annexure- a : details of bpcl requirements · annexure- a : details of bpcl requirements 1. bank...

52
Confidential ANNEXURES A & B ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto EOD, system totals will be treated as declared totals) for Cash, Credit/debit/Petro card, Cheque, NEFT and local account. b. Along with EOD/Shift report the Bank deposit statement to be printed. c. The format of the Bank deposit statement is to be provided by BPCL to the successful VENDOR. d. BPCL to provide the list of Banks to be configured at RO level for BDS entry. e. BDS should mention the totals for Cash, Credit/debit/Petro card, Cheque, NEFT and local account for the business day. f. Site Controller system will also capture BDS acknowledgement with actual bank deposit slip details to be entered before the next EOD. g. As an operational process, the deposit in the bank needs to be acknowledged in the system against the specific BDS before 13:00 hrs IST of the next business day. h. The business rules and operational process for Sunday/Public holidays has to be confirmed by BPCL. i. Site Controller system to send an auto SMS and auto e-mail to sales office and finance controller if BDS don’t match. j. BPCL to provide the e-mail content, format and e-mail id(s). k. BPCL to provide the SMS content and format and SMS number(s). l. A report to give BDS status for a selected time period (from Date and to date). *The Cash Amount entered by Dealer in the BDS GUI in the FCC should match the Receivables as per fuelling, in case it doesn’t match Auto SMS and Auto Email should be generated. Also this BDS related application part doesn’t require any integration with the Bank, rather the Bank Details will be just a manual entry in the system. 2. CENVAT AND LOCAL SALES TAXES : a. BPCL to provide the details on types of Taxes and their definition including the % values. b. Site Controller system will maintain CENVAT and local sales tax types and their definitions at RO level. c. Printing of CENVAT and other local sales tax details on the cash memo shall be a input parameter at RO level. d. The sales tax is the service tax on CENVAT. e. CENVAT and other sales taxes are applicable for dry/wet transactions closing. f. FCC GUI generates a report on transaction wise tax charges and Tax wise totals for the site for the day.

Upload: others

Post on 27-Sep-2019

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Confidential

ANNEXURES A & B

ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS

1. BANK DEPOSIT STATEMENTS :

a. At EOD, system should capture the declared amounts (for auto EOD, system totals will be treated as declared totals) for Cash, Credit/debit/Petro card, Cheque, NEFT and local account.

b. Along with EOD/Shift report the Bank deposit statement to be printed. c. The format of the Bank deposit statement is to be provided by BPCL to the successful VENDOR. d. BPCL to provide the list of Banks to be configured at RO level for BDS entry. e. BDS should mention the totals for Cash, Credit/debit/Petro card, Cheque, NEFT and local account for

the business day. f. Site Controller system will also capture BDS acknowledgement with actual bank deposit slip details to

be entered before the next EOD. g. As an operational process, the deposit in the bank needs to be acknowledged in the system against

the specific BDS before 13:00 hrs IST of the next business day. h. The business rules and operational process for Sunday/Public holidays has to be confirmed by BPCL. i. Site Controller system to send an auto SMS and auto e-mail to sales office and finance controller if

BDS don’t match. j. BPCL to provide the e-mail content, format and e-mail id(s). k. BPCL to provide the SMS content and format and SMS number(s). l. A report to give BDS status for a selected time period (from Date and to date).

*The Cash Amount entered by Dealer in the BDS GUI in the FCC should match the Receivables as per fuelling, in case it

doesn’t match Auto SMS and Auto Email should be generated. Also this BDS related application part doesn’t require

any integration with the Bank, rather the Bank Details will be just a manual entry in the system.

2. CENVAT AND LOCAL SALES TAXES :

a. BPCL to provide the details on types of Taxes and their definition including the % values. b. Site Controller system will maintain CENVAT and local sales tax types and their definitions at RO level. c. Printing of CENVAT and other local sales tax details on the cash memo shall be a input parameter at

RO level. d. The sales tax is the service tax on CENVAT. e. CENVAT and other sales taxes are applicable for dry/wet transactions closing. f. FCC GUI generates a report on transaction wise tax charges and Tax wise totals for the site for the day.

Page 2: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Confidential

ANNEXURES A & B 3. NEW CUSTOMER ACQUISITION PROCESS

Basic requirement: i. Pre Conditions: a. BPCL dealer/office-in charge wishes to register a new customer b. Customer should have at least one mobile number c. Customer should have at least one vehicle. d. The RO system is online with HQ system.

b. Limitation:

1. During the registration process, mobile number along with the Vehicle no of the customer acts as unique identification in the system. Multiple vehicle nos can be assigned to one mobile no however every vehicle should have only one mobile no.

ii. Process (at high level):For Registration:

1. When the customer fulfills the defined delivery limit /new customer acquisition criterion, Dealer/Office-in-charge captures the customer details at RO manually.

2. RO system validates the customer details (mobile numbers) and submits the request to HQ.

3. HQ system processes the request and generates a unique Identification number to the customer and gives a response back (if the RO system is online) that completes the registration process.

4. In offline status, the transaction is pending till the RO system is online.

iii. For generating SMS: 1. At RO, during EOD the transaction data sent to HQ. 2. At HQ, during scheduled/manual daily process, the HQ system runs through the

transaction data and maps all vehicle numbered transactions against the registered customer master.

3. At HQ, define the volume/amount criteria for sending the SMS. 4. For the customer who fulfills the volume/amount criteria, an auto SMS will be sent.

c. Process (in Detail)

i. At RO Level in FCC GUI through Monitor: 1. When dealer/office-in-charge decides to register a customer, the RO system user

opens ‘New customer acquisition’ interface in RO system, which should capture the below details.

Registration Number: _________________ (Generated at HQ) Transporter/Vehicle Owner: _________________(Mandatory) Mobile Number(s): _________________

_________________ _________________

email IDs _________________

________________

Page 3: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Confidential

ANNEXURES A & B

Contact Address: _________________

Vehicle Number(s): ________________

_________________ _________________ _________________

2. After filling the details, the user submits the request. 3. RO system validates the customer details (Mobile numbers) and sends to HQ system

to get the customer registration number. 4. Receives the customer registration number and generates a registration receipt. 5. At EOD, the transaction data sent to HQ system. Customer should receive SMS of

registration details within 24 hours of registration if the registration is done at the RO level thru automation or if the customer data is uploaded at the backend. The SMS should contain the Customer name, Customer Vehicle number, name of the RO where it is registered and the Location

ii. At HQ Level in HQ System

1. Further to customer Acquisition process under FCC Functionalities 2. Receives a request from RO for customer registration with necessary details 3. HQ system validates the data and generates a unique customer registration number. 4. At daily scheduled/manual process: The HQ system runs through the transaction data

and maps all vehicle numbered transactions against the registered customer master. 5. Define the volume/amount criteria for sending the SMS. 6. For the customer who fulfills the volume/amount criteria, an auto SMS will be sent. 7. An interface will be provided to configure the SMS content (the message). The other

details like vehicle number, grade of fuel, quantity, value, date, time, name of RO will be appended to this content.

8. HQ system should generate a report on transporter/vehicle owner name for the fuelling of linked vehicles to that account. The report should be generated on

territory, State, Region, HQ wise. 9. HQ should generate reports based on the transporter name. 10. System should be able to send the consolidated weekly/monthly summary of fuelling

transactions of all the customers on SMS. 11. It should be possible to centrally upload the aggregated list of customers at HOS GUI. 12. HOS GUI should also allow changing of mobile no or vehicle no in the system for the

acquired /registered customers.

13. Admin rights shall be created for multiple users as advised by BPCL for editing and uploading customer details

Page 4: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Confidential

ANNEXURES A & B

Central Customer Acquisition Module:

I. BPCL is setting up a central customer acquisition module. Vendor shall be required to

integrate with this module for sending SMS of fuelling information. In case this module is set

up, vendor shall send the transaction information to this central module either in the

decided format or shall share the details of their existing format for reading the information.

II. The registration would happen by directly accessing the Web GUI of the central module

through FCC OR Vendor’s Customer acquisition module shall provide details of registration

to the Central module instantaneously or periodically (every 6 hr- minimum)

4. HANDLING MPD CPU CARD CHANGE ANOMALY

For this instance, an interface will be provides at FCC system with the following details. Pump No _________________________ CPU serial number _________________ RO call report number ______________ OPENING READING Electronic totalizer Reading Before changing the card _____________ After changing the card _____________ Mechanical totalizer Reading Before changing the card _____________ (Assumption: NO sale has been performed after recording this value in the call

maintenance report) After changing the card _____________ Remarks _______________________________

In ROIR report at HQ system , for this scenario an ‘*’ will be provided on the specific day of the anomaly for the row with meter readings. The same anomaly details can be viewed on a separate report with details: Opening reading, changed reading, calculated stock and remarks.

Page 5: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Confidential

ANNEXURES A & B

ANNEXURE- B FORMAT FOR SERVICE LEVEL AGREEMENT FOR COMPREHENSIVE AMC SUPPORT PERIOD OF FOUR YEARS

INTRODUCTION:

This document stipulates the nature and level of service standards and support expected from the VENDOR/

Authorized Service Provider i.e. M/s ________ during post warranty CAMC Support Period of four (4) years for the

maintenance of the Automation Systems installed at 3000 ROs as a part of Tender No.__________________. This

document also specifies the required uptime for the equipment supplied the level of training and other conditions like

penalty provisions for the services not provided by M/s____________ during the Comprehensive AMC Support Period

of four (4) years. 1. SCOPE OF THE SERVICE LEVEL AGREEMENT:

The start of CAMC SUPPORT PERIOD for any RO shall be as per ‘Methodology of Execution’ explained in Special Purchase Conditions. Post warranty Comprehensive AMC support period shall be for Four (4) years.

CAMC is preventive in nature and requires minimum 1 visit to all the ROs every quarter. Comprehensive AMC Support

means that vendor should ensure smooth working of all the hardware & software components alongwith connectivity

of the Automation Systems provided at ROs under the contract. The scope includes supply, integration & installation

of hardware spares (as required) along with software (software updates/patches) and connectivity hardware,

establishing backhaul link, and the rental plan support to be provided during the CAMC period to ensure smooth and

satisfactorily working of Automation systems at the ROs and also to avoid downtime beyond permissible downtime.

CAMC scope shall include site visits for attending BROMA complaints for Breakdown maintenance and ensuring

contract deliverables. All this shall be covered for four years of Comprehensive AMC Support period. CAMC payments

shall be done on quarterly basis as explained in ‘Special Purchase Conditions’ and NO additional PAYMENT other than

this shall be done to the vendor towards CAMC support.

CAMC is preventive in nature. Vendor is required to visit every RO minimum once in a quarter for

preventive maintenance and take a sign off from the dealer which is to be attached with the quarterly

invoice. The gap between any 2 preventive maintenance visits should not be less than 60 days. Vendor to

share the schedule of preventive maintenance at the beginning of every quarter and is also required to

inform minimum 1 week in advance the concerned BPCL Dealer, SO and AE through E-mail. This is to ensure

that the concerned Service Engineer gets proper support from the Retail Outlet.

BROMA (Bharat Petroleum Retail Outlet Maintenance Application) is an online platform for dealers to record their

maintenance related complaints and the information (SMS & email) is sent to the respective vendors through the

system for corrective measures. Once the complaint is logged by dealers, the complaint downtime starts and is

accounted till the complaint is resolved & closed by vendor in the system and certified by dealer/BPCL site in-charge.

BROMA application has now been integrated with our internal business platforms like SAP. This ensures seamless &

transparent transactions, zero-time loss and accurate documentation apart from ease of billing and closing

maintenance calls.

Page 6: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Confidential

ANNEXURES A & B

All the maintenance calls regarding Retail Automation and CAMC uptime calculations shall be based on BROMA system only. Successful bidder shall be given training on BROMA operations for understanding the process flow.

b. It is mandatory for VENDOR to maintain sufficient Spares at its respective State Level Offices in

consultation with BPCL Any parts & components changed during Warranty Support period will carry an additional warranty (for those particular parts/component) for another three months from date of replacement or residual warranty period of the Automation System whichever is later.

c. The Service Provider will carry out breakdown maintenance as and when required/ informed by

BPCL in-charge/ Dealer representative/concerned Territory Office through BROMA and arrange for spare parts required, if any, immediately.

d. Service Requests will be done anytime during the day by BROMA only.

2. CAMC Payment

a. 25% of the total CAMC Support amount for ONE YEAR will be paid after completion of every QUARTER (3

Months) of each year of CAMC Support period by the concerned AE/Territories and will consist of 2

payable components explained below. BPCL can stop availing the CAMC services and therefore stop

making CAMC payments to the vendor by giving it a notice of 2 months in advance in case the RO gets

closed or due to any condition under Force Majeure or if it so desires:-

1. SITE COMPONENT 60% of the total CAMC amount payable in any quarter will be a fixed component

and will be paid subject to meeting each of the following below mentioned conditions:-

i. The Manpower resource positioned at the BPCL Regional Offices should on all the working days in

a quarter put together. This will be certified by the Regions individually. Failure to do so will result

in forfeiting the entire CAMC payment for the Region for that quarter.

ii. If the preventive maintenance has not been carried out for any RO to the satisfaction of BPCL, the

CAMC payment for that quarter will not be released.

iii. Signed Hard copies of Auto-EOD Report, ROIR, Day wise ROIR availability Report, Auto-RSP change,

TIP, SAP MIRROR for the full quarter will have to be enclosed along-with the quarterly CAMC bills.

2. HOS COMPONENT 40% of the balance CAMC amount, payable in any quarter, will be released only

if all the below mentioned conditions for each of ROS individually are fully met. It will be Vendors

responsibility to prove data availability on HOS as defined below. The vendor will be required to prove

conclusively and beyond doubt that the Automation systems are working and data is getting

populated on a daily basis in the HOS reports:-

i. EOD files must have reached the HOS on more than 90% of the days of that quarter.

For example, if in a quarter there are 92 days, then EOD files should have reached and processed for equal to or more

than 83 days. Vendor is required to develop an exception report in consultation with BPCL and attach the same

alongwith the CAMC invoice.

ii. Time Gap at HOS between any 2 EOD files should not be more than 120 Hours. Vendor is required

Page 7: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

to develop an exception report in consultation with BPCL. However 1 exception per quarter is

allowed.

iii. All HOS Reports should get populated for all the days of the quarter and should be available for

extraction. ROIR should be available with MPD and ATG data, individually for at least 81 days of

the quarter. Vendor to develop a report which displays the ROIR availability for each of the days of

the quarter individually. ROIR availability is defined as useful data available for at least 1 MPD and

at least 1 probe on a day. If for any day, the FCC does not get any response from any MPD/ATG, it

reports NA or Null Values – This is not useful data.

iv. Soft copies of Auto-EOD Report, ROIR, Day wise ROIR availability Report, Auto-RSP change, TIP,

SAP MIRROR for the full quarter will have to be enclosed along-with the quarterly CAMC bills.

v. Auto-RSP feature for the RO should have been demonstrated at least once during the contract

period

vi. Realtime dashboard is working smoothly and with a lag of not more than 10 minutes viz a viz the

site data. Vendor would be required to demonstrate the performance of the realtime dashboard

at least once in a quarter to the concerned BPCL officer to fulfill this condition.

vii. BPCL ROs may not be posting data on the HOS for reasons beyond the Vendor’s control. For the

sake of keeping the CAMC billing simpler and faster, only the following exceptions are permitted –

Legal Metrology issues, MPD and ATG vendor dependency issues and the FORCE MAJEURE CLAUSE

as illustrated in General conditions. However, the vendor must prove that the above stated issues

exist by sharing relevant reports (ROIR, TIP Report, Hourly sales report, etc) to get the benefit of

exception. In the unlikely event of ROs where BPCL is using its own connectivity medium (on

account of VSAT and SIM both not working), vendor will have to conclusively prove that the

connectivity (provided by BPCL) was not available for use in order to gain the benefit of exception.

BPCL will extend its support in this regard. No Exception would be granted on account of any other

issue like connectivity, electrical, etc. However, if the vendor is able to prove (by articulating and

quantifying the issue in writing either email or letter) that there are issues affecting data posting

on HOS other than the permitted exceptions, it can still get the benefit of the exception. It must

be noted that BPCL will have the final say in such matters.

viii. There will be no pro-rata payment for this component of CAMC. For any RO, the payment shall be

either full or 0 %.

3.RECOVERY FOR RO DOWNTIME:

VENDOR to ensure that the uptime of RO Automation system is at least 98%. Rs.500 per day per Retail Outlet

beyond 2% permitted downtime beyond 24 hrs (complaint resolution time) for failures including partial

failures calculated over 3 months (90 days). The same will be calculated and recorded in BROMA.

Page 8: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Confidential

ANNEXURES A & B

For CAMC Support period, down time calculation will be as under:-

A. Period of calculation: Quarterly (90 Days) B. Unit of measurement: Each RO C. RO’s downtime: A RO automation, partially or fully has remained nonfunctional for number of days in 3 months (90 days). D. Permissible downtime in RO days for each RO = 2% of a half year ,i.e. 0.02*90days E. Penalty calculation for a Quarterly (90 Days) = (C-D)* Rs. 500/- in case (C) > (D) .

3. The Service Provider shall procure and maintain sufficient spare inventory on their own and stock the same at their service offices. This will prevent any unnecessary delay in responding to the complaints logged.

4. A ‘Breakdown Rectification Report’ shall be sent to the respective BPCL Territory Engineer on the Maintenance

work carried out. The report shall include the following details:

a. Details of repair work carried out b. Reasons for the failure/ fault and methods suggested for preventing the same. c. Details of parts replaced if any d. Date and Time of call logging/Service Request. e. Date and Time of response by the Service Provider f. Date and Time when rectification was completed by the Service Provider g. Signature of the personnel attending the call h. Counter signature of the Dealer/ BPCL representative

A copy of the same shall also be kept at the RO for records.

Page 9: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Confidential

ANNEXURES A & B

2. DURATION OF THE AGREEMENT: Post warranty Comprehensive AMC Support Period for the complete Automation System supplied by M/s ___________________ shall be FOUR YEARS .

3. GENERAL TERMS AND CONDITIONS

3.1 Electricity, water and compressed air if required for carrying out maintenance at the R.O. will be provided by Bharat Petroleum Corporation, free of cost.

3.2 M/s.__________ will ensure that their service representatives while working at BPCL outlets will observe all safety

rules and regulations and statutory acts of Central/State Governments/Municipal Corporations or any other

Government bodies. M/s_____________ shall furnish all labour, material, equipment, tools and tackles required for

the rectification / maintenance job.

5. RESPONSIBILITY:

The vendor shall be solely responsible for any omission/ delay on the part of his Service Provider during the CAMC Support period and will be liable to pay Compensation charges as stipulated earlier.

----------------------- -------------------------------- For the Vendor For the Service Partner

Place ………………

Date ……………….

Page 10: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

ANNEXURE C -

Page 11: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

ANNEX-D AUTOMATION REPORT TEMPLATES

Please Note: All these reports mentioned below are sample reports and shall serve as a

template to guide vendor in solution for Reports. However the final reports are to be approved by BPCL approval and subject to customization. The following Report Templates do not cover all the Reports mentioned in the document. Balance formats to be devised by successful vendor after approval from BPCL

HQ LEVEL REPORTS

FOLLOWING MINIMUM INPUTS MUST BE THERE FOR GENERATING ANY REPORT

REGION <input field>

STATE OFFICE <input field>

STATE <input field>

TERRITORY <input field>

GROUPING 1 <input field>

GROUPING 2 <input field>

GROUPING 3 <input field>

GROUPING 4 <input field>

GROUPING 5 <input field>

GROUPING 6 <input field>

GROUPING 7 <input field>

GROUPING 8 <input field>

GROUPING 9 <input field>

GROUPING 10 <input field>

RO SAP CC <input field>

FROM-TO Options * <calender (wherever applicable) format>

Page 12: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

NR, ER, SR,WR TERRITORY CODE

RO IS EASILY SEARCHEABLE BY

INPUTTING FEW LETTERS OF NAME

SOME OTHER REPORTS MAY REQUIRE "AS ON" etc.

The vendor shall arrange to make provision for 10 more grouoings other than specified above. These

groupings will be advised and defined by BPCL upon finalization of the initial contract at the Project stage. *Essentially in the HQ system, with due authorization, user should be able to Generate Reports at RO level /Territory Level/ Regional Level. Reports to have sub-totals as required.

ALL THE OUTPUT REPORTS MUST HAVE FOLLOWING MINIMUM HEADER DETAILS

REPORT DESCRIPTION:

RETAIL OUTET NAME: RO SAP CC : TERRITORY :

FROM TO : <Date & Time> (*as applicable)

REPORT GENERATED ON : <Date&Time>

PRINT OPTION SAVE OPTION

Page 13: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

PRODUCT DATE DAY RATE/ SALE AMOUNT

LTR (Ltr.) (Rs.)

SPEED 5-Jun-09 FRI 47 1000 47000

6-Jun-09 SAT 47 500 23500

7-Jun-09 SUN 47 300 14100

8-Jun-09 MON 47 2000 94000

DIESEL 5-Jun-09 FRI 35 10000 350000

6-Jun-09 SAT 35 5000 175000

7-Jun-09 SUN 35 3000 105000

8-Jun-09 MON 35 20000 700000

HI- SPEED 5-Jun-09 FRI 39 700 27300

6-Jun-09 SAT 39 350 13650

7-Jun-09 SUN 39 210 8190

8-Jun-09 MON 39 1400 54600

PETROL 5-Jun-09 FRI 45 1500 67500

6-Jun-09 SAT 45 750 33750

7-Jun-09 SUN 45 450 20250

8-Jun-09 MON 45 3000 135000

DAILY PRODUCT WISE SALES BASED REPORT

Receipt

Amount Volume

Method of

DSM MPD Global

S.No. Product Rate/Ltr Date & Time No/MPD Nozzle Vehicle No Vehicle Segment

No. (Rs.) (ltr) Payment Name Side No

1 2345 Petrol 2000 44.44 45 Cash 1-Jun-09 10:00PM RAVI 2/1 5 DL4CU1602 CAR

2 2346 Diesel 1200 34.29 35 Credit/Debit

1-Jun-09 10:20PM SHYAM 2/2 6 UP16M8791 HCV

Card

3 2347 Speed 500 10.64 47 Petro/Fleet

1-Jun-09 10:30PM AMIT 1/2 1 DL31U1601 TWO-WHEELER

Card

4 2348 Hi-Speed 1000 25.64 39 Cash 1-Jun-09 10:40PM AMIT 1/2 2 RJ3CU2212 LCV

5 2349 Petrol 100 2.22 45 Cash 1-Jun-09 10:50PM RAM 1/1 3 RJ3CX2215 TWO-WHEELER

Note: Advance filtering based on vehicle segment, MOP, Product, MPD ID, Vehicle No, Date & Time (option to

choose range), Amount (option to choose the range) & Volume (option to choose the range)

AUDIT TRAIL FOR INDIVIDUAL TRANSACTIONS:-- User to have Search Options in various Fields

Page 14: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

RONAME ROSAP CC TERRITORY PRODUCT OLDPRICE NEWPRICE LOGINBY DATE ANDTIME OF PRICE PRICE CHANGE EFFECTI

CHANGE INPUT FROM

<RONAME> 123456 DELHI SPEED 50 47 DEALER 01-Jun-09 10:00 PM 02-Jun-09 00:00AM

PETROL 47 45 DEALER 01-Jun-09 10:01 PM 02-Jun-09 00:00AM

DIESEL 37 35 ADMIN 01-Jun-09 10:05 PM 02-Jun-09 00:00AM

HIGHSPEED 40 37 ADMIN 01-Jun-09 10:00 PM 02-Jun-09 00:00AM

AUDIT TRAIL FOR PRICE CHANGES AT RO LEVEL: User to have option of selecting multiple ROs/Territories.

NOZZLE NOZZLE

PRODUCT OLD PRICE PRODUCT NEW PRICE PRODUCT SOLD @ OLD SOLD @ PRICE NEW PRICE

SPEED 50 3000 47 6600

PETROL 47 15000 45 33000

DIESEL 37 20000 35 44000

HI-SPEED 40 2000 37 4400 FUEL PRICE VS FUEL SOLD BREAKUP REPORT

Count of Volume Vehicle No Product Transaction (Ltrs) Amount (Rs)

DL4CU1603 Petrol 5 70 5110

VEHICLE NO WISE REPORT. The Hyperlink under the number of times fuelled should connect to all Individual Fuellings against that vehicle No.

ACTUAL ACTUAL PRESET DELIVERED DELIVERED VEHICLE DSM_NAM

NOZZLE_ID BAY TRX_DATE TYPE VALUE AMOUNT VOLUME DIFF _NO E 29/04/2013 DL01BM2

1 1 / 1 02:54:02 AMOUNT 1500.00 808.90 16.62 691.10 011 JAIBIR 11 3 / 1 29/04/2013 VOLUME 10.00 654.79 9.90 0.10 DL03GH2 RAMNARES

Page 15: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E 10:55:00 047 H Preset Vs actual delivered quantity report : User should be able to generate product wise (all, individual or group wise)report for a day, week, month of desired period. Report to additionally include product and mobile no (if the customer is acquired) suitably.

Name Of the Tank RO Product Tank No Capacity Current Volume Date & Time

ABC Filling

station Petrol 2 20000 1000 22.03.2013, 1600 hrs RO Dry-out report : User should be able to generate report for a desired period for RO, territory or Region. The report should also be generated on product wise where consolidated tankage and capacity and current volume is shown.

Tank Allowed

Current Density

S .No Tank ID Product Tank Vol. ATG Reading

Capacity Minimum (ATG) Date/Time (M anual)

(Ltrs) Vol. (Ltrs) (KG/M 3)

(Ltrs)

1 1 SPEED 20000 2000 15000 01-Jun-09 01:00PM 727.2

2 2 PETROL 45000 4500 24500 01-Jun-09 01:00PM 725.2

3 3 HI-SPEED 20000 2000 10000 01-Jun-09 01:00PM 820.7

4 4 DIESEL 45000 4500 30000 01-Jun-09 01:00PM 815.9

5 1 SPEED 20000 2000 14000 01-Jun-09 02:00PM 727.2

6 2 PETROL 45000 4500 24000 01-Jun-09 02:00PM 725.2

7 3 HI-SPEED 20000 2000 9500 01-Jun-09 02:00PM 820.7

8 4 DIESEL 45000 4500 30000 01-Jun-09 02:00PM 815.9

Hourly Tank Stock Report: The Allowed minimum volume should be configurable

Last

Name of Tank Current Last reading date & settlement

the RO PRODUCT capacity Volume % Volume time date & time

29/01/2013

M/s AAA DIESEL 15000 6308 42.05 29/01/2013 22:00:16 23:39:00

29/01/2013

PETROL 15000 4233 28.22 29/01/2013 22:00:16 23:39:00

Percentage tank stock report- Individual RO wise report. It should be possible to generate a report for a particular hour (7,8,9 AM and PM) in last two days. The system should allow to generate the report on the basis of these hours.

Petrol DIESEL SPEED Total Tank Total Tank Total Tank

TERR CODE TERR NAME tankage stock % tankage stock % tankage stock % 1401 Manmad Retail T'ry

1403 Mumbai Retail T'ry Percentage tank stock report- Territory wise summary report.

Page 16: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E DSM WISE MOP report. These Reports to also Indicate the Shift No. PRODUCT WISE, MOP WISE DETAILED REPORT

S.No DryStock Item Details Qty Rate Amount Item Code Sold

1 1234 MAK 2T Lube 3 200 600

2 3456 MAK 4T Lube 3 300 900

DRY STOCK REPORT

Page 17: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

Site Controller Failure

RO Details Territory RO SAP cc RO Equipment & ID Alarm Details Alarm Date Time BPCL RO Name Meerut 123456 Site Controller ID No. 1234 Power Off 01.Jun.09 10:35pm BPCL RO Name Meerut 145237 Site Controller ID No. 7845 Power Off 03.Jun.09 01:35pm

MPD Failure

RO Details Territory RO SAP cc RO Equipment & ID Alarm Details Alarm Date Time BPCL RO Name Delhi 132552 Gilbarco 3x6x2 MPD ID 1 MPD Offline 01.Jun.09 11:35pm BPCL RO Name Delhi 112345 Gilbarco 2x4x4 MPD ID 2 Communication 03.Jun.09 02:35pm

Failure

EXCEPTION REPORT

VEHICLE SEGMENT WISE REPORT

Page 18: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

MPD

MAIN 2T Oil Sold Vol (Ltrs) TOTAL

MPD Nozzle No 2T OIL Sold

No/Side PRODUCT

2%

3% 4%

5% Vol. (Ltrs)

Dresser Wayne 2x4x4 3/1 10 PETROL 10

40 5

10 65

2T

Dresser Wayne 2x4x4 3/2 11 PETROL 5

35 0

5 45

2T

110

2T-OIL SALE REPORT

DSM PERFORMANCE REPORT These Reports to also Indicate the Shift No.

NOZZLE UTILIZATION REPORT: This report should be based on the product. It should also indicate the % against each nozzle.

Page 19: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

Observed ATG Manual

Invoice

Invoice Invoice Density Receipt Entry of

S.No. Product Receipt Date and Time Tank ID Density

No. Quantity (Ltr) (Kg/m3) Reading Receipt

(Kg/m3)

(Ltrs.) (Ltrs.)

1 DIESEL 01-June-09 @ 10:00 am 123456789

2 12000 820.22 820.12 11700 12000

0

1 SPEED 02-June-09- @ 11:00 am 144456789 2 12000 820.22 820.12 8000 9000

0

1 PETROL 03-June-09- @ 11:00 am 155456789

2 12000 820.22 820.12 11900 12000

0

Bulk Receipt Report

1600

1400 Vol.

Sold

1200

1000 PETROL

800 DIESEL

SPEED

600

400

200

0

:59

9 9 9 9 :59

:59

9 :59

:59

9 9 :59

:59

9 9 9

5 5 :5 :5 5 5 5 5 5 :5

0 -01: - 02: - 03:59 - 04:59 - 05 -06

9 0 3 4 -15: -16:

7 8 -19: -20: - 21:59 - 22:59 - 23

0 0 1 1 1 1 1

-

- 07:59 - 08:59 - -

- 11: - 12:59 - - - -

0 0 0

03:00 04:00

0 0

07:00 08:00

0 0 :00

12:00

0 0 0 0 0 0 0 0

21:00 22:00

0

0 :0 :0 :0 :0 :0 :0 :0 :0 :0 :0 0 0 :0 :0 :0

00:

01

02 5 6 9 0

11 3 4

15

16

17:

18: 19

20 3

0 0 0 1 1 1 2

TIME

24 Hr. Wet-Stock Sale Statistics- Graphical

Page 20: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

24 Hr. Wet-Stock Sale Statistics- Numeric : User should be able to generate product wise (all, individual or group wise)report for a day, week, month of desired period.

Invoice Details Trucklorry InOut Product Grade Product Qtyinltrs Density (kg/m3)

Ex. RO ATG Diff Correc

Diff (G-g)

Ex. SAP Ex. RO DateTime Depot Out Ex. RO Ex.SAP ted on Observed

(A) (a) (B) (C) RO IN ( c) Ex. SAP(D) (d) SAP Entere pick F=(E- (G) Invoic at RO(g) or (G'-g)

(E) d (e) (e') e) e (G') =H

1102073658 1102073658 15-APR-2009 15-APR-2009 15-APR-2009 SPEED (EUROIII) SPEED 6000 6000 5905 0 751.6 751.6 752.5 -0.9

16:53:43 18:19:00 21:00:00

1102073658 1102073658 15-APR-2009 15-APR-2009 15-APR-2009

HSD(EURO III) DIESEL 6000 6000 5963 0 829.9 829.9 829.7 0.2

16:53:43 18:19:00 21:00:00

1102073710 1102073710 16-APR-2009 16-APR-2009 16-APR-2009 MS (EURO III) PETROL6000 6000 5917 0 751.6 751.6 752.9 -1.3

13:02:51 15:07:10 17:00:00

1102073710 1102073710 16-APR-2009 16-APR-2009 16-APR-2009

HSD(EURO III) DIESEL 6000 6000 6038 0 829.9 829.9 830.7 -0.8

13:02:51 15:07:10 17:00:00

1102073727 1102073727 17-APR-2009 17-APR-2009 17-APR-2009

HSD(EURO III) DIESEL 120006000 121546000 829.9 829.9 830.4 -0.5

10:27:00 11:41:57 14:00:09

1102073727 1102073727 17-APR-2009 17-APR-2009 17-APR-2009

HSD(EURO III) DIESEL 120006000 121546000 829.9 829.9 830.4 -0.5

10:27:00 11:41:57 14:00:18

1102073797 1102073797 18-APR-2009 18-APR-2009 18-APR-2009 MS (EURO III, 5% PETROL6000 6000 5918 0 753.1 753.1 754.2 -1.1

12:23:52 15:16:45 18:00:00 EB)

1102073797 1102073797 18-APR-2009 18-APR-2009 18-APR-2009

HSD(EURO III) DIESEL 6000 6000 5945 0 829.9 829.9 830.7 -0.8

12:23:52 15:16:45 18:00:00

1102073876 1102073876 20-APR-2009 20-APR-2009 20-APR-2009

HSD(EURO III) DIESEL 120006000 119286000 830.3 830.3 830.9 -0.

16:43:46 18:35:11 20:30:49

SAP MIRROR REPORT

Page 21: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

Page 22: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E RO INSPECTION REPORT: Automation system should keep a log of ROIR confirmed by SO and to generate Territory & HQ wise summary (cumulative and quarter wise) of ROIR confirmed by SO. System to allow a window for SO to enter the comments while confirming the ROIR. PRODUCT WISE VARIATION: ROWISE REPORT FORMAT: The above represents a case of multiple tanks for the same product

Page 23: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E Note: Class A (MS, SPEED & SPEED 97) products would be clubbed under MS and Class B (HSD & Hi Speed) would be clubbed under HSD. PRODUCT WISE VARIATION: CONSOLIDATED REPORT FORMAT

PRODUCT DIESEL

MONTH May-09 GLOBAL

Nozzle 1 3 4 5 No.->

DAYS OF Opening Sale Opening Sale Opening Sale Opening Sale Total Pump MONTH Reading Reading Reading Reading Testing 1 2517375.1 8402.2 1033374.7 6969.3 494077.3 1220.9 246149.6 1089.2 17681.6 10 2 2525777.3 9466.5 1040344 5305.1 495298.2 1677.3 247238.8 1338 17786.9 5 3 2535243.8 3426.2 1045649.1 1246.8 496975.5 1099.9 248576.8 948.8 6721.7 10 4 2538670 3390.8 1046895.9 1813.6 498075.4 874.3 249525.6 703.1 6781.8 10 5 2542060.8 11076.7 1048709.5 6916.3 498949.7 2063.5 250228.7 998 21054.5 5 6 2553137.5 4727.4 1055625.8 3564.1 501013.2 1737.5 251226.7 1159.4 11188.4 10 7 2557864.9 5327.3 1059189.9 3143.8 502750.7 693.4 252386.1 449.5 9614 5 8 2563192.2 10807.5 1062333.7 5167 503444.1 1254.6 252835.6 729.8 17958.9 0 9 2573999.7 5571.1 1067500.7 3834.4 504698.7 558.6 253565.4 312.8 10276.9 5 10 2579570.8 0 1071335.1 0 505257.3 0 253878.2 0 0 5

MONTHLY TOTALIZER REPORT: User to get daily Productwise, Nozzle Wise sales for a particular month.

Page 24: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E REPORT PERIOD: 10-May-09 to 10-Jun-09 PARTY DETAILS ACCOUNT ID: 141 PARTY NAME : RJ ENTERPRISE LOCATION: GURGAON CONTACT PERSON: SUKHVINDER SINGH CONTACT: (M) 9958991234 (T) 0124-4567899 (F)0124-4569999 e-mail : rj_ent@ yahoo.com

FUELLING FUELLING

CREDIT SLIP PAD MPD

S.No. DATE&TIME VEHICLE ID PRODUCT No. RECEIPT MOP DSM

VOL (Ltrs.) AMT. (Rs.) NO/SIDE

(If Applicable) NO.

1 1-Jun-09 10:30AM HR3LC1934 20 700 DIESEL 2432 1234 CASH RAVI 1/2

2 1-JUN-09 11:40AM RJ35J1934 25 925 HI-SPEED 2433 1234 CASH RAVI 1/2

3 2-JUN-09 11:40AM HR3CK1934 15 525 DIESEL 2456

1234 PETRO/ FLEET GANESH 1/1

CARD

4 3-JUN-09 11:40AM DL16AJ5934 30 1110 DIESEL 2457

1234 PETRO/ FLEET SRI RAM 1/1

CARD

5 3-JUN-09 11:40AM UP16M8793 10 350 PETROL

1234 CREDIT/

SATISH 2/1

2458 DEBIT CARD

CREDIT/ADVANCE PARTY DETAILS : System also to keep a track of Credit Slips. System should be able generate Random

slip no.s or the credit slip no.s range can be entered manually for a particular party

Page 25: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E PRODUCT WISE, MOP WISE DETAILED REPORT

CONSOLIDATED MOP WISE REPORT:Consolidation of MOP to be done at bussiness area/Region, Territory & Dealer. When selected dealer wise report, the report format would be same like that of RO.

Territory

Territory

No Of dealers No Of No of

No of Dealers using SMS customers

Code Name SMS

facility

Registered

CUSTOMER SMS REPORT: Consolidation of SMS to be done at bussiness area/Region, Territory & Dealer.When selected dealer wise report, the report format would be same like that of RO.

Page 26: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

ROIR RECON AVAILABILITY REPORT: When territory wise report is generated for a period, it should give details of all the

ROs under that territory. For indicating manual sale flag, 500 lit/nozzle (for the selected period) to be considered as

the permissible limit (no Manual sale). This limit should be configurable by admin. An alert in form of SMS or report on

daily basis is also desired for this report functionality.

PRICE CHANGE Vs TANK STOCK ANALYSIS- RO WISE REPORT: This analysis is required to be generated for a period of min 10 days. The graphical representation is required in the same window. All values in KL.

Page 27: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

PRICE CHANGE Vs TANK STOCK ANALYSIS- TERRITORY WISE REPORT: This analysis is required to be generated for a

period of min 10 days. Total tankage to be displayed with each RO. Average closing stock to be derived for no of days

for which the report is generated .In case data not available for a particular day, then NA to be displayed and the same

should not be considered during average calculation

Page 28: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E PRICE CHANGE Vs TANK STOCK ANALYSIS- REGION WISE REPORT: This analysis is required to be generated for a period of min 10 days. Consolidated tankage to be displayed for each territory.

CLOSING STOCK Vs NOZZLE SALE COMPARISON: This analysis is required to be generated for a desired period. This consolidated report should also be generated for Territory and Region.

Page 29: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

ANNEX-E: AUTOMATION REPORT TEMPLATES

Please Note: All these reports mentioned below shall serve as a template to guide vendor in solution for Reports. However the final reports are to be approved by BPCL approval and subject to customization.

The following Report Templates do not cover all the Reports mentioned in the document. Balance formats to be devised by successful vendor after approval from BPCL

RO LEVEL REPORTS FOLLOWING MINIMUM INPUTS MUST BE THERE FOR GENERATING ANY REPORT

• PERIOD OPTIONS—<CALENDAR FORMAT> • TIME OPTIONS—WHERE-EVER APPLICABLE

ALL THE OUTPUT REPORTS MUST HAVE FOLLOWING MINIMUM HEADER DETAILS

REPORT DESCRIPTION:

RETAIL OUTET NAME: RO SAP CC : TERRITORY :

FROM TO : <Date & Time> (*as applicable)

REPORT GENERATED ON : <Date&Time>

PRINT OPTION SAVE OPTION

Page 30: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

PRODUCT DATE DAY RATE/ SALE AMOUNT

LTR (Ltr.) (Rs.)

SPEED 5-Jun-09 FRI 47 1000 47000

6-Jun-09 SAT 47 500 23500

7-Jun-09 SUN 47 300 14100

8-Jun-09 MON 47 2000 94000

DIESEL 5-Jun-09 FRI 35 10000 350000

6-Jun-09 SAT 35 5000 175000

7-Jun-09 SUN 35 3000 105000

8-Jun-09 MON 35 20000 700000

HI- SPEED 5-Jun-09 FRI 39 700 27300

6-Jun-09 SAT 39 350 13650

7-Jun-09 SUN 39 210 8190

8-Jun-09 MON 39 1400 54600

PETROL 5-Jun-09 FRI 45 1500 67500

6-Jun-09 SAT 45 750 33750

7-Jun-09 SUN 45 450 20250

8-Jun-09 MON 45 3000 135000

DAILY PRODUCT WISE SALES BASED REPORT

Receipt

Amount Volume

Method of

DSM MPD Global

S.No. Product Rate/Ltr Date & Time No/MPD Nozzle Vehicle No Vehicle Segment

No. (Rs.) (ltr) Payment Name Side No

1 2345 Petrol 2000 44.44 45 Cash 1-Jun-09 10:00PM RAVI 2/1 5 DL4CU1602 CAR

2 2346 Diesel 1200 34.29 35 Credit/Debit

1-Jun-09 10:20PM SHYAM 2/2 6 UP16M8791 HCV

Card

3 2347 Speed 500 10.64 47 Petro/Fleet

1-Jun-09 10:30PM AMIT 1/2 1 DL31U1601 TWO-WHEELER

Card

4 2348 Hi-Speed 1000 25.64 39 Cash 1-Jun-09 10:40PM AMIT 1/2 2 RJ3CU2212 LCV

5 2349 Petrol 100 2.22 45 Cash 1-Jun-09 10:50PM RAM 1/1 3 RJ3CX2215 TWO-WHEELER

Note: Advance filtering based on vehicle segment, MOP, Product, MPD ID, Vehicle No, Date & Time (option to

choose range), Amount (option to choose the range) & Volume (option to choose the range)

AUDIT TRAIL FOR INDIVIDUAL TRANSACTIONS:-- User to have Search Options in various Fields

Page 31: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

SHIFT RECONCILIATION REPORT

PRODUCT OLDPRICE NEWPRICE LOGINBY DATE ANDTIME OF PRICE PRICECHANGEEFFECTIVE

CHANGE INPUT FROM

SPEED 50 47 DEALER 01-Jun-09 10:00 PM 02-Jun-09 00:00AM

PETROL 47 45 DEALER 01-Jun-09 10:01 PM 02-Jun-09 00:00AM

DIESEL 37 35 ADMIN 01-Jun-09 10:05 PM 02-Jun-09 00:00AM

HIGHSPEED 40 37 ADMIN 01-Jun-09 10:00 PM 02-Jun-09 00:00AM

AUDIT TRAIL FOR PRICE CHANGES AT RO LEVEL:

NOZZLE NOZZLE

PRODUCT OLD PRICE PRODUCT NEW PRICE PRODUCT SOLD @ OLD SOLD @ PRICE NEW PRICE

SPEED 50 3000 47 6600

PETROL 47 15000 45 33000

DIESEL 37 20000 35 44000

HI-SPEED 40 2000 37 4400 FUEL PRICE VS FUEL SOLD BREAKUP REPORT

Count of Volume Vehicle No Product Transaction (Ltrs) Amount (Rs)

DL4CU1603 Petrol 5 70 5110 VEHICLE No. wise REPORT The hyperlink under No. of times fuelled should give all the individual Transactions

Page 32: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

Tank Allowed Current

Density

S .No Tank ID Product Tank Vol. ATG Reading

Capacity Minimum (ATG) Date/Time (M anual)

(Ltrs) Vol. (Ltrs) (KG/M 3)

(Ltrs)

1 1 SPEED 20000 2000 15000 01-Jun-09 01:00PM 727.2

2 2 PETROL 45000 4500 24500 01-Jun-09 01:00PM 725.2

3 3 HI-SPEED 20000 2000 10000 01-Jun-09 01:00PM 820.7

4 4 DIESEL 45000 4500 30000 01-Jun-09 01:00PM 815.9

5 1 SPEED 20000 2000 14000 01-Jun-09 02:00PM 727.2

6 2 PETROL 45000 4500 24000 01-Jun-09 02:00PM 725.2

7 3 HI-SPEED 20000 2000 9500 01-Jun-09 02:00PM 820.7

8 4 DIESEL 45000 4500 30000 01-Jun-09 02:00PM 815.9

Hourly Tank Stock Report: The Allowed minimum volume should be configurable

DSM WISE MOP report. These Reports to also Indicate the Shift No.

No. of Credit/ No. of No. of Cash Cash Debit Credit/ Loyalty Loyalty Local Sales Transactio Card Debit Card Amoun Transac Credit Own testin

Date Amount ns Amount Transactions t tions Account use g

MOP WISE DETAILED REPORT: This Report to be generated for selected period.

Page 33: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

S.No DryStock Item Details Qty Rate Amount Item Code Sold

1 1234 MAK 2T Lube 3 200 600

2 3456 MAK 4T Lube 3 300 900

Dry stock Report

EXCEPTION REPORTS

VEHICLE SEGMENT WISE REPORTS

Page 34: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

MPD

MAIN 2T Oil Sold Vol (Ltrs) TOTAL

MPD Nozzle No 2T OIL Sold

No/Side PRODUCT

2%

3% 4%

5% Vol. (Ltrs)

Dresser Wayne 2x4x4 3/1 10 PETROL 10

40 5

10 65

2T

Dresser Wayne 2x4x4 3/2 11 PETROL 5

35 0

5 45

2T

110

2T-Oil Sale Report DSM PERFORMANCE REPORT These Reports to also Indicate the Shift No.

Page 35: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E NOZZLE UTILIZATION REPORT: Advance filtering to be available based on MPD, Product & Nozzle.It should additionally provide % of the total sale under the product.

Observed ATG Manual

Invoice

Invoice Invoice Density Receipt Entry of

S.No. Product Receipt Date and Time Tank ID Density

No. Quantity (Ltr) (Kg/m3) Reading Receipt

(Kg/m3)

(Ltrs.) (Ltrs.)

1 DIESEL 01-June-09 @ 10:00 am 123456789

2 12000 820.22 820.12 11700 12000

0

1 SPEED 02-June-09- @ 11:00 am 144456789

2 12000 820.22 820.12 8000 9000

0

1 PETROL 03-June-09- @ 11:00 am 155456789

2 12000 820.22 820.12 11900 12000

0

Bulk Receipt Report

1600

1400 Vol.

Sold

1200

1000 PETROL

800 DIESEL

SPEED

600

400

200

0

:59

9 9 9 9 :59

:59

9 :59

:59

9 9 :59

:59

9 9 9

5 5 :5 :5 5 5 5 5 5 :5

0 -01: - 02: - 03:59 - 04:59 - 05 -06

9 0 3 4 -15: -16:

7 8 -19: -20: - 21:59 - 22:59 - 23

0 0 1 1 1 1 1

-

- 07:59 - 08:59 - -

- 11: - 12:59 - - - -

0 0 0

03:00 04:00

0 0

07:00 08:00

0 0 :00

12:00

0 0 0 0 0 0 0 0

21:00 22:00

0

0 :0 :0 :0 :0 :0 :0 :0 :0 :0 :0 0 0 :0 :0 :0

00:

01

02 5 6 9 0

11 3 4

15

16

17:

18: 19

20 3

0 0 0 1 1 1 2

TIME

24 Hr. Wet-Stock Sale Statistics- Graphical

Page 36: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

24 Hr. Wet-Stock Sale Statistics- Numeric : User should be able to generate product wise (all, individual or group wise)report for a day, week, month of desired period. The report should additionally have the vehicle count on day basis.

ACTUAL ACTUAL PRESET DELIVERED DELIVERED

NOZZLE_ID BAY TRX_DATE TYPE VALUE AMOUNT VOLUME DIFF VEHICLE_NO DSM_NAM 29/04/2013

1 1 / 1 02:54:02 AMOUNT 1500.00 808.90 16.62 691.10 DL01BM2011 JAIBIR 29/04/2013

11 3 / 1 10:55:00 VOLUME 10.00 654.79 9.90 0.10 DL03GH2047 RAMNARES Preset Vs actual delivered quantity report : User should be able to generate product wise (all, individual or group wise)report for a day, week, month of desired period. Report to additionally include product and mobile no (if the customer is acquired) suitably.

Name Of the Tank RO Product Tank No Capacity Current Volume Date & Time

ABC Filling station Petrol 2 20000 1000 22.03.2013, 1600 hrs

RO Dry-out report : User should be able to generate report for a desired period. The report should also be generated on product wise where consolidated tankage and capacity and current volume is shown.

Page 37: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

Page 38: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E RO INSPECTION REPORT PRODUCT WISE VARIATION: ROWISE REPORT FORMAT: The above represents a case of multiple tanks for the same product

Page 39: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E Note: Class A (MS, SPEED & SPEED 97) products would be clubbed under MS and Class B (HSD & Hi Speed) would be clubbed under HSD. PRODUCT WISE VARIATION: CONSOLIDATED REPORT FORMAT

PRODUCT DIESEL

MONTH May-09 GLOBAL

Nozzle 1 3 4 5 No.->

DAYS OF Opening Sale Opening Sale Opening Sale Opening Sale Total Pump MONTH Reading Reading Reading Reading Testing 1 2517375.1 8402.2 1033374.7 6969.3 494077.3 1220.9 246149.6 1089.2 17681.6 10 2 2525777.3 9466.5 1040344 5305.1 495298.2 1677.3 247238.8 1338 17786.9 5 3 2535243.8 3426.2 1045649.1 1246.8 496975.5 1099.9 248576.8 948.8 6721.7 10 4 2538670 3390.8 1046895.9 1813.6 498075.4 874.3 249525.6 703.1 6781.8 10 5 2542060.8 11076.7 1048709.5 6916.3 498949.7 2063.5 250228.7 998 21054.5 5 6 2553137.5 4727.4 1055625.8 3564.1 501013.2 1737.5 251226.7 1159.4 11188.4 10 7 2557864.9 5327.3 1059189.9 3143.8 502750.7 693.4 252386.1 449.5 9614 5 8 2563192.2 10807.5 1062333.7 5167 503444.1 1254.6 252835.6 729.8 17958.9 0 9 2573999.7 5571.1 1067500.7 3834.4 504698.7 558.6 253565.4 312.8 10276.9 5 10 2579570.8 0 1071335.1 0 505257.3 0 253878.2 0 0 5

MONTHLY TOTALIZER REPORT: User to get daily Productwise, Nozzle Wise sales for a particular month.

Page 40: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

OPENING AMOUNT

NEW

PAYMENT

CUST. RECEIVED PAYMENT PARTICULARS

S.NO. CUST. NAME BALANCE BALANCE RECEIVED DATE

ACCOUNT ID (RS.) MODE (TEXT ENTRY)

(A) (A+B) TIME

(B)

1 123 ST FLEET

0 20000 20000 CHEQUE ICICI BANK 189039 from

01-Jun-09 11:30AM

Anup Kumar

2 141 RJ ENTERPRISE 1000 50000 51000 CASH 500 Rupee NotesX100 Notes

02-Jun-09 01:30PM

from Nem Singh

3 152 KUMAR AGENCY 2000 100000 102000 NEFT Payment Advice 3388339 SBI

02-Jun-09 02:40PM

Bank

4 162 ANUP TRAVELS 5000 30000 35000 DD HDFC BANK 189039 from

03-Jun-09 06:40PM

Auro Shukla

CREDIT/ADVANCE PARTY DEPOSIT DETAILS

REPORT PERIOD: 10-May-09 to 10-Jun-09 PARTY DETAILS ACCOUNT ID: 141 PARTY NAME : RJ ENTERPRISE LOCATION: GURGAON CONTACT PERSON: SUKHVINDER SINGH CONTACT: (M) 9958991234 (T) 0124-4567899 (F)0124-4569999 e-mail : rj_ent@ yahoo.com

FUELLING FUELLING

CREDIT SLIP PAD MPD

S.No. DATE&TIME VEHICLE ID PRODUCT No. RECEIPT MOP DSM

VOL (Ltrs.) AMT. (Rs.) NO/SIDE

(If Applicable) NO.

1 1-Jun-09 10:30AM HR3LC1934 20 700 DIESEL 2432 1234 CASH RAVI 1/2

2 1-JUN-09 11:40AM RJ35J1934 25 925 HI-SPEED 2433 1234 CASH RAVI 1/2

3 2-JUN-09 11:40AM HR3CK1934 15 525 DIESEL 2456

1234 PETRO/ FLEET GANESH 1/1

CARD

4 3-JUN-09 11:40AM DL16AJ5934 30 1110 DIESEL 2457

1234 PETRO/ FLEET SRI RAM 1/1

CARD

5 3-JUN-09 11:40AM UP16M8793 10 350 PETROL

1234 CREDIT/

SATISH 2/1

2458 DEBIT CARD

DETAILED CREDIT/ADVANCE PARTY REPORT : System also to keep a track of Credit Slips. System should be able generate Random slip no.s or the credit slip no.s range can be entered manually for a particular party

Page 41: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REPORT TEMPLATES: ANNEXURES D & E

Name of the Mobile SMS generate Customer No Vehicle No Fuelling date/Time date/time

CUSTOMER SMS SITE REPORT

Observed ATG Manual

Invoice

Invoice Invoice Density Receipt Entry of

S.No. Product Receipt Date and Time Tank ID Density

No. Quantity (Ltr) (Kg/m3) Reading Receipt

(Kg/m3)

(Ltrs.) (Ltrs.)

1 DIESEL 01-June-09 @ 10:00 am 123456789

2 12000 820.22 820.12 11700 12000

0

1 SPEED 02-June-09- @ 11:00 am 144456789 2 12000 820.22 820.12 8000 9000

0

1 PETROL 03-June-09- @ 11:00 am 155456789

2 12000 820.22 820.12 11900 12000

0

Bulk Receipt Report Auto RSP Report -

TERR_NAME NAME SAPCC PRODUCT

LAST_TRX_ BEFORE MIDNIGHT LAST_RATE LAST_AMOUNT LAST_VOLUME

MATHURA ALKA FILLING STATION 157084 PETROL

01/01/2017 19:15:54 70.80 50.00 0.70

MATHURA SP TRANSPORT 167648 DIESEL 01/01/2017 22:29:23 57.60 1279.87 22.22

MATHURA KAMAL AGRO SERVICE STATION 118813 DIESEL

01/01/2017 20:22:20 57.59 1151.80 20.00

MATHURA TOMAR FILLING STATION 180277 DIESEL

01/01/2017 22:57:33 58.26 1000.00 17.16

MATHURA DINESH FILLING STATION 161656 DIESEL

01/01/2017 23:22:17 57.68 2000.00 34.67

MATHURA AMAR AUTO 115461 SPEED 01/01/2017 23:21:33 73.07 50.00 0.68

MATHURA NARENDRA FILLING STATION 149070 DIESEL

01/01/2017 22:38:55 57.47 100.00 1.74

MATHURA AMAR AUTO 115461 PETROL 01/01/2017 23:47:45 70.92 949.61 13.39

Continuing in the same row as above, the following fields also need to get populated as shown below:-

Page 42: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

FIRST_TRX_DATE AFTER MIDNIGHT FIRST_RATE FIRST_AMOUNT FIRST_VOLUME

FIRST RSP_TRX_DATE WITH NEW SAP APPROVED RATES RSP_RATE

RSP_TRNX_AMOUNT RSP_TRNX_VOLUME RSP_SITE SAP_RSP SAP_UPD_DATE

NULL NULL NULL NULL NULL NULL NULL NULL YES 72.10 01/01/2017 23:38:55

02/01/2017 01:06:57 58.58 500.00 8.53

02/01/2017 01:06:57 58.58 500.00 8.53 YES 58.58

01/01/2017 23:38:55

02/01/2017 05:14:26 57.59 4.03 0.07

02/01/2017 05:35:44 58.57 500.00 8.54 YES 58.57

01/01/2017 23:38:55

02/01/2017 04:08:20 59.23 6300.29 106.37

02/01/2017 04:08:20 59.23 6300.29 106.37 YES 59.23

01/01/2017 23:38:55

02/01/2017 06:36:37 57.68 500.00 8.67

02/01/2017 07:52:16 58.66 5000.00 85.24 YES 58.66

01/01/2017 23:38:55

NULL NULL NULL NULL NULL NULL NULL NULL NO 74.37 01/01/2017 23:38:55

02/01/2017 00:06:50 57.47 7700.98 134.00 NULL NULL NULL NULL YES 58.44

01/01/2017 23:38:55

02/01/2017 00:01:29 70.92 80.00 1.12 NULL NULL NULL NULL NO 72.23

01/01/2017 23:38:55

Number of transactions from the date of Auto RSP till the next 24 hours at the non-approved SAP rates

number of transactions between midnight and the SPECIFIED DAT/TIME

Time range in which these transactions took place

DATE OF AUTO RSP

Volume of transactions between midnight and the SPECIFIED DAT/TIME

retail outlet 1

29 (this should be clickable and should expand displaying all transactions at non-approved SAP rates)

01:03:59 @ 01/01/17 to 02:05:12 @ 01/01/17 01/01/17

retail outlet 2

retail outlet 3

retail outlet 4

retail outlet 5

retail outlet 6

retail outlet 7

Page 43: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

CUSTOMER COUNT OF VARIOUS FILL SIZES DISTRICTWISE

RO NAME, DURATION COUNT OF VEHICLES FOR USER DEFINED DURATION FOR ANY RO

LESS THAN 50

LITRE 50 LITRE - 100 LITRE 100 LITRE - 300

LITRE MORE THAN 300

LITRE

AP02 300 23 13 8

TN01 234 24 45 3

MH16 42 24 23 7

HP12 231 75 64 18

MANUAL SALE REPORT

INPUT TERRITORY/REGION NAME, DURATION

CC NO RO NAME

NOZZLE NUMBER

OTALIZER OPENING

TOTALIZER CLOSING

TOTALIZER SALE

AUTOMATION SALE

MANUAL SALE

NETWORK NON-AVAILABILITY IN MINUTES

CC NO RO NAME TERRITORY

1-Jan-17

2-Jan-17

3-Jan-17

4-Jan-17 5-Jan-17

6-Jan-17 7-Jan-17

Page 44: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

ANNEXURE D & E VIS Reports Customer Registration thru VIS

customer name

mobile number

vehicle number

product grade

date of registration RO territory region

akhil narang 99xxxxxxx3 ka03kj7807 HSD 01.01.17

BP BKC Mumbai WR

SMS transactions details happening thru VIS

period -> 10.01.17 to 11.02.17 Region - all 4

retail outlet territory region

total registered customers thru VIS

Total HOS transactions thru VIS

Total SMS generated thru VIS territory region

BP BKC Mumbai WR 6598 982 890 Mumbai WR

BP expressway Pune WR 263 121 121 PUNE WR

Page 45: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

REAL TIME DASHBOARD TEMPLATES: ANNEXURE F The below mentioned templates will be used to report the Realtime status of automation. The time lag between the actual site status and that accessed through the Realtime dashboard should not be more than 10 minutes. BPCL will have the right to ask these reports using any grouping it wants (any 15 groupings). The Real Time dashboard is required to access data both from dedicated HOS for this Tender or thrugh a common Reporting Server for all Vendors. If at any point in time during the duration of the contract, BPCL requires the vendor to switch from one database (or common reporting server) server to the other, vendor would be required to do so within 3 months of getting the official intimation through an email. Upon clicking on any RO, it should be possible to get the individual status of all equipments like MPD and ATG probes. Page 1 Date/Time, Territory/Region

TERRITORY/REGION/ANY OTHER GROUPING AS DEFINED BY BPCL

LAST EOD

LAST AUTO RSP

TOTAL MPD MPD NOT DETECTED

TOTAL PROBES

PROBES NOT DETECTED

RO 1 21:12:53 31/01/17

01:12:21 01/09/16

3 1 5 2

The above inputs should be clickable and should expand to the Nozzle number and Probe number which is not being detected by Automation

RO 2

RO 3

RO 4

RO 5

RO 6

RO 7

RO 8

RO 9

RO 10

RO 11

RO 12

RO 13

RO 14

RO 15

RO 16

RO 17

RO 18

RO 19

RO 20

SUMMATION OF ALL THE ROWS AS ABOVE

All 3000 ROs are required to get populated in the above report and the subsequent reports mentioned later.

Page 46: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Page 2 Date/Time, Territory/Region

TERRITORY/REGION/ANY OTHER GROUPING AS DEFINED BY BPCL

MS TANKAGE

MS STOCK LEVEL

SPEED TANKAGE

SPEED STOCK LEVEL

HSD TANKAGE

HSD STOCK LEVEL

HI-HSD TANKAGE

HI-HSD STOCK LEVEL

MS+SPD STOCK LEVEL

HSD+HI-HSD STOCK LEVEL

RO 1 20000 15634 10000 4536 40000 23001 15000 7201 20170 30202

RO 2

RO 3

RO 4

RO 5

RO 6

RO 7

RO 8

RO 9

RO 10

RO 11

RO 12

RO 13

RO 14

RO 15

RO 16

RO 17

RO 18

RO 19

RO 20

SUMMATION OF ALL THE ROWS AS ABOVE

Page 47: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

ANNEXURE G – List of URLs allowed access through vendor supplied connectivity –

a Access to SAP within BPCL network using Cisco VPN client b Mal.bharatpetroleum.in/* c Ebiz.co.in/* d Extaps.in/* e Efp.bpcl.in/* f 202.62.246.91/* g 203.145.163.126/* h www.corp.onlinesbi.com/* i www.hdfcbank.com j www.mail.bharatpetroleum.in k 202.87.51.33/*

BPCL reserves the right to add/edit any of these URLs during the contract period.

Page 48: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

ANNEXURE H – Automation commissioning & Preventive Maintenance Checklist SL NO

ACTIVITY YES/NO REMARKS

1 RO CC NUMBER

2 RO NAME

3 DATE OF INTEGRATION & COMMISSIONING

Vendor needs to mention the dates of both the site visits undertaken for integration, commissioning and training. Both the dates need to be on different calendar days

4 Dealer Signature and Seal

5 Automation Service Engineer Name & Mobile number

6 Automation Service Engineer Signature

7 Mention the software version loaded in FCC

8 Number of MPDs connected with automation

9 MPD make, mode, serial number which is non communicating with FCC

10 Mention MPD firmware version if the MPD is not communicating

11 TID number integrated with automation

12 Whether RFID holes drilled and RFID readers installed on all MPDs

13 Whether DSM/cashier name correctly configured for all RFID tags (DSM names to be collected from the Dealer/Manager)

14 Whether the leftover tags (after configuring DSM names) have been kept inside the IT rack and informed the dealer)

15 Whether the RFID was enabled (need authorization mode) before leaving the RO

16 Whether all MPDs were running in automation at the time Automation Service engineer left the RO

17 Whether all tanks and ATG configuration provided in FCC

18 Whether VIS integrated and rolled out (if VIS is applicable) Details of transactions through VIS, sample Tag numbers issued

Page 49: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

19 Whether VSAT integrated with automation

20 Number of EDC integrated with automation

21 Whether dealer/manager vehicle and mobile number was registered at the time of commissioning

22 Whether SMS was generated to the AE, SO, TM, TC, Dealer

23 Whether Dealer/Manager/DSMs trained on the following :-

a Shift wise report

b Audit trail report

c Preset Mis-match report

d DSM wise report

e ROIR

f Bulk receipt entry

g Customer registration for SMS

h Vehicle number entry in EDC while generating bill

i Basic trouble shooting for FCC

24 Mention the EOD date from the HOS

25 Whether the Trouble shooting sticker fixed on IT rack side (not on glass door)

26 Status of UPS

a Make

b Capacity

c Whether battery capacity more than 20 mts

d Earth to neutral voltage for Each UPS ( should be less than 2 Volts and not zero)

Page 50: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

ANNEXURE I Reporting Data posting and RO automation performance during the 30 day stabilization period

EOD at HOS publish the dates if EOD was received

at HOS, else leave it blank

sl no

retail outlet

cc number territory

region

date of automation installation

Date of start of 30 day stabilization period day 1 day 2 Day 3 Day 29 date 30

1 srinivsa fs 111222 Thane West 09.07.2017 11.07.2017 11.07.17

12.07.17

08.08.17

09.08.17

2 maruti ss 222134 Hyderabad South 12.09.2017 13.09.2017

13.09.17

14.09.17

15.09.17

11.10.17

12.10.17

In case of srinivasa ss cc – 111222, since the EOD did not happen on Day 3, the Stabilization cycle of 30 days will re-start if the vendor fails to rectify the issue within 48 hours to rectify the issue.

Page 51: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

ANNEXXURE D & E:- VIS (VEHICLE IDENTIFICATION HOS LEVEL & SITE LEVEL REPORTS)

sl no

customer name

rfid tag number

vehicle number

mobile number

date/time of tag issuance

sl no

customer name

rfid tag number

VIS Transaction

volume taken quantity Rate

date/time of transaction

VIS (VEHICLE IDENTIFICATION HOS LEVEL REPORTS) –

sl no

customer name

rfid tag number

vehicle number

mobile number

date/time of tag issuance

sl no

customer name

rfid tag number

VIS Transaction

volume taken quantity Rate

date/time of transaction

Page 52: ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS · ANNEXURE- A : DETAILS OF BPCL REQUIREMENTS 1. BANK DEPOSIT STATEMENTS : a. At EOD, system should capture the declared amounts (for auto

Period of report from date -- to date and territory to be specified

sl no Retail outlet Cc number

Number of VIS

Transaction

Total volume taken territory

Total VIS customers registered city