1 la yXud % , Annexure-A fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 16-01-2015 dz e- la- S. No. vkbZ Ve dk uke Name of items vkosnd dk uke Name of applicant vkosnu fnukad Date of application orZ eku fLFkfr Current status pkyu 'kfDr& bZ lh vkbZVe Motive Power – EC items 1. 8 V, 500 Ah LM Lead Acid Battery M/s Aegan Batteries Ltd No26/1,27/3, Chudagonda nahalli Village,Hosa kote,Lakkur Hobli,Malur Taluk , Kolar District- 563160 16.07.12 Letter issued and Deficiencies advised to firm on 03/08/12. Firm complied. Capability assessment carried out. Type Test under progress at firm's premises from 17.12.12.and type testing in under process. Vibration Test report submitted by firm dated 19.03.2013 and approved for trial on loco in diesel shed KJM. And one set (8units) of 8v, 500Ah LM Lead acid battery Commissioned in loco no.12636 on 15.05.2013. Battery is under field trial. Battery field trial is completed and performance report satisfactory found from KJM Diesel shed file put up for part II approval. 2. 8 V, 450 Ah LM Lead Acid Battery M/s Aegan Batteries Ltd No26/1,27/3, Chudagonda nahalli Village,Hosa kote,Lakkur Hobli,Malur Taluk , Kolar District- 563160 12.08.13 Application received on 19.08.13 and under scrutiny. Case file sent to legal Cell on 17.09.13 for Scrutiny. File return from Legal cell on 09.01.2014. Firm send internal type test results on 28.01.14 in office case is scrutinized. Type testing completed and after approval letter issued for developmental order on 19.12.2014. 3. Speed recorder- indicator, Micro Controller Based for ALCo locomotives (Spec. No. MP.0.3700-07 Rev. 05, Aug. 08) M/s Advance Instrumentati on 'n' Control Systems 25.07.13 A letter issued to firm vide our letter No.SD. DFM.M.1.3 (Advance Instrumentation) on 01/08/2013 regarding submission of documents for legal scrutiny. Firm has again Reminded by mail on 19/09/13 for submission of documents for legal scrutiny. 2nd time reminded by mail on 22.11.13. Documents received and scrutinised, The case is under process for legal scrutiny. Letter issued to firm for compliance of queries raised in the letter on dt: 17.02.14. Reply still awaited. Reminder issued to firm for closing the case on 13/06/14. Firm has visited RDSO on 16/07/2014 and given the assurance for submission of documents required by the office. 4. Classification Light (LED based) for EMD locomotives M/s Balin & Co 2A Ramkrishna Road, Sardapally, Barrackpore, PO Nonchandan pukur,Kolkat a-22 13.03.12 After scrutiny, letter issued to firm on 23.03.12. Reply received on 2-06-12, e- mailed to firm on 14-06-2012 for submitting complete reply-awaited, mail received from firm on 26-06-12, letter issued for clarification on 6/9-07-12 and reply received on 20-07-12 through e- mail and firm is again asked clarification through e-mail on 30-07-12 for address mismatch. Reply received on 9-08-11 & letter issued for clarification on 6-09-12, reply received on 01-11-12 and letter issued again to firm on 28-12-12 for reply. Reply received on 5-02-13 .Capability and capacity assessment has been planned on 23-05-13 &24-05-13 After scrutiny, letter issued to firm on 23.03.12. Reply received on 2-06-12, e- mailed to firm on 14-06-2012 for submitting complete reply- awaited, mail received from firm on 26-06-12, letter issued for clarification on 6/9-07-12 and reply received on 20-07-12 through e-mail and firm is again asked clarification through e-mail on 30-07-12 for address mismatch. Reply received on 9-08-11 & letter issued for clarification on 6-09-12, reply received on 01-11-12 and letter issued again to firm on 28-12-12 for reply. Reply received on 5-02-13. Capability and capacity assessment has been carried out from 4 -7 July 13 and

Upload: phamnga

Post on 13-Apr-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

1

layXud % ,

Annexure-A fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr

CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 16-01-2015 dze- la-

S. No.

vkbZVe dk uke

Name of items

vkosnd dk uke

Name of applicant

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& bZlh vkbZVe

Motive Power – EC items

1.

8 V, 500 Ah LM Lead Acid Battery

M/s Aegan Batteries Ltd No26/1,27/3, Chudagondanahalli Village,Hosakote,Lakkur Hobli,Malur Taluk , Kolar District-563160

16.07.12

Letter issued and Deficiencies advised to firm on 03/08/12. Firm complied. Capability assessment carried out. Type Test under progress at firm's premises from 17.12.12.and type testing in under process. Vibration Test report submitted by firm dated 19.03.2013 and approved for trial on loco in diesel shed KJM. And one set (8units) of 8v, 500Ah LM Lead acid battery Commissioned in loco no.12636 on 15.05.2013. Battery is under field trial. Battery field trial is completed and performance report satisfactory found from KJM Diesel shed file put up for part II approval.

2.

8 V, 450 Ah LM Lead Acid Battery

M/s Aegan Batteries Ltd No26/1,27/3, Chudagondanahalli Village,Hosakote,Lakkur Hobli,Malur Taluk , Kolar District-563160

12.08.13

Application received on 19.08.13 and under scrutiny. Case file sent to legal Cell on 17.09.13 for Scrutiny. File return from Legal cell on 09.01.2014. Firm send internal type test results on 28.01.14 in office case is scrutinized. Type testing completed and after approval letter issued for developmental order on 19.12.2014.

3.

Speed recorder-indicator, Micro Controller Based for ALCo locomotives (Spec. No. MP.0.3700-07 Rev. 05, Aug. 08)

M/s Advance Instrumentation 'n' Control Systems

25.07.13

A letter issued to firm vide our letter No.SD. DFM.M.1.3 (Advance Instrumentation) on 01/08/2013 regarding submission of documents for legal scrutiny. Firm has again Reminded by mail on 19/09/13 for submission of documents for legal scrutiny. 2nd time reminded by mail on 22.11.13. Documents received and scrutinised, The case is under process for legal scrutiny. Letter issued to firm for compliance of queries raised in the letter on dt: 17.02.14. Reply still awaited. Reminder issued to firm for closing the case on 13/06/14. Firm has visited RDSO on 16/07/2014 and given the assurance for submission of documents required by the office.

4.

Classification Light (LED based) for EMD locomotives

M/s Balin & Co 2A Ramkrishna Road, Sardapally, Barrackpore, PO Nonchandanpukur,Kolkata-22

13.03.12

After scrutiny, letter issued to firm on 23.03.12. Reply received on 2-06-12, e- mailed to firm on 14-06-2012 for submitting complete reply-awaited, mail received from firm on 26-06-12, letter issued for clarification on 6/9-07-12 and reply received on 20-07-12 through e-mail and firm is again asked clarification through e-mail on 30-07-12 for address mismatch. Reply received on 9-08-11 & letter issued for clarification on 6-09-12, reply received on 01-11-12 and letter issued again to firm on 28-12-12 for reply. Reply received on 5-02-13 .Capability and capacity assessment has been planned on 23-05-13 &24-05-13 After scrutiny, letter issued to firm on 23.03.12. Reply received on 2-06-12, e- mailed to firm on 14-06-2012 for submitting complete reply-awaited, mail received from firm on 26-06-12, letter issued for clarification on 6/9-07-12 and reply received on 20-07-12 through e-mail and firm is again asked clarification through e-mail on 30-07-12 for address mismatch. Reply received on 9-08-11 & letter issued for clarification on 6-09-12, reply received on 01-11-12 and letter issued again to firm on 28-12-12 for reply. Reply received on 5-02-13. Capability and capacity assessment has been carried out from 4 -7 July 13 and

Page 2: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

2

under process. Documents received on 12-08-13 and sent to Legal Cell for scrutiny on 27-08-13. File received from Legal cell with remarks on 28-10-13. Letter issued to firm on 08-11-13 for compliance the legal cell remarks and reply awaited. Reply received on 2-12-13 and again sent to Legal Cell for scrutiny on 11-12-13. File received from legal cell on 08.01.2014 and under further process. Letter sent to firm on 18.03.14 for manufacture the sample. Reply received through mail on 04.04.14 and letter issued to firm on 22.05.14 for submitted internal type test report. Letter issued to firm on 16.06.14 for submitted complete internal type test report.

5.

Flasher light (LED based)

M/s Balin & Company, 2/A, Ramkrishna Road, Saradaoally (JRR RD) Barrackpur, Kolkata-700122

31.05.04

After Type testing, recommended for field trial on 03.02.2009. Performance evaluation carried out. FRPCPY is very high, letter sent to firm on 18.11.11 for root cause analysis. Reply received through e-mail on 22.11.11 & further performance is under watch. Letter issued again for performance feedback on 29-06-12 and awaited. Mailed to firm on 28-12-12 about corrective and preventive action against the failure reported by Maulali shed. Reply received on 8-1-13 and FRPCPY calculated and letter issued to firm on 8/11-03-13 for root cause analysis and preventive action, reply received on 25.03.13. Letter issued to Maulali Diesel Shed for performance feedback after attending on 10.09.2013, reply awaited. Letter issued to GY, GTL, UDL, KZJ, MLY and KGP Sheds, for performance feedback on 03.01.2014, reply awaited. Reminder letter issued to GY, GTL, UDL, KZJ, MLY and KGP Sheds, for performance feedback on 26.03.2014. Reply received from Andal Diesel shed regarding failure of LED Flasher Light on 16.04.14. Case has been analysed and decided not possible to approved the product, same has intimated to firm on dated 21.07.2014 with copy to all railways.

6.

Sensor, Fuel Level

M/s BAYHAM INDIA PVT LTD

14.02.13

Application received on 14.02.13 and Letter issued to firm on 15.03.13 Reply received from M/s Bayham through Mail on 01-04-13. Letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7. Reply received on 08-08-13 and send for Legal cell /RDSO scrutiny on 27-08-13. File received from legal cell on 08.01.2014 and under further process. Letter sent to firm on 07.03.14 for submit the declaration for undertaking. Reply received on 24.03.14. Deficiencies advised to firm on 01.05.14. Reply received on17/18.06.14 and Letter issued to firm for deficiencies on 03-07-2014. Reminder letter issued to firm on 29/09/2014

7.

8V, 500 Ah LM Lead Acid Battery

M/s Beacon battery enterprises/ hoppecke battery systems Beacon :172 Sector 23 Gurgaon 122017

14.07.11

Application scrutinised. Documents not found as per RDSO Spec. Joint meeting held with firm on 19.07.11 and advised to comply the same. Firm agreed to modify the design and document. Reply received on 18.10.2011. Letter issued for manufacture of Ni-Cd Battery Sample on 03.11.2011. Visit to firm on 23.11.11. Testing facility and samples not available. Firm has given the assurance by Feb 2012. Reply received and letter issued to firm on 06.07.12 for deficiencies. Reminder letter issued on 06.03.2013. Letter issued on 02-07-13 for submitting documents as per vendor guideline. Documents received on July 19, 2013 against reminder. Document paper not completed by Notary attested till date. Document papers submitted by firm and file sent to Legal cell on date 22.11.13. File return from Legal cell on 09.01.2014. One set of 8V, 500Ah

Page 3: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

3

lead acid battery for developmental P.O. meet to firm from DLW Varanasi and checked by RDSO at firm premises not found suitable samples and letter send to firm and DLW Varanasi dated 03.03.2014. Revised letter sent to firm on 08.04.14. Firm has submit the compliance doc. to RDSO on 07.08.14 and discussed with JD/DEMU for development of testing Lab and ready the modified sample. Firm has agreed to submit the internal test results on Sept. 2014.

8.

6V, 150Ah Ni-Cd Battery Storage Unit

M/s Beacon battery enterprises/ hoppecke battery systems Beacon :172 Sector 23 Gurgaon 122017

13.05.11

Application scrutinised. Documents not found as per RDSO Spec. Joint meeting held with firm on 19.07.11 and advised to comply the same. Firm agreed to modify the design and document. Reply received on 18.10.11. Letter issued for manufacture of Ni-Cd Battery Sample on 03.11.2011. Visit to firm on 23.11.11.Testing facility and samples not available. Firm has given the assurance by Feb 2012. Reply received and letter issued to firm on 06.07.12 for deficiencies. Reminder letter issued on 06.03.2013. Letter issued on 02-07-13 for submitting documents as per vendor guideline. Documents received on July 19, 2013 against reminder. Case file sent to legal cell on 17.09.2013 for scrutiny. File return from Legal cell on 09.01.2014. DLW developmental order given to firm for one loco set of 6v, 150Ah Ni-Cd battery and proto type test done at firm’s premises. Test results are not found satisfactory and letter sent to DLW Varanasi and firm on 03.03.2014. Revised letter sent to firm on 08.04.14. Firm has submit the compliance doc. to RDSO on 07.08.14 and discussed with JD/DEMU for development of testing Lab and ready the modified sample. Firm has agreed to submit the internal test results on Sept. 2014.

9.

General Purpose Relay

M/s Bhopal Electrical Insulation Pvt Ltd, Plot no 82-B, Sector-H, Industrial Area, Govindpura, Bhopal-23

15.06.10

Re Endurance test to be done & ETDC report awaited. Letters & Reminders have been sent to firm on 30.08.11, 24.10.11, 16.11.11, 13.12.11, 28.12.11 & 16.01.12. Re-endurance test started on 16.03.12. Mechanical and electrical endurance test completed on 19.04.12 and 01.5.12 respectively. The firm has to get vibration & shock test completed at some NABL accredited/Gov. Lab. for getting shock and vibration test conducted, letter sent to the firm on 21.06.12 and 04.07.12. 6th reminder sent to the firm on 22.02.13. The report of vibration & shock test submitted by the firm on 16.04.2013. The QAP as per new format is still awaited. Letter for compliance of QAP as Per RDSO format sent to firm on 31.05.13. QAP after complying all points of deficiencies is awaited. QAP dated 30.07.2013 in one copy received on 06.08.2013 and is under scrutiny. Letter of deficiencies sent to the firm on 23.08.2013. A reminder citing the early deficiencies sent to the firm on 31 Oct/01 Nov/2013. After overcoming the deficiencies, QAP dated 04.12.2013 received from the firm. An e-mail dated 09.12.2013 sent to the firm for submitting required documents before approval. An e-mail dated 13.12.2013 sent to the firm for submitting required documents before approval. The firm submitted some documents along with their letter dated 11.02.2014 but not all documents as advised to the firm as per latest guidelines, ver-8.0. Letter for balance documents sent to the firm on 26/27.03.2014. Some of the documents submitted on 28.04.2014 by the firm but there were errors in documents. On 09.05.2014 the firm submitted documents but there were error in some documents. The firm assured that they will submit those documents after correction by 19.05.2014. Documents

Page 4: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

4

from the firm have been received on 20.05.2014. The firm has submitted justification letter on 06.06.2014 for not submitting factory license and another letter for waiver from field trial. An inspection at firm’s premises has been planned for checking the men power and installed power capacity to verify the claimed “none requirement of factory license”. Verification report submitted on 18.06.14 regarding substitute of factory license. Letter for developmental order issued on 16.07.2014.

10.

Sensor, Fuel Level

M/s Elixir Engineering, #6, SFHS Shopping Area, Nandini Lay out, Bangalore – 560 096

13.06.13

Letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7, Reply received on 13-08-13 and under process. Letter issued to firm on 20-08-13 for compliance of Legal Cell Observation. Reply received and sent to legal Cell on 19-09-13 for Scrutiny. File received from legal cell on 08.01.2014 and under further process. Letter sent to firm on 07.03.14 for submit the declaration for undertaking. Reply received on 24.03.14. Deficiencies advised to firm on 01.05.14. Reply received on 27.05.14 and letter issued for clarification on 20-06-14. Reply received from firm through e-mail on 27.06.14. Letter for clarification issued on 01.08.2014. Reply received on 04/09/14 and capacity and capability assessment to be carried out.

11.

Master Controller of EMD locomotive (Dynamic Control Assembly)

M/s Inspros Engineers Pvt Ltd,126, Sector-A, Industrial Area, Mandeep, Bhopal- 462046

30.04.11

Load Life test is completed. The firm has submitted vibration test report issued from ERTL New Delhi on 09/02/12. Letter issued to DLW vide our letter SD. EMD. Master Controller (Inspros) on 02/03/12 for extension of P.O. issued to M/s Inspros. IC issued on 23.03.12. Prototype clearance for field trial has been issued to M/s lnspros Engineers Pvt. Ltd, Bhopal on 19-04-12. Letter to SBI and GY Shed sent for Performance feedback of the EMD Master Controller under field trial. Technical Audit with DLW conducted on 23

rd and 24

th

May’13. Audit report prepared and issued to DLW and Firm for complying the issue raised in the report. Audit verification is still pending, however this office has reminded by letter on 08.11.2013. Letter issued to firm for providing the date of verification for audit on 05/03/2014. Reply received from firm. Date of verification finalised and letter issued to firm on 19/03/2014. Letter also issued to DLW for providing the fitment details on the locomotive on 19/03/14. Letter issued to DLW and M/s Inspros for re- scheduled the verification for audit as requested by the Firm on 03/04/14. M/s Inspros intimated to RDSO again and re- scheduled the date of verification for audit. Case is under process. Letter issued to M/s Inspros and DLW for verification for audit on 23/05/2014. Letter issued to firm on 18/07/2014 for clarification on failure of trial equipment. Letter issued to firm for QAP clarification on 21.10.2014.

12.

Conventional stick type Master controller BHEL model MC03802B

M/s Inspros Engineers Pvt Ltd,126, Sector-A, Industrial Area, Mandeep, Bhopal- 462046

03.01.12

After scrutiny, letter sent to firm vide our letter no. SD.ALCO MASTER CONTROLLER on 19/01/12 for submitting the QAP.The firm has submitted QAP on 09/02/12 and scrutinised. Intimated on Phone and e-mail also to M/s Inspros for offer the type test. Reply received on 21.06.12. BHEL type test programme sent to firm by e-mail on 18.07.12 and asked to submit the internal test result as per the BHEL test programme. The firm again advised by e-mail to offer for type test on 01/08/2012. Reminder issued to firm on 11/09/12.The capability assessment waived off. Prototype Type Test started. In-house test done at 6th and 7th feb` 2013 at the firm premises. Vibration test completed. Test report

Page 5: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

5

scrutinised. Letter issued to DMW/Patiala with a copy to firm for field trial on 14/08/2013 vide this office letter no. SD.DFM.ALCo MASTER CONTROLLER (Inspros) dt. 14.08.13. Reminder letter issued to DMW on 19/03/2014. Reply received from DMW/PTA of Status of field trial on loco.

13.

EP/EM contactor and 6M BKT/Reverser

M/s Jaysree Supply agency (Kolkata) Pvt Ltd 118, Garha Road, Kolkata-700075

21.09.11

Vendor registration form scrutinized and letter sent to the firm on 17.11.2011 for overcoming observed deficiency. Specification has been sent on Dec 5, 2011.Another letter sent on 17.02.12 for compliance to the observed deficiencies. Letter received from the firm, again the firm has been advised on 21.03.12 and on 09.04.12 for compliance to the observed deficiencies. Firm has complied with the letter dated 09.04.12. E-mail from the firm has been received on 15.05.12. It has partially complied to letter sent to the firm on 04/07.05.12. Letter to firm to fully comply has been sent on 01.6.12. Letter received from the firm on 27.06.12, complying the entire requirement before capacity/ capability assessment. A letter requesting a call to RDSO from the firm, for capacity/capability assessment of the firm sent through E-mail on 29.06.2012. A letter for capacity/capability assessment received from the firm on 04.07.12. Capacity /capability assessment completed and letter of deficiency sent to the firm on 30.08.12. Letter received from the firm to reconsider their case for continuing the process of approval. Again the reply to the firm for complying the points raised earlier has been sent on 26.11.12. An agreement paper of M/s Jayshree supply agency and M/s. N.U Industries for being sister concern has been received vide letter dated 05.12.2012 (letter was received on 02.01.2013. A letter asking new QAP and process flow chart, has been sent to the firm on 24.01.2013.again reminder for the Same has been sent to the firm on March 08, 2013. A letter with incomplete QAP has been received on 02.04.2013 from the firm. The letter regarding QAP has been mailed to the firm on 05.04.2013. Again a letter with incomplete QAP has been received on 12.04.2013 from the firm and again a letter regarding complete QAP has been sent to the firm as on 23/25.04.2013. A letter dated 24.06.2013 of the firm regarding early submission of QAP has been received on June 27, 2013. QAP dated 05.08.2013 received on 08.08.2013 and is under scrutiny. Letter of deficiencies sent to the firm on 23.08.2013. QAP received and under scrutiny. A letter and QAP dated 21.09.2013, complying the deficiencies received from the firm on 26.09.2013. Again a letter citing one of the early deficiencies sent to the firm on 31.12.13. Letter dated 11/11/2013 and amended QAP's of the firm received on 18/11/2013. A letter regarding re-capacity assessment sent to the firm on 11.02.2014 and planned on 24/02/14 to 25/02/14. Reassessment of capacity/capability completed from 24/02/14 to 25/02/14. On 12.09.2014 the letter has been sent to the firm for keeping 02 Nos. of each EM contactor ready for type test and send internal test reports of contactors along with a suitable date for type test.

14.

Flasher light (LED based)

M/s Kaysons Electrical Pvt Ltd, SH 15/79, Shivpur Varanasi 221003

24.02.11

Reminder uploaded for reply on 05-05-2011, till date reply not uploaded by firm. Letter issued again on 02.09.11 for same. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 17.11.11. Wave soldering certificate received on 02.12.11. Verified at firm by RDSO representative on 17.03.2012, Firm was asked to send compliance with Vendor

Page 6: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

6

guidelines on 1-05-12, firm is advised on 08-06-2012 through email to send the QAP as per Latest Format., reminder letter dated 5-10-12 mailed and reply received on 01-11-12 and letter issued to firm for reply on 07-12-12 and QAP revived on 28-1-2013 and under process. Capacity Assessment and type test is carried out from 26-2-13 to 2-03-13. Corrected copy of QAP received on 05-04-13, Inspection call not received for remaining type test, letter issued for type test inspection call on 26-06-13. Further Type test has been carried out from 22 to 26-07-13 & 12-08-13 at firm premises Letter issued for remaining test from outside lab on 23-08-13. Results awaited. Reminder Letter issued to firm on 06.03.14. Incomplete result received on 14.08.14. Letter issued to firm on 05.09.14 for submit remaining test report.

15.

Marker light (LED Type)

M/s Kay sons Electrical Pvt Ltd,SH 15/79, Shivpur Varanasi 221003

19.02.11

Reminder uploaded for reply on 05-05-2011, till date reply not uploaded by firm. Letter issued again on 02.09.11 for same. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 17.11.11. Wave soldering certificate received on 02.12.11. Verified at firm by RDSO representative on 17.03.2012, Firm was asked to send compliance with Vendor guidelines on 1-05-12, reply received on 19-05-12 after scrutiny, firm is advised on 08-06-12 through email to send the QAP as per Latest Format. Reminder letter dated 05-10-12 mailed and letter issued to firm for reply on 07-12-12 and QAP received on 28-1-2013 and under process. Capacity Assessment and type test is carried out from 26-2-13 to 2-03-13. Corrected copy of QAP received on 05-04-13. Inspection call not received for remaining type test, letter issued for type Test inspection call on 26-06-13. Further Type test has been carried out from 22-07-13 to 26-07-13 & 12-08-13 and Letter issued for remaining test from outside lab on 23-08-13. Results awaited. Reminder Letter issued to firm on 06.03.14. Incomplete result received on 14.08.14 Letter issued to firm on 04.09.14 for submit remaining test report.

16. Control System, AC- AC control system, AC-AC Traction for 4500HP EMD locomotives & its sub-assemblies Locomotives & its sub-assemblies

M/s K K IRON INDUSTRIES

24.09.13

Vendor registration form has been received & it is under scrutiny. Shortcomings have been advised to the firm on- 12.03.14. Reply from the firm has been received vide firm’s letter dated-15.04.14 and is under scrutiny. Letter written to the firm dt 15/07/14 for further compliance. Reminder letter written to the firm on 12.01.15.

17.

Intelligent Low Idling Equipment

M/s Laxven Systems,Plot No 188/A, Sector-III,Lane-1, IDA, Phase-II, Cherlapally Hyderabad- 500 051

18.04.12

Letter issued after scrutiny on 4-5-12. Reply received on 17-05-12. After scrutiny, firm is advised on 04-06-12 through email to send the QAP as per revised format. Reply received on 14.06.12 through email and hard copy received on 21.06.12. Prototype testing (In-house) has been carried out on 29.08.12 to 30.09.12 and ETDC /ERTL test completed. Loco validation test has been done on 01/10/2012 at KZJ. Firm has submitted the original copy of test reports. Letter issued to firm and Sr.DME(D)/KZJ on 04/12/2012 vide our letter no. SD.LOW IDLE (Laxven) dt. 04.12.12 reg. field trial clearance. Letter issued to MLY shed for field performance on 05.06.13. Reminder letter issued to MLY shed with a copy to and firm on 28/03/14. Reminder -II issued to Sr. DME/MLY on 21.10.2014 for performance.

18. Micro-Controller based governor for

M/s Laxven Systems,Plot

18.04.12 Application received on 19.04.2012. Letter written to the firm date 02.05.2012 for details. Letter received from

Page 7: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

7

ALCO / DLW / DMW 16 & 6 Cylinder 251 Series Diesel / Electric Locomotives

No 188/a, Sector-III,Lane-1, IDA, Phase-II, Cherlapally Hyderabad- 500 051

the firm vide letter no. LAX/RDSO/MCBG-048/12-13 date 15.05.12. Deficiencies advised to firm on 19.06.12 by email. Reply received on 04.07.12 by email and case is under process. Latest Digital Signature submitted and uploaded on RDSO website by firm on 31st July12.Further credentials have been sought from the vendor as per the vendor guideline on 7/8th Aug2012. Letter sent to firm on 8th Oct'2012 for compliance of infrastructure. Firm sent mail on 06.02.13 regarding the compliance of infrastructure. Check sheet has been prepared. Further, on 18th Feb'13, firm has been asked to submit Plant & Machinery list in non-judicial stamp of Rs. 100. And self-declaration form of allied sister concern. Firm has submitted self-declaration form of allied sister concern. Firm has submitted Plant & Machinery list in non-judicial stamp. MCBG test schedule under Scrutiny as per Rev 03. Testing at the firms premises planned in April 2013. Firm has been asked to send the OGA drg for MCBG. Capacity Assessment and functional testing of prototype conducted on 9

th and 10

th May 2013. Firm has to carry

out further testing at the Govt. recognised lab. Letter issued on 13/08/2013. Firm has submitted ETDC test report and the same is under study. MCBG unit is planned to be tested on engine test bed at DMW. Letter issued on 08.10.13 to DMW for testing. Letter issued to CMM/PTA on 23.05.14 for developmental order for two no. MCBG and a letter issued to M/s Laxven System on 23.05.14 for conducting remaining test as per Rev. 03. Remaining test has been carried out at firm premises from 17.07.14 to 22.07.14 and letter sent to DMW/Patiala on 07.08.14 for conducting performance test. Performance test has been carried out at DMW on 13.10.14 to 16.10.14 and case is under process.

19.

Marker light (LED Type)

M/s Malika International A-16, Sector-10, Noida-201301

25.04.12

Letter issued after scrutiny on 04-05-12 and reply received on 24-05-12, shortcoming advised to firm on 15-06-12 through email. Reply received on 21-06-12. Capability & Capacity assessment carried out on 24-07-12 & 25-07-12. Deficiency advised to the firm on 14.09.12.Reply received on 10-10-12 , Deficiency advised to the firm on 22-10-12 , reply received on 30-10-12 and Letter issued to firm for prototype development on 07-12-12. Internal test report received on 28.03.13 further queries called trough mail on 10-04-13 and reply received on 23-04-13 and under process, QAP compliance will be ascertained in June 13 however letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7. Reply received on 28-06-13 but documents are not as per guideline and informed to firm through phone on 08-07-13. Reply received on 16-07-13 and processed for Legal cell scrutiny. Letter issued to firm on 23-08-13 for compliance of Legal cell observation. Reply received on 02.09.2013 and send to legal cell on 04-09-13 for scrutiny of documents, Scrutinized document received on 05-09-13. Capability & capacity assessment has been carried out 04-10-13 & 05-10-13. Firm is advised to comply the observation before type test on 31-10-13. Reply awaited. Reply received through mail on 13.01.2014 and 12.03.14. Letter issued to firm on 07.04.14 for suitable date for type testing call from firm side. Reply received through mail on 15.04.14 and type test is carried out from 13.05.14 to 17.05.14. Remaining type test is carried out on 04.06.14 to 05.06.14. Letter issued for remaining test from outside lab on 12-06-14.

Page 8: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

8

Results awaited.

20.

Flasher Light, LED type for ALCO Locomotives- Spec No. ELRS/Spec/LFL/0017 Rev. 01, Sep 04

M/s Malika International A-16, Sector-10, Noida-201301

18.01.13

Letter issued to Firm for further clarification on 8/11-02-13, Firm reply received on 25-02-13 and further reply of firm received on 08-03-13 As per revised vendor guideline documents sought vide letter dt. 21.06.13. Reply received on 28-06-13 but documents are not as per guideline and informed to firm through phone on 08-07-13. Reply received on 16-07-13 and processed for Legal cell scrutiny. Letter issued to firm on 23-08-13 for compliance of Legal cell observation. Reply received on 02.09.2013 and send to legal cell on 4-09-13.Scrutinized document received on 05-09-13. Capability & capacity assessment has been carried out on 04-10-13, 05-10-13. Firm is advised to comply the observation before type test on 31-10-13.Reply awaited. Reminder-I issued to firm on 21.03.14.

21.

Flasher light (LED based)

M/s Mechtronics, 16/2, Mathura Road, Karkhana Bagh, Faridabad, Hariyana-121002

23.09.08

After type testing, recommended for field trial on 19.03.2010 and performance feedback, sought vide letter no. SD.LED. Flasher light, Dt: 13.06.2011. Letter issued on 02.09.11 to firm for supply details & failure reported to firm. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 23.11.11. A letter issued to firm for Current status of digital signature certificate and IPR undertaking. Reply received on 21-02-2012 .Letter issued to all Zonal Railway for performance again on 4-05-12 and awaited. Letter to DLW on 17-12-12 for exact homing shed details. Repeat (reminder1) letter to DLW on 21-02-13 for exact homing shed details. Repeat (Reminder 1) letter to DLW on 21-02-13 for exact homing Shed details. Reply received from DLW on 13-03-2013 and under process. Clarification from firm regarding address change has been asked vide this office letter dated 09-07-13. Reply received vide firm letter dt. 19-07-13 and Letter issued to firm on 03.09.2013 for submit all the documents with new work address & QAP. Reply awaited. Recently failure received from DLW of WR and called for root cause analysis on 24.01.2014. Reminder letter issued to firm on 05.03.2014 for submit all the documents with new work address. Reply received on 11.04.14. Letter issued to Firm on 23.04.2014 and reply awaited. Reminder letter issued on 16.10.14 reply awaited.

22.

Marker light (LED Type)

M/s Mechtronics, 16/2, Mathura Road, Karkhana Bagh, Faridabad, Hariyana-121002

06.08.09

After type testing, recommended for field trial on 19.03.2010. Letter issued on 02.09.11 to firm for supply details & failure reported to firm. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 23.11.11.A letter issued to firm for Current status of digital signature certificate and IPR undertaking. Reply received on 21-02-2012. Letter issued to all Zonal Railway for performance again on 4-05-12 and awaited. Letter to DLW on 21-02-13 for exact homing shed details. Reply received from DLW on 13-03-13, mean while firm has changed works address to sahibabad, informed on 03-05-13 and case is under process as per vendor guideline. Clarification from firm regarding address change has been asked vide this office letter dated 09-07-13. Reply received last week and under process. Reply received vide firm letter dt. 19-07-13 and under process. Letter issued to firm on 03.09.2013 for submit all the documents with new work address & QAP. Reply awaited. Reminder letter issued to firm on 05.03.2014 for submit all the documents with new work address. Reply received on 11.04.14. Letter issued to Firm on 23.04.2014 and reply awaited. Reminder letter issued on 16.10.14 reply awaited.

Page 9: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

9

23.

Classification Light (LED based) for EMD locomotives

M/s Mechtronics, 16/2, Mathura Road, Karkhana Bagh, Faridabad, Hariyana-121002

06.08.09

After type testing, recommended for field trial on 19.03.2010. Letter issued on 02.09.11 to firm for supply details & failure reported to firm. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 23.11.11.A letter issued to firm for Current status of digital signature certificate and IPR undertaking. Reply received on 21-02-2012 Letter issued to all Zonal Railway for performance again on 4-05-12 and Letter issued to DLW on 14-12-12 for getting exact homing shed and fitment details for all supplied classification light. Repeat (Reminder 1) letter to DLW on 21-02-13 for exact homing Shed details. Reply received from DLW on 13-03-13 and under process. Clarification from firm regarding address change has been asked vide this office letter dated 09-07-13. Reply received last week and under process. Reply received vide firm letter dt. 19-07-13 and under process. Letter issued to firm on 03.09.2013 for submit all the documents with new work address & QAP. Reply awaited. Recently failure received from DLW of WR and called for root cause analysis on 24.01.2014. Reminder letter issued to firm on 05.03.2014 for submit all the documents with new work address. Reply received on 11.04.14. Letter issued to Firm on 23.04.2014 and reply awaited. Reminder letter issued on 16.10.14 reply awaited.

24.

Micro Controller Based speed recorder-indicator

M/s Stesalit Ltd, Park Plaza (N) 71, Park Street, K O L K A T A – 700 016

12.09.07

Prototype approval is issued for field trials on 15.05.09 vide letter no.SD. DFM. M.1.3 (Stesalit). Letter issued to firm vide our letter even no. SD. DFM. M.1.3 (Stesalit) on 21/07/11 regarding status of field trial. Firm response received. Letter issued to DLW regarding to know the dispatch details of trial equipment. Reply from DLW received. As per the DLW letter, trial equipment is lying at the central dispatch at DLW and it is ready to dispatch. A request letter issued to DLW in this regard on 03/02/12. Firm has requested to include in Part-II Category. Reply issued to firm on 28.03.12 for completing the field trial in response to up gradation to part-II. A letter issued to DMW vides our letter of even no. SD. DFM. M.1.3 (Stesalit) on 18/07/2013 for providing the fitment details. Reminder letter issued to DMW on 31.01.2014. Reply from DMW/PTA is received on 20/03/2014. Letter issued to concerned diesel sheds for performance feedback on 21/03/2014. Letter issued to concerned diesel sheds for performance feedback on 21/03/2014. Trial equipment failed. Letter issued to M/s Stesalit for repair/ Replacement of the failed equipment on 06.08.2014.

25.

Flasher light LED type for ALCo locomotives

M/s Electronic Equipment Co. Pvt. Ltd, 544 Rabindrapally, brahmapur kolkata

15.04.13

Scrutiny of Online form & letter issued on 06 may 2013.Reply received through mail on 21-05-13 and letter issued to firm for sending documents as per Version 7 of the guideline on 21-06-13.Documents received from firm on 08-07-13 and sent to Legal cell for scrutiny on 11-07-13. After legal scrutiny letter issued to firm on 23-08-13 .Document submitted on 18-09-13 and send to Legal cell on 19-09-13 for scrutiny. After legal scrutiny, letter issued to firm on 30.09.13 to provide suitable date for the capacity assessment. Reply received through mail on 16.01.2014 related to clause wise compliance report of reliability specification and case is under process. Capacity assessment has been done in 26.02.14 to 27.02.14. Letter issued to firm on08.04.14 for manufacture samples.

26. Battery-8V, 500Ah lead acid

M/s United Leadoxide

12.06.13

Application received on 18.06.13 and as per revised Vendor guideline fresh documents sought Vide letter dt.

Page 10: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

10

Products Pvt. Ltd.

21.06.13. Documents received as on 19 July 2013. Documents with Original Case file Sent to legal Cell for Scrutiny. Observation raised by legal Cell communicated to the firm vide letter dt 17.09.13 and firm has submitted the documents on 05.12.13. File sent to Legal cell for scrutiny on 05.12.20. File return from Legal cell on 09.01.14. Firm has informed for firm visit and Capacity/capability assessment done on 06.04.14, and development order letter send to DMW/DLW and inform to firm. Letter sent to firm again for prepare the sample for Prototype testing on 11.09.14. Prototype testing is under process.

27.

AC-AC Traction system for 4500hp HHP locomotives

Trainelec, S.L.

23.07.12

M/s Trainelec Spain had applied for ac-ac traction system of HHP locomotive on 23.07.12. Shortcomings were advised to the firm on 19.09.12. Reply of short coming from the firm was received vide letter dated-09.11.12. After scrutiny of the documents, remaining short comings were advised to the firm on 21.03.13. Response is awaited. Reply from the firm received vide firm’s letter dated-02.08.13. Firm was reminded vide RDSO letter dated-19.03.14 to submit the documents committed in the firm’s letter dated-02.08.13. Reminder letter written to the firm on 12.01.15.

28.

Master Controller for EMD locomotive

M/s Saitronik Electric equipments Plot No. 2-10-168, EC Nagar, Post-Cherlapally, Hyderabad - 500 051

14/03/2014

Application received on 14.03.2014. As per vendor guideline documents scrutinised and letter issued for complying the deficiencies vide letter dt. 18.03.2014. Letter issued to firm on 03/04/2014 for complying the deficiencies mentioned vide our letter no. SD.EMD. MASTER CONTROLLER (Saitronik). Reply received, case is under process. Letter issued to firm on 02/05/2014 again for submission of list of M/c vide our letter no. SD.EMD. MASTER CONTROLLER (Saitronik). Documents received on 23/07/2014 and is under scrutiny. Deficiency advised to firm on 05.08.2014 SD.EMD. MASTER CONTROLLER (Saitronik). Case is under process in reference to firm`s Reply dated 06/08/2014. Letter issued to firm on 22.10.2014.

29.

Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

ABB India Ltd Survey No 88/3 & 4 Kasaba Hobli , Nelamangala Taluk , Bangalore 562 123

06-03-2014

Vendor registration form has been received & it is under scrutiny. Shortcomings were advised to the firm vide RDSO letter dated- 07.05.14. Reminder letter issued to the firm dt 11-07-14

30.

Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

Crompton Greaves Limited Plot No: 9, New Industrial Area Phase-2, Mandideep - 462 046 (Madhya Pradesh)

06-02-2014

Vendor registration form has been received & it is under scrutiny. Shortcomings were advised to the firm vide RDSO letter dated- 07.05.14. Reminder letter issued to the firm dt 11-07-14.

31.

General Purpose Relay

Narbada Electro Engineering, Shed No.46E,

17-04-2014

The form and attached documents were scrutinized and a letter citing deficiencies sent to the firm on 01.05.2014. QAP and undertakings/declarations received from the firm on 21.07.2014. Letter for deficiencies sent to the firm on 02.09.2014. QAP and

Page 11: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

11

Industrial Area, Govindpura Bhopal.

undertakings/declarations received from the firm on 12.01.2015

32.

Classification Light (LED based) for EMD locomotives

M/S Universal Controls, Plot No:42, Electronic Complex Extn,Kusahiguda, Hyderabad-500062

10.04.2014

Form On- line received and after scrutiny of the form and attached documents, a letter issued to firm on 07.05.2014. Incomplete reply received on 19.05.14 and a letter issued to firm on 28.08.14 for submit complete reply with, Mandatory Declarations as per revised vendor guide line version 12.0. Reply received on 17.09.14. Letter issued to firm on 03.12.14 for capacity assessment.

33.

Sensor, Fuel Level

M/s Pricol Engineering Industries Limted

10.06.2014

Online application received on 10.06.2014 and letter issued to firm on15.07.2014 for submitting documents/clarifications.

34.

Control system locomotives Microprocessor based for ALCO locomotives

Lotus Wireless Technologies India Pvt. Ltd.

27.06.2014

Online application received on 27.06.2014 and case is under process. Deficiencies advised to firm vide letter no. SD.Dev.MCS, dt: 08.08.14. Reply received on 11.09.14. Email sent to firm for obtaining balanced documents on 01.10.14, firm has submitted the same on 08.10.14. Email sent to firm for obtaining balanced documents on 14.10.14 and reply received on 22.10.14. Letter issued to firm on 02.12.14 for need few clarifications and reply awaited.

35.

Classification Light LED Type for EMD locomotives

Electricals Electronics Industrial Corporation, 108 Anandapally P.O. Jadavpur University Kolkata 700032

27.06.2014

Online application received on 27.06.2014 and case is under process. After scrutiny letter send to firm on 23.07.14. Reply received on 20.08.14. Mailed to firm on 29.08.14 for submit Mandatory Declarations as per revised vendor guide line version 12.0. Reply received on 01.09.14. Letter issued to firm on 14.10.14 for Capacity and Capability assessment. Firm visit on 13.11.14 to 14.11.14. A Letter issued to firm on 09.01.2015 for manufacture samples of LED based Classification Light for proto type testing.

36.

Micro-Controller based governor for ALCO / DLW / DMW 16 & 6 Cylinder 251 Series Diesel / Electric Locomotives

Lotus Wireless Technologies India Pvt. Ltd.

17.07.14

Online application received on 17.07.2014. Deficiencies advised to firm vide letter no. SD.Dev.MCBG (Alco), dt: 08.08.14. Reply received on 11.09.14. Email sent to firm for obtaining balanced documents on 01.10.14, firm has submitted the same on 08.10.14 and case is under process. Email sent to firm for obtaining balanced documents on 14.10.14 and reply received on 22.10.14. Letter issued to firm on 02.12.14 for need few clarifications and reply awaited.

37.

Sensor, Fuel Level M/s Saitronik Electric Equipments

11/08/2014

Online application form received and case after scrutiny letter issued to firm on 24/10/2014 for submitting deficiencies/clarifications. Reply received from firm on 10/11/2014. After scrutiny of documents letter issued to firm on 20/11/2014 for submitting clarifications. Documents received from firm on 01/12/2014 and scrutiny is under process.

40. Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

M/s Yongji Xinshisu Electric Equipment Co. Ltd., P.R. China

04.09.2014

Online application form dated-04.09.2014 was received and is under scrutiny. Shortcomings advised to firm on 29.12.14.

41. Governor/LCC Engine for DEMU

M/s MADHURA INTERNATIONAL, Pune

07.10.14

Online application received and case is under process.

Page 12: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

12

dze- la-

S. No.

vkbZVe dk uke

Name of items

os.Mj dk uke

Name of Vendor

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& bZe vkbZVe

Motive Power – EM items S. No. Name of item Name of applicant Date of

application Current status as on date: 16.01.2015.

A. Traction Motors Items ---

1. Carbon Brush Blocks M/s Mersen India Pvt. Ltd., Bangalore

21.04.14 Type test of new carbon block grade LFC554 (I) carried out at firm’s premises from 14-7-14 to 16-7-14.

2. Conductor copper Heat sealed kapton covered

M/s Cosmos Conductors Pvt. Ltd., Tumkur

02.01.13 On 06.05.13, assessment done by RDSO officer. Type test witnessed from 25.01.14 to 27.01.14. On 20.03.14, advised to offer for type test as a fresh due to non-compliance of cl. 5.1.2 of spec.

3. Conductor copper Heat sealed kapton covered

M/s Mahendra Industries, Bangalore

16.07.12 On 08.0513, assessment done by RDSO officer. Type test witnessed from 22.01.14 to 24.01.14. Cleared for developmental order on 23.05.14 to DMW/PTA.

4. Conductor copper Heat sealed kapton covered

M/s Malwa Strips Pvt. Ltd., Dewas

05.10.10 On 07.07.11, firm cleared for placement of developmental order by DMW. On 07.02.14, reminder-I issued to CME/DMW for placement of dev. order.

5. Glass tape, Silicon elastomer

M/s Bells Organic (P) Ltd., Kolkata

31.07.08 On 24.09.10, firm cleared for placement of developmental order by DMW. Vide letter, dtd: 18.12.13, firm informed that one dev. P.O. executed.

6. Glass tape, Silicon elastomer

M/s MICAPLY, Bhopal 28.04.14 Vendor form under scrutiny.

7. Holder Brush M/s Power Mica Insulators, Kolkata

03.12.12 On 04.02.13, capacity assessment carried out. From 28.05.13 to 29.05.13, type test carried out. Cleared for developmental order on 24.10.13 to DMW & on 17.12.13 to CMPE/NR.

8. Holder Brush (Constant Pressure type)

M/s Mersen India Pvt. Ltd., Bangalore.

20.01.12 Type test carried out from 19.07.11 to 20.07.11 for AG3101 and from 13.12.12 to 15.12.12 for TM4907. Firm supplied 500Nos. of AG3101 to BHEL and 180 Nos. to NR/AMV & KJM sheds. Firm also supplied 24Nos. BH to SWR/Hubli, 24 Nos. to Raipur/SECR & 24 Nos. to CGL/BPL for TM4907. Performance from various sheds found satisfactory and under process for Part-II. On 04-7-12 and 09.11.12, EOI for both BHs done.

9. Insulating material kit, Class 200 (Glass Mica Tape)

M/s Ruby Mica Company Lld., Giridih, Jharkhand.

23.04.12 Assessment and type test completed on 20.08.12. On 16.01.13, firm cleared for placement of developmental order by DMW. On 12.08.13, cleared for supply of rest qty. of Glass Mica Tape. On 01.04.14 asked performance from DMW/PTA.

10. Insulating material kit, Class 200 (Kapton Mica Tape)

M/s Ruby Mica Company Lld, Giridih, Jharkhand.

20.04.12 Assessment and type test completed on 20.08.12. On 16.01.13, firm cleared for placement of developmental order by DMW. On 12.08.13, cleared for supply of rest qty. of Kapton Mica Tape. On 01.04.14 asked performance from DMW/PTA.

11. Insulating material Kit, Class 200 (Glass Mica Tape)

M/s MICAPLY, Bhopal 05.06.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for developmental order on 07.05.14 to DMW/PTA.

12. Insulating material Kit, M/s Ruby Mica 06.12.13 On 31.07.14 advised firm to offer proto type

Page 13: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

13

Class 200 (Including Inter Turn Ceramic Sheet )

Company Lld., Giridih, Jharkhand.

for testing.

13. Insulating material kit, Class 200 (Inter Turn Ceramic Sheet)

M/s MICAPLY, Bhopal 13.05.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for developmental order on 07.05.14 to DMW/PTA.

14. Insulating material kit, Class 200 (Kapton Mica Tape)

M/s MICAPLY, Bhopal 20.03.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for developmental order on 07.05.14 to DMW/PTA.

15. Insulating material kit, Class 200 (Slot Liner Nomex Tape)

M/s MICAPLY, Bhopal 20.03.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for developmental order on 07.05.14 to DMW/PTA.

16. Insulating material kit, Class 200 (Slot Liner Nomex Tape)

M/s Ruby Mica Company Lld., Giridih, Jharkhand.

22.10.13 On 31.07.14 advised firm to offer proto type for testing.

17. Motor Armature, DC Traction for ALCo

M/s Daulat Ram Engineering Services (P) Ltd. Raisen

14.08.12 On 13.09.12, clearance given for fitment trial at DMW. On 16.04.13, cleared to supply balance quantity to DMW.

18. Motor Armature, DC Traction for ALCo

M/s Star Electric

Company, Ludhiana

27.01.14 On 04.03.14, advised shortcoming.

19. Motor Commutating field coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

13.06.13 On 22.02.14, RDSO officer visited for capability assessment. On 04.07.14, advised shortcomings.

20. Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A. Armature, B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

13.04.12 On 29.04.13, type test completed and 02 nos. cleared for fitment & field trial at DLW.

21. Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A Armature B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame machined)

M/s Saini Electrical & Engineering Works, Navi Mumbai

08.05.12 Type test completed. On 20.07.12, advised for fitment at DMW for field trial. On 04.12.12, 04 TMs cleared for trial at DMW.

22. Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

M/s Rotomac Electricals Pvt. Ltd., Kolkata

06.06.13 On 05.09.13, assessment of Kolkata premises done by RDSO officer. On 23.09.13, assessment of Sahibabad premises done by RDSO officer. On 10.07.14, advised shortcomings of QAP & capability assessment.

23. Motor Complete, DC Traction for ALCo with following sub-assembly:A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined) (TM 4907)

M/s Integrated Electric Co. Pvt. Ltd., Bengaluru.

19.12.11 On 27.03.13 & 22.11.13 (again), advised shortcomings. On 04.05.13, assessment

done by RDSO officer. Reminder sent on 15.04.2014 to respond to letter, dated 22.11.2013.

24. Motor Complete, DC M/s Integrated Electric 27.04.10 On 02.03.12, recommended for developmental

Page 14: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

14

Traction for ALCo with following sub-assembly:A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame(machined)- (TM 5002)

Co. Pvt. Ltd., Bangalore

order to DMW. Letter sent to DMW/PTA on 22.11.13 for status of P.O.

25. Motor Main Field Coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

19.07.13 On 22.02.14, RDSO officer visited for capability assessment. On 04.07.14, advised shortcomings.

26. Motor Main field coils assembly, DC Traction for ALCo

M/s Stesalit Ltd., Solan (H.P.)

27.04.12 On 22.02.13, provisional approval of drg. of main field coils given.

27. Motors Traction AC, for EMD locomotives

M/s BHEL, Bhopal 19.11.13 On 26.06.14, remaining documents received. On 01.07.14, advised shortcomings.

28. Motors Traction AC, for EMD locomotives

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

21.12.10 On 18.01.11, recommended for developmental order.

29. Motors Traction AC, for EMD locomotives

M/s Medha Traction Equipment Pvt. Ltd., Ranga Reddy Dist.,

27.02.13 Prototype motors are under field trial. On 25-26.02.14, visited by Dir/EM.

30. Motors Traction AC, for EMD locomotives

M/s Saini Electrical & Engineering Works, Navi Mumbai

04.01.11 On 18.01.11, recommended for developmental order. Also advised shortcomings on 04.02.11.

31. Motors Traction AC, for EMD locomotives

M/s CSR ZHUZHOU Electric CO., LTD

04.07.13 On 17.12.13, design detail received. On 15.05.14, received revised QAP. On 16.06.2014, asked RA/Berlin for carrying out capacity & capability assessment of the firm.

32. Motors Traction AC, for EMD locomotives

M/s Crompton Greaves Ltd., Mandideep, Bhopal

12.02.14 On 21.04.14, received clarification on shortcomings advised on 11.04.14. Discrepancies of clarification discussed on 8.05.14 with CGL at RDSO.

33. Motors Traction AC, for EMD locomotives

M/s Saini Electrical and Engineering Works, Ambernath (East), Dist. Thane.

28.07.14 Vendor form under scrutiny.

34. Tape, Kapton adhesive M/s MICAPLY, Bhopal 30.09.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for developmental order on 07.05.14 to DMW/PTA.

35. Tape, Resi-glass banding M/s Rotomac Electricals Pvt Ltd., Kolkata

03.12.12 On 02.05.13, assessment done by RDSO officer. On 19.08.13, advised DMW for placement of developmental order.

36. Tape, Resi-glass banding M/s Nashik Insulations Pvt. Ltd., Nashik

13.05.13 On 04.04.14 advised shortcomings.

B. Gears & Pinions Items ----

1. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Elecon Engineering Company Ltd., Anand Sojitra Road

14.08.12 On 14-15.12.12, capacity assessment carried out. On 22.01.13, recommended for developmental order to DLW for both items. Again on 03.07.13, 04.10.13 & 20.3.14, advised DLW for placement of dev. order. On 29/10/14 firm informed that DLW has placed 17 teeth pinions of EMD locos. 1. PO No. 061412060.14137565 dt. 23.09.2014 for 66 Nos. of Pinion 17 T G4. 2. PO No. 061412080.14137568, dt. 23.09.2014 for 25 Nos. of Pinion 17 T P4.

2. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s G. G. Automotive Gears Ltd., Dewas

19.02.11 On 26-27.03.12, capacity-cum-capability assessment done and on 02.05.12, cleared for developmental order for both items. IC issued on 21.7.2014 for 90 teeth bull gear of WDG4

Page 15: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

15

locos. On 24.11.14, firm has submitted dimensional inspection report of 17 teeth pinions (12nos) for EMD locos which is under scrutiny. On 16.01.15, informed firm for prototype inspection of 17 teeth pinions for WDG4 & WDP4 locos to be carried out on 27.1.2015.

3. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.09.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for developmental order to DLW for both items. DLW placed P.O. for 30 nos. of 90 teeth bull gears. On 20.3.14, again advised DLW for placement of dev. order for pinions. On 24.03.14, DLW informed that they placed 68 nos. pinions (WDG4 & WDP4) dev. order.

4. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Research Dev & Mfg Corporation, Bangalore

13.09.11 On 24.10.14, approved as Part-II for traction gears. Firm got 6 Nos. 17 teeth pinions order from DLW. On 20.3.14, again advised DLW for placement of dev. order for pinions.

5. Gears & Pinions, Traction, Case hardened for DEMU

M/s Elecon Engineering Company Ltd., Anand Sojitra Road.

29.01.13 On 02.05.13, recommended for developmental order to CDE/Chennai for both items. Firm informed that they got 10 sets order from M/s CGL. On 11.11.14, firm informed through email that they will call RDSO for prototype inspection in Dec 2014 against CGL order.

6. Gears & Pinions, Traction, Case hardened for DEMU

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.9.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for developmental order to CDE/ICF, Chennai for both items.

7. Gears & pinions, Traction, Case hardened, for ALCo

M/s Elecon Engineering Company Ltd., Anand Sojitra Road.

28.01.13 On 02.05.13 and again on 04.10.13, recommended for developmental order for both items to DMW/PTA. On 16.10.13, firm got P.O. for 10 Nos. of 18 teeth pinions from CGL. On 13.11.14, firm informed through email that they have received 58 nos traction bull gears order from DMW Patiala against P.O.no. 01/15/1013/1/561539, dated 17.9.2014. On 11.11.14, firm informed through email that they will call RDSO for prototype inspection in Dec. 2014 against CGL order.

8. Gears & pinions, Traction, Case hardened, for ALCo

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.9.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for developmental order to DMW for both items. On 13.11.13, DMW/PTA placed 18 teeth pinions dev. Order.

9. Gears & pinions, Traction, Case hardened, for ALCo

M/s Trina Quebec Gears Ltd., New Delhi

04.03.13 Pending due to not comply of shortcomings. On 22.11.13, advised firm to give latest status of shortcomings. As per firm’s letter, dtd: 19.12.13, shortcomings is still existing. Prototype inspection of 65 teeth & 74 teeth carried out against DMW P.O. from 18.02.14 to 21.02.14. On 05.03.14, IC issued.

10. Traction Gears, (Case hardened) for EMD

M/s Vulcan Industrial Engg Ct Ltd., Dist - Anand, Gujarat

07.02.14 On 15th & 16

th Dec.14, firm’s capacity cum

capability assessment carried out and firm again submitted some documents during RDSO visit, is under scrutiny.

11. Traction Gears, (Case hardened) for EMD

M/s Shanthi Gears Ltd., Coimbatore.

07.03.11 On 17.06.11, cleared for developmental order for item. Under process for manufacturing of traction gears. On 26/11/2014, firm advised to submit a general QAP for manufacturing of traction bull gears of HHP locos in place of two different QAP of 77 teeth & 90 teeth bull gears.

12. Traction Gears, (Case hardened) for EMD

M/S Kissan Steels Pvt. Ltd., Ghaziabad

22.11.13 On 19.8.14, advised firm to comply all basic requirements for manufacturing of traction

Page 16: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

16

gears as per RDSO STR NO. MP.STR.EM.04.11.11 in their own premises.

13. Traction Pinions, (Case hardened) for ALCo

M/s Research Development & Manufacturing Corpn, Banglore.

11.10.10 On 29.11.10, advised DMW for developmental order for item. On 17.04.13, I.C. for 18 teeth pinions for ALCo issued.

14. Traction Pinions, (Case hardened) for EMD

M/s Vulcan Industrial Engg Ct Ltd., Dist - Anand, Gujarat

07.02.14 On 15th & 16

th Dec.14, firm’s capacity cum

capability assessment carried out and firm again submitted some documents during RDSO visit, is under scrutiny.

15. Traction Pinions, (Case hardened) for EMD

M/s Trina Quebec Gears Ltd., New Delhi

26.09.09 Under process for manufacturing of traction pinions. On 24.03.14, DLW informed that they placed 81 nos. pinions (WDG4 & WDP4) dev. order.

C. Bearings & Susp. Tube Items ---

1. Bearing, Traction Motor- TM Drive end & TM Non-drive end for EMD locos

M/s FAG (Germany / Italy)

29.05.13 Compliance of the shortcomings received on 23.06.14 & case is being processed.

2. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s FAG Bearings India Ltd., Vadodara

31.07.12 On 06.02.13, assessment carried out. On 06.08.14, advised DMW for placement of developmental order.

3. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s SKF Technologies (India) Pvt. Ltd., Ahmedabad.

30.09.13 In Dec.’13, legal documents returned from Legal/Cell.

4. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s Austin Engineering Company Ltd., Junagadh (Gujarat)

07.10.14 On 05.11.14, advised shortcomings of vendor form.

5. Bearings, roller type of Traction motor for ALCo locomotives, (NH320 rivetless - Commutator end; NU330 rivetless - Pinion end & Alternator / Generator bearings)

M/s Austin Engineering Company Ltd., Junagadh (Gujarat)

07.10.14 On 05.11.14, advised shortcomings of vendor form.

6. Bearings, Suspension, Traction Motor for ALCo locomotives (Roller type)

M/s FAG Bearings India Ltd., Vadodara

13.06.12 On 12.01.15, approved in Part-II.

7. Bearings, Traction Motor- TM Drive end & TM Non-drive end for EMD locomotives

M/s FARO-S.p.A, Calendasco (PC) Italy

19.06.14 On 09.01.15, advised shortcomings of clarification received on 24.12.14.

8. Bearings Traction Motor & Alternator for DEMU (Tr. Alternator - 6326MC4, NU 326 EM/C4 (DE side), NH 324 EM/C4 (NDE side), TM Commutator end - NH 320 ECMRD/C4 (rivetless), NUP 318 EM/C4 (riveted), NH 320)

M/s Precision Bearings Pvt. Ltd., Ahmedabad

08.01.15 Vendor form under crutiny.

9. 5. Seal, Gear Case TPU for Alco Locomotives

M/s Quadrant EPP Surlon India Ltd., Dehradun

19.02.11 In Sept.’12, cleared for developmental order. On 02.07.13, asked performance from Rlys. On 07/10-02.14 & 08.07.14, reminders issued for performance to Rlys. On 26.09.14, asked performance feedback from JMP Workshop.

10. Tr. Alternator - 6326MC4, NU 326 EM/C4 (DE side), NH

M/s Austin Engineering Company Ltd., Junagadh

07.10.14 On 05.11.14, advised shortcomings of vendor form.

Page 17: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

17

324 EM/C4 (NDE side), (Gujarat)

11. Tube Suspension: Housing bearing kit (consisting 11 items)

M/s P.D. Steels, Mohali.

17.12.12 On 18.10.13, assessment carried out. On 16.01.14, cleared for placement of developmental order by DLW.

12. 9. Tube Suspension: Housing bearing kit (consisting 11 items)

M/s Sonak Engineering Pvt. Ltd. Navi Mumbai

23.09.11 On 18.09.12 & 02.02.13, assessment carried out. On 12.03.2013 cleared for developmental order.

13. 4. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Saurabh Metal Pvt. Ltd., Bhopal

03.06.09 On 05.08.09, advised to manufacture 3 sets of tubes & call for inspection. From 02-05-14 to 03-05-14, prototype inspection carried out against DLW P.O. On 17.10.14 IC issued.

14. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Anup Malleables Ltd., Dhanbad

08.01.15 Vendor form under scrutiny.

15. Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s P.D. Steels, Mohali

07.10.14 On 07.11.14, advised shortcomings of vendor form.

16. Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s Sonak Engineering Pvt. Ltd., Navi Mumbai

14.10.14 Vendor form scrutinized & case under process.

17. 10.

Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Alert Engineering Enterprises, Bhopal

21.12.11 On 20.03.13 assessment again carried out. On 04.07.13, firm cleared for placement of developmental order by DMW.

18. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s P.D. Steels, Mohali.

17.12.12 On 18.10.13, assessment carried out. On 16.01.14, cleared for placement of developmental order by DLW.

19. 1. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Simplex Engg. & Foundry works (P) Ltd., Bhilai,

12.03.07 Cleared for developmental order on 06.07.09.

20. 7. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Sonak Engineering Pvt. Ltd. Navi Mumbai

13.09.11 On 18.09.12 & 02.02.13, assessment carried out. On 12.03.2013 cleared for developmental order. From 05-05-14 to 07-05-14, prototype inspection carried out against DMW P.O. and clearance letter issued on 30.05.14 to firm for material dispatched to DLW. On 09.07.14, I.C issued.

D. Cables & Cleaning Solvent Items

1. Cables, control Electron beam irradiation

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 On 19.06.14, Internal test results received. QAP & Annexure to STR submitted on 29.07.14 scrutinized and capability assessment to be done under process from 30.10.14.

2. Cables, Fluoro elastomeric

M/s Siechem Technologies Pvt. Ltd., Pondicherry

21.01.13 On 03.06.13, capability cum capacity assessment and type testing completed. On 19.08.13, advised for fitment trial at DMW on 2 TMs.

3. 2. Cables, Fluoro elastomeric

M/s United cables Industries, Noida.

13.07.10 On 11.08.11, advised DMW for placement of developmental order & to conduct fitment trial. On 20.08.13, asked for legal documents. On 21.10.13, advised for fitment trial at DMW on 2 TMs.

4. Cables, power Electron beam irradiation

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 On 19.06.14, Internal test results received. QAP & Annexure to STR submitted on 29.07.14 scrutinized and capability assessment to be done under process from 30.10.14.

5. Resin, varinshes & Putty

M/s Fine Finish Organics Pvt Ltd., Navi Mumbai

22.05.14 On 30.09.14, advised shortcomings of clarifications received on 26.08.14.

6. 5. Solvent Cleaning for Electrical Machines

M/s Chem-Verse Consultants (India)

27.05.11 On 12.07.12, assessment carried out. On 03.04.14, cleared for placement of

Page 18: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

18

Private Ltd., Mumbai developmental order. From 02.02.15, trial to be started at Moula-Ali dsl shed.

7. Wires Lead for Brush Gear Connectors and main lead cables (outgoing) for TM

M/s Siechem Technologies Pvt. Ltd., Pondicherry

05.06.13 On 03.06.13, capability cum capacity assessment and type testing completed. On 19.08.13, advised for fitment trial at DMW on 2 TMs.

E. TM Blower & Duct Items ---

1. 1. Bellows- (Moulded rubber without fabric), TM for ALCo

M/s Waidhan Engg. & Industries Pvt. Ltd., Singrauli (MP)

07.12.09 On 09.12.11, advised to DMW & DLW for developmental order. On 30.04.12, advised DMW & all CMPEs for developmental order.

2. 2. Bellows- (Moulded rubber without fabric), TM for ALCo locomotives

M/s Abelasto Products Pvt. Ltd., Kolkata.

19.10.09 On 24.08.11, advised to DMW & DLW for developmental order. On 27.12.11, advised to all CMPEs for dev. order. On 30.04.12 & 16.05.13, advised DMW for developmental order.

3. 3. Blower of Traction motor for EMD locomotives

M/s Laxmi air control Limited, Mumbai

03.11.11 On 01.06.12, clearance given for fitment at DLW. Fitment details received from DLW and on 30.01.14 asked performance from Rlys. Firm was asked to send QAP as per std. format on 13/03/14. On 09.05.14 & 28.07.14, reminders issued for QAP. On 28.07.14 asked performance from Railways. On Q8.09.14, firm was asked to submit required documents along with QAP. On 03/11/14, asked firm to submit required documents & Railways for performance.

4. Blower of Traction motor for EMD locomotives

Precision Equipments Co., Varanasi

08.01.15 Vendor form under scrutiny.

F. Alternator & DB Items ----

1. Alternator, Traction & sub-assemblies for ALCo locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

22.10.13 Capability assessment of the firm done on 16.07.14. On 18-09-14, recommended for developmental order.

2. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s TD Power Systems Limited, Bangalore

27.06.13 Firm submitted revised QAP, M&P list, undertaking on 11.07.14. Drawings as advised in RDSO letter dt. 09-05-14 are still not submitted. Capability assessment of the firm done on 28.07.14. On 16-09-14, recommended for developmental order.

3. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s Saini Electrical and Engineering Works, Navi Mumbai

03.09.13 Capability Assessment of the firm done on 16.07.14 & case under process.

4. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s Medha Traction Equipment Pvt. Ltd., Ghatkesar

14.11.13 Capability assessment of the firm done on 29.07.14. On 16-09-14, recommended for developmental order. Letter dt. 16-09-14 issued to RA Berlin for capacity assessment of firm’s JV partner, i. e. TSA /Austria. As per RA/Berlin letter dt. 27

th Oct 2014, assessment

of TSA/Austria done and things found to be satisfactory for TA development.

5. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s Yongji Xinshisu Electric Equipment Co. Ltd., P.R. China

05.08.14 Advised shortcomings on 11-11-14.

6. Alternator-Rectifier Traction, for EMD locomotives for alternator (for Alternator & Rectifier)

M/s Daulat Ram Engineering Services (P) Ltd., Raisen

20.08.13 Capability assessment of the firm done on 17-06-14. On 16-09-14, recommended for developmental order.

7. Auxiliary machines & sub-assemblies for ALCo locomotives

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

09.10.12 On 11.01.13, prototype clearance granted.

8. Dynamic Brake Hatch M/s BHEL, Bhopal 18.11.13 On 28.11.13, asked Legal documents, QAP

Page 19: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

19

assembly (Complete assembly including grid, motor & fan) for EMD locomotives

and compliance of STR. Legal documents submitted on 20.01.14 under scrutiny. Advised shortcomings on 21.07.14.

9. 5.

Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD locomotives

M/s BLA Engg. Pvt. Ltd., Kolkata.

23.06.11

On 17.01.12, cleared for developmental order. Capability assessment done on 07.09.13. Type test carried out from 17.10.14 to 21.10.14.

10. 1.

Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD

M/s Kaptronics Pvt. Ltd., Bangalore

05.09.08 On 05.09.11, clearance given to firm for fitment of one unit at DLW. IC issued for balance 5 sets on 10.03.14.

11. Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD locomotives

M/s Resistance Alloys India Ltd., Mahadev, Jaunpur.

25.09.12 Capability assessment carried out on 28.08.13. Shortcomings of Legal documents advised to firm on 18.09.13.

12. Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD locomotives

M/s Resitech Electricals Pvt. Ltd., Kolkata

10.05.12 Capability assessment done on 3-4.09.13. Shortcomings of legal documents advised on 10.10.13.

13. Dynamic Brake Hatch Assembly (Complete assembly including grid, motor & fan) for EMD Locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

06.06.13 Capability assessment done on 28.09.13. Recommended for Developmental order on 18.03.14. Prototype test of DB fan assembly carried out from 14.12.14 to 18.12.14 and results under scrutiny.

14. Dynamic Brake Hatch Assembly (Complete assembly including grid, motor & fan) for EMD Locomotives

M/s Escorts Ltd. (RED), Faridabad

27.06.13 Legal doc. and compliance of STR received on 12.12.13. Capability assessment carried out on 20.02.14. Show cause notice issued for rejection of their application on 25.04.14.

15. Dynamic Brake Hatch Assembly (Complete assembly including grid, motor & fan) for EMD Locomotives

M/s Daulat Ram Engineering Services (P) Ltd., Raisen

01.08.13 Advised shortcomings on 19.05.14.

16. Dynamic Brake Hatch Assembly for EMD Locomotives (Complete assembly including grid, motor & fan) for EMD Locomotives

M/s Stesalit Telema Electricals Pvt. Ltd. Baddi, Distt. Solan

03.06.14 Shortcomings advised on 04.09.2014.

17. Dynamic Brake Hatch Assembly for EMD Locomotives (Complete assembly including grid, motor & fan) for EMD Locomotives

M/s Narmada Switch gear Pvt. Ltd., Bhopal

19.06.14 Shortcomings advised on 04.09.2014.

18. Dynamic braking fan assembly for EMD locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

03.06.14 Vendor form under scrutiny.

19. Dynamic braking fan assembly for EMD locomotives

M/s Standard Alloys, Bangalore

12.07.13 Firm has applied for fan blade and hub for DB fan assy. Which is not a separate item in RDSO vendor directory. Firm advised on 13.08.2014 to clarify the status.

20. Dynamic Braking Grid, (i) Fan tap & (ii) Non Fan tap for EMD

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

26.02.13 On 19-03-13, capacity assessment done On 15.04.13, cleared for developmental order. Prototype inspection of grid only done on 18 & 19.11.13. On 02.01.14, dispatch clearance for one set DB Grid assembly given for temp. rise test and field trial. Proto type cleared for 5 loco sets on 22.04.2014. IC for Dynamic Braking Grid has been issued on 27.06.14.

Page 20: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

20

21. Dynamic Braking Grid, (i) Fan tap & (ii) Non Fan tap for EMD

M/s Resitech Electricals Private Ltd., Kolkata

14.11.13 Advised shortcomings on 21.07.14.

22. Fan assembly (54”), Cooling for EMD locomotives

M/s Daulat Ram Industries, Govindpura, Bhopal

02.04.14 On 26-08-14, capability assessment carried out & under scrutiny.

23. Fan assembly, Cooling for EMD locomotives

M/s Kaptronics Pvt. Ltd., Bangalore

02.04.12 On 13.04.12, cleared for developmental order. On 27.08.12, advised to update manufacturing facilities. On 15-04-14, asked clarification regarding Dev. Progress & update manufacturing facilities. On 03.06.14, firm informed to offer for prototype testing after October 2014.

24. 7.

Fan assembly, Cooling for EMD locomotives

M/s Saini Electrical & Engineering Works, Navi Mumbai

10.04.12 On 02.08.13, advised shortcomings of clarification submitted by the firm. Capability assessment done on 28.09.13. On 08-05-14, developmental order recommended to DLW. On 15.10.14, dev. P.O. placed by DLW. From 09.12.14 to 13.12.14, type test done against dev. P.O. and results under scrutiny.

25. 54" , Cooling fan assembly for EMD locomotives

M/s Daulat Ram Inductries, Bhopal

09.01.15 Vendor form under scrutiny.

26. Generator Auxiliary for EMD locomotives

M/s Standard Electrical Industries, Coimbatore

03.06.14 On 26-08-14, capability assessment carried out. On 16-09-14, recommended for developmental order by DLW.

27. Generator Auxiliary for EMD locomotives

M/s BHEL Electrical Machines Ltd., Kasaragod

22.05.14 On 26-08-14, capability assessment carried out. On 13.11.14, cleared for developmental order against earlier DLW P.O.

28. Generator Auxiliary for EMD locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

13.12.13 On 07-11-14, recommended for developmental order by DLW.

29. Generator Auxillary for EMD locomotives

M/s Integrated Electric Co. Pvt. Ltd., Bangalore

26.07.12 On 04.05.13, capacity assessment carried out. On 07.07.14, Compliance of STR & legal documents received. On 11.09.14, advised shortcomings of submitted documents.

G. DEMU items ---

1. Alternator Traction & its sub-assemblies for DEMU

M/s Daulat Ram Engg. Service (P) Ltd., Raisen

12.06.14 Shortcomings of QAP again advised to firm on 12-11-14.

2. Bearings Traction Motor & Alternator for DEMU

M/s National Engg. Industries Ltd., Jaipur

05.09.13 Cleared for Dev. Order of bearing no. NH320 ECMRD/C4 (rivetless) for TM commutator end of 1400HP DEMU on 01.07.14.

3. Machines Auxiliary & its sub-assemblies for DEMU

M/s BHEL Electrical Machines Ltd., Kasaragod

14.11.13 Advised shortcomings on 19.12.13 & 27.03.14.

4. Motor Armature, DC Traction for DEMU

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 25.10.13 & 25.03.14, reminder issued for clarification on shortcomings. On 26-07-14, clarifications submitted by the firm and under scrutiny.

5. Motor Complete, DC Traction for DEMU with following sub-assembly: A. Armature, B. Commutator, C. Commutating field coils assembly, D.Main field coils assembly, E. Magnetframe-machined

M/s Saini Electrical and Engg. Works, Mumbai

13.05.13 Cleared for developmental order of 1400 hp DEMU on 23.09.2014.

6. Motor Magnet frame (machined), DC Traction for DEMU

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 26-07-14, clarifications of shortcomings received and under scrutiny.

7. Motor Main field coils assembly, DC Traction

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 26-07-14, clarifications of shortcomings received

Page 21: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

21

for DEMU and under scrutiny.

H. Starter Motor Items ---

1. Motor Starter for EMD locomotives

M/s Illinois Auto Eletric Company, Illinois

10.10.11 Capacity assessment & testing report submitted by RITES on 12.12.13. On 17/18.02.14, cleared for dev. order.

2. Motor Starter for EMD locomotives

M/s Lucas TVS Limited, PADI

05.10.11 On 28.03.12, cleared for developmental order.

3. Motor Starter for EMD locomotives

M/s REIL Electrical India Ltd., Pondicherry

10.09.12 On 12.12.12, capacity assessment carried out. On 12.02.13, cleared for developmental order. On 01.01.14, prototype clearance against DLW P.O. given. Firm supplied 6 Nos. Starter motors against DLW dev. P.O. for 18nos. All the six motors fitted on engine no. 1239, 1240 &1241. Testing of engine no. 124 was carried out on 22.03.14 at Engine testing shop/ DLW. Firm submitted revised QAP on 04.08.2014 & found in order.

4. Motor Starter for EMD locomotives

M/s Daulat Ram Engineering Services (P) Ltd., Raisen

15.10.14 On 17.11.14, advised short comings. Papers submitted by firm and scrutinized the same advised to firm for short comings on 11/12/2014.

dze- la-

S. No. vkbZVe dk uke

Name of items os.Mj dk uke

Name of Vendor

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

Motive Power – Engine items

EMD Items

1. Bearings shell, Con Rod (VD SN 105)

M/s PBW Pvt. Ltd., Rajkot

21.09.11 Time taken by firm from 21.09.2011 to 21.03.2012 for providing documents regarding registration, prototype inspection etc. Capacity assessment done on 01.05.12. Prototype inspection done and IC issued for con rod bearing lower only. Letter sent to DLW on 26.09.2012 for fitment details of con rod bearing lower. Letter sent to Zonal Rlys on 21.12.2012 & 22.02.2013 for monitoring of performance. Legal scrutiny of the documents has been done. Firm is yet to offer prototype upper con rod bearings.

2. Bearings shell, Main (VD SN 106)

M/s Daido Metal Europe Ltd., UK

27.07.12 Deficiencies like QAP, Digital signature certificate & Factory License etc. Deficiencies advised to firm on 09.08.2012. Reply received from firm on 05.04.2013. Last deficiencies advised to firm on 12.04.2013. Reply received from firm on 02.05.2013. Documents send to Legal Cell/RDSO for Legal scrutiny. Deficiencies advised to firm on 30.05.2013 & 07.06.2013. Reminder send to firm on 26.07.2013, 27.09.2013, 01.11.2013, 24.01.2014, 14.03.2014 & 27.06.2014. Showcause notice issued to firm on 16.07.2014. Letter sent to firm on 04.09.2014 . Letter sent to firm on 29.12.2014. Reply awaited.

3. Bearings shell, Main (VD SN 106)

M/s Zollern BHW Gleitlager GmbH & Co., Germany

05.09.13 Deficiencies like QAP, self compliance of the STR, Annexure to STR, Self compliance of specification advised to firm on 12.09.2013. Reply received on 08.10.13. Further deficiencies advised to firm on 30.10.13 & 20.11.2013. Reminder sent to firm on 26.12.2013. Reply received from firm on 28.01.14. Deficiency advised to firm on 26.02.2014. Reply received from firm on 19.03.14. Further deficiency advised to firm on 17.04.2014.Reply received from firm on 26.05.2014. Letter sent to firm on 15.07.2014. Reply received from firm on 28.07.2014. Deficiency advised to firm on 12.08.2014. Reminder sent to firm on 10.10.2014 Reply received from firm on 05.11.14. Letter sent to firm on 08/12/14 and 12.01.2015. Reply awaited.

4. Carrier Piston Pin (VD SN 107)

M/s M/s Jinan Shenggno

22.12.10 Deficiencies viz. Undertaking for infringement of IPR, digital signature, Clarification on QAP advised to the firm

Page 22: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

22

Machinery Co. Ltd., China

on 30.03.11. The firm is seeking some clarification from DLW vide its letter dt. 01.06.11 and final advice from the firm regarding inspection received on 11.07.2012 & 31.10.2012. I.C. issued on 11.02.2013.

5. Carrier Piston Pin (VD SN 107)

M/s Flash Forge Pvt. Ltd. Mumbai

05.07.12 Deficiencies like QAP, Digital Signature Certificate and Balance sheet, etc. advised to firm on 13.07.12. Reply received from firm on 21.01.2013. Further last deficiencies advised to firm on 01.02.2013 and reminder sent to firm on 10.05.2013, 16.08.2013 & 26.12.2013. Showcause notice issued to firm on 05.06.2014. Further showcause notice issued to firm on 22.08.2014 for 7 days. Firm has visited RDSO on 05.09.2014 for queries on documents to be submitted within 15 days & same has been explained to firm. Accordingly firm agreed to submit all documents/undertakings & certificates within 15 days. Reply received on 15.10.14. Further deficiency advised to firm on 31.10.14. Reply awaited. Further show cause notice issued to firm on 23.12.14 for one month. Reply awaited.

6. Carrier Piston Pin (VD SN 107)

M/s Rajshi Technologies India Pvt. Ltd. Rae Bareli

29.04.13 Time taken by firm from 29.04.2013 to 01.09.2013 for providing documents regarding registration, prototype inspection etc. Firm’s Capacity Assessment completed from 01.09.2013 to 02.09.2013. Reply received from Legal Cell/RDSO on 16.09.2013. DLW has been advised on 24.09.2013 to place developmental order on the firm. Prototype sample inspection call received from firm on 22.09.2014. Advice has been sent to M&C Dte. on date 29.09.2014 for deputing personnel for conducting inspections. Prototype sample inspection done and sample rejected due to dimensional variations. The firm will offer fresh sample for prototype inspection.

7. Carrier Piston Pin (VD SN 107)

M/s Bharat Forge Ltd., Pune

28.03.14 Deficiencies like QAP, registration with IREPs, Proof of calibration by Gov. test house, and declarations etc. advised to firm on 17.04.2014. Reply received from firm on 08.08.2014. Further deficiency advised to firm on 22.08.2014. Reply awaited. Further show cause notice issued to firm on 23.12.14 for 15 days. Reply awaited.

8. Carrier Piston Pin (VD SN 107)

Patel Brass Works Pvt. Ltd., Rajkot

22.05.14 Deficiencies like QAP, registration with IREPs, Proof of calibration by Gov. test house, and declarations etc. advised to firm on 06.06.2014. Reply received on 30.06.2014. Deficiencies advised to firm on 09.07.2014. Reply received on 24.07.2014. Further Deficiency advised to firm on 01.08.2014. Reply received from firm on 06.11.2014. Further deficiency advised to firm on 27.11.2014. Reply received on 17.12.14. Under Scrutiny.

9. Carrier Piston Pin (VD SN 107)

CSR CHANGZHOU DIESEL ENGINE COMPONENTS CO.,LTD China

07.02.14 Deficiency advised to firm on 22.05.2014. Reply received from firm on 31.07.2014. Further deficiency advised to firm on 14.08.2014. Reply received on 22.09.2014. Further Deficiency advised to firm on 10.10.2014. Reply awaited. Further show cause notice issued to firm on 23.12.14 for one month. Reply awaited.

10. Crank shaft 16 Cylinder (VD SN 109C)

M/s CSR Ziyang Co. Ltd. China.

26.12.11 Time taken by firm from 26.12.2011 to 07.01.2013 for providing documents regarding registration, prototype inspection etc. Inspection of steel source done by RDSO team from 07.01.2013 to 16.01.2013. Personnel have been deputed for prototype inspection at firm premises from 17.06.2013 to 26.06.2013. Prototype inspection has been done. IC has been issued to firm for supplying 5 crankshafts by 02.07.13. Firm has supplied prototype crankshafts to DLW for fitment. Fitment report received from DLW vide letter no. dlw.m.65.1G dt. 19.11.2013. Performance monitoring underway.

Page 23: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

23

11. Crank shaft 16 Cylinder (VD SN 109C)

M/s Bharat Forge Ltd., Pune

16.02.12 Time taken by firm from 16.02.2012 to 05.02.2014 for providing documents regarding registration, prototype inspection etc. Following inspections and clearance, it is awaited that firm will offer machined crankshafts, vide letter dt. 01.03.2013. Inspection of 5 prototypes has been undertaken. Report from M&C Dte. received on 12.06.2013. IC issued on 12.06.2013. Fitment report received from DLW vide letter no. dlw.m.65.1G dt. 09.10.2013 & 29.11.2013. Performance monitoring underway.

12. Cylinder Head (VD SN 111)

M/s National Railway Equipment Co. USA

13.10.11 Deficiencies viz. Undertaking for infringement of IPR, QAP not made as per guidelines, ISO Certificate, factory license, digital signature, etc. advised to firm on 25.10.11, 12.03.2012 and 29.06.12. Reply received on 03.08.2012. Further last deficiencies advised to firm on 26.10.2012, 01.03.2013, 31.05.2013 & 18.10.2013. Showcause notice issued to firm on 18.07.2014. Further showcause notice issued to firm on 22.08.2014 for 7 days. Reply awaited.

13. Cylinder Head (VD SN 111)

M/s Cooper Corporation Pvt. Ltd, Satara.

16.07.12 Time taken by firm from 16.07.2012 to 13.06.2013 for providing documents regarding registration, prototype inspection etc. Advice has been sent to M&C Dte. on 14.06.2013 for the deputing Personnel for conducting inspection. Prototype inspection has been done on 05.07.2013 to 07.07.2013. Metallurgical reports from the M&C dte received on 29.08.2013. IC issued on 03.09.2013. One loco set has already been fitted at DLW on Loco No. 12899 and dispatched to UDL Shed on 24.11.13. Performance monitoring underway.

14. Cylinder Head (VD SN 111)

M/s Dakshin Foundry Pvt Ltd, Karnataka

08.09.2014 Deficiency advised to firm on 26.09.2014. Reply received from firm on 20.10.14. Deficiency advised to firm on 12.11.2014. Reply received from firm on 31.12.2014. Under scrutiny

15. Cylinder Head (VD SN 111)

M/s Lohia Starlinger Ltd. Kanpur

30.01.13 Time taken by firm from 30.01.2013 to 08.07.2013 for providing documents regarding registration, prototype inspection etc. Capability assessment has been done on 08.07.2013 to 09.07.2013. DLW & DMW have been advised on 29.07.2013 to place developmental order on the firm.

16. Cylinder Head (VD SN 111)

M/s H.K. Engine Component LLc , USA.

17.05.13 Deficiencies advised to firm on 31.05.2013 & 23.08.2013. Reply received from firm on 25.11.2013. Further deficiency advised to firm on 29.11.2013. Reminder sent on 28.03.2014. Reply received from firm on 15.05.2014. Further deficiency advised on 30.05.2014 & 27.11.14. Reply received from firm on 08.12.14. Further deficiency advised to firm on 19.12.2014. Reply awaited.

17. Cylinder Head (VD SN 111)

M/s Ashok Iron Work’s Pvt. Ltd. Karnataka

05.06.13 Deficiency viz. Undertaking for infringement of IPR, Declaration for sister concerns, digital signature, QAP etc advised on 21.06.2013, 16.08.2013 & 24.01.2014. Showcause notice issued to firm on 05.06.2014. Further showcause notice issued to firm on 22.08.2014 for 7 days. Reply awaited.

18. Cylinder Head (VD SN 111)

M/s GE India Industrial Pvt. Ltd., Gurgaon 122009, Haryana

25.07.13 Deficiencies like Digital signature certificate, declaration of confidentiality & Income tax return etc. Advised to firm on 12.08.2013 & reminder sent to firm on 26.12.2013. Reply received from firm on 11.02.2014. Further deficiencies advised to firm on 26.02.2014. Reply received. Letter sent to RA, Berlin for capacity & capability assessment on 14.07.2014. Reply awaited.

19. Cylinder Head (VD SN 111)

M/s River Engineering Pvt. Ltd.

05.08.14 Deficiency advised to firm on 22.08.2014. Reply received from firm on 29.09.2014. Further deficiency advised on 17.10.2014. Further deficiency advised to firm on 10.10.14. Reply received on 26.12.14. Further

Page 24: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

24

Letter sent to firm on 02.01.15 regarding the registration fee. Reply received on 08.01.15. Under Scrutiny.

20. Piston and Piston- Casting (VD SN 113)

M/s AMW-MGM FORGINGS PVT LTD, Mysore.

21.01.11 Deficiencies viz. Undertaking for infringement of IPR, digital signature, QAP etc. advised to the firm on 21.04.11. Reminder sent to firm on 12.07.11, 09.11.11, 15.03.12, 29.06.12, 21.09.2012, 01.03.2013 & 16.08.2013. Showcause notice issued to firm on 05.06.2014. Further showcause notice issued to firm on 22.08.2014 for 7 days. Reply awaited.

21. Piston and Piston- Casting (VD SN 113)

M/s National Railway Equipment Co. USA

13.10.11 Deficiencies viz. Undertaking for infringement of IPR, QAP not made as per guidelines, etc. advised to firm on 25.10.11. Reply received from firm on 11.10.2012. Further last deficiencies advised to firm on 26.10.2012, 01.03.2013, 31.05.2013 & 18.10.2013. Showcause notice issued to firm on 18.07.2014. Further showcause notice issued to firm on 22.08.2014 for 7 days. Reply awaited.

22. Piston and Piston- Casting (VD SN 113)

M/s GETS, New Delhi.

29.02.12 Deficiency conveyed to the firm on 13.03.12 and reminder sent to firm on 20.04.2012 and 29.06.12. Reminder sent to firm on 14.09.2012, 29.11.2012, 11.04.2013, 23.08.2013 & 26.12.2013. Reply received from firm on 11.02.2014. Further deficiencies advised to firm on 26.02.2014. Reply received from firm on 23.04.14. Further deficiency advised on 15.05.2014. Reply received. Letter sent to RA, Berlin for capacity & capability assessment on 14.07.2014. Reply awaited.

23. Piston and Piston- Casting (VD SN 113)

M/s Cooper Corporation Pvt. Ltd, Satara

22.02.12 Time taken by firm from 22.02.2012 to 14.06.2012 for providing documents regarding registration, prototype inspection etc. Capacity & capability assessment and prototype inspection done on 19.07.2012 to 21.07.2012. Report of M&C Dte. received on 11.10.2012. IC issued on 22.10.2012. One loco set has been fitted at DLW on Loco No.70019 & dispatched to KZJ shed on 12.08.2014. Performance monitoring underway.

24. Piston and Piston- Casting (VD SN 113)

M/s Federal Mogul Goetz (India) Ltd., Gurgaon

07.08.12 Deficiencies like QAP, Digital signature certificate ISO certificate & Factory License etc. Deficiencies advised to firm on 16.08.2012 and reminder on 12.10.2012, 01.03.2013, 31.05.2013 & 23.08.2013. Reply received on 01.10.2013. Legal Documents sent to Legal Cell/RDSO on 08.10.2013 for legal scrutiny. Legal document received on 10.01.14 without any remarks, Further Deficiency advised to firm on 17.01.2014 as per latest Vendor Guideline. Showcause notice issued to firm on 22.08.2014 for 7 days. Firm vide their letter dated 19.08.2014 has requested that they will submit the QAP in the mid of September 2014. Reply received from firm on 10.11.2014. Further deficiency advised to firm on 28.11.2014. Reply awaited. Further show cause notice issued to firm on 23.12.14 for 15 days .Reply received on 06.01.15 Under Scrutiny

25. Piston and Piston- Casting (VD SN 113)

M/s Dalian Hellon Keben Piston Technology Development Co. Ltd., China.

12.07.13 Deficiencies like QAP, Digital signature certificate, & declaration of confidentiality etc. Advised to firm on 26.07.2013 & 08.11.2013. Reply received from firm on 20.05.2014. Further deficiency advised to firm on 13.06.2014. Reply awaited. However, firm has supplied one loco set of piston to DLW, against DLW P.O. and fitted on loco no. 12967 of Raipur d/shed. Performance monitoring of these pistons are underway.

26. Piston and Piston- Casting (VD SN 113)

M/s CSR Changzhou Diesel Engine Components Co., Ltd., China

14.11.13 Deficiencies like QAP, registration with IREPs, Proof of calibration by Gov. test house, and declarations etc. advised to firm on 18.11.2013. Reminder sent to firm on 23.05.14. Reply received from firm on 31.07.2014. Further deficiency advised to firm on 14.08.2014. Reply received on 22.09.2014. Further Deficiency advised to firm on 10.10.2014. Reply awaited. Further show cause

Page 25: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

25

notice issued to firm on 23.12.14 for one month.Reply awaited.

27. Piston and Piston- Casting (VD SN 113)

M/s CSR Qishuyan Institute Co. Ltd. China

12.02.14 Deficiency advised to firm on 22.05.2014. Reminder letter issued to firm on 19.09.2014 & 05.12.2014. Reply awaited. Firm has withdrawn the vendor registration process vide their letter No. nil dt 18.12.14.

28. Piston and Piston- Casting (VD SN 113)

M/s River Engineering Pvt. Ltd.

05.08.14 Deficiency advised to firm on 22.08.2014. Reply received from firm on 29.09.2014. Further Deficiency advised to firm on 10.10.2014. Reply received on 26.12.14. Further letter sent to firm on 02.01.15 regarding registration fee. Reply received on 08.01.15.Under scrutiny.

29. Ring set, Piston engine (VD SN 115)

M/s IGI, Rajkot 23.05.11 Time taken by firm from 23.05.2011 to 04.03.2013 for providing documents regarding registration, prototype inspection etc. DLW has been advised on 04.03.2013 to place dev. order on firm. Prototype inspection call received from firm on date 10.07.2014. Firm has requested to visit for inspection after 20.08.14. Prototype inspection done at firm premises from 06.09.2014 to 08.09.2014. Firm, vide letter dated 09.09.2014, shall offer casting witness & related testing by M&C/RDSO & subsequently fresh call will be given for ring inspection and documents regarding work address of unit - 2 has been asked from firm. Reply received from firm on 30.10.2014. Further deficiency advised to firm on 21.11.2014. Reply awaited.

30. Ring set, Piston engine (VD SN 115)

M/s JSC Klintcy Piston Rings Plant Russia

24.09.12 Deficiencies like QAP, Balance sheet, Income tax return, ISO certificate and undertaking infringement of IPR etc. Deficiencies advised to firm on 05.10.2012. Reply received from firm on 15.01.2013. Further last deficiencies advised to firm on 24.01.2013. Reminder sent to firm on 26.04.2013, 23.08.2013, 02.12.2013 & 03.06.2014. Showcause notice issued to firm on 18.07.2014. Further showcause notice issued to firm on 21.08.2014 for 7 days. Firm has withdraw the vendor registration process vide letter No .Stork /RDSO/14-15/061 dated 06/10/2014,has informed that the firm is not intrested in doing vendor registration for Piston rings for EMD locomotives.

31. Ring set, Piston engine (VD SN 115)

M/s CSR Qishuyan, China-213011

15.11.12 Deficiencies like QAP, Balance sheet and undertaking infringement of IPR etc. Deficiencies advised to firm on 23.11.2012. Reminder sent to firm on 28.01.2013, 26.04.2013, 23.08.2013 & 02.12.2013. Showcause notice issued to firm on 05.06.2014. Firm has withdraw the vendor registration process vide Letter No. NIL dated 10.06.2014, has informed that the firm is not interested in doing vendor registration for EMD Piston Ring.

32. Ring set, Piston engine (VD SN 115)

M/s CSR Qishuyan Institute Co. Ltd. China

03.12.13 Deficiency advised to firm on 22.05.2014. Reminder letter issued to firm on 19.09.2014. Reply Received on 07.10.2014. Further Deficiency advised to firm on 31.10.2014. Reply awaited. Further show cause notice issued to firm on 23.12.14 for one month. Reply received from firm on 05.01.2015. Under scrutiny.

33. Ring set, Piston engine (VD SN 115)

M/s Patel Brass Works, Rajkot

12.06.14 Deficiencies like QAP, Declaration proof of registration, with IREPS, List of plant & machinery etc. advised on 04.08.14. Reminder sent to firm on 19.11.2014. Reply awaited. Further show cause notice issued to firm on 23.12.14 for one month. Reply awaited.

Alco Items

34. Bearing Shell Connecting rod (VD SN 102)

M/s Benara Automotives Pvt. Ltd., Agra-282007

30.05.13 Deficiencies viz. Undertaking for infringement of IPR, digital signature, QAP, declaration of confidentially etc., advised to the firm on 13.06.13. Reminder send to firm on 26.07.2013.Reply received on 13.08.2013. Deficiencies advised to firm on 23.08.2013 and reminder sent to firm on 04.10.2013. Reply received on

Page 26: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

26

14.10.2013. Document sent to Legal Cell/RDSO for scrutiny. Legal document received on 10.01.14 without any remarks, Further Deficiency advised to firm on 17.01.2014 as per latest Vendor Guideline. Reply received from firm on 07.02.2014. Further deficiencies advised to firm on 14.03.2014. Reply received from firm on 15.04.2014. DMW & DLW have been advised on 20.06.2014 to place developmental order on firm.

35. Bearing, Shell, Inter & Center, Main (VD SN 103)

M/s Benara Automotives Pvt. Ltd., Agra-282007

10.06.14 Deficiencies like QAP, Digital signature, Availability of plant and machinery and declarations etc. advised to firm on 17.07.2014. Reminder sent to firm on 10.10.2014 & 05.12.2014. Reply awaited.

36. Crank Shaft-16 Cylinder ALCO Engine (VD SN 109 B)

M/s Bharat Forge Ltd., Pune

16.02.12 Time taken by firm from 16.02.2012 to 10.01.2014 for providing documents regarding registration, prototype inspection etc. On 10.01.2014, firm has sent an inspection call. Prototypes inspection of one crankshaft done at firm premises from 27.01.2014 to 29.01.2014 by RDSO team. IC issued on 12.02.2014 for one crankshaft. The remaining four nos. of prototype crankshafts yet to be offer by the Firm for final inspection. Reply received from firm on 06.03.2013. RDSO personnel visited DMW/PTA to witness the fitment of one no. crankshaft on ALCo engine on 26.03.2014. Inspection for remaining four numbers prototype carried out w.e.f. 20.08.2014 to 23.08.2014. IC issued on 08.09.2014 for 04 prototype crankshafts.

37. Cylinder Head (251 Plus) (VD SN 110)

M/s Ashok Iron Works, Belgaum

11.02.11 Deficiencies viz. Undertaking for infringement of IPR, digital signature, QAP advised to the firm on 21.04.11. Reminder sent to firm on 12.7.11, 09.11.11, 12.03.12, 29.06.12, 21.09.2012, 01.03.2013, 16.08.2013 & 24.01.2014. Showcause notice issued to firm on 05.06.2014. Further showcause notice issued to firm on 22.08.2014 for 7 days. Reply awaited.

38. Cylinder Head (251 Plus) (VD SN 110)

M/s Jai Guru Engineering Industries, Ajmer

12.03.12 Deficiency conveyed to the firm on 21.03.2012. Reply received from firm on 06.05.2013. Further last deficiencies advised to firm on 16.05.2013. Reply received from firm on 05.06.2013. Further deficiencies advised on 20.06.2013. Reply received from firm on 10.07.2013. Further deficiencies advised to firm on 12.07.2013 & reminder sent to firm on 26.12.2013. Showcause notice issued to firm on 05.06.2014. Further showcause notice issued to firm on 22.08.2014 for 7 days. Reply awaited.

39. Cylinder Head (251 Plus) (VD SN 110)

M/s Lohia Corp Ltd., Kanpur

17.05.13 Time taken by firm from 17.05.2013 to 29.07.2013 for providing documents regarding registration, prototype inspection etc. DLW & DMW have been advised on 29.07.2013 to place developmental order on the firm.

40. Cylinder Head (251 Plus) (VD SN 110)

M/s Dakshin Foundry Pvt Ltd, Karnataka

05.08.14 Deficiency advised to firm on 22.08.2014. Reply received from firm on 20.10.14. Further deficiency advised to firm on 12.11.2014. Reply received from firm on 31.12.2014. Under scrutiny

41. Liner, Kit Cylinder, 3RV (VD SN 112)

M/s Perfect Engg., Pune

14.01.11 Time taken by firm from 14.01.2011 to 28.01.2013 for providing documents regarding registration, prototype inspection etc. Firm Capacity Assessment completed from 06.02.2013 to 07.02.2013. DLW & DMW have been advised on 08.03.2013 to place dev. Order on the firm.

42. Liner, Kit Cylinder, 3RV (VD SN 112)

M/s Pefco Foundry, A division of Kores (India) Ltd. Pune

06.09.12 Time taken by firm from 06.09.2012 to 28.01.2013 for providing documents regarding registration, prototype inspection etc. Firm capacity assessment completed from 04.02.2013 to 05.02.2013. DLW & DMW have been advised on 08.03.2013 to place dev. order on the firm. Prototype sample inspection call received from firm on 01.05.2013. Advice has been sent to M&C Dte. on date 04.06.2013 for deputing personnel for

Page 27: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

27

conducting inspections. Prototype inspection has been done on 02.07.2013 to 04.07.2013 at firm premises. IC issued to firm on 22.07.2013. One loco set has already been fitted at DMW and dispatched to Abu Road Shed. Performance monitoring underway.

43. Liner, Kit Cylinder, 3RV (VD SN 112)

M/s Lohia Corp Ltd., Kanpur

17.05.13 Deficiencies advised to firm on 28.05.2013. Reminder sent to firm on 20.09.2013, 02.12.2013 & 03.06.2014. Showcause notice issued to firm on 18.07.2014. Further showcause notice issued to firm on 21.08.2014 for 7 days. Firm vide their letter dated 21.08.2014 mentioned that they has not yet to develop this product at their end & also mentioned for re-apply in due course of time.

44. Piston, Steel Cap Piston 11.75 CR & Piston, Steel Cap Piston 3RV for ALCo locos a)Steel Cap Piston

11.75 CR, 23.2+ 0.1Kg

b) 3RV Steel Cap Piston

(VD SN 114)

M/s Changjhou CSR Diesel Engine Component Co. Ltd., China

04.07.13 Deficiencies like QAP, Digital signature certificate, & declaration of confidentiality etc. Advised to firm on 18.07.2013, 08.11.2013 & 06.06.2014. Showcause notice issued to firm on 18.07.2014. Further showcause notice issued to firm on 22.08.2014. Reply awaited.

45. Ring, pack, 3 RV, for Alco Locomotives (VD SN 116)

M/s CSR Qishuyan Institute Co. Ltd. China

27.01.14 Deficiency advised to firm on 22.05.2014. Reminder letter issued to firm on 19.09.2014. Reply Received on 07.10.14. Further Deficiency advised to firm on 31.10.2014. Reply awaited. Further show cause notice issued to firm on 23.12.14 for one month. Reply received from firm on 05.01.15. Under scrutiny.

46. Ring, Pack, Piston (FE type with Moly Coated Top Ring) (VD SN 117)

M/s India Piston Ltd. Chennai

11.11.11 Deficiencies viz. ISO Certificate, QAP, factory license, digital signature, etc. advised to firm on 18.11.11. Reply received from firm on 23.04.2013. Last deficiencies advised to firm on 10.05.2013. M/s IPL is yet to give inspection call for conducting prototype inspection. Further show cause notice issued to firm on 23.12.14 for 15 days. Reply awaited.

47. Ring, Pack, Piston (FE type with Moly Coated Top Ring) (VD SN 117)

M/s Indo German Industries, Rajkot

19.03.13 Deficiencies like QAP, registration with IREPs, Proof of calibration by Gov. test house, self-compliance of specification, declaration in respect of classified sister concern etc. Deficiencies advised to firm on 02.04.2013. Reply received from firm on 26.04.2013. Further deficiencies advised to firm on 03.05.2013. Reply received from the firm on 23.05.2013. Reply received from the firm on 12-08-2013. Further deficiencies advised to firm on 14-08-2013. Reply received from firm on 30.10.2013. Further deficiency advised to firm on 07.11.2013. Reply received from firm on 19.11.2013. Legal documents sent to legal cell/RDSO on 27.11.2013 for legal scrutiny. Legal document received on 10.01.14 without any remarks, Further Deficiency advised to firm on 17.01.2014 as per latest Vendor Guideline. Reply received from firm on 20.02.2014. Further deficiency advised to firm on 23.05.2014. Reply received from firm on 27.06.2014. Deficiency of ISO certificate of work address has advised to firm on 31.07.2014.Reply received on 19.08.2014. Further deficiency advised to firm on 22.08.2014. Reply received from firm on 26.09.2014. ISO certificate is send to ISO Cell/RDSO for examine. Further deficiency advised to firm on 12.11.2014. Reply awaited. Further show cause notice issued to firm on 23.12.14 for one month. Reply awaited.

dze- la- vkbZVe dk uke os.Mj dk uke vkosnu orZeku fLFkfr

Page 28: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

28

S. No.

Name of items Name Of Vendor

fnukad

Date of applicati

on

Current status

Motive Power – Oils and filter group items

1. Filter Housing, Secondary Engine Air Filters, for ALCo & EMD Locomotives

M/s G.B. Equipments System Ltd., Dehradun (India)

13.05.13 Deficiencies advised to firm on 07/06/13. Firm Reply received on 26-06-2013. Deficiencies advised to firm on 09.07.13. Reply received on 22.7.2013. File has been sent to legal cell for legal clearance on 02.8.13. File returned from legal cell on 21.10.2013 with remarks. Deficiencies advised to firm on 07/11/13. Reply received from firm on 18.11.13. Further deficiency advised to firm on 04.12.2013. Reply received from firm on 31.12.2013. Deficiencies advised to firm on 10.01.2014. Reply received from firm on 25.02.2014. Deficiencies still exist in firm’s reply. Firm advised vide letter-dated 14.03.14. Deficiencies advised to firm on 26.03.2014. Reply received on 02.06.14. Deficiencies advised to firm on 24/06/14. Reply awaited. Reply recd from firm on dated 12.08.14. Deficiencies still exists. Firm replied on 12.08.2014. Firm’s reply received on 10.09.2014. Visit of the firm planned in the 2

nd week of Oct,2014. Capability

assessment done from 09.10.14 to 10.10.14. The case is being processed for next stage. Advice letter for placement of developmental order issued to CDE/DLW & CME/DMW on 26.11.2014.

2. Filter elements, spin on fuel filter for EMD locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

05.06.13 Deficiencies advised to firm on 03-07-2013. Reminder sent to firm on 31.01.2014. Firm has sent the related documents, on 11.02.14. Deficiencies advised to firm on 07.03.2014.Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Reply received on 08.05.2014. RDSO officer visited the firm on 09&10.05.14 for capacity assessment. Vide MOM dated 10.05.2014, the firm will submit copy of modified QAP. Copy of modified QAP has been recd. Deficiencies advised to firm on 23.05.2014. Reply received on 03.06.14. Deficiencies advised to firm on 06-06-2014. Reply dated 20.6.14 received from the firm. Type test has been planned to be conducted at firm’s premises from 11.08.14. RDSO team is at firm’s premises to conduct type test. Type testing has been completed on 13.08.14. Field trial is being planned. Letter for developmental order vide this office letter No.SD.Fil.Pioneer dt.01.09.14 has been issued to CMPE/D/NR.

3. Filter elements fibre glass ECC for EMD locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

06.06.13 Deficiencies advised to firm on 03-07-2013. Reminder sent to firm on 31.01.2014. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Reply received on 08.05.2014. Deficiencies advised to firm on 23.05.2014. Reply received on 03.06.14. Deficiencies advised to firm on 06-06-2014. Reply dated 25.6.14 received from the firm. Letter dated 29.08.2014 sent to firm. Reply awaited.

4. Filter, compressor oil spin on for EMD locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

06.06.13 Deficiencies advised to firm on 03-07-2013. Reminder sent to firm on 31.01.2014. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03.04.2014. Reply received on 08.05.2014. Deficiencies advised to firm on 23.05.2014. Reply received on 03.06.14. Deficiencies advised to firm on 06-06-2014. Reply dated 25.6.14 received from the firm. Letter dated 29.08.2014 sent to firm. Reply awaited.

Page 29: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

29

5. Filter Element, Fuel, Primary & Secondary (low mean pore size) for ALCo locomotives

M/s Sequoia Safety Products Pvt. Ltd. Roorkee

29.04.13 Deficiencies like ISO certificate, Digital signature certificate, declaration of confidentiality, undertaking for infringement of IPR, vendor code & production capacity etc. Advised to firm on 14.05.2013. Firm has submitted the required documents on 12.07.13. The file has been sent to legal cell for legal clearance on 25.07.13.File received from legal cell with minor Deficiencies on 11.09.13. Deficiencies advised to firm on 12.09.13. Reply received on 24.09.13. Firm has requested for Capability assessment on 09.10.13 & Capability assessment done on 17.10.13 & 18.10.13. Advised to firm on 06.11.13 to advise necessary preparedness for manufacturing of samples for type / rig testing. Reminder letter sent to firm on 24.07.14. The firm vide letter dated 13.08.14 has informed that they are in process of doing internal testing and will confirm the preparedness for type test shortly. Further communication from the firm is awaited.

6. Filter elements, Long Life(180 days) Lube and Fuel Oil for EMD Locomotives

M/s Sequoia Safety Products Pvt. Ltd. Roorkee

04.06.13 Deficiencies advised to firm on 25-06-2013. . Firm has submitted the required documents on 12.07.13. The file has been sent to legal cell for legal clearance on 25.07.13. File received from legal cell with minor Deficiencies on 11.09.13. Deficiencies advised to firm on 12.09.13. Reply received on 24.09.13. Firm has requested for Capability assessment on 09.10.13 & Capability assessment done on 17.10.13 & 18.10.13. Advised to firm on 06.11.13 to advise necessary preparedness for manufacturing of samples for type / rig testing. Reminder letter sent to firm on 24.07.14. The firm vide letter dated 13.08.14 has informed that they are in process of doing internal testing and will confirm the preparedness for type test shortly. Further communication from the firm is awaited.

7. Filter Elements, Long Life, Lube Oil, for ALCo locomotives

M/s Sequoia Safety Products Pvt. Ltd. Roorkee

04.06.13 Deficiencies advised to firm on 25-06-2013. Firm has submitted the required documents on 12.07.13. The file has been sent to legal cell for legal clearance on 25.07.13. File received from legal cell with minor Deficiencies on 11.09.13. Deficiencies advised to firm on 12.09.13. Reply received on 24.09.13. Firm has requested for Capability assessment on 09.10.13 & Capability assessment done on 17.10.13 & 18.10.13. Advised to firm on 06.11.13 to ensure necessary preparedness for manufacturing of samples for type / rig testing. Reminder letter sent to firm on 24.07.14. The firm vide letter dated 13.08.14 has informed that they are in process of doing internal testing and will confirm the preparedness for type test shortly. Further communication from the firm is awaited.

8. Filter Elements-Secondary Engine Air Filters- (A) Element Filter, Glass Fibre Bag Filter & Glass Fibre Secondary Engine Air Filter (Deep Design) (B) Glass Fiber Secondary Engine Air Filter

M/s USHA Filters Pvt. Ltd., Meerut (UP)

16.07.12 Deficiencies like QAP, Digital signature certificate, undertaking for infringement of IPR, Factory License & declaration of confidentiality etc. Deficiency advised to firm on 27.07.2012. Reply received on 17.09.2012. Further deficiencies advised to firm on 28.09.2012. Reminder sent to firm on 07.11.2012 & 11.01.2013 &14.05.2013. Firm reply received on 23.05.2013. Further deficiencies advised to firm on 07.06.2013. Reply received on 29.07.13. File has been sent to legal cell for legal clearance on 30.07.13. File received from legal cell with minor Deficiencies, which were advised to firm on 20.09.13. Capability assessment was done on 14.10.13 & 15.10.13. Incomplete testing facilities & shortcoming in QAP etc was noticed. The same are indicated in MOM with the firm. Reminder letter sent to firm on 24.07.14. Firm has asked for RDSO approved drawing of test rig. Reply sent on 12.09.2014. The firm vide its letter dt.08.08.2014 has informed that it is modifying the test

Page 30: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

30

facilities and will submit QAP shortly. Further advice from the firm is awaited.

9. Engine Inertial Primary Filter (ALCO)

M/s SPX India Pvt. Ltd. G-72/73, RIICO Industrial Area, Mansarovar–Jaipur-02020.

20.06.13 Deficiencies advised to firm on 10.07.13 & reminder sent to firm on 03.12.2013. Firm’s reply received on 07.01.2014. Deficiencies advised to firm on 17.01.14. Reminder letter sent to firm on 23.07.14. Letter sent to firm on 26.08.2014. Letter sent to firm on 07.01.2015. Reply awaited.

10. Filter Element, Long Life (180 days) Lube Oil for EMD Locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

20.08.13 Deficiencies advised to firm on 06.09.13. Reply received from firm on 12.09.13 and file sent to legal cell on 13.09.13. Capacity assessments done on 21.09.13 and firm have been advised vide letters 26.09.13 & 11.10.13 for manufacturing of samples & prototype test. Firm, vide letter no. nil dated 26.11.2013 has requested for conducting type test at their premises without fixing actual date. Firm has been advised vide letter dt. 30.12.2013 for fixing date for manufacturing of samples at their firm premises and prototype test at M&C Lab/RDSO. Legal document received on 10.01.14 without any remarks, Further Deficiency advised to firm on 17.01.2014 as per latest Vendor Guideline. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Reply awaited. Reply received on 08.05.2014. Deficiencies advised to firm on 23.05.2014. Letter recd from the firm to conduct type testing at firm’s premises received on 21.05.2014. Reply being sent. Reply sent to firm on 26.05.2014. Firm’s reply recd on 30.05.14. Visit to the firm to witness manufacturing of samples of prototypes of filter being planned. Reply received on 03.06.14. Deficiencies advised to firm on 06-06-2014. RDSO official had gone to firm premises to manufacturing of sample on 18.06.2014. The samples have been sealed thereat. The samples are to be carried to RDSO by the firm for testing at M&C lab. Samples brought to RDSO by firm’s representative. RDSO team has been deputed to visit firm’s premises from 11.08.2014 to witness remaining tests. Filter paper testing except rig test etc has been done on 14.08.14. Firm’s advice of date for rig test at RDSO is awaited. Firm’s letter dt.21.08.2014 for rig testing received on 28.08.2014. Replied to firm for rig testing on 28.08.2014. Rig testing is being rescheduled. Firm has been informed telephonically on 29.08.2014. Type tests including rig test at M&C Dte./RDSO have been completed. SCR vide RDSO letter dated 13.11.14 has been advised to place Developmental Purchase Order on the firm for procuring the subject filters.

11. Engine Inertial Primary Filter (ALCO)

M/s Trident Pneumatics Pvt. Ltd. Coimbatore.

17.10.13 Deficiencies like mandatory declaration by firm for ISO, QAP & detail of Digital Signature Certificate etc. Deficiency advised to firm on 31.10.2013. Reply received from firm on 27.12.2013. Deficiencies advised to firm on 10.01.2014. Reply received on 20.03.2014. Deficiencies advised to firm on 26.03.2014. Reply received on 26.05.14. Deficiencies advised to firm on 06.06.14. Reply received on 31.07.14. Reply sent vide letter dated 14.08.2014. Firm’s letter received on 20.08.2014. Firm advised to visit RDSO to physically demonstrate the product, fitment and submit cost benefit analysis vis-à-vis existing product. Firm’s representatives visited RDSO on 10.11.2014 and held discussions with RDSO officials. Firm advised vide RDSO letter dated 10.11.14 to examine the issues that came up during the discussions and submit the report. Reply is awaited.

Page 31: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

31

12. Filter Elements, Fuel Primary & Secondary (low mean pore size) for Alco locomotives.

M/s Pioneer Fil Med(P) Ltd., Gurgaon

24.10.13 Deficiencies like statutory compliance, QAP, factory license, power of attorney for authorized signatory etc. Deficiencies advised to firm on 07.11.13. Reply received on 13.01.14. Again deficiencies advised to firm on 22.01.14. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Reply awaited. Staff visiting the firm from 11.04.2014 for testing of fuel filters. Type test conducted from 11.04.2014 to 13.04.2014. Reply received on 08.05.2014. RDSO officer visited the firm on 09&10.05.14 for capacity assessment. Vide MOM dated 10.05.2014; the firm will submit copy of modified QAP. Copy of modified QAP has been recd. Deficiencies advised to firm on 23.05.2014. Reply received on 03.06.14. Deficiencies advised to firm on 06-06-2014. Reply received from the firm. The case is under examination from the view point of testing charges, field trials etc. Letter for field trial has been issued on 10.07.14. Firm has got developmental P.O. from SCR. RDSO representative deputed on 18.09.2014 – 19.09.2014 for inspection of fuel filter elements against developmental P.O. at firm’s premises. Inspection of fuel filter elements against developmental P.O. of SCR has been completed at firm’s premises & I.C. dated 26.09.2014 has been issued. Letter sent to Sr.DME(Dsl), Guntakal & Kazipet on 26.12.2014 requesting them to advise fitment details of filters put on field trial.

13. Filter Air dryer & MR for Alco & EMD locomotives.

M/s Trident Pneumatics Pvt. Ltd., Coimbatore.

29.01.14 Deficiencies advised to firm on 07.02.2014. Letter sent to firm on 07.01.2015. Reply awaited.

14. Filter housing, Secondary Engine Air Filter for Alco and EMD locomotives

M/s Prag Polymers, B-1, Talkatora, Industrial Estate, Lucknow-226011

27.06.14 Deficiencies advised to firm on 15.07.2014. Letter sent to firm on 07.01.2015. Reply awaited.

15. Filter Elements, Long life, Lube oil for Alco locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 30.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply awaited.

16. Filter Elements, Soak Back Lube oil Filter for EMD locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 30.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply awaited.

17. Filter Elements, Fuel Primary & Secondary as per Drg. SKDP-3901, 3902,3908 & 3909.

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 28.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply awaited.

18. Filter Elements, Suction strainer, for EMD locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

17.07.14 Deficiencies advised to firm on 28.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply awaited.

19. Filter Elements, Spin - on fuel filter for EMD locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

17.07.14 Deficiencies advised to firm on 31.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply awaited.

20. Filter Elements, Spin – on turbo, lube oil, for EMD locomotives

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

17.07.14 Deficiencies advised to firm on 31.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply awaited.

21. Filter Elements, Fuel, Primary & Secondary (low mean pore size) for Alco locomotives.

M/s G S Products, Dehradun

07.10.14 Deficiencies advised to firm on 29.10.2014. Original receipt of NEFT/RTGS payment and documents regarding category of vendors asked from firm vide letter dt. 05.01.2015. Reply received on 13.01.2015. Under examination.

Page 32: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

32

dze- la-

S. No.

vkbZVe dk uke

Name of items os.Mj dk uke

Name of Vendor

vkosnu

fnukad

Date of applicati

on

orZeku fLFkfr

Current status

pkyu 'kfDr& batu flLVe vkbZVe

Motive Power – Engine System items

1 Injector

Assembly for

EMD

locomotives

M/s Bosch limited,

Bengaluru.

01.09.11 Deficiencies viz. copy of ISO 9001 certificate, factory

license, and proof of registration with IREPS etc. not

submitted, advised to the firm on 15.09.11. Reply received

from the firm on 18.10.11. The firm has submitted latest

clarificpation on 08.11.11. Reply sent to firm regarding test

bed evaluation of MUI at ED Dte. On 14.11.11. Report

received from ED Dte on 06.07.2012. Letter sent to firm on

22/27.08.2012 regarding expediting online vendor

registration process for manufacturing of MUI. Reply

received from firm on 15.11.2012. Further deficiencies

advised to firm on 22.11.2012 and reminder sent to firm on

14.12.2012. On firm’s advise, capacity & capability

assessment and Prototype inspection has been completed

from 04.01.2013 to 10.01.2013. IC issued on 30.01.2013.

Advised to DLW on 06.02.2013 for fitment details. 16 No.

MUI under fitment at DLW. In the meeting held at DLW, it

was decided to fit MUI on an engine. 16MUIs have been

fitted and two MUIs showed teething troubles during testing

on ETS. DLW have informed vide their letter no.

dlw.m.65.9G dated 23.07.2013 that they have fitted 14 nos

Bosch make and 2 nos interstate make MUI of on loco no

12829 and dispatched to GOC shed/SR on 20.07.2013.

Next, DLW advised that 3 sets of MUI have been fitted in

Loco No. 40161/ Raipur/SECR, 12885/GOC/SR & Power

Pack No. G4-1133 to Gooty/SCR. Letter sent to the Rly on

30.12.2013 regarding performance. Performance received

from Gooty shed only & others sheds reply awaited. Letter

sent to firm on dated 07.03.14 for failure investigation. Firm

Vide letter dated 14.03.2014 advised that they are

investigating failures & the report will be sent. Once the

investigation is complete. Letter sent to firm on dated

07.04.2014 and 20.05.2014. Report awaited. DLW have

informed vide their letter no. dlw.m.65.9G dated 26.06.2014

that they have fitted 16 nos. Bosch make MUI on loco

no.70018 / PTRU / ECR, 15 nos. Bosch make MUI & 01

nos. Interstate on loco no. 70324 / PA / CR, 13 nos. on loco

no.12975/R/SECR and 13 nos. on loco no.12976/R/SECR.

All have been fitted on dated 23.06.2014. Letters sent to

these sheds to send performance feedback. DLW have

informed vide their letter no. dlw.m.65.9G dated 03.07.2014

that they have fitted 16 nos. Bosch make MUI on loco

no.12973/JHS/NCR & 12974/JHS/NCR and 04 nos. on

loco no. 12977/R/SECR. All have been fitted on dated

30.06.2014. Letters sent to these sheds on date

08.07.2014 to send performance feedback. Letters sent to

firm on dt. 11.07.2014 & 14.07.2014 regarding investigation

into failure cases of MUIs. Report received on dated

27.08.2014. Performance received from PTRU/ECR on

dt.23.08.2014. No failure noticed by shed. DLW have

informed vide their letter no. DLW. M.65.9G dated

Page 33: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

33

03.09.2014 that they have fitted 16 nos Bosch make MUI

on loco no. 70325 and dispatch to Pune shed/CR. Letter for

performance of MUI sent to Sr.DME pune shed on

dt.26.09.2014. Letter received from Sr.DME (D)/ PA shed

regarding loco no. 70325 WDG4D. Informed by PA shed

that loco no. 70325 has been transferred to KYN shed.

Letter sent to KYN shed for performance of MUIS on dt.

20.10.2014. Reply awaited.

2 Radiator Assly.

for EMD

Locomotives

M/s Fine Automotive

& Industrial Radiator

Pvt. Ltd., Pondicherry

16.07.12 Deficiencies like QAP, flow chart, infringement of IPR, ISO

Certificate & Digital signature certificate etc. Deficiencies

advised to firm on 25.07.2012. Reminder sent to firm on

14.09.2012. Reply received from firm on 03.10.2012.

Further deficiencies advised to firm on 09.10.2012. Reply

received on 23.10.2012. Further deficiencies advised to

firm on 02.11.2012 & reminder sent to firm on 03.12.2012.

Reply received from firm on 18.12.2012. Firm has been

advised sending the revised QAP as per guideline for

vendor approval on 28.12.2012. Reminder sent to firm on

29/30.01.2013, 27.02.2013 & 03.04.2013. Reply received

from firm on 22.04.2013. The visit of M/s Fine Automotive &

Industrial Radiator Pvt. Ltd., Pondicherry has been carried

by SSE/MP on dated 08.0713 & 09.0713 to see the

infrastructure facilities available in the firm. Capability

assessment has been completed, letter sent to DLW/BSB

on 10.10.2013 for developmental order on the firm.

Developmental order received by firm from DLW. An

inspection call has received by this office-dated

23.04.2014. Inspection has been planned in May, 2014.

Inspection carried out. The firm was found to be not

prepared for inspection. As recorded in joint note dated

14.05.14, the firm will advise their preparedness for

inspection again. Firm’s advice is awaited. Firm has

indicated that they have made good the deficiencies for

conducting inspection. RDSO representative has been

deputed to visit the firm’s facilities from 26.08.2014 to verify

the removal of deficiencies. Deficiencies removed. Testing

is going on. It may take 5-6 months.

3 Injector

Assembly for

EMD

locomotives

M/s Haynes

Corporation, USA

06.06.12 Deficiencies like QAP, Digital Signature Certificate,

Balance sheet, Factory License & Proof of address etc.

Deficiency advised to firm on 08.06.2012. Reply received

from firm on 09.10.2012. Further last deficiencies advised

to firm on 19.10.2012 and reminder sent to firm on

27.02.2013. Letters sent on 19.03.2013 to RITES and on

18.03.2013 to M/s Haynes regarding capacity cum

capability assessment. Reply awaited. M/s RITES has

informed that M/s Haynes have not submitted complete

details and have also not confirmed acceptance to pay

RITES charges. Letter dt. 11.6.13 sent to firm to submit

complete details and remit RITES’ charges. Letter sent to firm

on date 05.01.2015 regarding deficiencies according to latest

vendor guideline ver.12.0

4 Radiator Assly.

for EMD

Locomotives

M/s Poona Radiator,

Pune

12.01.11 Deficiencies viz. Undertaking for infringement of IPR, details of digital signature certificate, QAP advised to the firm on 28.04.11. Firm sent incomplete information. Deficiencies viz. unsigned QAP, Undertaking for infringement of IPR again advised on 11.5.11. Reminder has been sent to firm on 04.07.11. Reply received on 13.07.11. Letter sent to firm on 15.07.11 for further clarification on deficiencies viz drawings, process flow chart etc. Last reply received from firm on 26.03.12.

Page 34: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

34

Deficiency advised to firm on 20.04.2012. Reminder again sent to firm on 14.06.12. Reply received on 16.07.2012. Further deficiency advised to firm on 11/13.09.2012. Reply received on 21.09.2012. Letter sent to firm on 01.10.2012 to seek action taken in regard to points raised in RDSO letter dt. 11.07.2012. Last reminder letter sent to firm on 08.11.2012, 06.12.2012 & 19.12.2012. Vith Reminder sent to firm again on 29/30.01.2013. Reply received from firm on 04.03.2013. Visit of firm premises has been done and based on report letter has been sent on 07.05.2013 to DLW/BSB for dev. Order to firm. Letter dt 22.08.14 sent to CDE/DLW to seek current status of placement of developmental order on the firm. Further reminder has been sent to DLW on 14.10.14 for current status. Further reminder has been sent to DLW on 11.12.2014.

Reply awaited.

5 Radiator for

EMD Loco

M/s Dolphin

Manufacturing Ltd.

L.L.C, U.A.E

15.07.13 Complete documents uploaded by the firm could not be

downloaded due to downloading problem. Firm has been

requested to send the hard copies of the documents. After

scrutiny, deficiency has been advised to firm. Reply

received on 22.08.13. Deficiencies advised to firm on

30.08.13. Reply received on 07.11.2013. Firm vide letter

dated 18.11.13 has further intimated that legal documents

will be submitted within 10 days. Documents received on

26.11.2013. Documents sent to legal cell/RDSO for legal

scrutiny on 28.11.2013. Legal document received on

10.01.14. Without any remarks, Further Deficiency advised

to firm on 16.01.2014 & 20.01.2014 as per latest Vendor

Guideline. Deficiencies advised to firm vide letter dated

16.01.2014 have been removed & deficiencies advised to

firm vide letter dated 20.01.2014 are yet to be removed by

the firm. Reminder has been sent to firm for compliance of

Deficiencies dated 03.04.2014. Reply received from firm on

15.05.2014. Documents scrutinized and further

Deficiencies has been advised for compliance dated

21.05.2014. As requested by the firm, DLW has been

asked to provide a copy of the capability assessment

report, which RITES have submitted with them, so that the

case could be considered further. Further, vide letter dated

26.6.14, firm has been asked to provide more documents.

The same are awaited. The assessment report received

from DLW on 08.07.2014 and is under scrutiny. Letter from

firm received on 05.08.2014.Reply sent to the firm vide

letter-dated 13.08.2014. Reply from the firm is awaited.

Documents received on 08.09.2014. Letter has been sent

to firm on 15.09.2014 for sending documents as per latest

vendor guideline version 12. Reply partially received on

14.10.2014.

Reply received on 31.10.2014 and under consideration.

6 Cooler, lube oil,

Plate type for

Alco

locomotive.

M/s Adhiam Thermal

system & Solutions

Pvt. Ltd. Chennai

Bangalore Highway,

Thirupathy Estate,

Kanchipuram-631502

27.01.14 Deficiencies advised to firm on 06.02.2014. Deficiencies

again advised to firm on 28.08.2014. On non recipt of

reply,a notice for closer of vendor registration application,

issued vide this office letter no.SDWDM2.3.7.6 dt.01.10.14

with cut off date 15.10.14.Firm reply received on

17.10.2014.Still not complying the requirements hence

Letter sent to firm on dt. 07.11.14. Firm representative

visited RDSO on 20.11.14 along with RDSO letter date

07.11.14. Firm assured to submit the pending documents

at the earliest . Letter sent to firm on dt. 27.11.2014 for

Page 35: Annexure-A fnukad - Indian Railway of fresh... · fnukad % 16-01-2015 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF F RESH VENDOR REGISTRATION AS ON 16 -01-201 5 ... letter sent to

35

submission of pending documents. Letter sent to firm on

date 06.01.2015. Reply awaited.

7. Cooler, lube oil,

Plate type for

Alco

locomotive.

M/s Lord

Vishwakarma Heat

Exchangers Pvt. Ltd.

Laksar Road,

Kankhal Haridwar -

249408

31.10.14 Deficiencies advised to firm on dt. 25.11.2014. Reply

received on date 09.01.2015. and under scrutiny.

Letter sent to firm on dt.05.01.2015 regarding vendor

registration fee. Clarification.