Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications Draft Proposal for the redesign of CPC32413 Certificate III in Plumbing and Services At the National Plumbing and Services Continuous Improvement Reference Group (NPSCIRG) meeting held on May 1, 2015 it was agreed to seek wider stakeholder feedback on the following proposed changes to CPC32413 Certificate III in Plumbing and Services: embed common units rewrite and rebadge 2000 units as 3000 (where possible) rationalise packaging rules and unit listings, where logical – including change to mechanical core add LPG units and other recommended ‘incomings’ or missing competencies. remove suggested ‘unwanted’ competencies – but allow for ‘drawing in’ as required. Table 1, following, shows all of the units listed in the existing qualification This table also includes a column listing the proposed treatment of units based on the decisions taken by the project governance groups (NPSCIRG and NFIRG) including input to the initial project survey from industry practitioners and VET stakeholders. Following the table is the proposed structure of the DRAFT redesigned qualification – based on Table 1. Note STP = Standards for Training Packages Feedback has been received from both the ABCB and the VBA that increased specificity regarding regulatory compliance is required across all units i.e. references to: NCC, PCA and AS. Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 1 of 35

Upload: vohuong

Post on 17-May-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Draft Proposal for the redesign of CPC32413 Certificate III in Plumbing and Services

At the National Plumbing and Services Continuous Improvement Reference Group (NPSCIRG) meeting held on May 1, 2015 it was agreed to seek wider stakeholder feedback on the following proposed changes to CPC32413 Certificate III in Plumbing and Services:

embed common units rewrite and rebadge 2000 units as 3000 (where possible) rationalise packaging rules and unit listings, where logical – including change to mechanical core add LPG units and other recommended ‘incomings’ or missing competencies. remove suggested ‘unwanted’ competencies – but allow for ‘drawing in’ as required.

Table 1, following, shows all of the units listed in the existing qualification

This table also includes a column listing the proposed treatment of units based on the decisions taken by the project governance groups (NPSCIRG and NFIRG) including input to the initial project survey from industry practitioners and VET stakeholders.

Following the table is the proposed structure of the DRAFT redesigned qualification – based on Table 1.

Note STP = Standards for Training Packages

Feedback has been received from both the ABCB and the VBA that increased specificity regarding regulatory compliance is required across all units i.e. references to: NCC, PCA and AS.

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 1 of 26

Page 2: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

Elect gasElect mechElect roofElect sanitElect waterCoreElectElect

CPCCCM2008B Erect and dismantle restricted height scaffolding

Replace with licensing unitCPCCLSF2001A - Licence to erect, alter and dismantle scaffolding basic level

1 comment re: implications of changes for RTOs received to most units; however redesign of units to meet compliance with STP is mandatory and will mean changes whether the same redesigned unit is used – or a more suitable unit substituted.

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

Elect gasElect mechElect roofElect sanitElect waterCoreElectElect

CPCCCM2010B Work safely at heights

This unit has been redesigned as part of Construction qualifications and is now called ‘Work safely on scaffolding above 2 metres’Why not core in roof stream if core in CIII Roofing?

1 comment received that work at heights not always on scaffolding; however CPCPCM2055A Work safely on roofs is also included in this qualification.

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

Elect gasElect mechElect roofElect sanitElect waterCoreElectElect

CPCCCM3001C Operate elevated work platforms

This unit has been redesigned as part of Construction qualifications

No comment

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32713 Gas fitCPC50509 FSD

Elect gasElect mechElect roofElect sanitElect waterElectCore

CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry

Proposed to replace CPCPCM2043A with CIII unit re JSA and SWMS in the core – is this still required as elective?Propose to delete from electives

2 comments received re: this unit being required as pre-requisite for others.Note: Redesigned units will have no pre-requisites.

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 2 of 26

Page 3: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof PCPC32813 Fire P’tect

Elect mechElect roofElect sanitElect waterElectiveElect

CPCCPB3015A Install acoustic and thermal environmental protection systems

Redesign to STP Agreed

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

Elect gasElect mechElect roofElect sanitElect waterElectiveElectElect

CPCCRI3001A Operate personnel and materials hoists

Replace with CPCCLHS3001A - Licence to operate a personnel and materials hoist

Agreed

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

Elect drainElect gasElect mechElect roofElect sanitElect waterElectiveElectElect

CPCCST2005A Carry out load slinging of off-site materials

Not required for roofingFeedback received to delete from qualification – please advise

Agreed – not required for roofing

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

CoreCore waterCoreCoreCore

CPCPCM2039A Carry out interactive workplace communication

Embed content in relevant unitsDelete this unit

Agreed

CPC30X1X DrainageCPC32413 Plumbing

CoreCore water

CPCPCM2040A Read plans and calculate plumbing

Replace with new 3000 series plumbing units:

2 comments received disagreeing with level.

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 3 of 26

Page 4: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

CoreCoreCore

quantities CPCPCM300X Interpret plans, drawings and specifications and apply information to plumbing work preparationAndCPCPCM300X Calculate costs of minor plumbing work ($500 - $20,000)

Keep 2000 series unit

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

CoreCore waterCoreCoreCore

CPCPCM2041A Work effectively in the plumbing and services sector

Feedback received that more focus on compliance and regulatory framework is required; but this differs across streams and is sometimes task-specific and so should be embedded in relevant units in order to be meaningful and assessable.

Embed content as required in relevant units and delete this unit

1 comment supporting1 disagreeing

Note Keep proposal as is for wider stakeholder feedback

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

CoreCore waterCoreCoreCore

CPCPCM2043A Carry out WHS requirements

Feedback received – should be AQF3

Develop new 3000 series unit based on format of new construction WHS unit, but completely contextualised for plumbing and to be called: CPCPWHS300X Identify plumbing work hazards and select risk control strategies

Agreed

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 4 of 26

Page 5: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

CoreCore waterCoreCoreCore

CPCPCM2045A Handle and store plumbing materials

Delete – embed content relevant to specific work tasks in units

Agreed

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

CoreCore waterCoreCoreCoreCore

CPCPCM2046A Use plumbing hand and power tools

Feedback receivedA list of specific tools needs to be added to this e.g. con cut, grinders, Wacker, jack hammer, reciprocating saw etc. (this unit is across different qualifications and will require core and elective tools to meet the different trades.)It is not possible to have core and elective tools within a unit.

Embed the use of task-specific tools in relevant units

Agreed

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

CoreCore waterCoreCoreCore

CPCPCM2047A Carry out levelling Feedback received to add moving a level

Redesign to STP AND AQF3Feedback received to combine with other drainage unit – but required across too many streams so cannot be implemented

Agreed.Comment received that task-specific levelling also covered in other units as required.

Note: add moving a level and relative levels (see new unit suggestions)

CPC30X1X DrainageCPC32413 Plumbing

ElectCore gas

CPCPCM2048A Cut and join sheet metal

If pathways qualification created – retain at AQF2

Agreed – but comment received that mandatory

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 5 of 26

Page 6: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

Core mechCore roofCore sanitElect drainElect waterCoreCoreCore

Otherwise redesign to STP and upgrade to 3000 series.To enable required specificity of mandatory assessment tasks it may be necessary to develop stream-specific units.If different assessments are required for different streams – stream-specific units will have to be developed.

tasks should be applicable across streams

CPC30X1X DrainageCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

ElectElect drainElect gasElect mechElect roofElect sanitElect waterElectiveElectCore

CPCPCM2049A Cut using oxy-LPG-acetylene equipment

If pathways qualification created – retain at AQF2May not be required for roofing or drainage.If different assessments are required for different streams – stream-specific units will have to be developed.

Agreed but comment received about not having explicit assessments that inhibit RTO flexibility.

Note: specificity in assessment tasks is a mandatory requirement of STP.

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

ElectCore waterCoreCoreCore

CPCPCM2050A Mark out materials If pathways qualification created – retain at AQF2

Delete this unit from the Cert III Roofing – but embed competency in units where material is cut

Agree

2 conflicting comments 1 agree/ 1 disagree.Note: Retain proposal as is for wider feedback

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fit

ElectCore waterElectiveCore

CPCPCM2052A Weld using oxy-acetylene equipment

If pathways qualification created – retain at AQF2

Agreed

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 6 of 26

Page 7: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC32813 Fire P’tect

Core

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

ElectCore waterElectiveCoreCore

CPCPCM2053A Weld using manual metal arc welding equipment

If pathways qualification created – retain at AQF2

Agreed

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

CoreCore waterElectiveElectElect

CPCPCM2054A Carry out simple concreting and rendering

If pathways qualification created – retain at AQF2Feedback received – rendering not required

Agreed

Rendering is required

CPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

Core waterCoreCoreElect

CPCPCM2055A Work safely on roofs Redesign to STP and upgrade to 3000 series.

Agreed

CPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

Core waterCoreCoreElect

CPCPCM3021A Flash penetrations through roofs and walls

Redesign to STP Agreed

CPC30X1X DrainageCPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

ElectCore waterElectiveElectElect

CPCPCM3022A Weld polyethylene and polypropylene pipes using fusion method

Feedback received: assessment should have one joint for each of the following: Sanitary pipes, water pipes and gas pipes (thought to go into how done due to being across gas, roofing and drain laying qualifications)If different assessments are

1 comment – changing sector needs more discussion and 1 comment leave unit as is – not different assessments.

Note: Keep proposal as is for wider stakeholder feedback.

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 7 of 26

Page 8: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

required for different streams – stream-specific units will have to be developed.

CPC32413 PlumbingCPC32612 Roof PCPC32713 Gas fitCPC32813 Fire P’tect

Core waterElectiveElectCore

CPCPCM3023A Fabricate and install non-ferrous pressure piping

Redesign to STP Agreed

CPC30X1X DrainageCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof P

CoreCore drainCore sanitElective

CPCPDR2021A Locate and clear blockages

Redesign to STPIf pathways qualification created – retain at AQF2Feedback received – should be AQF 3Feedback received – combine with 3021 – but required across other streams – so cannot be implemented

Agreed1 comment to leave as 2000 seriesNote Feedback received at NPSCIRG meeting that this unit should be 3000 series.

1 comment: do not combine

CPC30X1X DrainageCPC32413 PlumbingCPC32413 Plumbing

CoreCore drainElect sanit

CPCPDR2022A Install domestic treatment plants

Redesign to STP and AQF3Feedback received to combine with 2023 and 3023 – please advise.

Agreed

Note: Delete this unit and add content to 3023

CPC30X1X DrainageCPC32413 PlumbingCPC32413 Plumbing

ElectElect drainElect sanit

CPCPDR2023A Maintain effluent disinfection systems

Feedback received – not required for drainageFeedback received to combine with 2022 and 3023 – please advise.

1 comment agreed1 comment: this unit does not meet current requirements and would need to be re written and would become a Cert IV unit.Note: Delete this unit and consult on adding relevant content to 3023 and developing a 4000 series unit

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 8 of 26

Page 9: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC30X1X DrainageCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof P

CoreCore drainElect sanitElective

CPCPDR2024A Install stormwater and sub-soil drainage systems

Redesign to STP and AQF3 2 comments received agreeingNote NPSCIRG meeting agreed to retain 2000 series PDR coded units at 2000 level pending further research into the drainer’s role.

CPC30X1X DrainageCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof P

CoreCore drainElect sanitElective

CPCPDR2025A Drain work site Redesign to STP and AQF3 2 comments received agreeingNote NPSCIRG meeting agreed to retain 2000 series PDR coded units at 2000 level pending further research into the drainer’s role.

CPC30X1X DrainageCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof P

CoreCore drainElect sanitElective

CPCPDR2026A Install prefabricated inspection openings and enclosures

Redesign to STP and AQF3 2 comments received agreeing Note NPSCIRG agreed to retain 2000 series PDR coded units at 2000 level pending further research into the drainer’s role.

CPC30X1X DrainageCPC32413 Plumbing

CoreCore drain

CPCPDR3021A Plan layout of a residential sanitary drainage system

Redesign to STPFeedback received to include PCA part C2

Agreed

CPC30X1X DrainageCPC32413 PlumbingCPC32413 Plumbing

CoreCore drainElect sanit

CPCPDR3022A Install below ground sanitary drainage systems

Redesign to STP Agreed

CPC30X1X DrainageCPC32413 PlumbingCPC32413 Plumbing

CoreCore drainElect sanit

CPCPDR3023A Install on-site disposal systems

Redesign to STPFeedback received to combine with 2022 and 2023 – please advise.

Agreed

Include content from:CPCPDR2022A Install domestic treatment plantsCPCPDR2023A Maintain

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 9 of 26

Page 10: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

effluent disinfection systemsCPC32413 PlumbingCPC32813 Fire P’tect

Elect waterElect

CPCPFS2022A Install portable fire equipment

Redesign to STP and upgrade to 3000 series.Feedback received to delete – please advise

Agreed to delete from this qualification

CPC32413 PlumbingCPC32813 Fire P’tect

Core waterCore

CPCPFS3031A Fabricate and install fire hydrant and hose reel systems

Redesign to STP.Feedback received that this unit needs to be contextualised for inclusion in C3 Fire Protection (remove header tank requirement) and recoded i.e. 2 units

Agreed

CPC32413 PlumbingCPC32513 P Mech SCPC32813 Fire P’tect

Elect waterElect waterCore

CPCPFS3034A Install control valve assemblies, actuating devices and local alarms

Redesign to STP Agreed

CPC32413 PlumbingCPC32813 Fire P’tect

Elect waterCore

CPCPFS3037A Install domestic and residential life safety sprinkler systems

Redesign to STP Agreed

CPC32413 PlumbingCPC32813 Fire P’tect

Elect waterCore

CPCPFS3038A Test and maintain fire hydrant and hose reel installations

Redesign to STP Agreed

CPC32413 PlumbingCPC32813 Fire P’tect

Elect waterCore

CPCPFS3045A Fit off sprinkler heads, controls and ancillary equipment

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Core gasCore

CPCPGS3046A Install LPG systems in caravans, mobile homes and mobile workplaces

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Core gasCore

CPCPGS3047A Install LPG systems in marine craft

Redesign to STP Agreed

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 10 of 26

Page 11: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC32413 PlumbingCPC32713 Gas fit

Core gasCore

CPCPGS3048A Install gas pressure control equipment

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Core gasCore

CPCPGS3049A Install Type A gas appliance flues

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Elect gasElect

CPCPGS3050A Install Type B gas appliance flues

Redesign to STP 1 comment agreed1 comment received that this unit should be removed and if there is a real need should be part of the Type B qualification. As a flue is a flue whether Type A or Type B.

Note: Keep proposal as is for wider stakeholder feedback

CPC32413 PlumbingCPC32713 Gas fit

Core gasCore

CPCPGS3051A Purge consumer piping

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Elect gasCore

CPCPGS3052A Maintain Type A gas appliances

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Core gasCore

CPCPGS3053A Disconnect and reconnect Type A gas appliances

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Core gasCore

CPCPGS3054A Calculate and install natural ventilation for Type A gas appliances

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Elect gasElect

CPCPGS3055A Install gas sub-meters

Redesign to STP Agreed

CPC32413 PlumbingCPC32513 P Mech SCPC32713 Gas fit

Core gasCore gasCore

CPCPGS3056A Install gas piping systems

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Core gasCore

CPCPGS3057A Size consumer gas piping systems

Redesign to STP Agreed

CPC32413 Plumbing Core gas CPCPGS3059A Install LPG storage of Redesign to STP AgreedDraft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 11 of 26

Page 12: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC32713 Gas fit Core aggregate storage capacity up to 500 litres

CPC32413 PlumbingCPC32713 Gas fit

Elect gasElect

CPCPGS3060A Install LPG storage of aggregate storage capacity exceeding 500 litres and less than 8KL

Redesign to STP Agreed

CPC32413 PlumbingCPC32713 Gas fit

Core gasCore

CPCPGS3061A Install and commission Type A gas appliances

Redesign to STP Agreed

CPC32413 Plumbing Elect water CPCPIG2021A Design domestic urban irrigation systems

Redesign to STP and AQF3Feedback received to delete – please advise

Agreed

CPC32413 Plumbing Elect water CPCPIG3021A Set out, install and commission irrigation systems

Redesign to STPFeedback received to delete – please advise

Agreed

CPC32413 Plumbing Elect water CPCPIG3022A Install and commission domestic irrigation pumps

Redesign to STPFeedback received to delete – please advise

Agreed

CPC32413 PlumbingCPC32413 PlumbingCPC32713 Gas fit

Core mechElect gasElect

CPCPMS2021A Assemble mechanical services components

Redesign to STP and 3000 series

Agreed

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32713 Gas fitCPC32813 Fire P’tect

Core mechElect gasElect waterElectCore

CPCPMS3031A Fabricate and install steel pressure piping

Redesign to STP Agreed

CPC32413 PlumbingCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof P

Elect mechElect sanitElect waterElective

CPCPMS3032A Select and fit insulation and sheathing

Redesign to STP Agreed

CPC32413 Plumbing Core mech CPCPMS3033A Install small bore Redesign to STP AgreedDraft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 12 of 26

Page 13: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC32413 PlumbingCPC32413 PlumbingCPC32713 Gas fit

Elect gasElect waterElect

heating systems

CPC32413 Plumbing Elect mech CPCPMS3034A Install medical gas pipeline systems

Redesign to STP Agreed

CPC32413 PlumbingCPC32413 PlumbingCPC32713 Gas fit

Elect gasElect mechElect

CPCPMS3035A Install and test ducting systems

Redesign to STP Agreed

CPC32413 PlumbingCPC32413 Plumbing

Elect gasElect mech

CPCPMS3036A Install air handling units

Redesign to STP Agreed

CPC32413 Plumbing Elect mech CPCPMS3037A Install and test split system air conditioning

Redesign to STP Agreed

CPC32413 Plumbing Elect mech CPCPMS3039A Maintain mechanical services equipment

Redesign to STP Agreed

CPC32413 PlumbingCPC32413 Plumbing

Elect mechElect water

CPCPMS3040A Install and maintain evaporative air cooling systems

Redesign to STP Agreed

CPC32413 Plumbing Elect mech CPCPMS3041A Install domestic solid fuel burning appliances

Redesign to STP Agreed

CPC32413 PlumbingCPC32612 Roof PCPC32612 Roof P

Core roofCoreCore

CPCPRF2022A Select and install roof sheeting and wall cladding

Feedback received to combine with CPCPRF3021ADelete this unit

Agreed

CPC30X1X DrainageCPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof P

ElectCore roofElect waterElective

CPCPRF2023A Collect and store roof water

Change title to: ‘Install systems to collect and store roof water’.Redesign to STP and upgrade to 3000 series.Feedback received – not required for drainage

Agreed

CPC32413 PlumbingCPC32612 Roof P

Elect roofElective

CPCPRF2024A Fabricate roof coverings for curved

Redesign to STP and upgrade to 3000 series.

Agreed

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 13 of 26

Page 14: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

structuresCPC32413 PlumbingCPC32612 Roof PCPC32612 Roof P

Core roofCoreCore

CPCPRF3021A Receive roofing materials

Combine unit with CPCPRF2022A and retitleCPCPRF30XX Select, receive and install roofing materialsFeedback received: add more in select & install roof cladding, roof drainage components, flashings, insulation.

Agreed

CPC32413 PlumbingCPC32612 Roof PCPC32612 Roof P

Core roofCoreCore

CPCPRF3022A Fabricate and install roof drainage components

Redesign to STP Agreed

CPC32413 PlumbingCPC32413 PlumbingCPC32612 Roof PCPC32612 Roof P

Core roofElect mechCoreCore

CPCPRF3023A Fabricate and install external flashings

Redesign to STP Agreed

CPC32413 PlumbingCPC32612 Roof PCPC32612 Roof P

Core roofCoreCore

CPCPRF3024A Install roof components

Redesign to STP Agreed

CPC32413 PlumbingCPC32612 Roof PCPC32612 Roof P

Elect roofCoreCore

CPCPRF3025A Install roof coverings to curved roof structures

Redesign to STP Agreed

CPC32413 PlumbingCPC32612 Roof PCPC32612 Roof P

Core roofCoreCore

CPCPRF3026A Install composite roof systems

Redesign to STP Agreed

CPC32413 PlumbingCPC32513 P Mech S

Core sanitCore sanit

CPCPSN3011B Plan layout of a residential sanitary plumbing system

Redesign to STP Agreed

CPC32413 Plumbing Core sanit CPCPSN3022A Install discharge pipes

Redesign to STP Agreed

CPC32413 Plumbing Core sanit CPCPSN3023A Fabricate and install sanitary stacks

Redesign to STP Agreed

CPC32413 Plumbing Core sanit CPCPSN3024A Install and fit off Redesign to STP AgreedDraft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 14 of 26

Page 15: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

sanitary fixturesCPC30X1X DrainageCPC32413 PlumbingCPC32413 Plumbing

ElectElect drainElect sanit

CPCPSN3025A Install pre-treatment facilities

Feedback received – not required for drainage

2 comments – disagree – it is required for drainage – some states also require the Cert IV trade waste unit.

Note: Redesign to STPCPC32413 Plumbing Elect sanit CPCPSN3026A Install sewerage

pumpsetsRedesign to STP Agreed

CPC32413 Plumbing Core water CPCPWT3020A Connect and install storage tanks to a domestic water supply

Redesign to STP Agreed

CPC32413 Plumbing Core water CPCPWT3021A Set out and install water services

Redesign to STP Agreed

CPC32413 Plumbing Core water CPCPWT3022A Install and adjust water service controls and devices

Redesign to STP Agreed

CPC32413 Plumbing Core water CPCPWT3023A Install and commission water heating systems

Redesign to STP Agreed

CPC32413 Plumbing Elect water CPCPWT3024A Install and maintain domestic water treatment equipment

Redesign to STP Agreed

CPC32413 PlumbingCPC32813 Fire P’tect

Core waterCore

CPCPWT3025A Install water pumpsets

Redesign to STP Agreed

CPC32413 Plumbing Core water CPCPWT3026A Fit off and commission heated and cold water services

Redesign to STP Agreed

CPC32413 Plumbing Core water CPCPWT3027A Connect irrigation systems from drinking water supply

Redesign to STP Agreed

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 15 of 26

Page 16: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

CPC32413 PlumbingCPC32813 Fire P’tect

Elect waterCore

CPCPWT3028A Install water services Redesign to STP Agreed

CPC30X1X DrainageCPC32413 PlumbingCPC32413 PlumbingCPC32813 Fire P’tect

ElectElect drainElect waterElect

CPCPWT3029A Install water pipe systems

Redesign to STPFeedback received – not required for drainage

Agreed

CPC32413 PlumbingCPC32813 Fire P’tect

Elect waterElect

CPCPWT3030A Install home fire sprinkler systems

Redesign to STP Agreed

Feedback received on imported units

HLTFA211A Provide basic emergency life support

Feedback received: There needs to be a way to update any non-CPC units to the current unit automatically.TGA issue

Agreed

Note: This is a Training.gov.au issue.

MEM05049B Perform routine gas tungsten arc welding

If retained develop CPCP unit

Agreed

MEM05050B Perform routine gas metal arc welding

If retained develop CPCP unit

Agreed

RIICCM210D Install trench support Feedback received to replace with CPCP (Plumbing specific) unit

Agreed

New units or additions suggested

New unit Silver solder copper pipe

There has been a proposal for a unit covering silver soldering for plumbers drainers and gas fitters to coversilver soldering of 100mm copper pipe

2 disagree commentsI comment that this is covered in other units already1 comment that it could be included in the non-ferrous unit or install discharge pipes unit.

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 16 of 26

Page 17: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

Is this enough content for a whole unit?

New units LPG New units proposed from accredited courses (none current)Course 1419 - Liquefied Petroleum Gas Installers (Restricted) Course 2005 (not listed on TGA)And the following non-current accredited courses:8322 - Course in LPG Gasfitter - Refresher Course in LPG Gasfitter - Refresher3767 - Course in LPG/NGV Installation Diagnosis and Repair Course in LPG/NGV Installation Diagnosis and Repair90853NSW - Course in Small LPG Cylinder Handling And Transportation Course in Small LPG Cylinder Handling And TransportationP1243 - Course in Stationary Engines (LPG) Course in Stationary Engines (LPG)Which units (as workplace tasks) are curently mising from the qualification

2 disagree comments – content already covered in existing units

New unit/s General plumbing maintenance work

Proposed new units to cover general plumbing maintenance work – as suggested at first NPSCIRG

2 comments agree in principle. Development stage to conduct further research into unit contents

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 17 of 26

Page 18: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

meeting (PN)Do you agree with these?:Carry out general water and sanitary systems repairs and maintenanceCarry out general roofing repairs and maintenanceCarry out general gas systems repairs and maintenanceCarry general drainage systems repairs and maintenanceCarry out general mechanical services repairs and maintenance

New unit Working with digital building systems and interfaces.

See Cert III Fire ProtectionIn the future, the content would be best embedded in all relevant units, but while the technology is still ‘incoming’ it is recommended that a standalone unit be developed which can be delivered as required.Fire protection have suggested Cert IV level

No comment

Confined spaces Covered in WHS units? 2 comments agree – list standalone unit

Note: List RIIWHS202D - Enter and work in confined spacesas an elective.

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 18 of 26

Page 19: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Table 1: Certificate III in Plumbing and ServicesQualifications/streams

Core or Elective:

Unit code: Unit title: Queries/proposals NPSCIRG agree/disagree

The use of mechanical jointing procedures

Add to relevant units – or new unit required?

2 comments to add to relevant units – one comment suggested adding to ‘non-ferrous’ unit

Hydro excavation Is a new unit required? 1 comment – this work probably sub-contracted

There are numerous new products and tools commonly used in industry today which are not included in the training package. Pex piping systems, new methods of copper jointing are just a few examples.

Add to relevant units Agreed – include in unit updates, as required

Relative levels Add to levelling unit? 2 comments – add relative levels to existing unit

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 19 of 26

Page 20: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Proposed structure for the Certificate III in Plumbing and Services

Note: Proposed that all units be recoded at the development stage to the same 6-letter code for general plumbing – for example CPCGPL. To complete this qualification 63 units are required:

52 core units 11 elective units, selected from:

o mechanical electives, oro general electives

Unit code: Unit title:

Core units

CPCPCM2048A Cut and join sheet metal

CPCPCM2052A Weld using oxy-acetylene equipment

CPCPCM2053A Weld using manual metal arc welding equipment

CPCPCM2054A Carry out simple concreting

CPCPCM2040A Read plans and calculate plumbing quantities

CPCPCM3021A Flash penetrations through roofs and wallsCPCCCM2010 Work safely on scaffolding above 2 metres

CPCCCM3001 Operate elevated work platforms

CPCCLSF2001A Licence to erect, alter and dismantle scaffolding basic level

CPCPCM3022A Weld polyethylene and polypropylene pipes using fusion method

CPCPCM3023A Fabricate and install non-ferrous pressure piping

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 20 of 26

Page 21: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Unit code: Unit title:

CPCPCM30XX Carry out levelling

CPCPCM30XX Work safely on roofsCPCPDR2024 Install stormwater and sub-soil drainage systems

CPCPDR2025 Drain work site

CPCPDR2026 Install prefabricated inspection openings and enclosures

CPCPDR3021A Plan layout of a residential sanitary drainage system

CPCPDR3022A Install below ground sanitary drainage systems

CPCPDR3023A Install on-site disposal systems (plus content 2022 and 2023)

CPCPDR30XX Locate and clear blockages

CPCPFS3031A Fabricate and install fire hydrant and hose reel systemsCPCPGS3046A Install LPG systems in caravans, mobile homes and mobile workplaces

CPCPGS3047A Install LPG systems in marine craft

CPCPGS3048A Install gas pressure control equipment

CPCPGS3049A Install Type A gas appliance flues

CPCPGS3051A Purge consumer piping

CPCPGS3053A Disconnect and reconnect Type A gas appliances

CPCPGS3054A Calculate and install natural ventilation for Type A gas appliances

CPCPGS3056A Install gas piping systems

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 21 of 26

Page 22: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Unit code: Unit title:

CPCPGS3057A Size consumer gas piping systems

CPCPGS3059A Install LPG storage of aggregate storage capacity up to 500 litres

CPCPGS3061A Install and commission Type A gas appliances

CPCPRF2022A Select and install roof sheeting and wall cladding

CPCPRF3022A Fabricate and install roof drainage components

CPCPRF3023A Fabricate and install external flashings

CPCPRF3024A Install roof components

CPCPRF3026A Install composite roof systems

CPCPRF30XX Select, receive and install roofing materials

CPCPSN3011B Plan layout of a residential sanitary plumbing system

CPCPSN3022A Install discharge pipes

CPCPSN3023A Fabricate and install sanitary stacks

CPCPSN3024A Install and fit off sanitary fixtures

CPCPWHS300X Identify plumbing work hazards and select risk control strategies

CPCPWT3020A Connect and install storage tanks to a domestic water supply

CPCPWT3021A Set out and install water services

CPCPWT3022A Install and adjust water service controls and devices

CPCPWT3023A Install and commission water heating systems

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 22 of 26

Page 23: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Unit code: Unit title:

CPCPWT3025A Install water pumpsets

CPCPWT3026A Fit off and commission heated and cold water services

CPCPWT3027A Connect irrigation systems from drinking water supply

HLTFA211A Provide basic emergency life supportRIICCM210D Install trench support

Mechanical electives

CPCPMS3031A Fabricate and install steel pressure piping

CPCPMS3032A Select and fit insulation and sheathing

CPCPMS3033A Install small bore heating systems

CPCPMS3035A Install and test ducting systems

CPCPMS3036A Install air handling units

CPCPMS3040A Install and maintain evaporative air cooling systems

CPCPMS30XX Assemble mechanical services components

General electives

AHCIRG306A Troubleshoot irrigation systems

CPCCLHS3001A Licence to operate a personnel and materials hoist

CPCCPB3015A Install acoustic and thermal environmental protection systems

CPCCST2005A Carry out load slinging of off-site materials

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 23 of 26

Page 24: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Unit code: Unit title:

CPCPCM2049A Cut using oxy-LPG-acetylene equipment

CPCPFS3034A Install control valve assemblies, actuating devices and local alarms

CPCPFS3037A Install domestic and residential life safety sprinkler systems

CPCPFS3038A Test and maintain fire hydrant and hose reel installations

CPCPFS3045A Fit off sprinkler heads, controls and ancillary equipment

CPCPGS3050A Install Type B gas appliance flues

CPCPGS3052A Maintain Type A gas appliances

CPCPGS3055A Install gas sub-meters

CPCPGS3060A Install LPG storage of aggregate storage capacity exceeding 500 litres and less than 8KL

CPCPMS3034A Install medical gas pipeline systems

CPCPMS3037A Install and test split system air conditioning

CPCPMS3039A Maintain mechanical services equipment

CPCPMS3041A Install domestic solid fuel burning appliances

CPCPRF3025A Install roof coverings to curved roof structures

CPCPRF30XX Fabricate roof coverings for curved structures

CPCPSN3025A Install pre-treatment facilities

CPCPSN3026A Install sewerage pumpsets

CPCPWT3024A Install and maintain domestic water treatment equipment

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 24 of 26

Page 25: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Unit code: Unit title:

CPCPWT3028A Install water services

CPCPWT3029A Install water pipe systems

CPCPWT3030A Install home fire sprinkler systems

CPCPXX30XX Perform routine gas tungsten arc welding (to replace MEM05049B)

CPCPXX30XX Perform routine gas metal arc welding (to replace MEM05050B)

MEM10009B Install refrigeration and air conditioning plant and equipment

MEM10010B Install pipework and pipework assemblies

MEM18086B Test, recover, evacuate and charge refrigeration systems

RIIWHS202D Enter and work in confined spaces

UEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace

UEENEEJ102A Prepare and connect refrigerant tubing and fittings

UEENEEJ105A Position, assemble and start up single head split air conditioning and water heating heat pump systems

UEENEEJ172A Recover, pressure test, evacuate, charge and leak test refrigerants – split systems

New unit Carry out general water and sanitary systems repairs and maintenance

New unit Carry out general roofing repairs and maintenance

New unit Carry out general gas system repairs and maintenance

New unit Carry general drainage system repairs and maintenance

New unit Carry out general mechanical services repairs and maintenance

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 25 of 26

Page 26: and Fire... · Web viewWeld using manual metal arc welding equipment If pathways qualification created – retain at AQF2 Agreed CPC30X1X Drainage CPC32413 Plumbing CPC32612 Roof

Scoping Study for the CPC08 Plumbing & Services Qualifications and the CPP07 Fire Protection Inspection & Testing Qualifications

Unit code: Unit title:

New unit Working with digital building systems and interfaces.

Draft Proposal for CPC32413 Certificate III in Plumbing and Services 12-05-15 Page 26 of 26