Other infrastructure

    E. Gender policy support and programme

    management

    a. Gender

    b. Policy support

    c. Programme management

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    11/66

    PTCRRMP, MFARD-Sri Lanka Page 4

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    1.6.Programme Cost (Funding Details)

    Table 1 Programme cost by loans

    Total Programme Cost by Loans - PTCRRMP & PTL ivSPP

    Programme PTCRRMP PTLivSPP Total

    Loan Number 664-LK 693-LK CIDA Grant 665-LK 694-LK

    Loan signing date 01.12.2005 18.04.2008 01.12.2005 18.04.2008

    Allocation in US$ Mn 14.2 15.713 .975 2.4 2.45 34.763

    Allocation in SDR Mn 9.4 10.95 .69 1.56 1.65 23.56

    Allocation in Rs. Mn.(1US$= Rs.110)

    1562.0 1728.4 107.25 259.16 260.37 3809.9

    Effective Date 16-10-2006 18-09-2008 9/3/2006 18-09-2008

    Completion Date 31-12-2011 31-03-2013 31.12.2009 31-03-09 30/09/2011

    Loan closing date 30.06.2012 18.09.2013 30.09.2009 31.03.2012

    Balance time left as fromDecember 2011. Extended tocoincide with 693lk 1 years and 9months Completed Completed Completed

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    12/66

    PTCRRMP, MFARD-Sri Lanka Page 5

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    2. Overall Performance

    Major outcomes anticipated in the PTCRRMP

    are:

    1. Coastal resources are managed by thecommunity in a sustainable manner

    2. Fisheries infrastructure rehabilitated and

    reconstructed

    3. Fisheries related infrastructure

    reconstructed

    4. Enhanced income and thriftiness

    5. Enhanced living conditions of the

    community

    6. Enhanced women participation and

    maintained gender balance

    The Programme is implemented through various

    agencies including government, INGOs and NGOs.

    The implementing partners of the Programme

    include:

    UN Habitat

    Coastal Conservation Department (CCD)

    Ceylon Fishery Harbour Corporation

    (CFHC)

    Department of Fisheries and Aquatic

    Resources (DFAR)

    Divisional Secretariat (DS)

    National Aquatic Resources Research and

    Development Authority (NARA)

    National Aquaculture Development

    Authority (NAqDA)

    National Housing Development Authority

    (NHDA)

    National Institute of Fisheries and Nautical

    Engineering (NIFNE)

    Urban Development Authority (UDA)

    United Nations Office for Project Services

    (UNOPS)

    2.1 Overall Assessment of project

    implementation progress

    Programme has achieved most of the targets by end

    of 2011. The overall physical progress is around

    80% while overall financial progress is about 65%

    (Table 2). The Programme has achieved almost all

    targets in implementing major activities.

    Component 1;

    The NARA has completed stock assessment surveys

    for 6 species in South and surveys in the East are in

    progress. Fishery Management plans is being

    implemented in Southern districts successfully.

    Community is aware and several raids on illegal

    fishing have been conducted. Management

    committees are established. New regulations are

    enforced and gazette is published. Monitoring log

    books are to be prepared.

    The water quality monitoring and awareness

    programmes of CCD are also almost completed.

    The scope of construction works of Mangroves

    rehabilitation centre is nearing completion.

    Component 2:

    Roads rehabilitation work targets come under this

    component have been achieved. Construction work

    of FI Offices and AD Offices of DFAR are almost

    completed except Galle AD Office which is planned

    to be completed during year 2012. Two multi day

    boats have been launched while other two are under

    construction.

    Cluster shrimp farms project in Batticaloa

    implemented by NAQDA is in progress. The state

    of the art fish market in Trincomalee is nearing

    completion. Construction of Nautical Engineering

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    13/66

    PTCRRMP, MFARD-Sri Lanka Page 6

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Training centre for NIFNE in Batticaloa has been

    commenced.

    The largest activity of the project, construction of

    15 landing sites and three anchorages is nearing

    completion. 12 landing sites are already completed

    and handed over to the community. 60 % of

    construction works of anchorages have been

    completed. The total investment for this activity

    implemented by UNOPS is US$ 10.0 Mn.

    Component 3:

    The micro enterprise development activities are

    being implemented forming enterprise clusters and

    granting loans and start -up grants. 800 loans were

    issued by end of 2011. Lending programme with

    the Womens Bank has commenced. A base line

    survey is being conducted for the beneficiaries of

    MEDP

    Component 4:

    The progress of this component is tremendously

    high. Large quantities of social infrastructure have

    been built under this component including houses

    and settlement infrastructure.

    Component 5:

    This component is for programme management,

    policy support and gender. GIS spatial based

    database is being prepared. The global interface of

    web site is to be launched by March 2012 to

    connect with all stakeholders international and

    national context.

    0

    10

    20

    30

    40

    50

    Total allocation Total expenditure

    42

    27.33 65%

    US$ Mn

    Figure 2 Overall Progress

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    14/66

    PTCRRMP, MFARD-Sri Lanka Page 7

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Table 2 Satisfaction level of infrastructure development

    Infrastructure Satisfaction level% of Beneficiary HHs (No.)

    Male-headed HHs Female-headed HHs Overall HHs

    Drinking water Very satisfied 63.6 (14) 33.3 (1) 60 (15)

    Moderately satisfied 31.8 (7) 33.3 (1) 32 (8)

    Not satisfied at all 4.5 (1) 33.3 (1) 8 (2)

    Community

    buildings

    Very satisfied 71.7 (33) 80 (4) 72.5 (37)

    Moderately satisfied 26.1 (12) 20 (1) 25.5 (13)

    Not satisfied at all 2.2 (1) 0 2 (1)

    CBOs formation Very satisfied 66.7 (20) 100 (3) 69.7 (23)

    Moderately satisfied 30 (9) 0 27.3 (9)Not satisfied at all 3.3 (1) 0 3 (1)

    Roads Very satisfied 66.7 (204) 64.9 (24) 66.5 (228)

    Moderately satisfied 28.4 (87) 24.3 (9) 28 (96)

    Not satisfied at all 4.9 (15) 10.8 (4) 5.5 (19)

    Training on

    sanitation habits

    Very satisfied 90.9 (20) 75 (3) 88.5 (23)

    Moderately satisfied 9.1 (2) 25 (1) 11.5 (3)

    Electricity Very satisfied 85.5 (59) 61.5 (8) 81.7 (67)

    Moderately satisfied 10.1 (7) 30.8 (4) 13.4 (11)Not satisfied at all 4.3 (3) 7.7 (1) 4.9 (4)

    Retaining walls Very satisfied 100 (1) 0 100 (1)

    Fisheries sales

    outlets

    Very satisfied 78.6 (33) 80 (4) 78.7 (37)

    Moderately satisfied 14.3 (6) 20 (1) 14.9 (7)

    Not satisfied at all 7.1 (3) 0 6.4 (3)

    Children's park Very satisfied 83.3 (15) 42.9 (3) 72 (18)

    Moderately satisfied 5.6 (1) 42.9 (3) 16 (4)

    Not satisfied at all 11.1 (2) 14.3 (1) 12 (3)Beacon lamps Very satisfied 29.4 (10) 50 (1) 30.6 (11)

    Moderately satisfied 58.8 (20) 50 (1) 58.3 (21)

    Not satisfied at all 11.8 (4) 0 11.1 (4)

    Drainage systems Very satisfied 58.8 (40) 42.8 (3) 57.3 (43)

    Moderately satisfied 33.8 (23) 14.3 (1) 32 (24)

    Not satisfied at all 7.4 (5) 42.8 (3) 10.7(8)

    (Source: mid term outcome survey report)

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    15/66

    PTCRRMP, MFARD-Sri Lanka Page 8

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 3 Activities Spatial Distribution

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    16/66

    PTCRRMP, MFARD-Sri Lanka Page 9

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    The overall satisfaction of the beneficiary HHs in

    different districts and different activities is presented in

    following tables and Map (Table 2, Table 3 & Figure

    3). In general, most of the HHs seem to be satisfiedwith the activities so far implemented by the

    Programme (Table 3 & Table 4).

    Table 3 Overall satisfaction about Programme activities - % Beneficiary HHs

    DistrictsMale-headed HHs Female-headed HHs

    Satisfied Can't say Unsatisfied Satisfied Can't say Unsatisfied

    Ampara 87.0 9.6 3.4 93.9 6.1 0.0

    Batticaloa 81.2 12.6 6.3 78.1 9.4 12.5

    Trincomalee 94.3 3.8 1.9 100.0 0.0 0.0

    Galle 89.6 6.5 3.9 92.3 0.0 7.7

    Hambantota 94.5 5.5 0.0 100.0 0.0 0.0

    Matara 92.7 5.5 1.8 100.0 0.0 0.0

    Kalutara 94.6 1.8 3.6 100.0 0.0 0.0

    (source: mid term outcome survey report)

    Figure 4 Male headed house holds

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    17/66

    PTCRRMP, MFARD-Sri Lanka Page 10

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 5 Female headed house holds

    2.2 Financial Targets and Progress 2011

    (Outputs and Outcomes)

    In the year 2011 programme planned to spend Rs.

    1563.9 Mn. Of which 863.8..has been spent by

    December 2011 (Table 8). Some of the activitieswere continued to year 2012 amount to 611.0

    Following graphs illustrate the financial

    performance of the programme of year 2011 in

    total loan, progress of PTCRRMP loan and CIDA

    grant (Table 5, Table 6 & Table 7).

    Figure 6 Financial Progress of Total Loan to

    Dec 2011

    Figure 7 Financial Progress of PTCRRMP Loan

    to Dec 2011

    Figure 8 Financial Progress of CIDA Grant

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    18/66

    PTCRRMP, MFARD-Sri Lanka Page 11

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 9 Financial Progress of PTCRRMP to

    Dec 2011

    Table 4 Total Expenditure variation

    Figure 10 Total Expenditure variation

    Due to cash flow issues and other administrative

    issues the programme experienced a slow financial

    progress from January to May 2011; we used

    several strategies to turn the progress in to upward

    trend. As a result, we were able to spend about Rs.

    746 Mn within seven months.

    The above table (Table 4) and graph (Figure 10)depicts this scenario.

    Procurement2011

    Procurement activities implemented by the

    programme in year 2011 could be categorized into

    03 groups such as;

    Civil works

    Goods and Services

    Consultancy Services

    Programme had allocated Rs. 925 Mn. as

    procurement budget of AWPB 2011.

    The progress of procurement in category wise

    could be shows as follows (Table 5 & Table 10).

    Table 5 Progress on aspect of Procurement of

    year 2011

    CategoryExpenditure in Rs. Mn.

    Planned Actual

    Civil Works 811 577

    Goods & Services 22 22

    ConsultancyServices

    92 46

    Total 925 645

    Figure 11 Progress on aspect of Procurement of

    year 2011

    2.3 Physical Targets Progress (Annual and

    Overall)

    The physical and financial progress of the

    Programme for 2011 and cumulative figures upto

    2011 given in the following table (Table 6).

    Exp

    Description

    Jan- May

    2011

    Jun-Dec

    2011 Total

    Total

    Expenditure117.547 746.23 863.8

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    19/66

    PTCRRMP, MFARD-Sri Lanka Page 12

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Table 6 INTEGRATED REPORT

    S.No

    Activity

    Unit

    (Specifiy

    the

    mesurab

    leunit)

    2011 Total

    Physical

    Target

    Physical

    Progress

    Financia

    l

    Target

    Expenditure

    Rs.

    Physical

    Target

    Physical

    Progress

    Financia

    l

    Target

    Expenditure

    Rs.

    1 Construction of Tubewells

    # 0 0 0 0 63 63 4.4 4.5

    2 Construction of Dugwells

    # 0 81 0 3.25 331 338 15.1 15.05

    3 Common Large Wells # 2 2 1 0.02 42 42 16.71 6.10

    4 Provision of Septric Tanksfor toilets

    # 0 45 6.02 0.99 599 421 17.93 9.45

    5 Construction of IndividualToilets

    # 15 115 0.52 4.03 1564 1489

    52.42 47.78

    6 Common Toilets # 1 0 3.1 0 15 14 8.94 4.211

    7 Construction/Renovationof Kitchens

    # 155 148 13.12 12.6 685 635 29.98 27.33

    8 Energy saving stoves #. 0 0 0 0 600 600 0.26 0.26

    9 Fishing Related Roads - km 2.686 1.89 12.07 10.33 60.70 45.24

    160.3 101.4

    10 Rural Roads km 3.859 3.62 21.55 14.19 44.18 42.27

    105.1 90.35

    11 Internal roads construction/ improvement

    km 0.536 0.4 9.75 6.99 17.60 19.68

    90.12 78.98

    13 Pipe bone Water Supply

    schemes (m)

    mete

    rs

    35 34 2.75 1.90 1104 110

    3

    12.49 10.59

    14 Dug well water schemes # 1 1 0.5 0.38 3 3 2.8 1.88

    15 Rain water harvestingtanks

    # 0 0 0 0 10 10 0.4 0.4

    16 Provision of Water tanks-plasti cells

    # 0 0 0 0 697 697 2.85 2.89

    17 Water connection toFCS

    # 1 1 0.03 0.03 2 2 0.06 0.06

    19 Community Buildings # 6 5 15.9 9.14 36 28 97.13 60.81

    20 Pre-Schools # 1 1 1 0.91 4 2 10.9 8.58

    21 Children's Park (Play

    equipment)

    # 2 2 2.22 1.82 4 4 4.49 2.49

    23 Provision of CompostBins

    # 0 0 0 0 431 431 2.21 2.21

    24 Home Gardening # 0 0 0 0 157 153 2.77 1.63

    26 Self employment/ME /Vocations related training

    # 3 3 0.10 0.10 117 116 5.63 4.88

    27 Fishery related training # 0 0 0 0 260 256 8.62 5.88

    28 Capacity building training # 0 0 0 0 19 12 9.16 2.09

    29 Promotion of hygienicpracticesTraining

    persons

    0 0 0 0 40 40 0.12 0.12

    30 Supply of beacon lamp # 0 0 0 0 25 20 5.18 4.60

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    20/66

    PTCRRMP, MFARD-Sri Lanka Page 13

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    31 Renovation of Houses( Number of houses)

    # 0 0 0 0 32 30 1.63 9.03

    32 Housing topping up( Number of houses)

    # 25 25 2.52 2.27 532 442 56.12 53.89

    33 Renovation of roofs (#) # 0 0 0 0 22 21 3.5 2.7

    34 Construction ofmarkets/pola /Fish out lets

    # 10 6 22.7 8.72 39 30 41.65 27.93

    37 Provision ofequipment/material toFishery Co-ops/banks

    # 0 0 0 0 163 162 7.73 3.59

    38 Equipments/materialprovided to otherCommunity orgs.)

    # 0 0 0 0 17 17 1.98 1.93

    39 Debris cleaning (Extent Inperch)

    # 1 1 0.19 0.19 7502 6502

    0.86 1.14

    40 CBOs formation # 0 0 0 0 40 40 2.5 0.51

    41 Sail cloth(nos) # 0 0 0 0 12 12 0.4 0.2

    42 Silage plant(nos) # 1 1 1.6 1.6 2 2 9.5 5.62

    43 Providing footcarts/mobile carts(nos)

    # 0 0 0 0 20 10 2 0.95

    45 Bio gas plants(nos) # 0 0 0 0 25 25 1.43 0.82

    47 Construction of smallbridges

    # 2 2 5.74 2.45 6 6 13.4 9.3

    48 Construction of Culverts # 12 8 2.3 1.73 18 14 5.08 2.63

    49 Construction of newhouses (DS/NHDA)

    # 88 82 48.37 23.61 789 784 408.7 381.2

    50 Construction of FIOffice

    # 0 0 0 0 5 6 10.25 9.94

    53 Providing Mobile Tent # 0 0 0 0 10 10 0.5 0.5

    54 Reconstruction of IndivaraBanks/ Samurdhi BankBuildings

    # 0 0 0 0 3 3 6.3 5.57

    57 Provision of Spot Light toFCS

    # 0 0 0 0 2 1 0.15 0.15

    59 AD Office -DFAR # 0 0 0 0 2 3 12.91 10.19

    60 Fish Auction hall # 1 1 2 1.35 4 4 8.35 7.32

    61 Street Lamps # 0 0 0 0 525 525 2.06 2.05

    63 Fish dryers # 0 0 0 0 20 26 3.6 3.54

    64 Providing doors/win doors # 0 0 0 0 44 44 0.65 0.7866 Renovation of Fisheries

    Inspector's Office# 0 0 0 0 1 1 0.34 0.46

    68 Power supply for coldstorage

    # 0 0 0 0 1 1 1.2 1.2

    69 Supply of Electricity sch 4 4 0.11 0.06 5 5 0.16 0.06

    70 Supply of water facilities sch 5 4 0.26 0.10 6 4 1.26 0.10

    73 Fish Store Room # 1 0 0.25 0.14 2 1 1.05 0.94

    74 Construction of BeachPark

    # 0 0 1.83 0.40 1 1 3.03 1.57

    75 Beach Park/ Play Ground # 1 1 0.5 0.46 1 1 0.5 0.46

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    21/66

    PTCRRMP, MFARD-Sri Lanka Page 14

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    2.3.1 District wise

    With compared to the previous years, the quantity

    of civil works completed during 2011 seems to be

    below the expected level. This is due to limited

    funds availability of the project for civil works. The

    civil works funds are already over spent with

    compared to the original allocations Activity wise

    progress is analysed as follows (Figure 12-18).

    Figure 12 Kalutara Activity Progress

    Figure 13 Galle Activity Progress

    Figure 14 Matara Activity Progress

    Figure 15 Hambantota Activity Progress

    Figure 16 Ampara Activity Progress

    Figure 17 Batticaloa Activity Progress

    Figure 18 Trincomalee Activity Progress

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    22/66

    PTCRRMP, MFARD-Sri Lanka Page 15

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    3. Project Implementation Performance

    3.1.Component 1 Coastal Rehabilitationand Resource Management

    Activities pertaining to this component wereachieved through NARA, DFAR and CCD (Table7).

    3.2.Component 1 Coastal Rehabilitation and Resource Management

    Table 7 Key activities and progress of community coastal resources management

    Component/Output/Activity

    Implementation targets/Physical progress

    Appraisal Targets Achieved (Cumulative)

    Conduct of awareness

    programmes on habitat

    conservation in 7 districts

    (videos, posters, awareness

    boards, booklets, pamphlets)

    (CCD)

    10 one day training

    programmes, 5 six

    day workshops

    Printing and distribution of of 70,000 posters

    and 218 display boards, production of one

    documentary film, arrangement of exposure

    visits and establishment of 8 exhibits and

    hosting of 9 awareness workshops have been

    completed

    Monitoring of coastal water

    quality in the programme area

    (CCD)

    13 sites Water quality tests have been conducted in 13

    sites and a draft report available on Coastal

    water quality management programme

    Mangrove restoration (CCD) 200,000 plants

    planted, 132 acres

    rehabilitated

    Mangrove Information Centre - Bentota

    development are in progress. Works to be

    completed by end of 2012

    Fish stock assessment

    (NARA)

    Stock Assessments on 6 species have been

    completed and reports on these assessments are

    available.

    Joint Project of IFAD and CIDA funded

    Programme has completed the Sri LankaFisheries AtlasVolume 1 and it is made

    available for interested parties.

    Preparation of fishery

    management plan (FMP) -

    (NARA & DFAR)

    FMPs prepared for Southern districts and being

    implemented. Awareness programmes were

    conducted, Fisheries Co-Management

    committees have been set-up and regulations

    were gazetted.

    FMP in Eastern region.

    Note : Implementing agencies: CCD, NARA and DFAR

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    23/66

    PTCRRMP, MFARD-Sri Lanka Page 16

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    a) I nformation dissemination and awarenesscreation

    This activity is almost completed. The results of the

    MTO survey indicated awareness of information

    disseminated by the Programme has reached the

    sample beneficiary households

    b) Mangroves, salt marshes and coral r eefrehabilitation

    Mangroves play a vital role in protecting coastal land

    from erosion, contributing to the ecological balance

    of the coastal zone as well as providing various

    resources to the coastal inhabitants

    The target was to replant 200,000 mangrove plants

    and rehabilitate 55 ha (132 acres) of mangroves

    affected by tsunami. Rather than going forward with

    replanting, the Programme supported establishment

    of two education centres by the CCD namely: 1.

    Coastal Habitat Demonstration Site in Kalamatiya

    and 2. Mangrove Information Centre in Bentota.

    While the former is deleted from scope, construction

    of the latter is considerably completed.

    c) Coastal water qual ity moni toring

    Monitoring of water quality is considered vital to

    formulate policy and prevent coastal water pollution

    caused mainly by bad human practices (Figure 19).

    Figure 19 Water Quality monitoring

    The Research and Design Division of the CCD has

    completed this study and the draft report on Coastal

    Water Quality Management Programme has been

    submitted to the relevant authorities for their perusal.

    CCD wants to continue the activity.

    d) Stock assessmentThe Programme funded NARA to carry out stock

    assessment surveys and prepared FMPs for South.

    Studies conducted and the FMPs prepared for lobster,

    sea cucumber, prawns, and chank. Studies in the

    East in progress.

    e) Commun ity based fi shery management plansThe Programme supported NARA and DFAR in the

    formulation and implementation of community based

    fisheries management plans for several specialized

    fisheries such as lobster, chank and Bech dMer, sea

    cucumber, shrimps in order to ensure their

    sustainability. DFAR has conducted awareness

    programmes based on these findings (Figure 20).

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    24/66

    PTCRRMP, MFARD-Sri Lanka Page 17

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 20 Expressing the views of the community

    The preparation of these community based

    management plans is completed. Plans implemented

    in South have shown a positive impact. Several

    management committees established (Figure 21).

    Figure 21 District Committee members for

    Management of Lobster and Live ornamental fish

    (Matara & Galle)

    Gazettes with regard to new regulations published

    (Figure 22 and Annex 11 - 12).

    Figure 22 New Regulations Published

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    25/66

    PTCRRMP, MFARD-Sri Lanka Page 18

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Several raids on illegal fishing conducted on

    information received. Several raids were held and

    accused were taken in to custody, (Figure 23) taken

    legal action against them to prevent restricted fishing

    species in certain seasons and to relevant degree.

    Monitoring log books are being printed.

    Figure 23 Illegal fishing during reproduction stage

    of lobster was taken in to custody during raids

    done by DFAR

    3.3. Component 2 Support to Artisanal FisheryDevelopment

    The largest component of the Programme is the

    Artisanal fishery Development Component. The total

    allocation for this component for 2011 was Rs. Mn.

    954.7. Out of this Rs. Mn 529.32 spent as at end

    December 2011. All major infra-structure

    development activities come under this component.

    Rehabilitation of production related roads,

    construction of Trincomalee fish market, construction

    of landing sites and anchorages, cluster shrimp farms

    in Batticaloa, AD Office and FI Offices, multi-day

    boats are some of the major works being

    implemented under the component. Construction of

    15 landing sites and 3 anchorages is the main activity

    of the Project. Twelve landing sites are already

    completed while construction of two large

    anchorages Nilwella (Figure 25) and Suduwella

    (Figure 30).

    Figure 24 Nilwella Anchorage at Matara

    Figure 25 Nilwella Anchorage and facility

    buildings at Matara

    Two anchorages are located in Southern Matara

    district of which investing more than 300 SL.Rs. Mn.

    for each is also nearing completion and hope to open

    by June 2012. The total investment for the completed

    twelve landing sites is around SL.Rs. Mn 300 .

    Landing sites have been constructed in all seven

    project districts. Each landing site facilitate nearly

    about 70 one day boats fitted with outboard engines.

    The anchorages have facilities for anchoring

    multiday boats usually length is more than 15 meters.

    It is estimated that around 90 multiday boats are

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    26/66

    PTCRRMP, MFARD-Sri Lanka Page 19

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    seeking anchoring facilities at each Nilwella and

    Suduwella anchorages currently being constructed

    (Figure 30). The total number of families being

    directly benefited under this activity is more than

    3000 families in minimum. Usually one day boats

    provide employment for two persons and a multiday

    boat for 5 persons.

    Figure 26 Landing site in Beruwala- Maradana,

    Kalutara

    Landing sites are equipped with facilities such as, net

    mending halls, engine storage rooms, toilets, meeting

    rooms, resting rooms, auction halls and fuel storage

    facilities. The anchorages have further marine

    structures such as break waters, groynes and quay

    walls. We have observed that fishermen in areas of

    our landing sites are getting used to this culture and

    now they use facilities provided mainly engine

    storage rooms (Figure 25).

    UNOPS together with the Ministry and PTCRRMP

    conducted participatory community meetings at each

    site during the planning process.

    Construction projects were also monitored by the

    CFHC, MFARD, UNOPS and programme officers.

    Once the constructions are completed, projects were

    handed over to DFAR. DFAR prepares sustainable

    implementation plans with the fisheries community

    organizations and handover the management of

    landing sites to community organizations often

    fisheries cooperatives.

    Figure 27 Fuel Storage Tank at Landing site

    Kaluwankerny, Batticaloa

    One of the serious challenges met by the Ministry,

    DFAR and the Programme is the fuel supply for the

    landing sites where constructed fuel storage tanks as

    the working capital required for this activity is very

    high (Figure 27). The DFAR has helped fisheries

    cooperatives to purchase fuels with local authorities

    and now this barrier is getting ease.

    According to surveys and studies it is revealed that

    fishermen are very keen about this facility and they

    are very satisfied about the facilities provided which

    has created a new culture for them strengthening their

    social commitments (Figure 28).

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    27/66

    PTCRRMP, MFARD-Sri Lanka Page 20

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 28 A man carrying a boat engine to home

    after fishing

    Figure 29 A traditional landing site

    DFAR has completed construction of 4 multiday

    boats of which 2 boats are launched. Other 2 boats

    are also almost completed and will be launched soon.

    However DFAR has not done any feasibility studies

    on the boats launched and therefore there is no

    chance of manufacturing more boats.

    Figure 30 Suduwella Anchorage in Matara, under

    construction

    3.3.1.Economic Infrastructure and AssetsRecovery

    (a) I ntellectual and Traini ng Base of the FisheryI ndustry in Sri L anka - NI FNE

    College of Fisheries and Nautical Engineering

    (COFNE) destroyed by devastating Tsunami was one

    of the cornerstones of the fisheries sector

    development in the area. It has been decided that the

    new COFNE will be constructed at the same site

    (Nawaladi) with adequate facilities including

    hostels, lecture rooms, library, fully equipped

    workshops, residence/quarters and modern

    infrastructure such as swimming pool, jetty etc,.

    IFAD will fund the project cost estimated to be Rs.

    40 m for the construction of a two storey building.

    In the aftermath of the Tsunami, non-existence of

    NIFNE was critically felt with the loss of experience

    and skill with the demise of skilled fishers. Therefore

    reconstruction of COFNE could fill this vacuum to a

    certain extent and facilitate the achievement of the

    objectives of Ten Year Development Plan and

    Negenahira Navodaya Development Plan.

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    28/66

    PTCRRMP, MFARD-Sri Lanka Page 21

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    The most suitable location for this construction with

    enough space, calm and quiet environment for

    academic background is Nawaladi where the old

    COFNE stood. Its close proximity to the sea and

    lagoon provides easy access to practical training. The

    location being isolated from the town and situated in

    a vast expanse of land with wonderful scenic beauty

    provides opportunities for future expansion required

    for a reputed academic institution.

    The present design has been proposed with a view to

    developing to the level and status of a university

    especially reserved for fisheries studies. It has been

    so designed that it can withstand disasters like

    Tsunami that has to be anticipated in the future. The

    output from this institute will undoubtedly lead to

    greater efficiency and performance in fishery

    industry with minimal post harvest losses and

    sustainable utilization of resources.

    National Institute of Fisheries and Nautical

    Engineering (NIFNE) is an institution which

    conducts courses designed for imparting knowledge

    on fishery industry related technology. Its courses

    range from Net Mending to repairing of boat engines

    and the body of the vessels. This immensely

    contributes to the qualitative and quantitative

    increase of the fish catch while maintaining

    ecological balance in marine waters. This also helps

    exploit the pool of talents of the fisher community

    towards the preservation of marine resources and

    reaping fish harvest methodically and scientifically

    such that there will be continuity in fish stocks in the

    waters.

    (b)National Institute of Fisheries and NauticalEngineering (NIFNE)

    The National Institute of Fisheries and Nautical

    Engineering (NIFNE) has had the legal acceptance

    through the Act No 36 of 1999 enacted by the

    Parliament. It is the only institute under the MFAR

    which is responsible for formulating and conducting

    the training and educational programmes to develop

    the human resource base and fisher skills. Eight

    regional colleges located around the coast (i.e.,

    Mattakkuliya, Kalutara, Galle, Tangalle, Batticaloa,

    Trincomalee, Jaffna and Negombo) are coherently

    linked with the head office of NIFNE located in

    Colombo to improve the skills and knowledge of the

    fisher community through conducting three types of

    vocational training courses such as diploma,

    certificate and mobile training. In addition, two

    degree programmes on Fisheries and Marine Science

    and Marine Engineering are conducted under the

    concept of Sagara Vishwavidyalaya for capacity

    building in order to develop an effective and

    sustainable utilization of marine resources.

    (c) Sagara Vi shwavidyalayaSagara Vishwavidyalaya, or the Ocean University

    was established in 1999 under NIFNE, recognizing

    the importance of human resource development in the

    fisheries sector and marine science to national

    economy. Two degree programmes namely B.Sc

    Degree in Fisheries and Marine Science (General and

    Special), B.Sc in Marine Engineering (Special) are

    being conducted at present at the Sagara Vishwa

    Vidyalaya.

    The main objectives of the reconstruction of COFNE

    complex are;To provide sufficient space and facilities

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    29/66

    PTCRRMP, MFARD-Sri Lanka Page 22

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    for training and education in fisheries industry and

    marine science and nautical engineering for

    sustainable utilization of fisheries and marine aquatic

    resources To introduce the logistics for training

    fishers which increase the number of skilled persons

    engaged in fisheries industry;

    To introduce the use of modern equipments and new

    technology for fishing and related industries in order

    to increase the fin fish and shell fish production

    Utilize the resources with least damage to the

    environment through application of Best

    Management Practices (BMP)

    To improve the quality and safety standards of fresh

    fish through the training on better fish handling

    practices

    (d)F ish Market I s an Asset to the Countr y

    Figure 31 Proposed Model of Trincomalee Fish

    Market

    The Wholesale Fish Market in Trincomalee was

    badly damaged by the Tsunami in December, 2004. It

    functioned way below the expected levels with lack

    of even basic facilities like water, sanitation,

    electricity etc (Figure 34). PTCRRMP rightly

    identified the need for the reconstruction of this Fish

    Market and offered to provide financial assistance for

    this purpose. This Fish Market which stands in

    Trincomalee town is a milestone in the post tsunami

    and post war development of the Eastern Province. It

    is an important link in the overall development in the

    region.

    Figure 32 Trincomalee Fish Market underconstruction

    The fisheries sector in Sri Lanka suffered a huge

    setback following immeasurable damage caused to

    the fishing gear and infrastructure in addition to the

    massive loss of life and property. Concerted efforts

    by the local and international community brought

    back normalcy to life in a short time, but it took a

    long time for fishermen to come to terms with thedevastation.

    Figure 33 Unloading Fish at a Landing Centre

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    30/66

    PTCRRMP, MFARD-Sri Lanka Page 23

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 34 Retail Fish Purchases by Lower Income

    Groups

    Figure 35 Wholesale Business at the old Market

    Fish vendors still used the old, dilapidated building

    for fish trading with no electricity, water and other

    sanitary standards required for food related industries

    (Figure 35). Therefore, in keeping with the modern,

    international trends and environmental regulations on

    food hygiene, the design for the new fish market had

    proper loading and unloading facilities (Figure 33),waste water and effluent treatment system, storm

    water drainage system, means for systematic

    cleaning, clean stalls and office rooms and cold

    storage facility incorporated in it (Figure 31).

    The total investment for construction of the new fish

    market is 100 M Rupees (Figure 32).

    3.4. Component 3 Micro Enterprises and

    Financial Services Development

    In order to support and rehabilitate the Tsunami

    affected people, many government, non government

    and private sector organizations took many

    endeavours to reinstate them. Being part of the

    intervention the PTCRRMP implemented Micro-

    Enterprise development programme and provided

    financial services to develop their livelihood in a

    sustainable manner.

    Altogether there are 2,183 beneficiaries registered

    under the programme fulfilling the requirements

    imposed by the MED Programme (Figure 36 &

    Figure 37). (Annex A). It was a pre identified

    requirement to provide 75% of the total benefits for

    the women participants considering the gender equity

    according to the Sri Lankan context. The programme

    has taken necessary measures to fulfil this

    requirement. Composition of number of beneficiaries

    selected by December 2011 is as follows.

    Figure 36 Registered Beneficiaries Percentage

    (%)

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    31/66

    PTCRRMP, MFARD-Sri Lanka Page 24

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 37 Registered Beneficiaries Gender Wise

    It is clear that only the Batticaloa regions progress is

    laying behind others regions progress. Ampara,

    Matara and Hambantota leads in penetration of the

    project towards the local beneficiaries.

    It is clear that the Kalutara, Batticaloa and the

    Trincomalee districts have reached the above need of

    gender consideration of the participants already.

    It has been referred 1,679 beneficiaries from entire

    programme region to obtain the registration at the

    Central Bank of Sri Lanka (CBSL) prior to receiving

    grants and 1,320 have already registered. Out of them

    871 are eligible to obtain the grants and 322 have

    successfully received amounting to a total of Rs.

    5,581,500/-. This is a considerable success rate

    compared with the proceedings of the entire

    programme. On the other hand if any one disqualifies

    to receive the grants from CBSL out of the above

    category, they will be guided to the Womens banks

    established in the village level to facilitate themaccordingly.

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    32/66

    PTCRRMP, MFARD-Sri Lanka Page 25

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 38 Micro Enterprises Beneficiary Clusters

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    33/66

    PTCRRMP, MFARD-Sri Lanka Page 26

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    1,901 beneficiaries have successfully undergone the

    entrepreneurship development training programmes

    incorporating the adult training methodology in entire

    districts and they were enabled to prepare business

    plans for their future businesses in a more viable and

    sustainable manner.

    For the beneficiaries who already have undergone the

    above entrepreneurship training will be provided the

    training on technical skills training programmes to

    improve their technical skills related to their business

    needs (Figure 39). And 154 beneficiaries already

    have been benefited through this training programme.The total cost expenditure on this technical training

    was recorded to a total sum of Rs. 407,760/-.

    Figure 39 Technical training held at NationalDesign Centre Ministry of Traditional Industries

    and Small Enterprises Development

    Ministry of Traditional Industries and Small

    Enterprises Development

    Yet the Social Mobilization training programmes are

    to be conducted and these beneficiaries are expected

    to be strengthening more towards keeping the success

    levels within the dynamic and competitive

    environment potentially arise in the future conditions.

    Figure 40 Mrs. Nandani Warusawithana with her

    Handicrafts products Galagoda, Hikkaduwa

    It is also a requirement to form the clusters among

    the similar kind of business ventures out of these

    selected beneficiaries, to benefit them in a collective

    manner as a team in the future. This will be much

    helpful in the case of problematic situations that may

    arise and create inevitable circumstances for the

    entire industry, to come out as collective unit and

    make strategic decisions. 43 clusters have been

    already formed among the beneficiaries and they are

    functioning very well at the current scenario (Figure

    38).

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    34/66

    PTCRRMP, MFARD-Sri Lanka Page 27

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Further 192 small business groups have formed for

    the micro level businesses to help functioning

    smoothly considering the same facts highlighted

    above.

    Figure 41 Composition of the Clusters

    As shown above (Figure 40) the Coir industry, Fish

    based products (Figure 42), Garment Industry, and

    Poultry farming shows higher percentages of theclusters that have been already formed. While the

    Dry fish/ Maldive fish (Figure 43), Agriculture sector

    and Food products clusters show the secondary level

    success percentages. And Goat farming, dairy

    products, Animal husbandry and Handicrafts sector

    shows the low level percentage of success to date.

    But there are many other clusters being formed and

    they have a better chance to compete with these

    clusters as the programme proceeds (Figure 40).

    PTCRRMP together with UNOPS have planned to

    construct seven sales outlets in respective districts to

    market their Products and Services. The estimated

    amount is around Rs. 20 million for this aspect.

    Some photographs taken during the field visits for

    individual business premises for programme

    activities are shown below (Figure 44 - Figure 46):

    Figure 42 Fish based products at Kalmunai Kudi

    Figure 43 Dry Fish Manufacturing

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    35/66

    PTCRRMP, MFARD-Sri Lanka Page 28

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Figure 44 Coir Products Manufacturing at Galle

    Figure 45 During the Entrepreneurship Training

    Programme

    Figure 46 Some Home decorating products

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    36/66

    PTCRRMP, MFARD-Sri Lanka Page 29

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    Table 8 Progress as at 31st December 2011

    Progress as at 31st

    December 2011

    Description Kalutara Galle Matara Hambantota. Batticaloa Ampara Trincomalee Total

    No. of beneficiaries registered - Total 298 335 361 350 147 382 310 2183

    - Female 216 271 327 69 105 235 222 1445

    - Male 82 64 34 281 42 147 88 738

    No. of Beneficiaries referred to CBSLfor registration

    175 322 248 260 239 281 154 1679

    No. of beneficiaries registered at CBSL 152 291 227 262 147 159 82 1320

    No. of loans granted 79 223 209 184 18 115 43 871

    Total Loan Amount (Rs.) 3,980,000 13,420,000 12,750,000 13,030,000 1,235,000 8,455,000 - 52,870,000

    No. of grants handed over 76 68 125 53 0 0 0 322

    Total Grant Amount (Rs.) 1,341,500 1,310,000 2,100,000 830,000 0 0 0 5,581,500

    Grant to be handed over 3 155 84 131 18 115 43 549

    No. of Social Mobilization Conducted 0 0 0 0 0 0 0 0

    No of clusters formed 2 6 6 9 9 5 6 43

    No. of small groups formed 10 25 39 34 48 4 32 192

    No. of beneficiaries trained(Entrepreneurship Training)

    175 300 305 241 239 245 396 1901

    No. of business plans prepared 175 300 305 202 239 245 304 1770

    No of beneficiaries trained(Technical Training)

    0 0 97 57 0 0 0 154

    Total Cost of the Technical

    programme

    0 0 155,710 252,050 0 0 0 407,60

    Baseline Completed 262 262 230 332 233 305 305 1929

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    37/66

    PTCRRMP, MFARD-Sri Lanka Page 30

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    3.4.1. Micro Enterprises Developments

    The programme designed with and overall package

    of Micro enterprise Development that consist of

    financing of product and business advancement

    ,adopting appropriate technology and link with

    profitable market. Therefore, this will be a great

    opportunity that the Tsunami -affected women will

    receive to develop their income status and hence an

    impact on their upward social mobility.

    The Programme targeted poor rural women and

    men in tsunami affected communities in the

    programme area. Self-targeting will be achieved

    by the type and size of support (size of enterprise,

    loan ceilings, etc.) and through participatory

    assessments. The programme identity potential

    income generating opportunities in both the

    fisheries sector it self, fishery related activities and

    non fishery activities in the district by obtaining

    services from the qualified service providers. The

    volume of loans to be covered by credit scheme

    would amount to LKR 175.This Program selected

    banks as the participatory financial institutions to

    expedite the loan disbursement.

    3.4.2.Technical training forbeneficiaries

    The programme reinforced the income base of the

    enterprises through focusing the business

    management training coupled with the technical

    and marketing aspects. To cater for more

    sophisticated and larger markets through these

    enterprises, the Business Development Services

    providers already identified should be enabled to

    create clusters of enterprises which wanted to

    develop similar products and markets for more

    success.

    3.4.3.Baseline Survey for MicroEnterprises Development

    Programme

    The Base line survey was completed to understand

    the prevailing situation of selected beneficiaries

    with the view of planning and implementing most

    suitable intervenes in terms of improving their

    living conditions

    Micro-enterprises are a vital part of the economic

    and social structure and contribute to balanced

    regional development. The sector represents 75-

    85% of all enterprises, provides jobs to 20-40% ofthe total labour force in Sri Lanka and produces

    about 15 - 20% of total output. Even though the

    cost of creating employment in micro- and small

    enterprises is relatively low, the income level

    obtained from micro-enterprises is also low. About

    30% of the enterprise owners have incomes below

    the poverty line because they are in low entry/low

    profit activities. Workers, in majority women are

    poor and have less formal education than their

    colleagues in larger enterprises. The output of the

    small scale sector can often not compete with

    trade-marked products of larger enterprises but

    price-wise they often cater for the essential demand

    of poorer households. Achieved progress during

    2011 shows in disbursement of loans, grants,

    technical training and clusters found in the

    programme area (Table 8).

    3.5. Component 4 Social and EconomicInfrastructure

    The Programme provided support to the tsunami-

    affected communities to reconstruct housing and

    infrastructure with the partnership of local

    authorities. The Programme, therefore, supported

    the affected communities to return to their

    normalcy.

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    38/66

    PTCRRMP, MFARD-Sri Lanka Page 31

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    As financial and physical progress are concerned,

    this component shows the highest progress as it is

    anticipated that the activities are completed. A

    large amount of community infrastructuredevelopment work (drainage, retention wall,

    internal roads, drinking water supply, sanitation

    and sewerage, solid waste disposal, street lights,

    community centres, pre-school day-care centres,

    etc.) has been completed under this component,

    which includes the allocations of PTLivSPP as well

    (Figure 47).

    Figure 47 Foot way bridge at Hambantota

    a) Housing

    Under housing, 784 new houses collaborating with

    NHDA have been constructed. In addition, topping

    up grants to construct houses have been received

    by 442 households (Figure 49). Financial supportto repair 30 houses, 21 roofs, and 44 doors and

    windows has also been given. The allocations have

    been used for owner driven construction.

    Construction of 100 new houses in Ampara district

    on the recommendations of the 2011 supervision

    mission currently being implemented.

    Owner driven method in housing and communitycontribution in most activities is a speciality in

    PTCRRMP. People are more interested of what

    they have been provided with. Beneficiary

    satisfaction is high since people feel their

    ownership when participatory approach used

    (Figure 50). this helps in sustainability of thedeliverables even.

    Figure 48 Construction of houses ,

    Saithamaruthu, Ampara

    Figure 49 House constructed in Ampara

    Figure 50 Womens Community contribution on

    road construction in Ampara

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    39/66

    PTCRRMP, MFARD-Sri Lanka Page 32

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    b) Other inf rastructure

    Under this sub-component the Programme assisted

    construction and re-establishment of various social

    and economic infrastructures of the people affected

    by tsunami. The activities include internal roads,

    bridges, drainage, retaining walls, drinking water

    supply, sanitation and sewerage, solid waste

    disposal, street lights, community centres, pre-

    school day-care centres, etc.

    Figure 51 Road Construction, Batticaloa

    Figure 52 People using constructed road

    3.5.1.Outcomes of the social and economicinfrastructure development

    a) New houses and house improvement

    The results of the MTO survey indicated that

    households have benefited from rural roads,community drinking water, multipurpose

    community building, fisheries bank building,

    supply of electricity, establishment of Children

    Park, retaining walls, drainage system, electricity,

    etc (Figure 54).

    Figure 53 Raladinugama/Juisepiyagama

    beneficiary owns her developed kitchen

    Figure 54 Fish auction hall, Matara

    The construction of community roads has improved

    the transportation and availability of private

    transport services, accessibility to markets forbuyers and sellers, value of lands, etc (Figure 53 &

    Figure 54).

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    40/66

    PTCRRMP, MFARD-Sri Lanka Page 33

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    3.6. Component 5 Gender, PolicySupport and Programme

    Management

    3.6.1.Gender, Policy Support

    Figure 55 Gender, Policy Support and

    Programme

    Women, in particular continue to be

    disproportionately affected unless their vulnerablestatus is acknowledged, understood and addressed.

    Relief efforts must aim to specifically respond to

    and address womens needs. Economic insecurity,

    the gendered division of domestic labour,

    reproductive and health differences, exposure to

    violence, disparate educational and social

    opportunities, and secondary political status

    combine to put women at a higher risk, particularly

    those that support households alone, the aged and

    disabled and those marginalised by social class,

    caste or religion.

    The objective of the Programme is to achieve a

    situation which women in tsunami affected areas

    have recovered their physical and financial assets,

    have re-established their economic activities while

    diversifying them in other and more profitable

    income generating activities (Figure 55).

    Gender relationships open up opportunity for

    reducing the poverty levels of households. The

    women in MED Programme have made for

    strengthening promotion of women savings andcredit for economic empowerment, link with the

    Sri Lanka Women Development Service

    Cooperative Society (WBCC). They are

    strengthening 34 women Bank branches in 7

    districts, Training the relevant women members in

    leadership, basic accounting and management &

    any other identified sectors.

    Mobilizing and capacitating at least 3400 womens

    in 7 districts in savings, micro investments & credit

    culture, leadership and management improving

    access to micro credit by developing their own

    (Figure 56).

    The Management mentioned to Recruit of 08

    gender focal persons from the community and

    build their capacities to identify and address

    specific needs of women engaged in micro

    enterprises including marginalized women from a

    gender perspective.

    Figure 56 marginalized women from a gender

    perspective.

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    41/66

    PTCRRMP, MFARD-Sri Lanka Page 34

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    3.6.2.Programme Management

    During the year under consideration we have

    adopted several management strategies to ensure

    smooth functioning of programme implementation.

    This is discussed in following aspects.

    Cash fl ow Problems

    At one stage the project had serious cash flow

    problems and there was a little money to settle

    payments to the contractors and meet other

    commitments. Withdrawal Applications were used

    to send every two months.

    It took a long time to process withdrawals since

    then. Therefore our approach was to reduce the

    processing time of withdrawals to ensure smooth

    cash flow situation.

    In this contextduring the year our strategy was to

    send at least 2 applications per month to pick up

    the backlog created up to mid of 2nd quarter of

    2011. This worked well with the commitment of all

    the staff members involved.

    During the year 2011, we have submitted 21

    Withdrawal Applications (WAs) to IFAD amount

    to USD 5.2Mn. of which only 2 WA were

    outstanding by December 2011 (Table 11).

    Table 9 21 Withdrawal Applications (WAs)

    Loan

    No.

    No. of WA

    to IFAD

    Value

    USD Mn

    Value

    LKR Mn

    664 LK 13 2.9 324.7

    693 LK 08 2.3 259.0

    TOTAL 21 5.2 583.7

    The expenditure during the period spread into two

    periods; Jan to May 2011 & June to December

    2011. The relevant expenditure during the two

    periods are Rs.117Mn & Rs.746Mn respectively.

    Training

    It is our view that skill development and

    specialized training are closely linked to the

    successful implementation of any programme.

    Taking this into consideration, almost the entire

    staffs in the project was given some kind of

    training related to their field of specialization.

    Training given to staff covered the area of project

    & programme Impact Assessment, Project

    Budgeting & Cost Control, Contract Management

    & Disbursement Monitoring, Results Based

    Management Implementation & Performance

    Indicators, Procurement of Good & Services

    Planning, Procurement of Goods & Services,

    Advanced Purchasing Skills, Knowledge

    Management, Monitoring & Evaluation and GIS.

    This has paid dividends in terms of performance

    and achievement of targets.

    o Outsourcing Technical Officers for

    Quality Assurance of Civil Works

    To ensure the QA of civil works, programme hired

    technical officers on the approval of SIS mission

    2011. Most of the civil construction works of the

    project were undertaken by implementing agencies

    such as local government bodies, RDA, etc.

    Supervision of these constructions was made by the

    technical officers of the respective agencies.

    Supervision was lax in many respects. Therefore

    with the approval of mission 2011 PTCRRMP

    recruited technical officers for the districts on

    contract basis and from then onwards we have

    witnessed a remarkable improvement in the quality

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    42/66

    PTCRRMP, MFARD-Sri Lanka Page 35

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    of the work. Delays in the implementation have

    also been minimized. Therefore, this strategy has

    worked well for the advancement of the project.

    o

    Outsourcing CDOs to Expedite theMED Programme

    Gender, Micro Enterprise and Rural Financial

    Development manager has to deal with banks,

    financial institutions, beneficiaries, service

    providers and stake holders in the scope of work

    assigned to him. Therefore, to avoid delays in the

    selection and processing of loans, CDOs were

    recruited to all district offices following anapproval from the mission 2011. The component

    of micro enterprise development and gender related

    activities have seen a remarkable progress since

    then.

    As a result of applying this strategy the programme

    could accelerate the number of loans endowed

    from June which was slow in progress, inter alia

    we 850 loans granted from June to December 2011.

    Field Visits

    Senior Managers along with the manager in charge

    in relevant district have made field visits for

    observations and third party opinion on the

    progress and other issues. This too has had an

    influence on the contractors and service providers

    and prompted them to speed up and complete the

    works maintain quality standards.

    3.6.3.Geographic Information System - Use tothe Programme

    As a tool of data management and information

    management GIS was applied to the project

    particularly for data management and decision

    making.

    For this purpose, a consultant was procured to

    design, develop, and installed a spatial database.

    This GIS data base provides ongoing support for

    process monitoring of project activities.

    This database also enable store data in form of

    Photos, Video Clips, and other statistical means for

    easy navigation of project interventions. It also

    includes locations and all relevant data of Micro

    Enterprises Beneficiaries selected from each

    District.

    To utilize data and information in an effective way,

    and to make easy to help in decision supporting for

    the management, the staff was trained on GIS and

    applications. This was already done from the Post

    Graduated Institute of Science of University of

    Peradeniya, Sri Lanka. Further, all relevant

    trainings for the customized spatial database is

    being done by the consultant for all project staff.

    3.6.4.Knowledge Management

    The PTCRRMP and PTLivSPP have gained a lot of

    first hand experiences in different contexts with

    different partners. The PTLivSPP is already

    completed and therefore the project experiences

    should now be recorded for sharing with other

    communities. The PTCRRMP is still to continue

    and gain more experience in a wide range of

    implementation of project activities. At this stage,

    it is very important to formulate a system to

    capture, analyse, and store data, producing KM

    materials and sharing knowledge with other

    partners. This will help to perform better in our

    future project activities empowering the rural poor

    fisheries communities.

    In PTCRRMP we have conducted radio

    programmes, TV programmes, Newsletters, News

  • 7/27/2019 Annual Progress Report 2011-Ifad Ptcrrmp

    43/66

    PTCRRMP, MFARD-Sri Lanka Page 36

    Enabling poor rural people to overcome poverty Annual Progress ReportPTCRRMP 2011

    paper articles, exhibits, brochures, display boards,

    posters, reports and many things to disseminate the

    knowledge.

    It is also observed that there is a large amount oftacit knowledge is kept with our project

    beneficiaries who are positively affected for their

    interventions. These experiences are useful for

    other project as well as the