annexure a: locality map & layout of the …rhdhv.co.za/media/eskom ucg - final eir for...

4
ANNEXURE A: LOCALITY MAP & LAYOUT OF THE UCG FACILITIES ON THE FARM ROODEKOPJES

Upload: tranngoc

Post on 23-Mar-2018

219 views

Category:

Documents


3 download

TRANSCRIPT

ANNEXURE A: LOCALITY MAP & LAYOUT OF THE UCG

FACILITIES ON THE FARM ROODEKOPJES

TITLE:

Project:DataType: Data

DateMapNo:

September 2012

PREPARED BY:

CLIENT:

SCALE:

0 1 20.5 km1:50 000

DATA:

PROJECTION:

Transverse MercatorWGS LO 29 .

LOCALITY MAP

LEGEND:

!

Ptn 3/67

Ptn 1/67

Ptn 2/67

Ptn 67

Ptn 17/65

Proposed new service road

Amersfoort

Proposed New Service Road

Rietfontein 66 HS

Bergvliet 65 HS

Roodekopjes 67 HS

Hydrology - Dams

Hydrology - Rivers

LOCALITY MAP:UNDERGROUND COAL GASIFICATION

PROJECT AND ASSOCIATED INFRASTRUCTUREIN SUPPORT OF CO-FIRING OF GAS AT

THE MAJUBA POWER STATION,AMERSFOORT, MPUMALANGA

Majuba Power Station

R35

£¤N11

£¤N11

Site Offices

Wastewater Treatment Works

Lekwa Mkhondo

Albert Luthuli

Ptn 21/65

Ptn 4/66Ptn 5/66

1650

- 760

00 Y

- 780

00 Y

- 800

00 Y

- 800

00 Y

- 820

00 Y

+ 3000000 X

+ 2998000 X + 2998000 X

+ 2996000 X + 2996000 X

+ 2994000 X + 2994000 X

+ 2992000 X

1660

To A

mer

sfoo

rt

N

W E

S

600m

m G

as P

ipe

For official use

ESKOM HOLDINGS SOC Ltd

MINING RIGHTS APPLICATION PLANREG 2(2)

Survey SystemWGS84 Spheriod WG29

Scale 1:15000

Plan compiled by:J C Fourie - Professional Mine Surveyor

8 January 2012

SIGNED

D.L. MAROKANE for Eskom Holdings SOC Ltd Date

Surveyor JC Fourie (PMS0101) Date

Regional Manager Mpumalanga Date

1660

1660

1660

1670

1670

1670

1670

1670

16801680

1680

1680

1680

1680

1680

1680

1680

1680

1690

1690

1690

1690

1690

1690

1690

1690

1690

1700

1700

17001700

1700

1700

1700

1700

1700

1700

1700

1700

1700

1700

1700

1700

17001700

1710

1710

1710

1710

1710

1710

1710

1710

1710

1710

1720

1720

1720

1720

1720

1720 1720

1730

1730

1730

1730

1730

11

KV

Po

we

rlin

e

Proposedpowerplant area

GTP Plant

CL of 27.5m W

ide Electric Powerline on Both Sides

CL of 27.5m W

ide Electric Powerline on Both Sides

Road Servitude

Rail S

erv

itud

e

CL of 7m Wide Water Pipeline Servitude

CL of 7m Wide Water Pipeline Servitude

Railway S

ervitu

de

R35 To V

olksrust

MajubaPower Station

Access RoadRIETFONTEIN No.66

WEILAND No.59

BERGVLIETNo.65

ROODEKOPJESNo.67

RIETPOORTNo.83

KOPPIESKRAAL No.56

ApplicationArea

- 750

00 Y

- 750

00 Y

- 800

00 Y

- 800

00 Y

- 850

00 Y

- 850

00 Y

+ 3005000 X + 3005000 X

+ 3000000 X + 3000000 X

+ 2995000 X + 2995000 X

Locality PlanScale 1:75000

- 780

00 Y

Extract from Land Surveyor's Co-ordinates

Survey System WG 29Constants - Nil

A -81125.32 2991492.31B -81823.02 2992549.00C -80643.64 2994196.29D -81161.70 2994317.30E -77754.02 2999076.55F -75437.75 2999176.45G -76568.85 2993243.86H -79657.94 2993965.90J -79878.14 2991675.71

The area A-B-C-D-E-F-G-H-Jbeing the Mining Right Application Area

represents 2359.5688 hectares

Components:1. Remainder of the farm Roodekopjes No 67 Vide diagram S.G. No A.161

2. Portion 3 of the farm Roodekopjes No 67 Vide diagram S.G. No A. 164/183. Portion 2 of the farm Roodekopjes No 67 Vide diagram S.G. No A. 163/184. Portion 1 of the farm Roodekopjes No 67 Vide diagram S.G. No A. 162/18

Proposed new service road

Proposed dam

Water tanks

A

B

C

D

EF

G

H

To Amers

foort

To Standerton

Majuba Power Station

To Volksrust

600m

m Gas

Pipe

Rai

lway

Sid

ing

Rai

lway

11 K

V P

ow

erlin

e

PROPOSEDGASIFIER

No 2

PROPOSEDGASIFIER

No 3

PROPOSEDGASIFIER

No 6

ProposedGASIFIER

No 4

PROPOSEDGASIFIER

No 5

PROPOSEDGASIFIER

No 7

PROPOSEDGASIFIER

No 9

RIETFONTEINNo.66

WEILANDNo.59

ROODEKOPJESNo.67

JAPTRAPNo.115

KLEIN RIEFONTEINNo.117

VLAKPLAATSNo.58

KOPPIESKRAALNo.56

PALMIETSPRUITNo 68

0 200 400 600 800 1000 1200 1400 1600 1800 2000

Scale 1:15000Metres

600m

m G

as P

ipe

Access Road

J

Offices andControl Room

Condensate Dam

CompressorStation

Offices andWorkshops

Condensate Dam

PROPOSEDGASIFIER

No 1

PROPOSEDGASIFIER

No 8

+ 2990000 X

Old Majuba CollieryUnderground workings

RIETFONTEIN No.66

To Standerton

To Amersfoort

Airfield

Access Road

RIETPOORT No.83

ROODEKOPJES 67 HSPALMIETSPRUIT 68 HS

KOPPIESKRAAL 56 HS

WEILAND 59 HS

WITKOPPIES 81 HS

RIETFONTEIN 66 HS

ROAD

ROAD

ROAD

ROAD

ROAD

ROAD

ROAD

STONE

GAS

OFF

JAPTRAP115 HS

KLEIN RIETFONTEIN117 HS

ROAD

ROAD

ROAD

NEW ROAD

NEW ROAD

NEW ROAD

BERM

BERM

ROAD

ROAD

PIPE UNDER ROAD

MAJUBA

12,19

27,85

102,92

22 KV Powerline

22 KV Powerline

22 KV Powerline

22 KV Powerline

22 KV Powerline

22 KV Pow

erline

22 KV Powerline

22 KV Powerline

22 KV Powerline

22 KV Powerline

22 KV

Powerlin

e

22 KV Powerline

22 KV Powerline

Gasplant

36.37.33

R65m

Graveyard

600mm Pipeline

600mm Pipeline

Gasplant

R65m

Graveyard

22 KV Powerline

22 KV Powerline

Condensate Dam

Condensate Dam

Graveyard

WATER TANKS

Workshop

Workshop

Stores

Canteen

Toilets

Office

Carports

Offices

Carports

Office

Water treatment plant

Diesel Bay

Control roomOffices/Laboratory

Air compressors

ContainersStores

FARM ROODEKOPJES PORTIONS 1,2,3, REMAINDER

TARRED NATIONAL ROAD

UCG OWN 100 M WIDE WETLAND RESTRICTION BUFFER LINE

OUTLINE OF GASFIELD

WATERCOURSES

LEGEND:

GRAVEL GOVERMENT ROAD

PERMANENT ROAD BRIDGE

MAIN ACCESS GOVERNMENT ROAD (TARRED)

SITE OFFICES, WORKSHOPS AND STORES, TOILETS WITH

WTP (PROCESS WATER TREATMENT PLANT)

CONTROL ROOM(TEMPORARY), PARKING, TOILETS WITH

RAW WATER DAM

GASIFIER 1

CULVERTS

BRIDGE (ROAD AND PIPE)

G.T.P GAS TREATMENT PLANT, OFFICE, TOILETS WITH

PIPE BRIDGE

SECURITY ACCESS CONTROL

PERIMETER FENCE

DIRTY WATER DAM (CONDENSATE DAM)

GRAVEL SITE ROADS

GRAVEL NATIONAL ROAD

UCG OWN 100 M WIDE WETLAND RESTRICTION BUFFER

100 YEAR FLOOD LINE

50 YEAR FLOOD LINE

100 YEAR FLOOD INUNDATED AREA

GRASSLAND

GRAVES

GRAVES

BORROW PIT

CULVERTS

CONCRETE DAM

SEPTIC TANKS & FRENCH DRAINS

SEPTIC TANKS & FRENCH DRAINS

SEPTIC TANKS & FRENCH DRAINS

0

25 50 100 200 250 500

MAJUBA POWER STATION

175M SERVITUDE FROM BOUNDARY OF RIGHTS

50M SERVITUDE FROM NATIONAL ROADS AND RAILWAY

RAILWAY

MINEABLE AREA LEFT

AIR LANDING STRIP

MAJUBA POWER STATION NATURE RESERVE

OLD BORROW PIT

DIESEL TANKS

147.15.53

450m

NEW SERVICE ROAD

NO. DESCRIPTION

EXTEND

CONDITION

EXTEND

CONDITION

APPLIED FOR

24G APPROVAL

GRAVEL SITE ROAD

BERGVLIET65 HS

Tar Road CL

Manhole

Manhole

Manhole

Manhole

Manhole

Buried Pipeline

Telephone line Fence

Buried

Pipelin

e

11 KV Power lines

Manhole

Drain

Borehole

Borehole

OLDMAJUBA COLLIERY

Borehole

Borehole

Buried Pipeline

Buried Pipeline

ROAD

ROAD

Graveyard

BoreholeBorehole

Buried Pipeline

T N