Actions related to each dept. for completing “Format-Con-5” for Signing of Connection Agreement
Sno Action by Annexure
1 SEF Annexure-A
2 Engg-S/s Annexure-I,II,III a
3 LD&C Annexure-III b, V
4 Region/Site Annexure-IV, VI
-
8/16/2019 Annexure for CON-5
2/10
Annexure-A
Final Arrangement Interim Arrangement
. !ame of the "in#
$. %oltage le&el
'. (ype of "in#
). *eacti&e compensation to
be pro&ided
5. +aximum Import Capacity
through the "in#
,. +aximum xport Capacitythrough the "in#
. /ate of commissioning
-
8/16/2019 Annexure for CON-5
3/10
Annexure - I
01a2.3ay Allocated in the s4itchyard of Connecti&ity - Final Connection
Arrangement
S.
!o.
3ay !os. at 4hich connecti&ity is
to be established
a2
b!
"!
#!
** Refer enclosed Single Line diagram
01b2.3ay Allocated in the s4itchyard of Connecti&ity-Interim Connection
Arrangement
Detai$s in abo%e or'at, i a(($i"ab$e
-
8/16/2019 Annexure for CON-5
4/10
Annexure - II
61a2.7uipment to be pro&ided by applicant in the allocated bay meeting the
re7uirement of Central lectricity Authority 1(echnical Standards for
Connecti&ity to the 8rid2 *egulations9 $:: 4hich shall be compatible 4ith the
e7uipment installed at other end- Final Connection Arrangement
S.!o.
!ame of 7uipments !os. *atings
. Cir"uit )rea*er
2+ Iso$ators
3+ Eart Sit"es
4+ C.
+ CV.
0+ a%e .ra(
+ Surge Arrestors
+ ters5
6+
61b2.7uipment to be pro&ided by applicant in the allocated bay meeting the
re7uirement of Central lectricity Authority 1(echnical Standards for
Connecti&ity to the 8rid2 *egulations9 $:: 4hich shall be compatible 4ith the
e7uipment installed at other end- Interim Connection Arrangement
Detai$s in abo%e or'at, i a(($i"ab$e
:1a2.;rotection 7uipment to be pro&ided by applicant shall be meeting the
technical standards as per Central lectricity Authority 1(echnical Standards for
Connecti&ity to the 8rid2 *egulations9 $:: and shall be compatible < matching
4ith the e7uipment installed at other end-- Final Connection Arrangement
a.
b.
c.
d.
:1b2.;rotection 7uipment to be pro&ided by applicant shall be meeting the
technical standards as per Central lectricity Authority 1(echnical Standards for
Connecti&ity to the 8rid2 *egulations9 $:: and shall be compatible < matching
4ith the e7uipment installed at other end-- Interim Connection Arrangement
Detai$s in abo%e or'at, i a(($i"ab$e
-
8/16/2019 Annexure for CON-5
5/10
Annexure-III1a2
1a2. System recording 7uipments shall be meeting the technical standards as
per Central lectricity Authority 1(echnical Standards for Connecti&ity to the
8rid2 *egulations9 $:: and shall be compatible to facilitate exchange of data
4ith the existing system installed in the IS(S net4or#--Final ConnectionArrangement
S.
!o.
!ame of 7uipments !os. *atings
. E%ent Logger
2+ Disturban"e re"or#er
3+ Fau$t $o"ator
4+ An7 oter e8ui('ent
+
0+
1b2.System recording 7uipments shall be meeting the technical standards as
per Central lectricity Authority 1(echnical Standards for Connecti&ity to the
8rid2 *egulations9 $:: and shall be compatible to facilitate exchange of data
4ith the existing system installed in the IS(S net4or#--Interim Connection
Arrangement
Detai$s in abo%e or'at, i a(($i"ab$e
-
8/16/2019 Annexure for CON-5
6/10
Annexure-III1b2
1a2.SCA/A 7uipments shall be meeting the technical standards as per Central
lectricity Authority 1(echnical Standards for Connecti&ity to the 8rid2
*egulations9 $:: and shall be compatible to facilitate exchange of data 4ith the
existing system installed in the IS(S net4or#-- Final Connection Arrangement
S.
!o.
!ame of 7uipments !os. *atings
. Data A"8uisition S7ste'
2+ Co''uni"ation e8ui('ent
3+ An7 oter e8ui('ent
4+
+
1b2.SCA/A 7uipments shall be meeting the technical standards as per Centrallectricity Authority 1(echnical Standards for Connecti&ity to the 8rid2
*egulations9 $:: and shall be compatible to facilitate exchange of data 4ith the
existing system installed in the IS(S net4or#-- Interim Connection Arrangement
Detai$s in abo%e or'at, i a(($i"ab$e
-
8/16/2019 Annexure for CON-5
7/10
Annexure-I%
$./etails of the modification=alteration to existing facilities for accommodating proposed connection and its estimated cost
i2 For Final Connection Arrangement
A. +odification=alteration to existing facilities in terminal substation for accommodating proposed connection >
a! Re8uire#
9ot Re8uire#
b! I re8uire#, #etai$s o 'o#ii"ation:s! /a$teration:s! are as un#er
1+ .er'ina$ )a7 ;;;;;;;;;;;;;;;;
2+
-
8/16/2019 Annexure for CON-5
8/10
1+ ;;;;;;;;;;;;;;;;
2+ ;;;;;;;;;;;;;;;;
3+ ;;;;;;;;;;;;;;;;
4+ ;;;;;;;;;;;;;;;;
(otal estimated Cost of abo&e 4or#s 1A?32 > Rs ;;;; Cr
ii2 For Interim Connection Arrangement
Detai$s in abo%e or'at, i a(($i"ab$e
-
8/16/2019 Annexure for CON-5
9/10
Annexure-%
'
-
8/16/2019 Annexure for CON-5
10/10
Annexure-%I
5. Site responsibility schedule
A. ;rinciple < ;rocedure >.e res(onsibi$it7 o "ontro$, o(eration, 'aintenan"e & a$$ 'atters
(ertaining to saet7 o e8ui('ents an# a((aratus at te "onne"tion (oint
sa$$ $ie it te oner+ For ease o #a7-to-#a7 o(eration as a genera$
(ra"ti"e &= is "arrie# out b7 te oner o te substation in ose
(re'ises te (ro(ose# ba7 is $o"ate# or i" a se(arate &= "ontra"t
is entere# into, base# on 'utua$$7 agree# ter's an# "on#itions+
3. "ist of e7uipment and their o4nership at the connection point >
Sl.
!o.
!ame of 7uipments @4nership
For Final Connection Arrangement
.
2+
3+
4+For Interim Connection
Arrangement
1+2+
3+
4+