annual environmental report 2011 jamestown shot blasting ... · jamestown shot blasting & metal...

32
DOCUMENT CONTROL SHEET Client Jamestown Shot Blasting & Metal Coating Limited Document Title Annual Environmental Report 2011 Document No. MDE0868Rp0013 DCS TOC Text List of Tables List of Figures No. of Appendices This Document Comprises 1 1 21 1 - 1 Rev. Status Author(s) Reviewed By Approved By Office of Origin Issue Date D01 Draft M. Roche C. Reilly P. Chadwick West Pier 21/03/12 A01 Client Approval M. Roche C. Reilly P. Chadwick West Pier 26/03/12 F01 Final M. Roche C. Reilly P. Chadwick West Pier 28/03/12 Annual Environmental Report 2011 Jamestown Shot Blasting & Metal Coating Ltd.

Upload: truongkiet

Post on 27-May-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

DOCUMENT CONTROL SHEET

Client Jamestown Shot Blasting & Metal Coating Limited

Document Title Annual Environmental Report 2011

Document No. MDE0868Rp0013

DCS TOC Text List of Tables List of Figures No. of Appendices This Document

Comprises 1 1 21 1 - 1

Rev. Status Author(s) Reviewed By Approved By Office of Origin Issue Date

D01 Draft M. Roche C. Reilly P. Chadwick West Pier 21/03/12

A01 Client Approval

M. Roche C. Reilly P. Chadwick West Pier 26/03/12

F01 Final M. Roche C. Reilly P. Chadwick West Pier 28/03/12

Annual Environmental Report 2011

Jamestown Shot Blasting & Metal Coating Ltd.

Page 2: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 i Rev F01

EXECUTIVE SUMMARY

This Annual Environmental Report (AER) for Jamestown Shot Blasting & Metal Coating Limited, Inchicore, Dublin 8 presents environmental management information for the period 1st January 2011 to the 31st of December 2011. The format of the report follows guidance issued by the Environmental Protection Agency and presents information on environmental performance.

Jamestown Shot Blasting & Metal Coating Limited is involved in the surface preparation and coating of steel with primer for structural use. The site is situated within an Industrial area and occupies an area of 3,822 square metres.

In accordance with the Environmental policy for Jamestown Shot Blasting and Metal Coating Ltd., an Environmental Management System (EMS) is maintained. The EMS ensures that the company achieves best practice in the area of environmental management and compliance. The EMS incorporates procedures of operational activities on site, training and awareness, reporting and an Environmental Management Programme. Through the on-going achievement and reviewing of the objectives and targets, Jamestown Shot Blasting and Metal Coating Ltd. aim to achieve environmental improvements.

A brief summary of the compliance of the site throughout 2011 is presented below:

• Storm water monitoring is required bi-annually at two surface water manhole location (SW1 and SW2). COD analysis was unable to be carried out on some occasions due to the low volume of water at the manhole locations on the date of sampling.

• In summary, groundwater trends are similar to the previously determined trends in 2009. The results of the metals analysis for 2011 indicate levels above the Interim Guideline Values for Calcium, Potassium and Zinc. All other metal parameters were below the IGV’s.

• Monitoring of emissions to atmosphere from air emission points A2-1 and A2-2 indicate that emissions of Total Organic Carbon (as C) are below the Emission Limit Values specified in the IPPC licence.

• Annual Particulate monitoring of emissions to atmosphere from emission point A2-1 is below the TA Luft Guidance level. There is no emission limit value specified in the IPPC licence.

• Annual Organic Solvents monitoring of emissions to atmosphere from emission points A2-1 and A2-2 was carried out in accordance with schedule C.1.2. There are no specified emission limit values in the IPPC licence.

• In general the quantity of waste sent off site (both hazardous and non-hazardous) is lower than the previous year.

• Use of natural resources (gas, electricity and water) have noted decreases in usage since the previous year.

• There were no environmental complaints or incidents in 2011.

• The EPA issued no non-compliances in 2011.

Further details of these compliance issues are presented within this report. In addition, details of the environmental management of the site are also included.

Page 3: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 ii Rev F01

TABLE OF CONTENTS

EXECUTIVE SUMMARY.......................................................................................................................... I

1 INTRODUCTION.............................................................................................................................. 1

1.1 REPORT OVERVIEW .......................................................................................................... 1

1.2 SITE DESCRIPTION............................................................................................................ 1

1.3 DESCRIPTION OF ACTIVITIES.............................................................................................. 1

1.4 ENVIRONMENTAL MANAGEMENT SYSTEM ........................................................................... 2

2 SUMMARY OF EMISSIONS AND WASTE TRANSFERS........... ................................................... 3

2.1 SURFACE WATER MONITORING .......................................................................................... 3

2.1.1 Monitored Parameters....................................................................................... 5

2.2 GROUNDWATER MONITORING............................................................................................ 6

2.2.1 General Determinants ....................................................................................... 8

2.2.2 Metals.............................................................................................................. 10

2.3 EMISSIONS TO AIR.......................................................................................................... 11

2.4 NOISE EMISSIONS........................................................................................................... 12

2.5 WASTE GENERATION ...................................................................................................... 14

2.5.1 Hazardous Waste Generation......................................................................... 14

2.5.2 Non-Hazardous Waste Generation................................................................. 14

2.6 ENERGY USAGE.............................................................................................................. 15

2.7 WATER USAGE ............................................................................................................... 15

2.8 ENVIRONMENTAL INCIDENTS AND COMPLAINTS ................................................................ 15

3 MANAGEMENT OF THE ACTIVITY ......................... .................................................................... 16

3.1 ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR 2011 ..................................... 16

3.2 ENVIRONMENTAL MANAGEMENT PROGRAMME PROPOSAL 2012 ........................................ 19

LIST OF TABLES

Table 2.1: Bi-annual Surface Water Monitoring Analysis........................................................................ 4

Table 2.2: Groundwater Monitoring Well Location & Sampling Frequency ............................................ 6

Table 2.3: Bi-annual Groundwater Monitoring Analysis .......................................................................... 7

Table 2.4: Bi-annual Groundwater Monitoring Metals analysis............................................................... 9

Table 2.5: Volume Flow and Temperature Results ............................................................................... 11

Table 2.6: Total Organic Carbon Results .............................................................................................. 11

Page 4: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 iii Rev F01

Table 2.7: Total Particulate Matter Results ........................................................................................... 11

Table 2.8: Organic Solvent Results – using Solvent Tubes .................................................................. 12

Table 2.9: Annual Noise Monitoring Results ......................................................................................... 13

Table 2.10: Non-hazardous Waste Generation..................................................................................... 14

Table 2.11: Summary Waste Statistics for JSB for 2011 ...................................................................... 14

Table 2.12: Gas Usage for 2011 ........................................................................................................... 15

Table 2.13: Electricity Usage................................................................................................................. 15

Table 2.14: Water Usage 2011 ............................................................................................................. 15

Table 3.1: Review of Objectives and Targets for 2011 ......................................................................... 17

Table 3.2: Proposed Objectives and Targets for 2012.......................................................................... 20

APPENDICES

APPENDIX A POLLUTANT RELEASE TRANSFER REGISTER (PR TR)

Page 5: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 1 Rev F01

1 INTRODUCTION

1.1 REPORT OVERVIEW

This Annual Environmental Report (AER) for Jamestown Shot Blasting & Metal Coating (JSB) presents information for the period from the 1st January 2011 to 31st December 2011.

Integrated Pollution Prevention Control (IPPC) Licence Register Number:

P0796-01

Principal Class of Activity: 3.4.0: Metals

Name and Location of the Site: Jamestown Shot Blasting & Metal Coating Ltd, Jamestown Road, Inchicore, Dublin 8

The report format follows the Guidance Note for Annual Environmental Reporting and the Annex for AER/PRTR Reporting issued by the Environmental Protection Agency (EPA).

Section 1 provides a brief description on the activities of Jamestown Shot Blasting & Metal Coating Limited and also provides details on the existing Environmental Management System in place.

Section 2 presents summary information on self-monitoring data, energy and water consumption, waste management, environmental incidents and complaints for the 2011 calendar year. Also included are copies of the relevant PRTR Emissions and Waste Transfers summary tables.

Section 3 presents information on environmental management at the site including a review of progress on the Environmental Management Programme (EMP) for 2011; it’s update for 2012 and the Targets and Objects for 2011 (review) and 2012 (proposed).

1.2 SITE DESCRIPTION

Jamestown Shot Blasting & Metal Coating is situated in an industrial area on an existing brown-field site, with residential areas immediately east and north of the site. Industrial units are located to the south and northwest of the site. The site is adjoined to the west by green fields.

1.3 DESCRIPTION OF ACTIVITIES

The company is involved in the surface preparation and coating of steel with primer for structural use. This process is carried out using a Gietart fully integrated automatic shot blasting, painting and drying system, which was installed on the JSB premises in 2004. The facility operates over one day shifts for an 8-hour working day with painting occurring for approximately 6 hours per day. The process can be broken down into the following phases:

� Virgin steel (material) is feed into the machine by a set of cross transfers located outside the main building in the yard. In feed rollers carry the steel to an automatic blower, which removes

Page 6: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 2 Rev F01

debris such as stones and leaves. The material then passes underneath a natural gas powered heater to improve the drying time of the paint.

� The steel then moves into the shot blast unit, where it is exposed to metal shot (Zeleznik) to

be blasted to an industry standard of SA 2.5. The mill scale produced by the blasting is removed via a dust-extracting unit. The shot used is recycled in the system to be used again while dust is separated into a dust bag under the filter unit. The blasted material then passes through a brush unit where any remaining pieces of shot are removed and returned back to the hopper for reuse.

� The material is then passed through the automatic paint spraying system; this unit has

sensors to detect the size, number of pieces and the distance between the units. It then automatically sets the shortest stroke possible for the piece being painted. JSB have changed from solvent based primers to water based primers in November 2007 and are currently operating at an 8:2 ratio of solvent to water based paints.

� The painted material is then passed through a drying tunnel, which is heated by natural gas

burners. The material once passed this stage is said to be cured and is again cross-transferred to be packed into bundles.

1.4 ENVIRONMENTAL MANAGEMENT SYSTEM

Jamestown Shot Blasting & Metal Coating Limited have implemented an EMS under Condition 2 of the IPPC licence P0796-01. The EMS enables a systematic and documented approach to environmental performance and improvement. The goal of JSB Ltd EMS is to improve its environmental performance, by committing to:

� Meet all relevant legislation and other requirements

� Seek to reduce consumption of materials in our operations and reuse rather than dispose whenever possible

� Reduce wherever practicable the levels of harmful emissions

� Seek to minimise the visual, noise and other impacts on the local environment when conducting our activities

� Introduce environmental issues through training programmes and encourage the implementation by all JSB staff of sound environmental practices.

Organisational chart and responsibilities of the environmental management structure at Jamestown Shot Blasting & Metal Coating Limited are presented below.

Name Job Title Responsibilities Frank Moore Company Director Overall Management Responsibilities Tom Collins Environmental Health & Safety

Manager Overall Technical & Environmental responsibility

Brendan Nolan

Production Manager Overall responsibility for production related to environmental issues

Joe Maloney Production Supervisor Day-to-Day responsibility for production related environmental issues

Page 7: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 3 Rev F01

2 SUMMARY OF EMISSIONS AND WASTE TRANSFERS

This section presents summary information on environmental monitoring, water and energy consumption and incidents and complaints at Jamestown Shot Blasting & Metal Coating Limited for the monitoring period 1st January 2011 to 31st December 2011. Interpretation of the summary information and data for all environmental self-monitoring is presented.

2.1 SURFACE WATER MONITORING

There are no emissions to surface water at the JSB facility. Storm water monitoring was carried out in accordance with Schedule C.2.3 of the IPPC Licence P0796-01 Monitoring of Storm Water Emission.

Storm water monitoring is required bi-annually at SW-1 and SW2 (formerly MH8) for pH and COD. Bi-annual monitoring was carried out on the 26th of April and on the 17th of November 2011.

All results of the bi-annual monitoring are presented in Table 2.1. All surface water results are compared with the Environmental Quality Standards (EQS) for Surface Waters (EQS for the Aquatic Environment, EPA Discussion Document, 2003). During both bi-annual monitoring events the Dissolved Oxygen probe could not be calibrated resulting in a lack of field measurements for Dissolved Oxygen.

Page 8: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 4 Rev F01

Table 2.1: Bi-annual Surface Water Monitoring Analy sis

Field Parameter s Laboratory Analysis

Sample ID pH

Temperature

Conductivity

Dissolved O2

pH COD Observations

Units

Date

(pH Units) (°C ) (µS/cm) (mg/l) (pH Units) (mg/l)

26/04/2011 8.20 11.7 874 - 8.20 - Shallow water in manhole, sediment in sample. Not enough sample for COD analysis. SW1

17/11/2011 6.83 12.9 954 - 6.83 19 Shallow water in manhole.

23/05/2011 7.20 15.7 720 - 7.2 - Clear sample. Not enough sample for COD analysis.

SW2 08/12/2011 - - - - - - Incorrect parameters (copper & lead)

were tested.

EQS for Surface Water (EQS for the Aquatic

Environment, EPA Discussion Document, 2003)

>6.5 & <9.5 25 Note 1 1000 -

>6.5 & <9.5

- -

Note 1: Reference has been made to the EPA Interim Guideline Values (IGV) as set out in the Interim Report “Towards Setting Guideline Values for the Protection of Groundwater in Ireland” 2004.

Page 9: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 5 Rev F01

2.1.1 Monitored Parameters

pH levels are all within the recommended range specified by the EPA and Electrical Conductivity levels are all below the Interim Guideline Value of 1000 µs/cm. pH levels recorded during the first bi-annual monitoring event indicate slightly acidic conditions. pH levels recorded during the second bi-annual reflected a more neutral environment.

In accordance with Schedule C.2.3, pH and COD analysis is required on a bi-annual basis.

For the first bi-annual monitoring event in April 2011, due to the low level of water in SW1, not enough sample could be taken for COD analysis by the laboratory. A sample from SW2 was unable to be taken in April 2011; therefore a sample was taken in May 2011. Similarly, a sufficient volume of sample for COD analysis by the laboratory was unable to be taken.

For the second bi-annual monitoring event in November 2011, a sample was successfully retrieved from SW1. The measured pH level was within the recommended range for surface waters. The COD level measured was 19 mg/l.

A sample from SW2 was unable to be taken in November 2011 due to low volume of water at this location; therefore a sample was taken in December 2011. Incorrect parameters (Copper and Lead) were scheduled for analysis and no results for pH and COD are reported. The copper analysis recorded a concentration of 0.008 mg/l, which is below the EQS of 0.03 mg/l. Lead analysis recorded a level of 0.04 mg/l, which is above the EQS of 0.01 mg/l. However, these parameters are not required for testing under the IPPC licence.

Page 10: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 6 Rev F01

2.2 GROUNDWATER MONITORING

There are no direct emissions to groundwater at the facility. There are a total of two boreholes at the facility (GW1 and GW2) and monitoring is carried out bi-annually at these boreholes in accordance with Schedule C.6.1 of the IPPC licence. Sampling frequencies of each borehole are summarised in Table 2.2.

Table 2.2: Groundwater Monitoring Well Location & S ampling Frequency

Borehole ID Location Description Sampling

Frequency GW1 South Eastern boundary of the site Bi-annual GW2 North Western boundary of site, adjacent to Shot Blast Building Bi-annual

The results of the bi-annual monitoring are presented in Tables 2.3 to 2.4. All results are compared to the EPA Interim Guideline Values as outlined in “Towards Setting Guidelines for the Protection of Groundwater” (EPA, 2004). These interim guideline values take into account a number of existing standards such as drinking water standards. In general, the interim guideline value is based on the most stringent value of the drinking water standard or the EQS for the aquatic environment/dangerous substances where appropriate. These are not limits applicable to the site and are used in this report as comparative guidelines.

Page 11: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 7 Rev F01

Table 2.3: Bi-annual Groundwater Monitoring Analysi s

Borehole ID Date pH (pH

units)

Temperature (°C)

Conductivity (µS/cm)

Dissolved Oxygen (mg/l)

Alkalinity as CaCO3

(mg/l)

Ammonical Nitrogen

(as N) mg/l

Chloride mg/l

Nitrate (as

NO3) mg/l

Sulphate mg/l

26/04/11 6.25 10.8 930 1.6 248 1.36 56.9 <1.3 126 GW1

17/11/11 6.79 11.3 396 6.01 178 <0.19 7.8 1.3 11.3 26/04/11 7.20 11.6 1402 4.7 405 1.49 26.0 23.0 344

GW2 17/11/11 7.20 12.6 1182 5.71 389 <0.19 12.6 46.5 189

Interim Guideline

Value

>6.5 and <9.5

25 1000 - No abnormal

change 0.15 30 25 200

Note 1 Figures in Bold and Shaded exceed guideline values

Page 12: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 8 Rev F01

2.2.1 General Determinants

pH levels are within the recommended range specified by the EPA with the exception of GW1, during the first bi-annual monitoring event, where conditions were slightly alkaline. Electrical conductivity levels exceeded the Interim Guideline Value of 1000 µS/cm in GW2 during both bi-annual monitoring events. Ammonical Nitrogen as N, also recorded levels above the IGV at all locations for both bi-annual monitoring events. However it is important to note that the laboratory limit of detection of 0.19 mg/l is above the IGV of 0.12 mg/l. Concentrations of Chloride have been detected above the IGV of 30 mg/l at GW1 during the first bi-annual monitoring event however levels have decreased significantly since April 2011. Nitrate as N recorded a level above the IGV of 25 mg/l at GW2, with a recorded concentration of 46.5 mg/l during the second bi-annual monitoring event. Elevated levels of Sulphate above the IGV of 200 mg/l were detected in GW2 during the first bi-annual monitoring event. The level of Sulphate as SO4 at GW2 has decreased in concentration from 344 mg/l to 189 mg/l and is now below the IGV of 200 mg/l. The Sulphate levels at the GW1 were below the IGV for 2011.

Page 13: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 9 Rev F01

Table 2.4: Bi-annual Groundwater Monitoring Metals analysis

Borehole ID Units

GW1 GW2 Parameter

Date 26/04/11 17/11/11 26/04/11 17/11/11

Interim EPA Guideline Values

(Units as indicated)

Aluminium mg/l <0.032 <0.032 <0.032 <0.032 0.2

Cadmium mg/l <0.0006 <0.0006 <0.0006 <0.0006 0.005

Calcium mg/l 149 63.1 302 217 200

Chromium mg/l <0.0007 <0.0007 <0.0007 <0.0007 0.03

Copper mg/l 0.001 0.006 0.002 <0.003 0.03

Lead mg/l <0.005 <0.005 <0.005 <0.005 0.01

Magnesium mg/l 6.92 2.86 18 14 50

Mercury mg/l <0.0001 0.0002 <0.0001 <0.0001 0.001

Nickel mg/l 0.002 0.003 <0.002 0.003 0.02

Potassium mg/l 3.29 4.43 12 12.2 5

Sodium mg/l 32.4 12.5 20.2 18.9 150

Zinc mg/l 0.329 0.248 0.003 0.003 0.1

Selenium mg/l 0.0024 <0.0016 0.0047 0.0019 -

Arsenic mg/l <0.0008 <0.0014 <0.0008 <0.0014 0.01 Note 1 Figures in Bold and Shaded exceed guideline values

Page 14: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 10 Rev F01

2.2.2 Metals

The results of the metals analysis for 2011 indicate that Calcium, Potassium and Zinc have exceeded their respective IGV’s. All other parameters were in compliance with the recommended IGV’s. Concentrations of Calcium exceeded the IGV of 200 mg/l at GW2 during both bi-annual monitoring events. Calcium concentrations decreased in the second bi-annual monitoring event from 302 mg/l to 217 mg/l. The calcium concentrations at GW1 were below the IGV of 200 mg/l. Potassium recorded levels above the IGV of 5 mg/l at GW2 with concentrations of 12.0 mg/l and 12.2 mg/l in the first and second bi-annual monitoring events respectively. The potassium concentrations at GW1 were below the IGV of 5 mg/l. Concentrations of Zinc exceeded the IGV of 0.1mg/l at GW1 during 2011 with measured concentrations of 0.329 mg/l and 0.248 mg/l. The concentration at GW2 was below the IGV.

Page 15: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 11 Rev F01

2.3 EMISSIONS TO AIR

Monitoring of emissions to air was carried out in accordance with Schedule C.1.2 of the IPPC licence.

There are two emission points, A2-1 located inside the main production building at the Paint Spray Booth and A2-2 at the Paint Drying Oven in the main production building. Bord na Móna Environmental Limited on behalf of JSB undertook air emissions monitoring on the 30th of March and 15th of December 2011. The results of the monitoring are detailed in Tables 2.5 to 2.8.

Table 2.5: Volume Flow and Temperature Results

Emission Point A2-1 A2-2

Parameter Units 30/03/11 15/12/11 30/03/11 15/12/11

Temperature °C 14 10 13 15 Volume Flow Nm3/hr 7,382 7,773 1,855 1,588

Volume Flow Emission Limit Value m3/hr 10,646 3,185 Note: All Concentrations are referenced to 273k, 1013.25kPa with no correction for water content or oxygen.

Total Organic Carbon monitoring is required on a quarterly basis as per Schedule C.1.2 of the IPPC Licence. Following agreement with the agency, the frequency was reduced from quarterly monitoring to bi-annual monitoring. The results are outlined in Table 2.6 below.

Table 2.6: Total Organic Carbon Results

Emission Point A2-1 A2-2

Parameter Units 30/03/11 15/12/11 30/03/11 15/12/11

Concentration* mg/Nm3 12.2 14.3 31.2 24.9 Total Organic Carbon (as C) Mass Emission Rate Kg/hr 0.09 0.11 0.058 0.039

mg/Nm3 75 50 TOC Emission Limit Value

Kg/hr None Stated None Stated Note: All Concentrations are referenced to 273k, 101.3kPa with no correction for water content.

Particulates monitoring is required on an annual basis at emission point A2-1 as per Schedule C.1.2 of the IPPC Licence. There is no requirement for this monitoring at emission point A2-2. The monitoring was carried out in December 2011 and the results are outlined in Table 2.7 below.

Table 2.7: Total Particulate Matter Results

Emission Point A2-1

Parameter Units 15/12/11

Concentration* mg/Nm3 15.66 Total Particulate Matter

Mass Emission Rate Kg/hr 0.12 mg/Nm3 20 Note 1

Emission Limit Value Kg/hr None Stated

Note 1: There is no limit value for particulates specified in IPPC Licence P0796-01. For guidance, the result has been compared with TA Luft 2002 limit value for total dust.

Monitoring of Organic Solvents is required on an annual basis at emission points A2-1 and A2-2 as per Schedule C.1.2 of the IPPC Licence. The monitoring was carried out in December 2011 and the results are outlined in Table 2.8 below.

Page 16: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 12 Rev F01

Table 2.8: Organic Solvent Results – using Solvent Tubes

Emission Point A2-1 A2-2 IPPC Licence Limits

Parameter Units 15/12/11 15/12/11 mg/Nm 3

Toluene Concentration* mg/Nm3 0.61 0.17 None Stated Ethylbenzene Concentration* mg/Nm3 0.17 - None Stated m+p Xylene Concentration* mg/Nm3 0.09 - None Stated

Acetone Concentration* mg/Nm3 1.22 - None Stated Isopropanol Concentration* mg/Nm3 - 0.43 None Stated Other VOC’s Concentration* mg/Nm3 <0.09 <0.09 None Stated

* All results are referenced to 273k, 101.3kPa with no correction for water content.

Both emission points, A2-1 and A2-2 were operating normally during both bi-annual monitoring events.

All measured parameters were below the relevant limits outlined in Schedule B.1 of the IPPC license No. P076-01, during both bi-annual monitoring events.

2.4 NOISE EMISSIONS

In accordance with Condition 6.13 of the IPPC Licence, a noise survey of the site operations is required annually.

Bord na Móna Environmental Limited, on behalf of JSB, undertook the annual noise assessment on the 15th of December 2011 at the nearest Noise Sensitive Location (NSR1), which is located in a residential area on Landen Road, Ballyfermot. Four additional boundary locations were monitored during the previous annual monitoring event however the shot blaster was not in operation on the day of monitoring therefore the boundary locations were not monitored. The JSB Ltd. facility does not operate at night-time, therefore no night-time noise monitoring was undertaken during the annual survey. The results of the monitoring during normal daytime activities are detailed in Table 2.9 below.

The results of the survey indicate that the measured LAeq at NSR1 was higher than the EPA guideline limit of 55 dB(A) and therefore exceeds the licence limit. However, plant noise from the facility was not audible at this location. The measured noise level at this locations was attributable to background noise and passing traffic. The measured LAA90 of 47.6 dB(A) indicates background noise rather than event noise.

In conclusion, the operation of the facility does not contribute to elevated noise levels at the noise sensitive location surrounding the site. Furthermore, the plant does not contribute to tonal or impulsive components at this noise sensitive location.

Page 17: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 13 Rev F01

Table 2.9: Annual Noise Monitoring Results

Date Time Period Location LAeq

(dB) LA90 (dB)

LA10 (dB)

LAmax (dB)

Tonal or

Impulsive Noise

LAr

(dB)

Compliant with

Noise Limits

Comments

15/12/2011 30 minutes NSR1 61.1 47.6 60.7 83.1 No 61.1 Yes

Site not audible from NSR1. Background noise from passing cars/vans/lorries, dogs barking, gates banging and pedestrians talking. A train also passed and sounded its horn.

Page 18: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 14 Rev F01

2.5 WASTE GENERATION

JSB maintains records of waste generated on-site in accordance with Condition 8 of the IPPC Licence. This section presents details on waste quantities and types at the facility and represents the waste management record for the site as prescribed under Condition 8 of the IPPC licence.

2.5.1 Hazardous Waste Generation

Due to significantly scaled down operations at the facility, there was no hazardous waste generated at the site during 2011.

Waste paint was generated on-site in 2012 and will be reported in the 2012 AER.

2.5.2 Non-Hazardous Waste Generation

The quantity of non-hazardous waste generated in 2011 is provided in Table 2.10.

Table 2.10: Non-hazardous Waste Generation

Waste Type EWC Code

Quantity (tonnes)

Primary Waste Contractor & Permit Details

Steel Shot and Dust 12 01 01 4.5

Galway Metal, Oranmore, Co. Galway

WCP-LK-001-02b

Waste Packaging 15 01 04 0.2

Galway Metal, Oranmore, Co. Galway

WCP-LK-001-02b

Municipal Waste 20 03 01 1.4

OZO, Jamestown Road,

Inchicore, Dublin 8

Waste Permit Register No. WP 98101

Non-Hazardous Waste Generation 6.1

A summary of the waste statistics for 2011 are presented in Table 2.11. From Table 2.11, it is evident that the quantity of waste sent off site (both hazardous and non-hazardous) is lower than the quantities in 2010. This is due to the reduction in the processing at the facility and the scaled down operations.

Table 2.11: Summary Waste Statistics for JSB for 20 11

2010 2011 Source Quantity (tonnes)

Hazardous Waste Off Site 0.669 - Non-Hazardous Waste Off Site 10.85 6.1

Page 19: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 15 Rev F01

2.6 ENERGY USAGE

The summary details of the gas for heating and for production are summarised in Table 2.12 below. The trend illustrates that gas consumption for the site has decreased since 2010, with an overall reduction of 66%.

Table 2.12: Gas Usage for 2011

Consumption Period Gas Usage 2010 kWh

Gas Usage 2011 kWh

From 01/01/11 to 31/12/11 318,346 107,072

Electricity usage for the site was calculated from ESB utility bills. Table 2.13 details the energy consumption at the facility for the period January to December 2011.

Table 2.13: Electricity Usage

Consumption Period Electricity Usage 2010 kWh

Electricity Usage 2011 kWh

From 01/01/11 to 31/12/11 200,596 102,798

The trend illustrates that Electricity consumption for the site has decreased since 2010, with an overall reduction of 49%.

The reduction in trends for gas and electricity consumption are due a reduction in the processing at the facility.

2.7 WATER USAGE

Table 2.14 details the water consumption at the facility for 2011. Condition 7.3 states that the “licensee shall identify opportunities for reduction in the quantity of water used on site including recycling and reuse initiatives, wherever possible.” Table 2.14: Water Usage 2011

Consumption Period Consumption (m 3) 2010 Consumption (m 3) 2011

From 01/01/09 to 31/12/09 195 m3 182 m3

2.8 ENVIRONMENTAL INCIDENTS AND COMPLAINTS

JSB maintains records of incidents in accordance with Condition 9.3 of the IPPC Licence. This section presents details on environmental incidents and complaints for the site. There were no environmental complaints and no environmental incidents in 2011.

There were no non-compliances issued by the EPA in 2011.

Page 20: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 16 Rev F01

3 MANAGEMENT OF THE ACTIVITY

This section of the AER presents an update on work achieved and work planned at the facility in achieving continual environmental improvement.

Continual improvement is managed through the Environmental Management Programme (EMP) as a requirement of the IPPC licence. The Environmental targets and progress for 2011 is detailed in this section. In addition to achieving continual improvements, the objectives and targets for 2012 are also presented in this section.

The Environmental Management Programme (EMP) ensures that the requirements of the EHS Policy are met. The EMP documents the strategy for achieving the planned objectives and targets and will:

� Identify specific actions which are required to ensure that environmental objectives are achieved

� Assign appropriate responsibilities for achieving each environmental objective and � Set deadlines for achieving the various environmental objectives.

The EMP is prepared, reviewed and updated annually to account for yearly improvements resulting from the introduction of the objectives and targets programme, and to ensure that new developments or products are covered and are maintained within the scope of the environmental management system.

3.1 ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR 2 011

All environmental monitoring as specified in the IPPC licence took place in 2011.

A review of the status of the individual objectives and targets for 2011, previously reported in the EMP for 2010 are outlined in Table 3.1.

Page 21: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 17 Rev F01

Table 3.1: Review of Objectives and Targets for 201 1

Environmental Aspect: Emissions to Air

Objective Target Person Responsible Action Timeframe

Reduce or eliminate solvent based compounds Tom Collins

� Minimise the use of solvent based compounds

Ongoing

Reduce combustion gas emissions from boiler Tom Collins � Management of ongoing boiler service

programme Completed for 2011

To keep our emissions as low as possible

To monitor air emissions in accordance with IPPC licence

Tom Collins � Maintain ongoing monitoring programme Completed for 2011

Environmental Aspect: Waste Generation

Objective Target Person Responsible Action Timeframe

Maintain a waste register Tom Collins � Maintain a hazardous & non-hazardous

waste register Completed for 2011

Minimise volume of waste produced Tom Collins � Review current waste production

� Implement any improvements identified

Completed for 2011

To minimise all waste streams

Minimise waste solvents Tom Collins � Switch from solvent based paints to water

based paint Ongoing

Page 22: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 18 Rev F01

Environmental Aspect: Water Monitoring

Objective Target Person Responsible Action Timeframe

To monitor storm water in accordance with IPPC Licence Tom Collins � Maintain ongoing monitoring programme

Storm water monitoring completed in 2011

To ensure that all water monitoring requirements are achieved

To monitor ground water in accordance with IPPC Licence

Tom Collins � Maintain ongoing monitoring programme Monitoring completed in 2011

Page 23: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 19 Rev F01

3.2 ENVIRONMENTAL MANAGEMENT PROGRAMME PROPOSAL 201 2

The environmental monitoring programme as specified in the IPPC licence will be continued for the year 2012. The requirements for the environmental programme as specified in Schedule 2 will be complied with. The reporting schedule as specified in Schedule 4 of the licence will be followed and submitted to the EPA.

The proposed objectives and targets for the year 2012 are outlined in Table 3.2 below.

Page 24: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 20 Rev F01

Table 3.2: Proposed Objectives and Targets for 2012

Environmental Aspect: Emissions to Air

Objective Target Person Responsible Action Timeframe

To monitor air emissions in accordance with IPPC licence

Tom Collins � Maintain ongoing monitoring programme Schedule for 2011 To reduce the potential for air emissions To maintain boilers operating at

optimum efficiency Tom Collins

� Annual flue gas survey to be undertaken by plant engineers

Schedule for 2012

Environmental Aspect: Emissions to Water

Objective Target Person Responsible Action Timeframe

Reduce the potential for leaks from diesel tanks & bunds

Carry out Bund Integrity testing Tom Collins

� All bunds to be integrity tested & reports to be submitted to the EPA

� Ensure testing is carried out once every 3 years.

� Maintain a record of such testing

Schedule in 2012

Minimise emissions to surface water

Ensure tanks are emptied by an approved contractor

Tom Collins � Keep a record/track the frequency and

quantities of such events Schedule in 2012

Environmental Aspect: Non-Hazardous Waste Generatio n

Objective Target Person Responsible Action Timeframe

Improve the quantity of non-hazardous waste generated

Identify opportunities for the improvement in the reduction of non-hazardous waste generated

Tom Collins � Review all waste streams and identify areas

for improvement

Will continue to look for waste reduction measures

Page 25: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011

MDE0868Rp0013 21 Rev F01

Environmental Aspect: Hazardous Waste Generation

Objective Target Person Responsible Action Timeframe

Implement a register for all hazardous waste generated and removed from site, maintaining records of C1 forms, treatment & disposal certificates.

Tom Collins � Maintain a digital register & hard copy files

Improve hazardous waste records

Ensure all waste record including permits are maintained on site for inspection.

Tom Collins � Maintain a log of records & permits

Maintain in 2012

Environmental Aspect: Noise Control

Objective Target Person Responsible Action Timeframe

Noise Control

To ensure noise emissions from the site do not result in breaches of IPPC licence noise limits at the nearest noise sensitive locations

Tom Collins � Conduct annual noise survey at boundary & noise

sensitive location

Schedule for 2012

Environmental Aspect: Storm Water

Objective Target Person Responsible Action Timeframe

Storm water monitoring

To monitor storm water emissions in accordance with IPPC licence

Tom Collins � Maintain ongoing monitoring programme and ensure

the correct parameters as outlined in Schedule C.2.3 of the licence are scheduled for analysis

Schedule for 2012

Page 26: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

APPENDIX A

POLLUTANT RELEASE TRANSFER REGISTER

(PRTR)

Page 27: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

#VALUE!

Guidance to completing the PRTR workbook

Version 1.1.13

REFERENCE YEAR 2011

1. FACILITY IDENTIFICATIONParent Company Name Jamestown Shot Blasting & Metal Coating Limited

Facility Name Jamestown Shot Blasting & Metal Coating LimitedPRTR Identification Number P0796

Licence Number P0796-01

Waste or IPPC Classes of ActivityNo. class_name

12.2.2 ######################################################

Address 1 Jamestown RoadAddress 2 InchicoreAddress 3 Dublin 8Address 4

DublinCountry Ireland

Coordinates of Location -6.33875 53.3362River Basin District IEEA

NACE Code 2561Main Economic Activity Treatment and coating of metals

AER Returns Contact Name Gerry O'RiordanAER Returns Contact Email Address [email protected]

AER Returns Contact Position General ManagerAER Returns Contact Telephone Number +353 1 4201715

AER Returns Contact Mobile Phone Number +353 87 2316592AER Returns Contact Fax Number +353 1 4549640

Production Volume 0.0Production Volume Units

Number of Installations 0Number of Operating Hours in Year 0

Number of Employees 0User Feedback/Comments

Web Address

2. PRTR CLASS ACTIVITIESActivity Number Activity Name50.1 General

3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)Is it applicable? Yes

Have you been granted an exemption ? NoIf applicable which activity class applies (as per

Schedule 2 of the regulations) ?Is the reduction scheme compliance route being

used ?

AER Returns Workbook

Page 28: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

4.1 RELEASES TO AIR Link to previous years emissions data | PRTR# : P0796 | Facility Name : Jamestown Shot Blasting & Metal Coating Limited | Filename : P0796_2011 for PDF.xls | Return Year : 2011 | 30/03/2012 15:45

8 8 16 18 26 26 6 6 6 7SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS

Please enter all quantities in this section in KGsQUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTSPlease enter all quantities in this section in KGs

QUANTITYA2-1 A2-2

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 T (Total) KG/YearA (Accidental) KG/Year

F (Fugitive) KG/Year

73 Toluene M EN 13649:2001 Sorbent Tubes 9.5 0.5 10.0 0.0 0.065 Ethyl benzene M EN 13649:2001 Sorbent Tubes 2.6 0.0 2.6 0.0 0.078 Xylenes M EN 13649:2001 Sorbent Tubes 1.4 0.0 1.4 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)Please enter all quantities in this section in KGs

QUANTITYA2-1 A2-2

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 T (Total) KG/YearA (Accidental) KG/Year

F (Fugitive) KG/Year

351 Total Organic Carbon (as C) M ALT EN 13526 200.0 97.0 297.0 0.0 0.0* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

Additional Data Requested from Landfill operators

Landfill: Jamestown Shot Blasting & Metal Coating LimitedPlease enter summary data on the quantities of methane flared and / or utilised

additional_pollutant_no T (Total) kg/Year M/C/E Method CodeDesignation or

DescriptionFacility Total Capacity m3

per hourTotal estimated methane generation (as per

site model) 0.0 N/AMethane flared 0.0 0.0 (Total Flaring Capacity)

Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)Net methane emission (as reported in Section

A above) 0.0 N/A

RELEASES TO AIR

RELEASES TO AIRMETHOD

POLLUTANT METHODMethod Used

RELEASES TO AIRPOLLUTANT METHOD

Method Used

For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide summary data on landfill gas (Methane) flared or utilised on their facilities to accompany the figures for total methane generated. Operators should only report their Net methane (CH4) emission to the environment under T(total) KG/yr for Section A: Sector specific PRTR pollutants above. Please complete the table below:

Method Used

Method UsedPOLLUTANT

Page 29: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

NOTE: No direct release to waters from the JSB facility in 2011

4.2 RELEASES TO WATERS Link to previous years emissions data | PRTR# : P0796 | Facility Name : Jamestown Shot Blasting & Metal Coating Limited | Filename : P0796_2011 for PDF.xls | Return Year : 2011 | 30/03/2012 15:46

8 8 16 16 24 24 6 6 6SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as this only concerns Releases from your facility

Please enter all quantities in this section in KGsQUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTSPlease enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence)Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

Method Used

POLLUTANTMethod Used

POLLUTANT

POLLUTANTRELEASES TO WATERS

Method Used

RELEASES TO WATERS

RELEASES TO WATERS

Page 30: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

NOTE: No direct releases to wastewater or sewers from the JSB facility in 2011

4.3 RELEASES TO WASTEWATER OR SEWER Link to previous years emissions data | PRTR# : P0796 | Facility Name : Jamestown Shot Blasting & Metal Coating Limited | Filename : P0796_2011 for PDF.xls | Return Year : 2011 |30/03/2012 15:46

8 8 16 16 6 6 6 6SECTION A : PRTR POLLUTANTS

Please enter all quantities in this section in KGsQUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER

Method Used

Method Used

POLLUTANT METHOD

POLLUTANT METHOD

Page 31: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

NOTE: No direct releases to land from the JSB facility in 2011

4.4 RELEASES TO LAND Link to previous years emissions data | PRTR# : P0796 | Facility Name : Jamestown Shot Blasting & Metal Coating Limited | Filename : P0796_2011 for PDF.xls | Return Year : 2011 | 30/03/2012 15:53

8 8 16 16 6 6 6 6SECTION A : PRTR POLLUTANTS

Please enter all quantities in this section in KGsQUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

POLLUTANT METHODMethod Used

RELEASES TO LAND

RELEASES TO LAND

POLLUTANT METHODMethod Used

Page 32: Annual Environmental Report 2011 Jamestown Shot Blasting ... · Jamestown Shot Blasting & Metal Coating Annual Environmental Report 2011 MDE0868Rp0013 i Rev F01 EXECUTIVE SUMMARY

5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE | PRTR# : P0796 | Facility Name : Jamestown Shot Blasting & Metal Coating Limited | Filename : P0796_2011 for PDF.xls | Return Year : 2011 | 30/03/2012 15:53

5 7 Please enter all quantities on this sheet in Tonnes 0

Quantity (Tonnes per

Year)

Haz Waste : Name and Licence/Permit No of Next Destination Facility Non Haz Waste:

Name and Licence/Permit No of Recover/Disposer

Haz Waste : Address of Next Destination Facility

Non Haz Waste: Address of Recover/Disposer

Name and License / Permit No. and Address of Final Recoverer / Disposer

(HAZARDOUS WASTE ONLY)

Actual Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY)

Transfer DestinationEuropean Waste

Code Hazardous Quantity T/Year Description of Waste

Waste Treatment Operation M/C/E Method Used

Location of Treatment Name and Licence / Permit No. of Recoverer / Disposer / Broker Address of Recoverer / Disposer / Broker Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY)

Within the Country 12 01 02 No 4.5 ferrous metal dust and particles R4 M Weighed Offsite in IrelandGalway Metal,WCP-LK-001-02b

Oranmore,Co. Galway,.,.,Ireland

Within the Country 15 01 04 No 0.2 metallic packaging R4 M Weighed Offsite in IrelandGalway Metal,WCP-LK-001-02b

Oranmore,Co. Galway,.,.,Ireland

Within the Country 20 03 01 No 1.4 mixed municipal waste D1 M Weighed Offsite in Ireland

OZO 24/7 Collect & Recycle,WCP-DC-08-0096-01

Jamestown Road,Inchicore,Dublin 8,.,Ireland

* Select a row by double-clicking the Description of Waste then click the delete button

Link to previous years waste dataLink to previous years waste summary data & percentage change

Method Used