    Development of Ancillary PowerDevelopment of Ancillary Power

    market & Exchangesmarket & Exchanges

    AndAnd

    Guidelines for Short-term PowerGuidelines for Short-term Powerprocurementprocurement

    NPTI 10TH BATCHT & D presentation

    GROUP 24

    Presented By:Debasish Pal (77)

    Md Imtiyaz Perwaiz (84)Mohit Shrivastava (85)

    Ratanjeet Singh (96)

  • 7/31/2019 Ancilliary Equipment (2)

    2/17

    Ancillary meansAncillary means

    Providing necessary support to the primaryProviding necessary support to the primaryactivities or operation of an organization,activities or operation of an organization,

    institution, industry or system.institution, industry or system.

  • 7/31/2019 Ancilliary Equipment (2)

    3/17

    Basic/ System ServicesBasic/ System Services System or Basic services are the services such as generation,System or Basic services are the services such as generation,

    transmission and distribution of power which are delivered totransmission and distribution of power which are delivered to

    all the users connected to the system.all the users connected to the system. Ancillary ServicesAncillary Services Ancillary services are those functions performed to support theAncillary services are those functions performed to support the

    basic services of generation, transmission, energy supply andbasic services of generation, transmission, energy supply and

    power delivery. Ancillary services are required for the reliablepower delivery. Ancillary services are required for the reliable

    operation of the power system.operation of the power system.

  • 7/31/2019 Ancilliary Equipment (2)

    4/17

  • 7/31/2019 Ancilliary Equipment (2)

    5/17

  • 7/31/2019 Ancilliary Equipment (2)

    6/17

    50Hz

    49.3

    Hz

  • 7/31/2019 Ancilliary Equipment (2)

    7/17

    Primary frequency controlPrimary frequency control is a local automatic controlis a local automatic controlwhich adjusts the active power generation of generating unitswhich adjusts the active power generation of generating units

    and consumption of controllable loads to check the deviationand consumption of controllable loads to check the deviation

    in frequencyin frequencySecondary frequency controlSecondary frequency control is a centralized automaticis a centralized automatic

    control that adjusts the active power production of thecontrol that adjusts the active power production of the

    generating units to restore the frequency and the interchangesgenerating units to restore the frequency and the interchanges

    with other systems to their target values following anwith other systems to their target values following animbalance.imbalance.

    Tertiary frequency controlTertiary frequency controlrefers to manual changes inrefers to manual changes in

    the despatching and commitment of generating unitsthe despatching and commitment of generating units ..

  • 7/31/2019 Ancilliary Equipment (2)

    8/17

  • 7/31/2019 Ancilliary Equipment (2)

    9/17

    Spinning Reserves/ Reliability ReservesSpinning Reserves/ Reliability Reserves --This includes generating units which are capable of beingThis includes generating units which are capable of being

    fully available of responding nearly instantaneouslyfully available of responding nearly instantaneously

    Supplementary Reserves-Supplementary Reserves-This reserve might beThis reserve might beprovided by generating units on hot standby also.provided by generating units on hot standby also.

    Backup reserves - These are reserves that can stay inThese are reserves that can stay in

    service for a considerable period after they are calledservice for a considerable period after they are calledupon (in the range of hours), but that are not expected toupon (in the range of hours), but that are not expected to

    come on line for sometime (typically, 30 minutes orcome on line for sometime (typically, 30 minutes or

    more).more).

  • 7/31/2019 Ancilliary Equipment (2)

    10/17

    System voltage is the other benchmarkSystem voltage is the other benchmark

    parameter for power quality. Voltage in powerparameter for power quality. Voltage in power

    system is controlled by controlling the reactivesystem is controlled by controlling the reactive

    power injection and drawl. Flows in thepower injection and drawl. Flows in the

    network create voltage increases and dropsnetwork create voltage increases and drops

    that are the result of interactions betweenthat are the result of interactions between

    flows and the inductance and capacitance offlows and the inductance and capacitance ofeach line or transformer.each line or transformer.

  • 7/31/2019 Ancilliary Equipment (2)

    11/17

    Voltage supply to equipments must be within its designVoltage supply to equipments must be within its designlimits for safe operation and good performance.limits for safe operation and good performance.

    Change in voltages changes the reactive power flow inChange in voltages changes the reactive power flow in

    the system which in turn has an effect on the systemthe system which in turn has an effect on the systemlosses.losses.

    Voltages might also limit the transfer capability of theVoltages might also limit the transfer capability of the

    system.system.

    Injection and absorption of reactive power is alsoInjection and absorption of reactive power is also

    required to maintain system stability, in particular torequired to maintain system stability, in particular to

    protect against contingencies that could lead to voltageprotect against contingencies that could lead to voltage

    collapse.collapse.

  • 7/31/2019 Ancilliary Equipment (2)

    12/17

    1.1. Primary voltage controlPrimary voltage controlis a local automatic control thatis a local automatic control thatmaintains the voltage at a given bus (at the generating bus) at its setmaintains the voltage at a given bus (at the generating bus) at its set

    point. Automatic voltage regulator (AVR) fulfills this task. Otherpoint. Automatic voltage regulator (AVR) fulfills this task. Other

    controllable devices, such as static voltage compensators(SVC), cancontrollable devices, such as static voltage compensators(SVC), can

    also participate in this primary voltage controlalso participate in this primary voltage control..

    22.. Secondary voltage controlSecondary voltage control is a centralized automaticis a centralized automaticcontrol that coordinates the actions of local regulators in order tocontrol that coordinates the actions of local regulators in order to

    manage the injection of reactive power within a regional powermanage the injection of reactive power within a regional power

    system.system.

    3.3. Tertiary voltage controlTertiary voltage control refers to the manual optimizationrefers to the manual optimizationof reactive power flows across the power systemof reactive power flows across the power system

  • 7/31/2019 Ancilliary Equipment (2)

    13/17

    Frequency Profile-The permissible frequency bandThe permissible frequency bandas per the Indian Electricity Grid Code (IEGC) is 49.7-as per the Indian Electricity Grid Code (IEGC) is 49.7-

    50.2 Hz.50.2 Hz.

    Voltage Profile-Voltage Profile-Extreme environmental conditionExtreme environmental conditionvarying from foggy cold winter to extremely hotvarying from foggy cold winter to extremely hot

    summer and wide fluctuation in hydro-thermalsummer and wide fluctuation in hydro-thermalgeneration mix reflects in the form of wide fluctuationgeneration mix reflects in the form of wide fluctuation

    in system voltage profilein system voltage profile

  • 7/31/2019 Ancilliary Equipment (2)

    14/17

    Availability Based tariff (ABT)Availability Based tariff (ABT)

    Regulatory initiativesRegulatory initiatives

    Reactive power managementReactive power management-shunt reactor switching-shunt reactor switching

    -shunt capacitor switching-shunt capacitor switching

    -transformer tap co-ordination-transformer tap co-ordination-switching of transmission lines-switching of transmission lines

    -synchronous condenser mode-synchronous condenser mode

  • 7/31/2019 Ancilliary Equipment (2)

    15/17

    Availability based tariff (ABT) mechanismAvailability based tariff (ABT) mechanism

    provides frequency linked incentives/penaltiesprovides frequency linked incentives/penalties

    to beneficiaries/suppliers. In the ABT, a twoto beneficiaries/suppliers. In the ABT, a two

    part tariff is supplemented with a charge forpart tariff is supplemented with a charge for

    unscheduled interchange (UI) for the supplyunscheduled interchange (UI) for the supply

    and consumption of energy in variation fromand consumption of energy in variation from

    the pre-committed daily schedule andthe pre-committed daily schedule anddepending on grid frequency at that point ofdepending on grid frequency at that point of

    time.time.

  • 7/31/2019 Ancilliary Equipment (2)

    16/17

    According to Indian Electricity Grid CodeAccording to Indian Electricity Grid Code

    (IEGC) prepared by CERC,(IEGC) prepared by CERC, (i) beneficiaries pays for VAr drawal when voltage is(i) beneficiaries pays for VAr drawal when voltage is

    below 97% at point of drawal,below 97% at point of drawal,

    (ii) beneficiaries pays for VAr return when voltage is(ii) beneficiaries pays for VAr return when voltage is

    above 103% at point of return,above 103% at point of return,

    (iii) beneficiaries gets paid for VAr return when voltage(iii) beneficiaries gets paid for VAr return when voltageis below 97% at point of return,is below 97% at point of return,

    (iv) beneficiaries gets paid for VAr drawal when voltage(iv) beneficiaries gets paid for VAr drawal when voltage

    is above 103% at point of drawal.is above 103% at point of drawal.