ANALYST’S BRIEFING : No.3/2014
August 26, 2014
1
This presentation was made from the analysis of reliable information in order to assist
investment community to better understand the company's financial status and operation. It also
supports the "Good Corporate Governance Project" of the Securities and Exchange Commission
(SEC).
However, the information within this presentation has been derived from the existing factors in
the present time. Therefore, the forward-looking information on this presentation may not occur
in the future if the aforementioned factors or situations are changed. Investors are, nevertheless,
required to use their own discretion regarding the use of information contained in this
presentation for any purpose.
For further information, please contact Investor Relations Section of the Electricity Generating
Public Company Limited (EGCO) at Tel: (662) 998-5145-8 or Email: [email protected]
2
3
► Highlights
► Q2/2014 Financial Results
► EGCO Group’s Overview
Highlights Q2/2014 Financial Results EGCO Group’s Overview
4
► Highlights
♦ Under Construction Projects
♦ Under Development Projects
♦ Activities & Achievements
Highlights Q2/2014 Financial Results EGCO Group’s Overview
5
Thailand
Laos
GIDEC
Songkhla
SCOD: October 2014
(almost complete)
XPCL
Xayaburi, Laos PDR
SCOD: October 2019
(30.85%)
KN4
Nakorn Si Thammarat
SCOD: June 2016
(32.50%)
Australia
BRWF
New South Wales,
Australia
SCOD: February 2015
(79.42%)
Under Construction : 4 projects
Philippines
Highlights Q2/2014 Financial Results EGCO Group’s Overview
6
► Highlights
♦ Under Construction Projects
♦ Under Development Projects
♦ Activities & Achievements
Highlights Q2/2014 Financial Results EGCO Group’s Overview
7
Thailand
Laos
Australia
Philippines Under Development : 4 projects
CWF
Sub Yai, Chaiyaphum
SCOD: December 2016
TJ Cogen
Klong Luang, Pathum Thani
SCOD: June 2017
TP Cogen
Ban Pong, Ratchaburi
SCOD: February 2017
SK Cogen
Ban Pong, Ratchaburi
SCOD: February 2017
Highlights Q2/2014 Financial Results EGCO Group’s Overview
Subyai
Chaiyaphum Wind Farm (CWF)
Project Description
Type: Wind Power Plant
Location: Subyai, Chaiyaphum
Shareholders: EGCO 90%, PVI Group 10%
SCOD: December 2016
PPA with EGAT (SPP Non-Firm)
Contracted Capacity: 90 MW
Adder: 3.50 baht/unit for 10 years
8
CWF
Highlights Q2/2014 Financial Results EGCO Group’s Overview
TP Cogeneration Project (TP Cogen) & SK Cogeneration Project (SK Cogen)
Project Description
Type: Cogeneration Power Plant
Location: Ban Pong, Ratchaburi Province
Shareholder: EGCO 100%
SCOD: February 2017
Installed Capacity: 125 MW each
Contracted Capacity with EGAT: 90 MW each
Expected Contracted Capacity with IUs: 23 MW
with 40 T/hr of steam (TP Cogen)
Expected Contracted Capacity with IUs: 17 MW
with 60 T/hr of steam (SK Cogen)
TP Cogen
& SK Cogen
Highlights Q2/2014 Financial Results EGCO Group’s Overview
9
TJ Cogen
10
TJ Cogeneration Project (TJ Cogen)
Project Description
Type: Cogeneration Power Plant
Location: Klong Luang, Pathum Thani Province
Shareholder: EGCO 100%
SCOD: June 2017
Installed Capacity: 110 MW
Contracted Capacity with EGAT: 90 MW
Expected Contracted Capacity with IUs: 16 MW
with 10 T/hr of steam
Highlights Q2/2014 Financial Results EGCO Group’s Overview
11
► Highlights
♦ Under Construction Projects
♦ Under Development Projects
♦ Activities & Achievements
Highlights Q2/2014 Financial Results EGCO Group’s Overview
12
Thailand
Laos
Australia
SBPL
Quezon, The Philippines
SCOD: Q3/2018
Philippines
MPPCL
Zambales, The Philippines
Acquisition date: July 15, 2014
Achievement for signing Power Supply
Agreement with Meralco in SBPL
Achievement for acquisition of shares in MPPCL
Highlights Q2/2014 Financial Results EGCO Group’s Overview
San Buenaventura Power Company Limited (SBPL)
Project Description
Type: Coal Fired Power Plant
Installed Capacity: 500 MW
Contracted Capacity: 455 MW
Location: Quezon Province, Luzon, the Philippines
Shareholders: EGCO 49% and MeralcoGen 51%
SCOD: Q3/2018
PSA: 20 years with Meralco
Project Progress
- Achievement for signing Power Supply Agreement with
Meralco on May 30, 2014
- The effectiveness of PSA will be subject to the review
and approval of ERC of the Philippines 13
Highlights Q2/2014 Financial Results EGCO Group’s Overview
Masinloc Power Partners Company Limited (MPPCL)
14
Achievement :
- Achievement for signing of Share Purchase
Agreement to acquire the shares in MPPCL was on
June 25, 2014.
- Acquisition transaction was completed on July 15,
2014 and Shareholders’ Agreement was signed on
the same date.
Achievement
Highlights Q2/2014 Financial Results EGCO Group’s Overview
Masinloc Power Partners Company Limited (MPPCL)
15
Power Plant Description
Type: Coal Fired Power Plant
Technology: Subcritical Pulverized Coal
Installed Capacity: 2x315 MW
Contracted Capacity: 589 MW
Location: Zambales Province, Luzon, the Philippines
COD: Unit 1 - June 1998 / Unit 2 – December 1998
History
- MPPCL was originally developed and owned by NPC, the
Philippines state power utility.
- In 2008, AES acquired MPPCL through privatization auction.
- Upon takeover, AES executed on rehabilitation plan during
2008-2010
- MPPCL is now operating at world class standards
O&M : MPPCL employees
After
Upon turn-over
in April 2008
April 2009,
1 year after turn-over
Rated Capacity
150 - MW
(Unit 1: 150 MW,
Unit 2: 0 MW)
630 – MW
(2x315 MW)
Heat Rate > 12,000 btu/kwh 9,995.5 btu/kwh
(average full load)
Availability
Factor < 50% > 90%
Auxiliary Load > 12% < 8.5%
Environmental
Footprint
Compliant with
Philippine Standards
Surpasses Philippine,
World Bank Standards
Highlights Q2/2014 Financial Results EGCO Group’s Overview
16
Luzon
Metro Manila
Masinloc
Masinloc Power Partners Company Limited (MPPCL)
Highlights Q2/2014 Financial Results EGCO Group’s Overview
Masinloc is located
250 Km north of
Metro Manila
17
51.00% 40.95% 8.05%
Masinloc Power Partners Co Ltd
(Phlippines) “MPPCL”
Masinloc Power Partners Company Limited (MPPCL)
Highlights Q2/2014 Financial Results EGCO Group’s Overview
18
70%
20%
10%
Contract Sales Meralco
ECs
Industrial Customers
Power Supply Agreement
Group Term* (yrs) Rate Type Indexation
Meralco 9 CAB Coal, FX, CPI
Electric Cooperatives
(ECs) 4 – 12 BER & TOU Coal, FX, CPI
Industrial Customers
(ICs) 3 - 7 BER & TOU Coal, FX, CPI
Capacity Base Rate (CAB):
• capacity fee and fixed O&M fee paid regardless of dispatch (subject to
availability performance), variable O&M and energy fee paid based on
energy delivered
Bilateral Energy Rate (BER):
• fixed rate paid based on energy delivered + annual take-or-pay
volumes
Time-of-Use Rate (TOU):
• similar to the BER except the fee paid varies depending on the hour of
the day + annual take-or-pay volumes
* Term including the remaining term and extension provision (as of 2014)
Masinloc Power Partners Company Limited (MPPCL)
Highlights Q2/2014 Financial Results EGCO Group’s Overview
Coal Supply Arrangements and Strategy
• 75% of requirement sourced under term contracts, the remaining is purchased at spot.
• Freight Swaps, tap into freight opportunities provided by multi freight contract among AES group
Coal Source • Coal sources are Indonesia, China and Australia
Current Coal Suppliers and Transportation
• Coal Supply Agreements (CSAs) are entered with a diverse group of suppliers Vitol Group Banpu Public Co Ltd Glencore International AGCoal
• Coal Transportation Agreements (CTAs) are signed with 2 credible transporters
Term • CSA term vary from 3-5 years
• CTA duration is 5 years
Coal Price
• FOB coal price based on globalCoal NEWC Index with a fixed premium
• Basis heating value of coal is 6,300 kCal/kg.
• Coal transportation component based on a FIOT basis for Load Ports Indonesia/Australia
Coal Stockpile • Minimum 25 days of coal stock at site
19
Masinloc Power Partners Company Limited (MPPCL)
Highlights Q2/2014 Financial Results EGCO Group’s Overview
*AGM on April 24, 2014 approved the appropriation of net profit from the second half-year operation of 2013 at 3.25 baht for the final dividend
payment on May 2, 2014.
* BOD at the meeting on August 23, 2014 approved the interim dividend payment for the first half- year operation at 3.00 baht to be paid on
September 19, 2014.
1.00 1.25 1.25
1.50 1.50 2.00
2.25 2.50 2.50 2.50 2.50
2.75 2.75 3.00
1.25 1.25
1.50 1.50
1.75
2.00
2.50 2.50
2.75 2.75 2.75
3.25 3.25
-
1.00
2.00
3.00
4.00
5.00
6.00
7.00
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Second Payment Interim Payment
Baht/Share
6.00
5.25 5.00
5.25 5.25
4.75
4.00
3.25 3.00
2.75 2.50
2.25
6.00
Highlights Q2/2014 Financial Results EGCO Group’s Overview
20
21
► Highlights
► Q2/2014 Financial Results
► EGCO Group’s Overview
Highlights Q2/2014 Financial Results EGCO Group’s Overview
2,110
2,566
-206
13
-69
-234
-212
126
-500
-
500
1,000
1,500
2,000
2,500
3,000
Q2/2013 (restated) Q2/2014
Net Profit Before FX, DT& TFRIC FX Deferred Tax TFRIC4&12
Million Baht
MD&A
+456 MB or +22%
22
2,471
1,623 Net Profit
+848 MB or +52%
Highlights Q2/2014 Financial Results EGCO Group’s Overview
Million Baht
23
2,053
2,522
57
44
-
500
1,000
1,500
2,000
2,500
3,000
Q2/2013 (restated) Q2/2014
Others Power Generation
2,566
2,110
MD&A
+456 or +22%
Highlights Q2/2014 Financial Results EGCO Group’s Overview
24
49 259
(14) 162
0
500
1,000
1,500
2,000
2,500
3,000Increase in AP
BLCP 207
KEGCO (126)
GPG (17)
Rayong (15)
2,159
2,418
2,110
2,566
Q2/2014 Q2/2013
Construction &
Development
SBPL (6)
GIDEC (5)
BRWF (3)
Solar & Wind
YEH 144
NED 10
GPS 6
SPP5 3
TWF 1
SPP3 (2)
Operating Performances
QPL 220 North Pole (245)
KEGCO 164 BLCP (83)
NTPC 144 GPG (39)
EGCO 113 ESCO (29)
GEC-SPP 24 Roi ET (5)
Rayong 3 EGCO Cogen (4)
Egcom Tara 3 Others (8)
MME 1
2,404 2,566
Million Baht
Highlights Q2/2014 Financial Results EGCO Group’s Overview
25
4,098 4,435
-88
54 34
173
-27
293
-200
300
800
1,300
1,800
2,300
2,800
3,300
3,800
4,300
4,800
5,300
6M2013 (restated) 6M2014
Net Profit Before FX, DT& TFRIC FX Deferred Tax TFRIC4&12
Million Baht
MD&A
+337 MB or 8%
Net Profit
+940 MB or +23%
4,956
4,016
Highlights Q2/2014 Financial Results EGCO Group’s Overview
27%
20%
15%
13%
13%
6%
4%
26
BLCP 1,473 MB
Quezon 1,084 MB
(QPL,QMS,PEPOI)
GPG(KK2) 717 MB
Note: Excluding EGCO
SOLAR & Wind 789 MB
(GPS,SPP2-5,NED,YEH,
Theppana)
Rayong 233 MB
SPP 323 MB
(GEC, EGCO Cogen, Roi-Et Green)
ET 72 MB, 1% ESCO 58 MB, 1% Unit: Million Baht
NTPC 686 MB
Highlights Q2/2014 Financial Results EGCO Group’s Overview
USD 893 M
THB 19,337 M
JPY 210 M
Total Outstanding
(Baht Equivalent) THB 52,106 M
Total Outstanding
As of 30 June 2014
USD 861 M
THB 20,472 M
JPY 210 M
THB 54,498 M
Total Outstanding
As of 31 Mar 2014
27
AUD 122 M AUD 191 M
Highlights Q2/2014 Financial Results EGCO Group’s Overview
0.23 0.21 0.25
0.70
0.87 0.89
0.18 0.17 0.23
0.41 0.44
0.41
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
2009 2010 2011 2012 2013(Restate) 6M/2014
EGCO+Subsidiaries EGCO
Debt 23,117
Equity 56,103
Debt Equity
Debt 65,227
Equity 73,165
Debt Equity
EGCO + Subsidiaries
Unit: MB
EGCO
Unit: MB
Times (X)
28
Highlights Q2/2014 Financial Results EGCO Group’s Overview
29
Million Baht
2012 2013 2014
Investment of EGCO Group (EGCO PORTION)
21,942 14,488 15,318
Descriptions 2014 CAPEX Cost
(EGCO Portion)
6M2014
CAPEX Cost
(EGCO Portion)
1. Boco Rock Wind Farm (BRWF) 5,837 4,428
2. KN4 5,157 4,130
3. Chaiyaphum Wind Farm (CWF) 1,509 -
4. SK Project 699 -
5. TP Project 699 -
6. TJ Project 100 -
7. Xayaburi 1,317 992
Total-Developing 15,318 9,550
Highlights Q2/2014 Financial Results EGCO Group’s Overview
30
► Highlights
► Q2/2014 Financial Results
► EGCO Group’s Overview
Highlights Q2/2014 Financial Results EGCO Group’s Overview
31
► EGCO Group’s Overview
♦ EGCO Shareholders
♦ Portfolio and Corporate Strategies
Highlights Q2/2014 Financial Results EGCO Group’s Overview
EGAT
25.41%
TEPDIA
23.94%
Thai Investors
15.16%
Foreign Investors
20.88%
NVDR 10.43% NVDR
14.61%
32
TEPCO 50%
Mitsubishi 50%
As of March 21, 2014
* Nuclear Damage Liability Facilitation Fund
NDF* 50.11%
Others 49.89%
Highlights Q2/2014 Financial Results EGCO Group’s Overview
33
► EGCO Group’s Overview
♦ EGCO Shareholders
♦ Portfolio and Corporate Strategies
Highlights Q2/2014 Financial Results EGCO Group’s Overview
IPPs SPPs Renewable Overseas
34
Currently, EGCO Group’s portfolio comprises of 21 operating power plants, totaling contracted capacity 4,759.46 MWe.
278.23 MWe
5.85%
3,330.44 MWe
69.98%
1,050.05 MWe
22.06%
100.74 MWe
2.12%
Total 4,759.46 MWe
IPPs
Rayong 1,174.99 1,174.99
KEGCO 748.20 748.20
GPG (KK 2) 1,468.00 734.00
BLCP 1,346.50 673.25
3,330.44
Power Plant MW EquityContracted
Cap. (MW)
Renewable
NED 63.00 21.00
SPP2 8.00 8.00
SPP3 8.00 8.00
SPP4 6.00 6.00
SPP5 8.00 8.00
GPS 26.00 15.60
TWF 6.90 6.21
Solarco 57.00 27.93
100.74
Power Plant MW EquityContracted
Cap. (MW)
Overseas
NTPC 1,023.00 358.05
QUEZON 460.00 450.80
MPPCL 589.00 241.20
1,050.05
SPPs
EGCO COGEN 112.18 89.74
ROI-ET GREEN 8.80 6.19
GEC-GCC 108.63 54.32
GEC-NKCC 121.30 60.65
GEC-SCC 114.45 57.23
GEC-GYG 20.20 10.10
278.23
Highlights Q2/2014 Financial Results EGCO Group’s Overview
Under Construction Under Development
Currently, EGCO Group’s portfolio consists of 4 under construction projects and 4 under development projects,
totaling contracted capacity 1,613.25 MWe.
Total 1,613.25 MWe
407 MWe
25.2%
1,206.25 MWe
74.8%
35
Under Construction
GIDEC 6.50 3.25
BRWF 113.00 113.00
KN4 930.00 930.00
XPCL 1,280.00 160.00
1,206.25
Contracted
Cap. (MW)Power Plant MW Equity
Under Development
CWF 90.00 81.00
TP Cogen 113.00 113.00
SK Cogen 107.00 107.00
TJ Cogen 106.00 106.00
407.00
Power Plant MW EquityContracted
Cap. (MW)
Highlights Q2/2014 Financial Results EGCO Group’s Overview
Currently, EGCO Group’s other business portfolio comprises of 6 companies:
36
Company Business Type
EGCO Engineering and Service Co., Ltd. (ESCO)
Pearl Energy Philippines Operating Inc. (PEPOI)
Quezon Management Services Inc. (QMS)
Eastern Water Resources Development and Management Plc. (EASTW)
Egcom Tara Co., Ltd. (Egcom Tara)
Manambang Muara Enim Co., Ltd. (MME)
O&M
O&M
Management Service
Water
Water
Coal Mining
Highlights Q2/2014 Financial Results EGCO Group’s Overview
XPCL
(Hydro)
KN4
(Gas)
BRWF
(Wind)
GIDEC
(Waste)
2014 2015 2016 2017 2018 2019 2020
Under Construction Projects
Under Development Projects 37
TP Cogen
(Gas) CWF
(Wind) SK Cogen
(Gas)
TJ Cogen
(Gas)
SBPL
(Coal)
Under Development Projects
Under Construction Projects
Potential Project (Waiting for ERC ’s Approval)
THANK YOU
38
Appendices
39
40
Classified by Producer Classified by Fuel type
As of June 2014, Thailand’s Power Installed Capacity was 34,179.02 MW.
EGAT : 14,708 MW SPP : 3,525 MW
IPP : 13,542 MW Import : 2,404 MW
Natural Gas : 23,402 MW Coal : 4,609 MW
Hydro : 5,541 MW Others* : 627 MW
*OTHERS = Fuel Oil, Diesel, Renewable
Source: EGAT
43.0%
39.6%
10.3%
7.0%
EGAT IPP SPP IMPORT
68.6%
16.2%
13.4%
1.8%
NATURAL GAS HYDRO COAL OTHERS*
15,000
20,000
25,000
30,000
January Februaary March April May June July August September October November December
2009 2010 2011 2012 2013 201441
MW
Source: EGAT
26,253.29 MW (June 3, 2014)
- 1.3%
26,598.14 MW (May 16, 2013)
Key Financial Data:
FX Variance MD&A
42
Key Financial Data:
Deferred Income (Expense) Tax
43
14
193
(13)
(291)
(43)
10
91
13
(32)
161
4
43
9 7
103
(2)
(300)
(250)
(200)
(150)
(100)
(50)
-
50
100
150
200
RYPP KEGCO Roi-EtGreen
BLCP GPG GYG NTPC ET
6M2013
6M2014
Key Financial Data:
Impact of the Adoption of TFRIC 4 and TFRIC 12
44
Million Baht
* FX gains/losses from Income Statements including financial cost from foreign currency loans (EGCO & Subs) and JVs 45
6M/2013 6M/2014
Debt to Equity (Time) 0.73 0.89
Net Debt to Equity (Time) 0.74 0.75
Net Profit before FX* (Million Baht) 4,124 4,608
EPS (Baht) 7.68 8.86
Operating Cash Flow / share (Baht) 3.24 6.98
BV / share (Baht) 126.81 137.27
Financial Ratio Highlights
Key Financial Data:
46
Segmental Operating Results, Ended June 30, 2014
Key Financial Data:
(Million Baht) EGCO
Rayong
power
plant
KEGCOEGCO
Cogen
Roi-Et
GreenSPP4 SPP3 YEH SPP2 SPP5 TWF
QPL
(included
PEPOI&QMS)
BRWF BLCP GPG
GCC,
NKCC,
SCC,
GYG
NED CONAL NTPC GPS GIDEC SBPL ESCO ET MME APPC
Sales of Electricity - 1,052 776 1,218 190 76 98 703 102 98 37 5,341 - 9,691 - - - 9,691
- Capacity Payment - 1,023 742 120 22 - - - - - - - - 1,907 - - - 1,907
- Energy Payment - 29 34 1,098 168 76 98 703 102 98 37 5,341 - 7,784 - - - 7,784
Sales of Water - - - - - - - - - - - - - - - 159 159 159
Service Income - - - - - - - - - - - - - - 206 - 206 206
Cost of Sales - 743 661 1,155 104 19 24 158 25 24 16 2,973 - 5,902 - 43 43 5,945
Cost of Services - - - - - - - - - - - - - - 121 - 121 121
Gross Profit - 309 115 63 86 57 74 545 77 74 21 2,368 - 3,789 85 116 201 3,990
EBITDA (547) 783 396 103 72 72 94 675 96 93 28 2,399 (6) 2,378 1,214 465 256 1,332 151 (12) (17) 10,025 76 100 - 176 10,201
EBIT (570) 242 (32) 33 63 57 75 545 76 75 18 1,947 (6) 1,856 864 324 205 1,044 112 (12) (17) 6,899 66 95 - 161 7,060
Net Profit before FX and
deferred income tax(895) 233 (65) 21 54 39 50 352 53 52 6 1,084 (6) 1,473 717 248 159 686 78 (13) (17) 4,310 58 72 (5) 125 4,435
Net Profit before FX (801) 245 (53) 21 53 39 50 352 52 52 7 1,083 65 1,504 717 205 159 686 78 (13) (17) 4,483 58 72 (5) 125 4,608
Net Profit (659) 245 (27) 22 52 39 50 340 52 52 9 1,097 72 1,397 739 213 158 643 78 (13) (19) 4,540 56 72 (5) 123 4,662
6M2014 HoldingSubsidiaries Joint Ventures
Total
Power
generation
Subsidiaries
Total
Other
businesses
Grand
Total
Power Generation Power Generation Others Others
Joint Ventures
47
Segmental Operating Results, Ended June 30, 2013
Key Financial Data:
(Million Baht) EGCO
Rayong
power
plant
KEGCOEGCO
Cogen
Roi-Et
GreenSPP4 SPP3 YEH SPP2 SPP5 TWF
QPL
(included
PEPOI&QMS)
BRWF BLCP GPG
GCC,
NKCC,
SCC,
GYG
NED CONAL NTPC GPS GIDEC SBPL ESCO ET MME APPC
Sales of Electricity - 1,111 1,078 1,244 167 74 97 - 100 97 - 5,005 - 8,973 - - - 8,973
- Capacity Payment - 1,051 1,046 58 20 - - - - - - - - 2,175 - - - 2,175
- Energy Payment - 60 32 1,186 147 74 97 - 100 97 - 5,005 - 6,798 - - - 6,798
Sales of Water - - - - - - - - - - - - - - - 153 153 153
Service Income - - - - - - - - - - - - - - 364 - 364 364
Cost of Sales - 761 679 1,131 81 19 25 - 27 26 - 2,961 - 5,710 - 44 44 5,754
Cost of Services - - - - - - - - - - - - - - 249 - 249 249
Gross Profit - 350 399 113 86 55 72 - 73 71 - 2,044 - 3,263 115 109 224 3,487
EBITDA (642) 830 739 148 75 70 91 13 93 89 (2) 2,338 - 2,094 1,515 503 215 161 1,054 140 (3) - 9,521 107 96 (13) (15) 153 9,696
EBIT (666) 278 278 79 66 55 72 13 73 70 (2) 1,928 - 1,567 1,132 366 167 78 795 101 (3) - 6,447 95 88 (13) (15) 155 6,602
Net Profit before FX and
deferred income tax(960) 270 110 64 54 35 45 12 47 45 (3) 1,113 - 1,294 958 299 119 35 376 73 (4) - 3,982 81 68 (14) (19) 116 4,098
Net Profit before FX (658) 167 115 63 54 35 45 6 47 45 (3) 1,021 - 1,223 958 299 119 33 376 73 (4) - 4,016 81 67 (13) (19) 116 4,132
Net Profit (837) 167 115 62 65 35 45 (10) 47 45 (7) 1,001 - 1,287 939 292 119 34 459 73 (4) - 3,929 80 67 (13) (19) 115 4,044
6M2013 HoldingSubsidiaries Joint Ventures
Total
Power
generation
Subsidiaries Joint Ventures
Total
Other
businesses
Grand
Total
Power Generation Power Generation Others Others
Net Generation
GWh
Electricity Sales MM Baht
REGCO and KEGCO receive the capacity payment (Rayong Power Plant) or availability payment (KEGCO) for maintaining the availability of the power plants, regardless of whether the electric power will be supplied to EGAT
or not.
EGAT is the sole offtaker for electricity produced by Rayong Power Plant and KEGCO under long term cost-plus based Power Purchase Agreements (PPAs).
48
Annual Net Generation & Electricity Sales for the Year 2009-2013
Operating Performance (IPPs) : 2
,952
4,7
83
2,1
27
4,0
04
2,6
93 5
,643
5,4
76
5,8
16
5,3
11
5,1
88
10,0
18
10,0
36
10,6
17
10,7
70
10,1
57
9,3
29
9,8
57
8,8
13
10,8
48
9,3
23
-
4,9
76
6,3
61
5,7
70
5,8
97
-
3,000
6,000
9,000
12,000
2009 2010 2011 2012 2013
RYPP KEGCO BLCP KK II NT2
3,7
22
2,5
35
2,2
58
2,1
67
2,2
01
2,3
19
2,7
88
2,1
70
1,7
62
2,0
38
17,9
09
17,7
06
17,8
68
18
,50
5
17,2
55
22,5
06
22,7
50
22
,65
5
29,6
49
27
,47
0
-
6,3
17
7,6
72
8,1
07
7,9
37
-
5,000
10,000
15,000
20,000
25,000
30,000
2009 2010 2011 2012 2013
49
Major Maintenance Expenses for the Year 2014
Operating Performance (IPPs) :
Million Baht
Quarter 1 2 3 4 Total
Actual Actual Budget Budget
Spare Parts 3.06 0.24 0.00 0.00 3.30
Service Charge 15.21 6.45 7.21 7.21 36.08
Total 18.27 6.69 7.21 7.21 39.38
Quarter 1 2 3 4 Total
Actual Actual Budget Budget
Spare Parts 33.47 12.39 15.31 5.22 66.39
Service Charge 23.95 4.63 25.05 4.96 58.58
Total 57.42 17.02 40.36 10.18 124.97
Rayong Power Plant
KEGCO
Million Baht
50
Major Maintenance Expenses for the Year 2013
Operating Performance (IPPs) :
Quarter 1 2 3 4 Total
Actual Actual Actual Actual
Spare Parts 10.67 2.12 5.66 0.22 18.67
Service Charge 25.74 23.12 21.44 7.80 78.10
Total 36.41 25.24 27.10 8.02 96.77
Quarter 1 2 3 4 Total
Actual Actual Actual Actual
Spare Parts 19.09 15.93 27.68 51.64 114.34
Service Charge 21.84 33.03 39.57 48.69 143.14
Total 40.93 48.96 67.25 100.33 257.48
Rayong Power Plant
KEGCO
Operating Performance Equivalent Availability Factor
Operating Performance (IPPs) :
51
Rayong Power Plant
Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%)
CCGT #1 81.85 85.83 98.44 99.06 98.80 97.82 95.90 97.12
CCGT #2 99.63 99.66 97.60 98.47 82.25 83.44 96.74 98.00
CCGT #3 90.19 92.95 97.60 98.44 99.64 99.50 95.90 97.43
CCGT #4 99.49 100.00 98.31 99.10 97.87 97.10 96.65 96.59
Rayong Power Plant
Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%)
CCGT #1 95.93 100.00 97.92 99.09 99.12 99.12
CCGT #2 99.07 98.48 95.63 99.09 98.28 99.12
CCGT #3 89.47 93.33 96.54 99.00 98.89 98.28
CCGT #4 98.89 100.00 95.42 99.19 98.91 98.98
KEGCO
Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%)
Barge #1 - - - - - - - -
Barge #2 94.00 99.51 63.01 66.83 78.67 88.18 92.90 87.36
CCGT #3 79.87 87.31 80.53 86.88 91.66 95.10 66.22 79.50
KEGCO
Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%)
Barge #1 -
Barge #2 91.00 82.90 91.00 96.00 91.00 90.38
CCGT #3 83.60 86.00 82.19 99.29 87.87 94.94
2014
Plant Type1Q14 2Q14 3Q14 4Q14
2013
Plant Type1Q13 2Q13 3Q13 4Q13
2014
Plant Type1Q14 2Q14 3Q14 4Q14
2013
Plant Type1Q13 2Q13 3Q13 4Q13
52
Net Generation and Fuel Consumption
Operating Performance (IPPs) :
Rayong Power Plant
CCGT #1- 4 1Q13 2Q13 3Q13 4Q13 1Q14 2Q14
Net Generation
- By Natural Gas (GWh) 979 1,146 288 280 441 560
- By Secondary Fuel (GWh) - 0.170 - - 0.160 -
Fuel Consumption
- By Natural Gas (MMBTU) 8,432,352 9,904,901 2,557,558 2,483,331 3,906,610 4,951,634
- By Secondary Fuel (Million Litre) - 0.040 - - 0.040 -
KEGCOBarge # 2 1Q13 2Q13 3Q13 4Q13 1Q14 2Q14
Net Generation -
- By Natural Gas (GWh) 142 98 130 124 115 130
- By Secondary Fuel (GWh) - - - - - -
Fuel Consumption -
- By Natural Gas (MMBTU) 1,791,289 1,286,936 1,695,172 1,590,779 1,470,853 1,659,281
- By Secondary Fuel (Million Litre) - - 0.004 0.002 0.029 0
CCGT # 3 1Q13 2Q13 3Q13 4Q13 1Q14 2Q14
Net Generation -
- By Natural Gas (GWh) 1,162 1,181 1,288 1,062 1,099 1,302
- By Secondary Fuel (GWh) - - - - - -
Fuel Consumption -
- By Natural Gas (MMBTU) 9,404,137 9,571,503 10,481,570 8,696,415 10,493,579 10,619,075
- By Secondary Fuel (Million Litre) 0.01 0.01 - - - 0.02
2014
20142013
2013
53
GIDEC Waste Power Plant Project (GIDEC)
Project Description
Type: Municipal Solid Waste Plant
Location: Hat Yai, Songkhla Province
Shareholders: EGCO 50%, IEC Green Energy 50%
Expected COD: October 2014
PPA with PEA (VSPP Program)
Contracted Capacity: 6.5 MW
Adder: 3.5 baht/unit for 7 years
Project Progress
- Construction work was almost complete, individual function test
of each equipment is ongoing.
- Steam flushing/blowout was complete. Commissioning of boiler,
steam turbine, generator and BOP are under preparation.
54
Boco Rock Wind Farm (BRWF)
Project Description
Type: Wind Power Plant (Green Field)
Location: New South Wales, Australia
Shareholder: EGCO 100%
SCOD: February 2015
PPA: 15 years with Energy Australia Pty Ltd.
Installed Capacity: 113 MW
Project Progress
- Ending Q2/2014, the progress of work was 79.42%.
- Construction work is progressing well, installation of 21 WTGs
was complete.
55
Khanom Power Plant Project Unit 4 (KN 4)
Project Description
Type: Combined Cycle Power Plant
Location: Khanom, Nakhon Si Thammarat Province
Shareholder: EGCO 99.99%
SCOD: June 2016
PPA: 25 years with EGAT
Contracted Capacity: 930 MW
Project Progress
- Ending Q2/2014, the overall project progress was 32.50%.
- Piling and foundation works are ongoing ahead of the planned
schedule.
Xayaburi Power Company Limited (XPCL)
Project Description
Type: Hydro Power Plant Project, Run off River
Location: Xayaburi District, Laos PDR
Shareholders: EGCO 12.5%, CK 30%, EDL 20%, BECL 7.5%,
Natee Synergy 25%, PT Construction and
Irrigation Co., Ltd. 5%
SCOD: October 2019
PPA: 29 years with EGAT and EDL
Contracted Capacity with EGAT: 1,220 MW
Contracted Capacity with EDL: 60 MW
Project Progress
- Ending Q2/2014, the progress of work was 30.85%.
- Design of Navigation Lock, Spillway and Intermediate Block were
approved, detailed design for Powerhouse and Fish Passing
Facilities is continuing. Construction work is progressing.
56