analysis of rates(airfieldworks)
TRANSCRIPT
-
8/11/2019 Analysis of Rates(AirfieldWorks)
1/9
GOVERNMENT OF THE REPUBLIC OF TH E UNION OF MY NM R
MINISTRY OF CONSTRUCTION
PUBLIC WORKS
N LYSIS
OF
R TES
FOR
IRFIELD W ORKS
SECOND EDITION
JUNE 2 13
-
8/11/2019 Analysis of Rates(AirfieldWorks)
2/9
Sr.
\lo.
1
2
3
Standard D ata for Wo rking Out Rates
Particulars of Materials and Lab our
Earth work
See to Road W ork
Construction of subgrade for l m
(compacted) thickness using selected
soil, adjusting moisture content to obtain
OMC I-1 and specified density for
1000 sqm.
Compaction shall be done in layers.
Material
Transported soil
Labour
Head worker
Worker
Operator
Driver
Operator helper Driver helper
Machine
Grader GD-500
Compactor Cat
8
15
Water bowzer 5 400 litre) within lkm
Water pump
Three whee ls roller
P .0 .L
for operation
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Site cleaning before construction of
concrete sub-base course for 1000 sqm.
Labour
Head worker
Worker
Unit Quc
Unit
cum
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
9
f Items of Work
Quantity
ontd
Remarks
-
8/11/2019 Analysis of Rates(AirfieldWorks)
3/9
Sr.
\lo.
5
Standard ata for Working Out Rates
Particular of Materials and Labours
Laying of 50mm thick sand filling before
construction of concr ete sub-base cou rse
including waterin g and compacting with
roller fo r 1 000 sqm.
Material
Sand
Labour
Head worker
Worker
Operator
Driver
Operator helper Driver helper
Machine
Three wheels roller
Water bowzer 5400 litre) within lkrn)
Water pump
P.0 .L for operation
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Concrete m ixing by batching plant,
operating works all machines and
materials cement, sand, crushed rock
and w ater)according to th e mix design
and batching plant cleaning,operating
work completed for 100 cum.
Concrete mixed
r nit ut
Unit
cum
vlan-Day
Man-Day
vlan-Day
uian-Day
Man-Day
cum
ity
of Items of Work
uantity
lontd
Remarks
-
8/11/2019 Analysis of Rates(AirfieldWorks)
4/9
Material
Cement
Fine aggregate sand)
Coarse aggregate crushed rock or crushed
stone)
Water
Standard ata for Workin gOut ates er
Unit
Quantity of I t e m of Work ..,
Labour
Head worker
Worker
Operator
Driver
Operator helper Driver helper
Particu lar of Materials and Labours
Machine
Concrete batching plant 80 cumlhr)
Generator 3 50 KVA)
Loader medium)
Air
compressor 390 CFM
Cement pump
Agitator truck 6 cum) within
1
km
Water pump
Water bowzer 5400 litre) within lkm)
P.0.L for o~eratio n
Diesel
Engine oil
Gear oil
Hydraulic oil
Unit
Grease
Quantity
Concrete paving w ork
< 3
mm
-
thick lay er. By machine including
cleaning, alignment and level checking
each station, fixing tempo rary tim ber
formworks, concrete leveling work for
sag portion,surface dressing with cotton
clothes and vibra ting wh ere necessary
for 1 sqm.
kg
cum
cum
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Remarks
ccording to
m x
design
-
8/11/2019 Analysis of Rates(AirfieldWorks)
5/9
Standard ata for work in^ utRates
sr
Particular of Materials and Labours
Concrete
Jungle wood scant) three times used)
Jungle wood plank) three times used)
Wire nail
Cotton clothes
No.
Labour
Mason
Carpenter
Head worker
Worker
Driver
Operator helper Driver helper
Material
Machine
Concrete paver GP 2600)
Texturing machine
Loader medium)
Water bowzer 5400 litre)
within
lkrn)
Water pump
P 0 L for operation
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Concrete paving w ork 3 mm thick
1ayer .B~machine including cleaning,
alignment a nd level checking each
station, fixing temp orary timbe r
formworks, concrete leveling work for
sag portion, surfac e dressing with cotton
clothes and vibra ting wh ere necessary
for 1 sqm.
Material
Jungle wood scant) three times used)
Jungle wood @ lank) three times used)
Wire nail
Cotton clothes
-
8/11/2019 Analysis of Rates(AirfieldWorks)
6/9
Sr.
No.
8
Standard Data for Working OutRates
Particula r of Materials and Labours
Labour
Mason
Carpenter
Head worker
Worker
Operator
Driver
Operator helper Driver helper
Machine
Concrete paver GP 2600)
Texturing machine
Loader medium)
Water bowzer 5400 litre) within lkm)
Water pump
P.0.L for o~e ratio n
Diesel
Engine oil
Gear oil
Hydraulic o il
Grease
Texturing work and curing compound
spraying work by texturing machine for
1
sqm
Material
Curing compound
Labour
Worker
Operator
Helper
Machine
Texturing machine
er Unit QU
Unit
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
ity o tems o Work
Quantity
ontd
Remarks
-
8/11/2019 Analysis of Rates(AirfieldWorks)
7/9
Sr.
No.
9
10
Stand ard ata for Working Out Rates
Particular of Materials and Labours
P.0 .L for operation
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Cutting work for cement concrete by
machine. Painting the line and cleaning
for 100m.
Material
Cutter disc
Paint
Brush
Labour
Worker
Operator
Driver
Operator helper Driver helper
Machine
Concrete cutter
Water bowzer 5400 litre)
within
lkm)
Water pump
P .0 .L
for operation
M.S
Diesel
Laying of plastic sheet between sub-base
layer and base layer for
1000
sqm.
Material
Plastic sheet
Per Unit Quantity
Unit
litre
litre
litre
litre
k
disc
L.
S
L.S
Man-Day
Man-Day
Man-Day
Man-Day
r
hr
r
litre
litre
sqm
of I t e m of Work ....
Quantity
9 7
0.1
0.1
0.1
0.1
contd
Remarks
-
8/11/2019 Analysis of Rates(AirfieldWorks)
8/9
Sr.
No.
2
Standard ata for Working ut ates
Particular of M aterials and Lab ours
Labour
Head worker
Worker
15
mm groove
2
mm depth groove
cutting by milling machine clean ing by
air and water jet caulking and filling
joint sealant thoroughly for 1 m.
Material
Joint sealant
Propane gas
String
Milling disc
Labour
Worker
Operator
Helper
Machine
Milling machine
Air compressor
P.0 .L for operation
M.S
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Construction of flexible Pavement
Construction of sub-base course
See to Road Work
Per Unit Quantity
Unit
Man Day
Man Day
kg
L.S
m
disc
Man Day
Man Day
Man Day
hr
r
litre
litre
litre
litre
litre
kg
of t em of Work
Quantity
contd
Remarks
-
8/11/2019 Analysis of Rates(AirfieldWorks)
9/9