analysis of revised receptor site installation order
DESCRIPTION
Analysis of Revised Receptor Site Installation Order. Jim Valenti COPC Meeting 21 October 2009. Analysis Methodology. Methodology Cases run by adding SafetyNet sites in the proposed install order Multiple DSAT runs executed at each case with weather and station outages DSAT Parameters - PowerPoint PPT PresentationTRANSCRIPT
Analysis of Revised Receptor Site Installation Order
Jim Valenti
COPC Meeting
21 October 2009
2
Analysis Methodology
• Methodology– Cases run by adding SafetyNet sites in the proposed install order– Multiple DSAT runs executed at each case with weather and station outages
• DSAT Parameters– Satellites: 1 nominal orbit planes (1330)– Rain: Worst Month Rain Statistics (ITU model)– Margin: 3 db link margin– VIIRS: VIIRS day / night acquisition and compression rates modeled– IDPS: IDPS queuing model.– DMR: Updated DMR processing model
3
C3S Receptors (Phase 1)CY09 CY10 CY11 CY12 CY13
Site Prep Period
Site Install Period
Site Integration & C/O
System Test (off-site)
Key
3572 – Orlando
10/25/1006/09/09
07/23/10
04/22/10
12/17/10
05/13/11
3574 – Svalbard
12/16/117/06/10 07/22/11
10/21/11
1/23/1111/11/10
02/24/1112/16/10
McMurdo Multimission Opt.1
Site Integration 3/15/12
FY09 FY10 FY11 FY12 FY13CY09 CY10 CY11 CY12 CY13
FY09 FY10 FY11 FY12 FY13
35790 – McMurdo
1/23/12
7/06/10
11/11/11
12/16/11
02/24/12
4
C1
C3S Receptors (Phase 2)
CY12 CY13 CY14 CY15 CY16
FY12 FY13 FY14 FY15 FY16
10/24/14
76912 – Brazil2/13/151/02/14
4/17/15
76948– S. Africa7/24/155/05/14
76928 – Arizona1/24/1411/16/12
10/11/13
76932 – India7/11/146/03/13
04/11/14
2/14/14
76912 – Spain5/23/144/12/13
76940 – N. Zealand1/25/1312/01/11
10/12/12
76936 – Chile8/02/136/18/12
05/03/13
76916 – Alaska 10/25/139/10/12
07/12/13
76924 – Hawaii10/31/149/23/13
07/25/14
02/15/13
76944 – Japan5/24/134/09/12
2/13/15
76908 – Australia5/15/154/07/14
O&S C2
FY12 FY13 FY14 FY15 FY16
CY12 CY13 CY14 CY15 CY16
76952 – Guam9/18/158/04/14
06/26/15
Site Prep Period
Site Install Period
Site Integration & C/O
System Test (off-site)
Key
5
95% Latency Based on Revised Receptor Site Installation Order
McM
urd
o
New
Zea
land
Jap
an
Chi
le
Ala
ska
Ariz
ona
Sp
ain
Ind
ia
Haw
aii
Bra
zil
Aus
tral
ia
So
uth
Afr
ica
Gua
m
20
30
40
50
60
70
80
90
100
Dec-2011 May-2012 Sep-2012 Feb-2013 Jul-2013 Nov-2013 Apr-2014 Aug-2014 Jan-2015 Jun-2015 Oct-2015
Sys
tem
95%
Lat
ency
(m
in)
◄Florida and Svalbard Receptors installed previously C2 Launch - 5/16/2016 ►
C1
Laun
ch -
3/14
/201
4
6
Svalbard, McMurdo, and Florida95% System Latency
Latency (min)
7
New Zealand Added
Latency (min)
8
Japan Added
Latency (min)
9
Chile Added
Latency (min)
10
Alaska Added
Latency (min)
11
Arizona Added
Latency (min)
12
Spain Added
Latency (min)
13
India Added
Latency (min)
14
Hawaii Added
Latency (min)
15
Brazil Added
Latency (min)
16
Australia Added
Latency (min)
17
South Africa Added
Latency (min)
18
Guam Added
Latency (min)