annexure ii-sample filled form
DESCRIPTION
sample filled formTRANSCRIPT
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 1
APPENDIX- I
(See Paragraph - 6)
FORM 1
Sr. No. Item Details
1 Name of the Project/s “M/s. Indus Ferrotech Ltd.” At D-3,D-
3/1& D-3/2 ,Kagal-Hatkanangale Five Star
industrial Area,Dist-kolhapur
( Maharashtra)India.
2 S. No in the Schedule 8 (a)
3 Proposed capacity/area/length/tonnge to be
handled/command area/lease area/number
of wells to be drilled
Total Plot Area of the Project: 62,491 Sq. mt.
4 New/Expansion/Modernization New
5 Existing capacity/Area etc. Total Plot Area: 62,491 Sq. mt.
Built up Area: - 24381.66 Sq.mt.
6 Category of Project i.e. ‘A’ or ‘B’ B Category Project
7 Does it attract the general condition? If Yes
please Specify.
Not Applicable
8 Does it attract the specific condition? If yes
please specify.
Not Applicable
9 Location Kagal-Hatkanangale Five star MIDC
Plot/survey/Khasra No D-3,D-3/1& D-3/2 , Five Star M.I.D.C
Village Talandage
Tehsil Hatkanangale
District Kolhapur
State Maharashtra
10 Nearest railway station/airport along with
distance in kms
Kolhapur Railway junction (30 km SW)
11 Nearest town, city, District Headquarters
along with distance in
Kolhapur (25 Km) & 9Km From the
National Highway 4 (Mumbai –Banglore)
12 Village panchyats Zilla Parishad, municipal
corporation, Local body (Complete postal
addresses with telephone nos. to be given)
D-3, D-3/1& D-3/2, Kagal-Hatkanangale
Five Star industrial Area, Kolhapur.
Company Name, Address,City, State - PinCode
xxx (specify if MIDC)
xxx
yyy
yyyy
aaa, bbb, ccc, ddd with phone numbers
jjj
zzz
survey No 288/4
Khed
Khed
Pune
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 3
24 Forest land involved (hectares) Not Applicable
25 Whether there is any litigation pending
against the project and/or land in which the
project is propose to be set up?
(a)Name of the Court.
(b)Case No.
(c) Orders /Directions of the court, if any
and its relevance with the proposed Project.
Not Applicable
Screening Category : 8(a) to sub category B
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
Sr.
No.
Information/Checklist
confirmation
Yes
/
No
Details thereof (with approximate quantities / rates, wherever
possible) with source of information data
1.1 Permanent or
temporary charge in
land use, land cover or
topography including
increase in intensity of
land use (with respect
to local land use plan)
No No change in Land Use
1.2 Clearance of existing
land, vegetation and
building?
No Land is leveled.
No demolition of building involved.
No cutting of trees.
1.3 Creation of new land
uses?
No --
1.4 Pre-construction
investigation e.g. bore
houses, soil testing?
Yes Geotechnical Investigation is already conducted.
1.5 Construction works?
Yes 62% construction work done out of 24,381.66 Sq.mt sanctioned
built up area.
1.6 Demolition works?
No There is no demolition work.
1.7 Temporary sites used
for construction works
or housing of
construction workers?
No No residential workers or labor camp.
1.8 Above ground
building, structures or
earthworks including
linear structures, cut
Yes Above ground building, structures and Excavation work only for
the construction of footings & area grading.
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 4
Sr.
No.
Information/Checklist
confirmation
Yes
/
No
Details thereof (with approximate quantities / rates, wherever
possible) with source of information data
and fill or excavations
1.9 Underground works
including mining or
Tunneling?
No --
1.10 Reclamation works?
No. --
1.11 Dredging?
No --
1.12 Offshore structures?
No --
1.13 Production and
manufacturing
processes?
Yes Company proposed production capacity –Fettling, Machining,
painting of jobs (1, 00,000 nos.) & surface treatment (Mn
Phosphating(surface treatement),Electroless nickel plating =5000
nos/m),
1.14 Facilities for storage of
goods or materials?
Yes Goods and Material is stored in proper storage facility.
1.15 Facilities for treatment
or disposal of solid
waste or liquid
effluents?
Yes A) During Construction
phase:
• Non Hazardous waste generated from the construction is reused
predominantly for filling and compaction of site. Empty gunny
bags are returned to suppliers. Scrap Mild steels bars/ general
mild steel items to send back for rerolling.
• There is no labor camp. The day workers are served by regular existing sewage treatment plant.
• Hazardous waste was not generated during construction phase
B) During Operation Phase:
• Total solid waste: 166 kg/day
• Biodegradable waste: 116 kg/day. (will be handled over to
authorized vendors for disposal)
• Non-biodegradable waste: 50 kg/day. will be handed over to
authorized contractors.
Use of dried STP sludge as manure.
Non Hazardous Waste :
Sr.
No.
Type Quantity UoM Disposal
1 Griding
/Fettling
powder
25 MT/M Sale
2. Griding
wheel
2000 nos. Sale
3. Shot
blasting
dust
25 MT/M Sale
4. CI boring
/MS
Turning
300 MT/M Sale
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 5
Sr.
No.
Information/Checklist
confirmation
Yes
/
No
Details thereof (with approximate quantities / rates, wherever
possible) with source of information data
Hazardous waste Details :
Sr.
No.
Item no.
as per
HW
Schedule
Type of
waste
Quantity Disposal
1. 21.1 Paint
sludge
30MT/A CHWTSDF
2. 5.2 Hand
gloves,oil
soked
rags/cotton
3.7MT/A CHWTSDF
3
5.1 Used
oil/spent
oil
15 KL/A Authorised
reprocesser/recycler
4 33.3 Discarded
containers
6000
nos/A
CHWTSDF
5 12.2 Alkali
residue
1.44MT/A CHWTSDF
6 14.1 Nitrite
containing
sludge
7MT/A CHWTSDF
7 12.3 Spaint bath
sludge
3.6MT/A CHWTSDF
8 12.5 Phosphate
sludge
6.2MT/A CHWTSDF
Sewage:
• Sewage generation : 24 m3/day
• Capacity of STP (CMD): 25 m3/day
• STP Technology: MBR
Effluent:
• Effluent generation: 18 m3/day
• Capacity of ETP (CMD): 4 m3/Hr
• Capital Cost: Rs 80 Lakh
O & M Cost: Rs 11 Lakh / Year
1.16 Facilities for long term
housing of operational
workers?
No -
1.17 New road, rail, or sea
traffic during construction or
operation?
No -
1.18 New road, rail, air
waterborne or other
transport infrastructure
including new or
No Site is already in Kagal-Hatkanangale Five star MIDC; all
transportation facility is easily available.
xxx
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 6
Sr.
No.
Information/Checklist
confirmation
Yes
/
No
Details thereof (with approximate quantities / rates, wherever
possible) with source of information data
altered routes and
stations, ports, airports
etc?
1.19 Closure or diversion of
existing transport
routes or infrastructure leading to changes in
traffic Movements?
No No Diversion or closer of existing transport routes or any other
infrastructures to changes.
1.20 New or diverted
transmission lines or
pipelines?
No
-
1.21 Impoundment,
damming, culverting,
realignment or other
change o the hydrology
of watercourses or
aquifers?
No
-
1.22 Stream crossings? No -
1.23 Abstraction or transfers
of water from ground or surface waters?
No For Construction: MIDC During this proposed construction period we may need Water 20 KLD. Total consumption will be within consented
quantity.
For Operational Phase: MIDC
• Daily fresh water requirement = 47 m3/day
• Recycled water reused = 40 m3/day
One time water requirement 87 m3/day
(Source of water is MIDC)
1.24 Changes in water
bodies or the land
surface affecting
drainage or runoff?
No Water drains of appropriate capacity will be designed.
1.25 Transport of personnel
or materials for
construction, operation
or decommissioning?
Yes Transportation of Raw material and final product
Mainly, will be by road. Within factory premises, all
Raw material will be safely transported by carboys
Thorough trolleys.
The movement of vehicular traffic would be restricted
to only during receipt of materials and dispatches of
Materials. Hence the impact due to noise pollution will be occasional. Precautions will be taken to reduce the impact of
the vehicular movement by trying to avoid the vehicular trips
during peak hours.
1.26 Long-term dismantling
or decommissioning or
restoration works?
No --
1.27 Ongoing activity
during
decommissioning
which could have an
impact on the
environment?
No --
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 7
Sr.
No.
Information/Checklist
confirmation
Yes
/
No
Details thereof (with approximate quantities / rates, wherever
possible) with source of information data
1.28 Influx of people to an
area in either
temporarily or
permanently?
Yes Total Manpower is on project site 665 nos. including contract
workers and staff.
1.29 Introduction of alien
species?
No --
1.30 Loss of native species
or genetic diversity?
No --
1.31 Any other actions? No --
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or ion short
supply):
Sr.
No. Information/Checklist confirmation
Yes /
No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
2.1 Land especially undeveloped or
agricultural land (ha)
No --
2.2 Water (expected source & competing
users) unit : KLD
Yes During Construction Phase :
During this small construction period we
may need water 20 KLD. Consumption will
be within consented quantity.
During Operational Phase -
Total Daily Water Requirement: 87 m3/ day.
Fresh water intake :
For Domestic : 13 m3/ day.
For Processing: 23 m3/ day.
For Gardening : 34 m3/ day.
(When sewage Treatment Plants is run in the
full-fledged condition treated water will be reused for Gardening. So that extra load on
the MIDC water supply system is reduced)
2.3 Minerals (MT) No --
2.4 Construction material – stone,
aggregates, and / soil (expected source
– MT)
Yes For proposed Building structures, estimated
Construction material like – Cement, Sand,
Grits, Bricks, Steel, etc. shall be purchased
from the local vendors.
2.5 Forests and timber (source – MT) No Recycled shuttering & Carpentry kind of material will be used for Proposed structures
2.6 Energy including electricity and fuels
(source, competing users) Unit: fuel During Operational Phase -
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 8
Sr.
No. Information/Checklist confirmation
Yes /
No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
(MT), energy (MW) Source: MSEDC
Connected
Load
2.5 MVA
Maximum
Demand
1 MVA
DG Set 1.5 MVA
2.7 Any other natural resources (use
appropriate standard units)
No --
3. Use, storage, transport, handling or production of substances or materials, which would be
harmful to human health or the environment or raise concern about actual or perceived risks to
human health.
Sr.
No. Information/Checklist confirmation
Yes /
No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human
health or the environment (flora, fauna, and
water supplies)
Yes Construction : Minimum amount of waste will be
generated during construction which
will be confined within existing
building structure
Operational Phase : Hazardous waste generated from
Production process will be send to CHWTSDF.
3.2 Changes in occurrence of disease or affect
disease vectors (e.g. insect or water borne
diseases)
No Construction only for short
duration with small number of
Workers.
3.3 Affect the welfare of people e.g. by
changing living conditions?
No Positive effect in the Socio economic
conditions.
3.4 Vulnerable groups of people who could be
affected by the project e.g. hospital
patients, children, the elderly etc.,
No --
3.5 Any other causes No --
4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
Sr.
No.
Information/Checkli
st confirmation
Yes /
No
Details thereof (with approximate quantities / rates,
wherever possible) with source of information data
4.1 Spoil, overburden or
mine wastes
Yes The Top soil will be used for gardening and other for refilling
the plinth.
4.2 Municipal waste
(domestic and or
commercial wastes)
Yes Construction Phase : There is no labor camp. The day workers waste will be taken
care of in the existing premises.
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 9
Sr.
No.
Information/Checkli
st confirmation
Yes /
No
Details thereof (with approximate quantities / rates,
wherever possible) with source of information data
Operation Phase:
Sr.
No.
Type Quantity UoM Disposal
1. Griding
/Fettling
powder
25 MT/M Sale
2. Griding
wheel
2000 nos. Sale
3. Shot
blasting
dust
25 MT/M Sale
4. CI boring
/MS
Turning
300 MT/M Sale
4.3 Hazardous wastes (as
per Hazardous waste Management Rules)
Yes Construction Phase: Hazardous waste was not generated from the construction phase.
4.4 Other industrial
process wastes
Yes Sr.
No.
Item no.
as per
Type of
waste
Quantity Disposal
1. 21.1 Paint
sludge
30MT/A CHWTSDF
2. 5.2 Hand
gloves,oil soked
3.7MT/A CHWTSDF
3
5.1 Used
oil/spent
oil
15 KL/A Authorised
reprocesser/recycler
4 33.3 Discarded
containers
6000
nos/A
CHWTSDF
5 12.2 Alkali
residue
1.44MT/A CHWTSDF
6 14.1 Nitrite
containing
sludge
7MT/A CHWTSDF
7 12.3 Spaint 3.6MT/A CHWTSDF
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 10
Sr.
No.
Information/Checkli
st confirmation
Yes /
No
Details thereof (with approximate quantities / rates,
wherever possible) with source of information data
bath sludge
8 12.5 Phosphate
sludge
6.2MT/A CHWTSDF
4.5 Surplus product No --
4.6 Sewage sludge or
other sludge from
effluent treatment.
Yes Dried sludge from STP will be used as manure for the plants.
4.7 Construction or
demolition wastes.
Yes Only construction wastes. Solid waste would be
mainly due to excavation in the form of rubble and
Soil. This soil and rubble will be reused for leveling
of project site.
4.8 Redundant machinery or equipment.
No --
4.9 Contaminated soils or
other materials.
No --
4.10 Agriculture wastes. No --
4.11 Other solid wastes. No --
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
Sr.
No.
Information/Checklist
confirmation
Yes /
No
Details thereof (with approximate quantities
/ rates, wherever possible) with source of
information data
5.1 Emissions from combustion of fossil
fuels from stationary or mobile
sources
Yes D.G. Sets will be provided only in case of
power failures during operational phase. The
Pollutants like SO2 that may arise from
emissions from D.G. Sets will be discharged
through vent of proper height.
5.2 Emissions from production processes Yes Nominal emissions are expected from process
plant while operation, as and When operated.
Approval of CTE & CTO will be taken from
MPCB
For pollution control, we will provide the
scrubber.
5.3 Emissions from materials handling
including storage or transport
Yes
The earth moving machineries and dumpers
will be used. Pollution under control ( PUC)
will be ensured .Proper and safe storage as per
the regulation shall be practiced & certificates
are made mandatory
5.4 Emissions from construction
activities including plant and
equipment
Yes /
Marg
inal
Nominal emissions expected from earth
moving machineries and dumpers .Pollution
under control (PUC) certificates are Made
mandatory.
Water sprinkling on ground and new
construction will be done at regular intervals to
reduce spreading of dust particles.
5.5 Dust or odours from handling of
materials including construction
materials, sewage and waste
Yes Dust levels are expected during the
construction phase. Proper measures such as
sprinkling of water on the ground and new
Construction will be done at regular intervals
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 11
Sr.
No.
Information/Checklist
confirmation
Yes /
No
Details thereof (with approximate quantities
/ rates, wherever possible) with source of
information data
to reduce the Spreading of the dust particles.
Sewage: - It shall be treated in Sewage
treatment Plant.
Effluent: It Shall be treated in Effluent
treatment Plant.
Waste:- Waste is segregated as per category
and disposed off as per Hazardous Waste
(Management, Handling and Transboundry
Movement) Rules, 2008
5.6 Emissions from incineration of waste No --
5.7 Emissions from burning of waste in
open air (e.g. slash materials,
construction debris)
No --
5.8 Emissions from any other sources No --
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
Sr.
No.
Information/Checklist
confirmation Yes / No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
6.1 From operation of equipment e.g.
engines, ventilation plant, crushers.
Yes but
negligible
1. No additional DG set, No Crusher is
planned for construction. No construction
will be undertaken in the night.Use of
equipment generating Noise less than 75
dB (A) in day time.
2. Noise generating constructional
activities would be carried out only during
day time.
3. Installation, use and maintenance of
mufflers on equipment would be ensured.
4. Workers working near noise
construction machinery would be supplied with necessary Personnel protective
Equipments like ear muffs/ear plugs etc. as
per requirement.
6.2 From industrial or similar processes. No --
6.3 From construction or demolition. No There is no demolition activity.
6.4 From blasting or piling. No No blasting will be undertaken.
6.5 From construction or operational
traffic.
Yes During Construction phase: There will be transport of materials for
construction work. Precautions will be
taken to reduce the impact of the vehicular
movement such as vehicular trips will not
be at peak traffic hours.
Operation Phase : The vehicular parking shall be restricted
only in the adequate parking area provided,
which would help in reducing noise and air
pollution due toVehicular
movement. The project proponent has
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 12
proposed good tree plantation which will
also help to reduce the noise level and
enhance air quality.
6.6 From lighting or cooling systems. No --
6.7 From any other sources. No --
7. Risks of contamination of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea:
Sr.
No. Information/Checklist confirmation
Yes /
No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
7.1 From handling, storage, use or spillage
of hazardous materials.
No Hazardous wastes like Paints sludge as per
Hazardous Waste (Management, Handling
and Transboundry Movement) Rules,2008.
Well equipped Fire fighting system shall
be installed. Risk assessment and disaster
management plan shall be prepared.
Formation of Safety Department under
Safety Officer to take care of Occupation,
Hazard & Hygiene.
7.2 From discharge of sewage or other
effluents to water or the land (expected
mode and place of discharge).
No Treated sewage will be reused for
gardening within the premises.
7.3 By deposition of pollutants emitted to air into the land or into water.
No Dust will be generated during construction phase from earthworks and movement of
vehicles. Appropriate fugitive dust control
measures, including water sprinkling of
exposed areas and dust covers for trucks,
will be provided to minimize any impacts.
7.4 From any other sources. No --
7.5 Is there a risk of long term build up of
pollutants in the environment from
these sources?
No --
8. Risk of accidents during construction or operation of the Project, which could affect human
health or the environment
Sr.
No. Information/Checklist confirmation
Yes /
No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
8.1 From explosions, spillages, fires etc
from storage, handling, use or
production of hazardous substances
No Blasting is not allowed so risk of explosion
does not exist. Fire Fighting system is
operational to control any fire hazard.
Secondary containments are provided for all
liquids spillages. Hazardous wastes generated
will be disposed off as per The Hazardous
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 13
Waste (Management, Handling and
Transboundry Movement) Rules, 2008.
8.2 From any other causes. No --
8.3 Could the project be affected by
natural disasters causing environmental
damage (e.g. floods, earthquakes,
landslides, cloudburst)?
No There is no history of such a disaster in the
area under reference. However, drains will
be designed of appropriate size. Structures
will be designed as per the Seismic zone
requirements.
9. Factors which should be considered (such as consequential development) which could lead
to environmental effected or the potential for cumulative impacts with other existing or
planned activities in the locality
Sr.
No.
Information/Checklist
confirmation Yes / No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
9.1 Lead to development of supporting, lities, ancillary development or
development stimulated by the
project which could have impact on
the environment e.g.:
• Supporting infrastructure
(roads, power supply, waste or
waste water treatment etc)
• Housing development
• Extractive industries
• Supply industries
• Other
No
Power, water, roads, wastes disposal
approvals are granted by as per State
Government rules hence no impact would be
observed for below mentioned
9.2 Lead to after-use of the site, which
could have an impact on the environment
No --
9.3 Set a precedent for later
developments
No The additional proposed Structures are to
support storage activities. Like, receiving of
materials, dispatch.
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar
effects
No
The additional proposed Structures are to
support storage activities. Like, receiving of
materials, dispatch.
(III) Environmental Sensitivity
Sr.
No.
Information/Checklist
confirmation
Name/
Identity
Aerial distance (within 15 km.)
Proposed project location boundary
1 Areas protected under international No --
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 14
Sr.
No.
Information/Checklist
confirmation
Name/
Identity
Aerial distance (within 15 km.)
Proposed project location boundary
conventions, national or local
legislation for their ecological,
landscape, cultural or other related
value
2 Areas which are important or sensitive for ecological reasons –
Wetlands, watercourses other water
bodies, costal zone, biospheres,
mounting, forests
Yes There is Panchaganga River at 15 km SE direction from site.
3 Areas used by protected, important
or sensitive species of flora or
fauna for breeding, nesting,
foraging, resting, over wintering,
migration
No --
4 Inland, costal, marine or
underground waters
No --
5 State, national boundaries No --
6 Routes or facilities used by the
public for access to recreation or other tourist, pilgrim areas
Yes State Highway No. 4- Mumbai –Bangalore
within 9 Km.
7 Defence installations No --
8 Densely populated or built-up area No NA
9 Areas occupied by sensitive man-
made land uses (hospitals, schools,
places of worship, community
facilities)
Yes As industry is located in MIDC Area all
infrastructure facilities are available.
.
10 Areas containing important, high
quality or scarce resources (ground
water resources, surface resources,
forestry, agriculture, fisheries,
tourism, minerals)
No --
11 Areas already subjected to pollution
or environmental damage. (those
where existing legal environmental
standards are exceeded)
No --
12 Areas susceptible to natural hazard which could cause the project to
preset environmental problems
(earthquakes, subsidence,
landslides, erosion, flooding
or extreme or adverse climatic
conditions)
No --
(IV). Proposed Terms of Reference for EIA studies: Not Applicable.
a xxx from yyy km distance
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 15
Form IA
APPENDIX II
(See paragraph 6)
FORM-1 A (only for construction projects listed under item 8 of the Schedule)
CHECK LIST OF ENVIRONMENTAL IMPACTS
(Project proponents are required to provide full information and wherever necessary attach
explanatory notes with the Form and submit along with proposed environmental management plan
& monitoring programme)
1. LAND ENVIRONMENT
(Attach panoramic view of the project site and the vicinity)
1.1. Will the existing land use get significantly altered from the project that is not consistent with
the surroundings? (Proposed land use must conform to the approved Master Plan /
Development Plan of the area. Change of land use if any and the statutory approval from the
competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features
of the proposed site (within 500 meters) and (iii) The site (indicating levels & contours) to
appropriate scales. If not available attach only conceptual plans.
Land Use Pattern:
The project falls within Kagal-Hatkanangale MIDC. The site is situated at D-3, D-3/1, D-3/2,
Kagal-Hatkanangle Five Star Industrial area, Dist-Kolhapur (Maharashtra) INDIA.
The project is an Industrial construction activity for manufacturing of Fettling, Shot blasting, Painting, &
machining Casting of ancillaries for tractors and farm equipments automotives and Engineering products.
The additional proposed structures are to support Storage activities like, receiving of materials, Separate
Storage and dispatch.
Agriculture / Livestock:
There is no agricultural activity in the vicinity of the proposed area. Industry is located in Kagal –
Hatkanangale five star MIDC.
Please refer the enclosed maps showing the following:
(i) Google Image
(ii) Layout of the site
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 16
1.2. List out all the major project requirements in terms of the land area, built up area, water
consumption, power requirement, connectivity, community facilities, parking needs etc.
I. PROJECT DETAILS :
a. Name & Location: “M/s. Indus Ferrotech Ltd.”
A. Plot History:
This project is located at D-3, D-3/1, D-3/2, Kagal-Hatkanangle Five Star Industrial area, Dist-
Kolhapur (Maharashtra) INDIA, having plot area 62,491.00 Sq. mt.
• The Built-up area of the Project is 24,381.66 Sq.mt. Now we are applying for Obtaining
Environmental Clearance for the industrial construction project under 8(a) category of schedule.
b. Area Statement:
No. Description Area Sq. Mt.
a. Total Plot Area: 62,491
b. Built-up area approved by MIDC 24,381.66
c. Parking Statement:
As an Industry is in Kagal-Hatkanangale five star MIDC, Management has provided transportation Pick
and drop facility to their staff. so required parking area (6300.68 m2) is provided for bus, cars & two
wheelers.
d. Occupancy
665 nos. of staff including Contract and permanent.
a. Water Consumption: (Domestic and flushing requirement)
1. During Construction Phase: MIDC Source
• From MIDC: 20 KLD
2. During Operation Phase:
Total Water requirement of the project is:
Sr.
No.
Description Quantity of water required
m3/day
Source of water supply
a. Domestic 13 m3/day MIDC
b. Gardening 34 m3/day MIDC
c Processing 23 m3/day MIDC
Total 87 m3/day
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 17
f. Sewage Generation:
Sewage:
• Sewage generation : 24 m3/day
• Capacity of STP (CMD): 25 m3/day
• STP Technology: MBR
Effluent:
• Effluent generation: 18 m3/day
• Capacity of ETP (CMD): 4 m3/Hr
g. Solid Wastes:
During Construction phase:
The total quantities of solid waste generated will be210 MT in the project; it will be disposed off
through existing authorized and local contractor.
During Operation Phase:
Total solid waste: 166 kg/day
Biodegradable waste: 116 kg/day. (will be handled over to authorized vendors for disposal)
Non-biodegradable waste: 50 kg/day. will be handed over to authorized contractors.
Use of dried STP sludge as manure.
Non Hazardous Waste
Sr.
No.
Type Quantity UoM Disposal
1. Griding /Fettling powder 25 MT/M Sale
2. Griding wheel 2000 nos. Sale
3. Shot blasting dust 25 MT/M Sale
4. CI boring /MS Turning 300 MT/M Sale
Hazardous waste Details:
Sr.
No.
Item no.
as per
HW
Schedule
Type of waste Quantity Disposal
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 18
1. 21.1 Paint sludge 30MT/A CHWTSDF
2. 5.2 Hand gloves,oil soked rags/cotton 3.7MT/A CHWTSDF
3
5.1 Used oil/spent oil 15 KL/A Authorised
reprocesser/recycler
4 33.3 Discarded containers 6000 nos/A CHWTSDF
5 12.2 Alkali residue 1.44MT/A CHWTSDF
6 14.1 Nitrite containing sludge 7MT/A CHWTSDF
7 12.3 Spaint bath sludge 3.6MT/A CHWTSDF
8 12.5 Phosphate sludge 6.2MT/A CHWTSDF
h. Power requirement:
For Construction Phase:
During Construction Phase -
Source: MSEDC
During Operational Phase – Source: MSEDC
Sr. No. Details Unit
1. Connected Load 2.5 MVA
2. Maximum Demand 1.0 MVA
3. D.G set 1.5 MVA
1.3. What are the likely impacts of the proposed activity on the existing facilities adjacent to
the proposed site? (Such as open spaces, community facilities, details of the existing landuse,
disturbance to the local ecology).
No impact on adjacent facilities due to proposed development. All required pollution control
equipments in the proposed facility to control liquid, solid and air pollutant parameters.
1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability?
(Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc. may be given).
No significant land disturbance as the site is flat land. As per the Seismic Zoning Map of India,
Kolhapur region falls under Zone-II. Stability Certificate, as per prevalent IS Code will be
obtained for these buildings from registered Consulting Structural Engineer considering the
seismic forces and wind forces etc.
aaa
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 19
1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour
map showing the natural drainage near the proposed project site)
For building structure there will not be any alteration in existing natural drainage systems.
1.6.
1.7
What are the quantities of earthwork involved in the construction activity-cutting, filling,
reclamation etc. (Give details of the quantities of earthwork involved, transport of fill
materials from outside the site etc.)
Excavation in the form of rubble and soil. Part of this soil and rubble will be used
for back filling and remaining material will be disposed within the site.
Give details regarding water supply, waste handling etc during the construction period.
During Construction Phase -
• Approximate 20 KLD water is required for proposed construction during construction phase.
Water will be utilized from existing source and it will be well within consented quantity.
• Sewage will be treated in Sewage treatment plant and reused for gardening/horticulture. And it
will well within demand.
• Non Hazardous waste generated from the construction is reused predominantly for filling and
compaction of site.
1.8
Will the low lying areas and wetlands get altered? (Provide details of how low lying and
wetlands are getting modified from the proposed activity)
There is no low laying area and wetlands are available in the existing site which is going to be
affected due to the project
1.9
Whether construction debris & waste during construction cause health hazard? (Give
quantities of various types of wastes generated during construction including the
construction labour and the means of disposal)
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 20
Excavated material will be generated as mentioned below; same would be used within premises
for land leveling.
Nominal dust level is expected during the construction phase. Proper measures such as sprinkling
of water on the ground and new construction will be done at regular intervals to reduce the
spreading of the dust particles.
Wastes generated by Construction labor-
Biodegradable garbage = 20m3 /day
Non-biodegradable garbage = NIL
Total : 20 m3 /day
The total quantities of Non-biodegradable waste generated in the project will be disposed off
through existing authorized contractor.
2. WATER ENVIRONMENT
2.1. Give the total quantity of water requirement for the proposed project with the breakup of
requirements for various uses. How will the water requirement be met? State the sources
& quantities and furnish a water balance statement.
Water Requirement & Sources :
For Construction : From MIDC
MIDC: 20 KLD (depending upon the activity).
During Operational Phase -
Total Water Requirement. :
For Domestic : 13 m3/ day.
For Gardening : 34m3/ day.
For processing : 23 m3/ day
Total Water Requirement: 87 m3 /day.
(When sewage Treatment Plants will run in the full-fledged condition treated water is reused for
flushing, paint shop & gardening. So that extra load on the MIDC water supply system will be
reduced)
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 21
Net water Demand from local water supply body will be 47 m3 /day only.
• Water demand for fire fighting is one time and occasional. Therefore water requirement for fire
fighting has not been considered while calculating daily water requirement.
Sr.
No. Description Input
M3/day Loss
M3/day Reason for
Loss Effluent
M3/day
Remark
1 Domestic 13.00
Consumption
2 Flushing 17
7.2
Loss
22.8 Domestic
Effluent
3 Gardening 34 NIL Loss 0 -------
4 Process 23 5.9 Processing 17.1 Industrial
Effluent
TOTAL 87 13.1 ------- 39.9 -------
Form I &IA and Consolidated statement
M/s. Indus Ferrotech Ltd.” At D-3, D-3/1& D-3/2, Kagal-Hatkanangale Five Star industrial Area, Kolhapur. Page 22
Water Balance daily Requirement