analysis of revised receptor site installation order

18
Analysis of Revised Receptor Site Installation Order Jim Valenti COPC Meeting 21 October 2009

Upload: fran

Post on 19-Jan-2016

41 views

Category:

Documents


0 download

DESCRIPTION

Analysis of Revised Receptor Site Installation Order. Jim Valenti COPC Meeting 21 October 2009. Analysis Methodology. Methodology Cases run by adding SafetyNet sites in the proposed install order Multiple DSAT runs executed at each case with weather and station outages DSAT Parameters - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Analysis of Revised  Receptor Site Installation Order

Analysis of Revised Receptor Site Installation Order

Jim Valenti

COPC Meeting

21 October 2009

Page 2: Analysis of Revised  Receptor Site Installation Order

2

Analysis Methodology

• Methodology– Cases run by adding SafetyNet sites in the proposed install order– Multiple DSAT runs executed at each case with weather and station outages

• DSAT Parameters– Satellites: 1 nominal orbit planes (1330)– Rain: Worst Month Rain Statistics (ITU model)– Margin: 3 db link margin– VIIRS: VIIRS day / night acquisition and compression rates modeled– IDPS: IDPS queuing model.– DMR: Updated DMR processing model

Page 3: Analysis of Revised  Receptor Site Installation Order

3

C3S Receptors (Phase 1)CY09 CY10 CY11 CY12 CY13

Site Prep Period

Site Install Period

Site Integration & C/O

System Test (off-site)

Key

3572 – Orlando

10/25/1006/09/09

07/23/10

04/22/10

12/17/10

05/13/11

3574 – Svalbard

12/16/117/06/10 07/22/11

10/21/11

1/23/1111/11/10

02/24/1112/16/10

McMurdo Multimission Opt.1

Site Integration 3/15/12

FY09 FY10 FY11 FY12 FY13CY09 CY10 CY11 CY12 CY13

FY09 FY10 FY11 FY12 FY13

35790 – McMurdo

1/23/12

7/06/10

11/11/11

12/16/11

02/24/12

Page 4: Analysis of Revised  Receptor Site Installation Order

4

C1

C3S Receptors (Phase 2)

CY12 CY13 CY14 CY15 CY16

FY12 FY13 FY14 FY15 FY16

10/24/14

76912 – Brazil2/13/151/02/14

4/17/15

76948– S. Africa7/24/155/05/14

76928 – Arizona1/24/1411/16/12

10/11/13

76932 – India7/11/146/03/13

04/11/14

2/14/14

76912 – Spain5/23/144/12/13

76940 – N. Zealand1/25/1312/01/11

10/12/12

76936 – Chile8/02/136/18/12

05/03/13

76916 – Alaska 10/25/139/10/12

07/12/13

76924 – Hawaii10/31/149/23/13

07/25/14

02/15/13

76944 – Japan5/24/134/09/12

2/13/15

76908 – Australia5/15/154/07/14

O&S C2

FY12 FY13 FY14 FY15 FY16

CY12 CY13 CY14 CY15 CY16

76952 – Guam9/18/158/04/14

06/26/15

Site Prep Period

Site Install Period

Site Integration & C/O

System Test (off-site)

Key

Page 5: Analysis of Revised  Receptor Site Installation Order

5

95% Latency Based on Revised Receptor Site Installation Order

McM

urd

o

New

Zea

land

Jap

an

Chi

le

Ala

ska

Ariz

ona

Sp

ain

Ind

ia

Haw

aii

Bra

zil

Aus

tral

ia

So

uth

Afr

ica

Gua

m

20

30

40

50

60

70

80

90

100

Dec-2011 May-2012 Sep-2012 Feb-2013 Jul-2013 Nov-2013 Apr-2014 Aug-2014 Jan-2015 Jun-2015 Oct-2015

Sys

tem

95%

Lat

ency

(m

in)

◄Florida and Svalbard Receptors installed previously C2 Launch - 5/16/2016 ►

C1

Laun

ch -

3/14

/201

4

Page 6: Analysis of Revised  Receptor Site Installation Order

6

Svalbard, McMurdo, and Florida95% System Latency

Latency (min)

Page 7: Analysis of Revised  Receptor Site Installation Order

7

New Zealand Added

Latency (min)

Page 8: Analysis of Revised  Receptor Site Installation Order

8

Japan Added

Latency (min)

Page 9: Analysis of Revised  Receptor Site Installation Order

9

Chile Added

Latency (min)

Page 10: Analysis of Revised  Receptor Site Installation Order

10

Alaska Added

Latency (min)

Page 11: Analysis of Revised  Receptor Site Installation Order

11

Arizona Added

Latency (min)

Page 12: Analysis of Revised  Receptor Site Installation Order

12

Spain Added

Latency (min)

Page 13: Analysis of Revised  Receptor Site Installation Order

13

India Added

Latency (min)

Page 14: Analysis of Revised  Receptor Site Installation Order

14

Hawaii Added

Latency (min)

Page 15: Analysis of Revised  Receptor Site Installation Order

15

Brazil Added

Latency (min)

Page 16: Analysis of Revised  Receptor Site Installation Order

16

Australia Added

Latency (min)

Page 17: Analysis of Revised  Receptor Site Installation Order

17

South Africa Added

Latency (min)

Page 18: Analysis of Revised  Receptor Site Installation Order

18

Guam Added

Latency (min)