analytical data recieved anticipated actions ......update_093018.docx table 1 soil sampling...
TRANSCRIPT
{MDEQ Muni‐Well‐
An Equal Opportunity Employer M/F/V/H
M E M O R A N D U M
To: Abby Hendershott, MDEQ
From: Leslie Nelson, Rose & Westra, a Division of GZA GeoEnvironmental, Inc. Date: September 30, 2018
File No.: 16.0062677.81 Task 001
Re: Wolverine World Wide, Inc. (Wolverine) – Wolven/Jewell RI – Monthly Progress Report
This Monthly Progress Report (MPR) is being provided at the request of the MDEQ to provide an update regarding the implementation of the December 13, 2017 Source Area Investigation Work Plan (WP) and the August 3, 2018 Revised Lamoreaux Farms Soil Investigation Work Plan (LF WP) related to per‐ and polyfluorinated alkyl substances (PFAS) detected in residential wells in the Wolven/Jewell study area.
ACTIONS PERFORMED
During this time period, August 11 through September 26, 2018, GZA has done the following tasks:
1. August 27 through September 7: R&W/GZA mobilized to the Site. Mobilization included clearing the temporary access road, clearing vegetation in the drilling area, temporary fence installation at the entrance of the property, and getting equipment and supplies up for use at the Site.
2. September 10 through September 26: The grid drilling and soil sampling was completed. During this period, 58 soil samples were collected and submitted to the laboratory for analysis.
Table 1 summarizes the soil samples collected. The approximate soil boring locations are shown on attached Figure 1. Final boring locations will be included in the next MPR.
ANALYTICAL DATA RECIEVED
No data was received.
ANTICIPATED ACTIONS AND SCHEDULE FOR NEXT REPORTING PERIOD
During the next reporting period, September 25 through October 25, 2018, R&W/GZA anticipates the following activities:
1) Begin the data evaluation of soil data from Lamoreaux Farms once complete data sets are received from the laboratories.
September 30, 2018 16.0062677.81, Task 1
Wolverine – Wolven/Jewell RI – Monthly Progress Report Page | 2
Proactive by Design
An Equal Opportunity Employer M/F/V/H
2) Begin drilling at proposed monitoring well PMW‐WV‐7 and potentially other locations as access is gained.
3) Prepare boring logs from the Lamoreaux Farms investigation. We anticipate data from the soil sampling will be received during the next period.
4) Conduct a round of static water levels on the existing monitoring wells.
J:\62000\626xx\62677.81 ‐ Wolven‐Jewell Investigation\DEQ Monthly Updates\September 30 DEQ Monthly Report\Wolven_Jewell Monthly Update_093018.docx
Table 1
Soil Sampling Locations Completed
Lamoreaux Farms Soil Investigation
1 of 1
Lab Lab
Sample Sample
Location ID S1 (ft) S2 (ft) End Date Additional Notes
WV‐SB‐01 7‐9 16‐18 9/18/18
WV‐SB‐02 7‐9 12‐14 9/18/18
WV‐SB‐03a 2‐4 17‐19 9/19/18 MS/MSD (17‐19)
WV‐SB‐04 1‐3 11‐13 9/18/18 Dup (1‐3)
WV‐SB‐05 5‐7 15‐17 9/18/18
WV‐SB‐06 2‐4 10‐12 9/19/18
WV‐SB‐07 7‐9 13‐15 9/18/18
WV‐SB‐08 6‐8 14‐16 9/18/18
WV‐SB‐09 7‐9 17‐19 9/19/18
WV‐SB‐10 6‐8 16‐18 9/19/18
WV‐SB‐11 8‐10 16‐18 9/25/18
WV‐SB‐12 7‐9 14‐16 9/24/18
WV‐SB‐13 3‐5 15‐17 9/19/18
WV‐SB‐14 8‐10 12‐14 9/19/18 Dup (8‐10)
WV‐SB‐15 1‐3 18‐20 9/19/18
WV‐SB‐16 4‐6 14‐16 9/19/18 MS/MSD (4‐6')
WV‐SB‐17 1‐3 18‐20 9/25/18
WV‐SB‐18 1‐3 11‐13 9/24/18 MS/MSD (1‐3)
WV‐SB‐19 1‐3 18‐20 9/24/18
WV‐SB‐20 6‐8 11‐13 9/24/18
WV‐SB‐21 7‐9 12‐14 9/24/18 Dup (12‐14)
WV‐SB‐22 0‐2 13‐15 9/24/18
WV‐SB‐23 4‐6 15‐17 9/26/18
WV‐SB‐24 7‐9 12‐14 9/26/18
WV‐SB‐25 1‐3 13‐15 9/26/18
WV‐SB‐26 6‐8 18‐20 9/26/18 MS/MSD (18‐20)
WV‐SB‐27 7‐9 13‐15 9/25/18
WV‐SB‐28 0‐2 15‐17 9/25/18
WV‐SB‐29 2‐4 12‐14 9/26/18
10/1/2018
© 20
18 - G
ZA G
eoEn
viron
menta
l, Inc
. J:\
16-G
rand R
apids
\16.00
6233
5.54 W
WW
Belm
ont E
xpan
sion\F
igures
\WW
W_L
amore
aux_
Farm
s_Sa
mple_
Loca
tions
.mxd
, Octo
ber 0
1, 20
18 - 9
:34:13
AM, h
oracio
.chav
ez
Lady Lauren Dr
WV-SB-11
WV-SB-17WV-SB-12WV-SB-15
WV-SB-03
WV-SB-29
WV-SB-28WV-SB-27WV-SB-26WV-SB-25WV-SB-24WV-SB-23
WV-SB-22WV-SB-21WV-SB-20WV-SB-19WV-SB-18
WV-SB-16WV-SB-14WV-SB-13
WV-SB-10WV-SB-09WV-SB-08WV-SB-07WV-SB-06
WV-SB-05WV-SB-04WV-SB-02WV-SB-01
TRANSFER , REUSE, OR MOD IFICAT ION TO THE DRAWING BY THE C LIENT OR OTHERS, WITHOUT THE PRIOR WRITTEN
UNLESS SPEC IF ICALLY STATED BY WRITTEN AGREEMEN T, TH IS D RAWING IS THE SOLE PROPERTY OF GZAGEOENVIR ONMENTAL, INC. (GZA). TH E INFOR MATION SHOWN ON THE DRAWING IS SOLELY FOR THE USE BY GZA'SCLIENT OR THE C LIENT'S DESIGNATED REPRESEN TATIVE FOR THE SPECIFIC PROJECT AND LOCATION IDENTIFIED ONTHE DR AWING. THE DR AW ING SHALL N OT BE TRANSFER RED, REUSED, COPIED, OR ALTERED IN ANY MANNER FORUSE AT ANY OTHER LOCAT ION OR FOR ANY OTHER PU RPOSE WITHOUT TH E PRIOR WRITTEN CONSENT OF GZA, ANY
EXPRESS CONSENT OF GZA, WILL BE AT TH E U SER 'S SOLE R ISK AND WITHOUT ANY RISK OR LIABILITY TO GZA.
GZA GeoEnvironmental, Inc.Engineers and Scientists
www.gza.com
PREPARED BY: PREPARED FOR:
SHEET NO:
DESIGNED BY:PROJ MGR:
DATE:
REVIEWED BY:DRAWN BY:PROJECT NO:
SCALE:CHECKED BY:
REVISION NO:
SOIL BORING LOCATION PLAN
1 OF 110/01/2018 PROJECT NO
PICHC
PRM CR1 in = 75 ft
WOLVERINE WORLD WIDEROCKFORD, MICHIGAN
1FIGURE
Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS User Community
0 75 15037.5
SCALE IN FEET
LAMOREAUX FARMS SOIL INVESTIGATIONROCKFORD, MICHIGAN
4Legend
Soil Boring Location