analyse assure accelerate tm u-ats umts automatic test system roadmap (april, 2005) rev draft 01
DESCRIPTION
Analyse Assure Accelerate TM High-level U-ATS Roadmap* 2005 Q1 Q2 Q3 Q4 December 2005 HSDPA: Initial test cases from Section 9 - (2) TX Diversity: Open Loop Transmit Diversity (including validated test case) TX Diversity: Closed-Loop Transmit Diversity (including validated test case) OB V test validation (subject to UE availability) April 2005 (U-ATS 3.1) Support for asymmetric data rate testing as per real-world deployments Operating Band V and VI support for Development Partners RRM: GSM Cell Selection Test Cases (including validated , test cases) RRM: Measurement Accuracy Test Cases (including validated , , , test cases) OB I and II validation of new tests (per April 2005 roadmap) August 2005 RRM: GSM Hard Handover Test Cases (including validated test case) RRM: GSM Cell Re-Selection (including validated test case) RRM: GSM Measurement Accuracy (including validated test case) Power Control: Combining of Power Control (TPC) streams (including validation of test) Enhanced Energy Management tests OB I and II validation of new tests (per Aug 2005 roadmap) * Target availability – dates and contents subject to changeTRANSCRIPT
Analyse Assure AccelerateTM
U-ATS UMTS Automatic Test System
Roadmap (April, 2005)Rev Draft 01
Analyse Assure AccelerateTM
The information contained in this presentation is considered to be
confidential and proprietary information of Spirent Communications Inc. and is subject
to the terms and conditions of the Non-disclosure agreement (NDA) between the recipient(s) or recipient's organization and
Spirent Communications Inc.
Notice of Confidential Information
Analyse Assure AccelerateTM
High-level U-ATS Roadmap*
2005 Q1 Q2 Q3 Q4
December 2005 HSDPA: Initial test cases
from Section 9 - (2) TX Diversity: Open Loop
Transmit Diversity (including validated 7.6.1 test case)
TX Diversity: Closed-Loop Transmit Diversity (including validated 7.6.2 test case)
OB V test validation (subject to UE availability)
April 2005 (U-ATS 3.1) Support for asymmetric data
rate testing as per real-world deployments
Operating Band V and VI support for Development Partners
RRM: GSM Cell Selection Test Cases (including validated 8.2.3.1, 8.2.3.2 test cases)
RRM: Measurement Accuracy Test Cases (including validated 8.7.1.1, 8.7.1.2, 8.7.2.1, 8.7.2.2 test cases)
OB I and II validation of new tests (per April 2005 roadmap)
August 2005RRM: GSM Hard Handover Test
Cases (including validated 8.3.4 test case)
RRM: GSM Cell Re-Selection (including validated 8.3.5 test case)
RRM: GSM Measurement Accuracy (including validated 8.6.4.1 test case)
Power Control: Combining of Power Control (TPC) streams (including validation of 7.7.3 test)
Enhanced Energy Management tests
OB I and II validation of new tests (per Aug 2005 roadmap)
* Target availability – dates and contents subject to change
Analyse Assure AccelerateTM
All trademarks mentioned herein are the property of their respective owners
Copyright © 2004 Spirent Communications Inc.
Analyse | Assure | Accelerate™