  • GOVERNMENT OF INDIACENTRAL PUBLIC WORKS DEPARTMENT

    ANALYSIS OF RATESFOR DELHI

    (V0L.2)

    2007PUBLISHED BY:

    DIRECTOR GENERAL OF WORKS, CPWD, NIRMAN BHAWAN, NEW DELHI

  • GOVERNMENT OF INDIACENTRAL PUBLIC WORKS DEPARTMENT

    ANALYSIS OF RATESFOR DELHI

    (V0L.2)

    2007PUBLISHED BY:

    DIRECTOR GENERAL OF WORKS, CPWD, NIRMAN BHAWAN, NEW DELHI

  • All rights reserved. No part of this publication, either in English or in Hindi, may be reproduced inany form or by any means, electronic or mechanical, including photocopy, recording or anyinformation storage and retrieval system, without permission, in writing, from the Director General(Works), CPWD, New Delhi. Photocopying of this book is strictly prohibited

    A GOVERNMENT OF INDIA PUBLICATION

    Published byDIRECTOR GENERAL (WORKS)

    CPWD, NIRMAN BHAWAN, NEW DELHI-110 011&

    Printed & Marketed byJAIN BOOK AGENCY

    Authorised Dealers of Govt. PublicationsC-9, Connaught Place, New Delhi-110001

    Phones : 23416390 upto 97, 41513852E-mail : [email protected] : www.jainbookagency.com

    Also available atAll Leading Booksellers & Authorised Govt. Dealers In India

    Price : Rs. 3000/- per set of two volumes (excluding postage and forwarding charges etc.)

    JAIN BOOK AGENCY (SOUTHEND)1, Aurobindo Place Market,

    Hauz Khas, New Delhi-110016Phone : 26567066, 26566113,41758700

    E-mail : [email protected] : www.jainbookagency.com

    DIAL-A-BOOK011-4175 8700

    JAIN BOOK AGENCY (GURGAON)12, Central Plaza Mall, Sector 53,

    Golf Course Road,Gurgaon 122002 Haryana

    Phone : 4143020,Moblile 9810666810

    Distributed byJBA DISTRIBUTORS

    N-67, First Floor, Munshiram Building,Connaught Place, New Delhi-110001

    Phone : 41523870, 23354824 Fax : 41513850E-mail : [email protected] : www.jba.in

    Books will be delivered next day by COURIER(Payment to courier-boy)

    in Delhi, Noida, Ghaziabad, Faridabad &Gurgaon (nominal courier charges extra)

  • FOREWORD

    Central Public Works Department Analysis of Rates for Delhi is a very comprehensive anduseful document. It is based on scientific assessment of inputs of materials, labour and machineryin various items of work normally encountered in a project.

    It was first compiled in the year 1950, followed by publication or revisions in 1955, 1962, 1972,1977, 1985 and 1997. Since publication of DAR, 1997, prices of labour and materials have registeredsubstantial increase. Besides the increased cost, there has been a spurt of new constructionmaterials and introduction of mechanised construction techniques for speedier construction. Thishas necessitated revision of existing DAR, 1997 to include the above changes. Accordingly, thisAnalysis of Rates for Delhi, 2007 has been prepared incorporating element of machinery andprefabricated building components, wherever applicable.

    Earlier C.P.W.D. Analysis of Rates for Delhi was a confidential document and was issued toCPWD Officers and Government Departments only. In this age of transparency, we feel that thisis an anachronism. Therefore, for the first time DAR, 2007 is being published as an open documentand shall be available in two volumes. This will facilitate in obtaining feed back from the constructionindustry and the professionals for continuous updation and improvement in the document.

    Although DAR, 2007 contains most of the items of DAR, 1997, analysis of items which areeither obsolete or are not in use have been deleted. Similarly, analysis of many items have beenmodified to correspond to items of DSR, 2007. Several new analysis of items pertaining to newmaterials and new technologies in the construction sector have also been included. Analysisof rates of many items also incorporate element of machinery instead of the lump sum provisions.

    I wish to place on record the technical input and the effective coordination on the part of ShriD.S.Sachdev, ADG(TD) and the efforts put in by Shri Suresh Kumar, CE(CSQ) and his team ofofficers in TAS unit in finalising DAR, 2007 in a record time.

    I am sure that C.P.W.D. Analysis of Rates for Delhi, 2007 along with Delhi Schedule of Rates,2007 shall be a useful document to a number of departments, public sector undertakings, privatesector builders and architects etc.

    (K. Srinivasan)DIRECTOR GENERAL (WORKS)

    New DelhiFebruary, 2008

  • PREFACE

    1.0 C.P.W.D. Analysis of Rates for Delhi, 2007 is the revised edition of C.P.W.D. Analysis ofRates for Delhi, 1997.

    2.0. DAR, 2007 incorporates most of the analysis of DAR, 1997 with all correction slips up-todate and will replace DAR, 1997.

    3.0 DAR, 2007 is a bilingual document (Hindi version will follow).

    4.0 DAR, 2007 is published in two volumes as under:

    Volume Number Sub-head No. Contents/ Chapters

    00 Basic Rates01 Carriage of materials02 Earth Work03 Mortars04 Concrete Work05 Reinforced Cement Concrete Work

    One 06 Brick Work07 Stone Work08 Marble Work09 Wood and PVC Work10 Steel Work11 Flooring12 Roofing

    13 Finishing14 Repairs to Buildings15 Dismantling and Demolishing

    Two 16 Road Work17 Sanitary Installation18 Water Supply19 Drainage20 Pile Work21 Aluminium Work22 Water Proofing23 Horticulture and Landscape

    5.0 Analysis of many items in DAR, 2007, which are either obsolete or are not in use, havebeen deleted. Similarly, analysis of many items have been modified to correspond to itemsof DSR, 2007. Several new analysis of items pertaining to new materials and newtechnologies in the construction sector have also been included. Analysis of rates of manyitems also incorporate element of machinery instead of lump sum provisions.

    6.0 Analysis have been modified to include execution of different works by using variouselectrical and mechanical equipments i.e. excavators, tower cranes, mobile cranes,mechanical platforms, Batch Mix plant, transit mixers and pumps, piling rigs, pneumaticcutters, chisels, chippers, hammers etc. Built-in provision has been taken in the analysisof rates for new construction technology/ mechanisation.

  • 3

    7.0 Analysis of dry work using prefabricated materials and pre-finished elements for speedierconstruction are included viz gypsum block walls, calcium silicate and non-asbestos cementboard partitions, pre-finished counter tops for kitchen and washbasins, pre-moulded andpre-finished stone work in risers and treads of steps and window sills, dry stone cladding,sub-frames for windows, use of chemical and mechanical fasteners, laying of tiles in flooringand dado with polymer based adhesives etc.

    8.0 DAR, 2007 is based on the study of current market rates of materials at Delhi, collectedduring the period of April, 2007 to October, 2007. Generally, the basic rates of materials,incorporated in the analysis, pertain to materials conforming to BIS Standards/CPWDSpecifications/Materials of best quality available in the market.

    Labour rates are the minimum wages issued by the Government of Delhi w.e.f. 01-09-2007.

    9.0 Lump sum provision of labour/ T& P is replaced with mechanisation inputs. Prominentitems incorporating mechanization are earth-work in excavation, RMC / BMC, brick workin superstructure above floor V level, road work, dismantling of R.C.C. work, dismantlingof C.C. and flexible pavements, pile work etc.

    10.0 Number of uses of steel and wooden shuttering have been reduced from 80 and 16 timesto 40 and 8 times respectively, so that proper quality of shuttering is put to use.

    11.0 Contractors profit and Overheads @ 15% ( CP=7.5% & OH 7.5%) has been adopted asapproved by the DGW vide Office Memorandum no. DG(W)MAN/150 dated 14-12-2007.

    12.0 Sundries have been considered as 1.00 times based on Cost Index of Delhi as 100 overDPAR 01-10-2007.

    13.0 A lot of effort has gone into the preparation of this Analysis of Rates. I convey mydeep appreciation and sincere thanks to Shri Suresh Kumar, CE, CSQ, Shri MayankTilak, S.E. (TAS), Sh. S.K.Jain EE(S&S) I, Sh.S.C. Malik EE (S&S) -II ,Sh. A.V.R.Bhat EE (S&S) III, Sh. V.P.Singh AE, Sh. H.N.Singh AE, Sh. S.K.SarkarAE, Sh.L.C.Gothwal AE, Sh.G.K. Jindal AE, Sh. S.S.Pal AE, Sh. Bahal SinghD/Man Gr-I, Sh Upender Walia D/Man Gr.-I and other officers and staff of TAS Unitfor sincere efforts made in the preparation of this document in such a short time.

    14.0 Due care has been taken to print the C.P.W.D. Analysis of Rates for Delhi as correctly aspossible. It is, however possible that some errors might have crept in. In case any error oromission is noticed, it may be brought to the notice of the Superintending Engineer(TAS), CPWD, Room no. 418, A- wing, Nirman Bhawan, New Delhi.

    15.0 In case of any discrepancy between English and Hindi versions, the English version shallbe held valid. Suggestions for improvement are welcome.

    (D.S.SACHDEV)ADG (TD), CPWD,

    Nirman Bhawan, New Delhi

    New DelhiFebruary, 2008

  • ContentsVol. 2

    SH. NO. NAME OF SUB HEAD PAGE NO.

    13. Finishing 583-635

    14. Repairs to Buildings 637-692

    15. Dismantling & Demolishing 693-729

    16. Road Work 731-817

    17. Sanitary Installation 819-900

    18. Water Supply 901-1067

    19. Drainage 1069-1152

    20. Pile Work 1153-1178

    21. Aluminium Work 1179-1203

    22. Water Proofing 1205-1224

    23. Horticulture and Landscaping 1225-1241

    Note: For Sub Heads 1 to 12 refer to Vol.1

  • 583

    SUB HEAD : 13.0

    FINISHING

  • 585

    13.1 12 mm cement plaster of mix:13.1.1 1:4 (1 cement : 4 fine sand)

    Code Description Unit Quantity Rate Amount

    0155011501019999

    cum

    DayDayDayL.S

    0.144

    0.670.750.9212.61

    2,278.85

    146.55135.25138.45

    1.00