LEVANTAMIENTO DE VENTILACION INTERIOR MINAVELOCIDADES FUERA DE ESTANDAR POR NIVELES Y SUB-NIVELES
Estac.UBICACIÓN VELOCIDAD (m/s)
Labor Detalle V1 V2
EN-01 Nv4720 Sost. Malla - Rugoso 0.05 0.06
E-02 Nv4670 Sost. Shortcrete y split set- Rugoso 0.45 0.38
E-03 0.03 0.01
E-03 Nv4670 Sost. Shortcrete y split set- Rugoso 0.48 0.45
E-01 Nv4620 0.08 0.23
E-02 Nv4620 0.07 0.01
E-03 Nv4620 0.18 0.02
E-05 Nv4620 0.1 0.05
E-07 Nv4620 0 0.02
Nv4720 - VE 46402
Sost. Malla y split set - desmonte al 90%
Sost. Shortcrete,Malla y split set- Rugoso- Ch.
Sost. Shortcrete,Malla y split set- Rugoso
Sost. Shortcrete,Malla y split set- Rugoso
Sost. Shortcrete,Malla y split set- Rugoso
Sost. Shortcrete,Malla y split set- Rugoso
E-03 Nv4570 Sost. Malla y split set- Rugoso 0.03 0.06
E-04 Nv4570 Sost. Malla y split set- Rugoso 0.05 0.19
LEVANTAMIENTO DE VENTILACION INTERIOR MINAVELOCIDADES FUERA DE ESTANDAR POR NIVELES Y SUB-NIVELES
VELOCIDAD (m/s)HORA
V3 V4 V5 V6 V7 V8 V9
0 0.02 0.23 0.1 0 0 0 09:18am
0.26 0.06 0.29 0.38 0.21 0.1 0.07 10:35am
0.06 0.01 0.04 0.02 0.09 0 0.03 09:57am
0.34 0.18 0.36 0.32 0.36 0.25 0.15 10:45am
0.05 0.01 0.13 0.05 0.13 0.02 0.02 08:57am
0.02 0.03 0.05 0.01 0 0 0 09:06am
0.01 0.01 0.14 0.21 0.03 0.01 0.08 09:23am
0.03 0.05 0.09 0.38 0.18 0.6 0.13 09:45am
0.16 0.1 0.1 0 0 0.03 0.07 10:08am
0.3 0.32 0.19 0.01 0.18 0.13 0.12 11:13am
0.08 0.11 0.16 0.19 0.25 0.23 0.12 11:30am
TEMP P. bar. SECCION AREA VELOCIDAD CAUDAL°C hpa a (m) h (m) m2 m/s m/min m3/min
6.62 579 3.53 3.17 6.28 0.05 3.1 19
7.26 582.2 2.93 2.45 6.71 0.24 14.7 98
7.83 579 2.55 2.94 0.7 0.03 1.9 1
7.4 582.2 3.13 2.46 7.2 0.32 19.3 139
9.99 589 1.28 2.38 2.85 0.08 4.8 14
11.33 589.2 3.6 3.1 10.43 0.02 1.3 13
9.36 590 3.35 3.1 9.71 0.08 4.6 45
10.92 590.6 3.26 2.75 8.38 0.18 10.7 90
13.13 590.9 3.83 2.78 9.96 0.05 3.2 32
13.11 592.9 4.7 4.23 18.59 0.15 8.9 166
14.32 591.7 3.59 3.44 11.55 0.15 9.2 106
TOTAL INGRESO
CAUDALCFM
680
3476
48
4898
483
467
1577
3177
1125
5864
3752
25548
Estac.UBICACIÓN VELOCIDAD (m/s)
Labor Detalle V1
E-01 Sn 4713 Sost. Malla y split set- Rugoso 0.25
E-02 Sn 4713 0.09
E-04 Sn 4703 Sost. Malla y split set- Rugoso- VE 46427 0.19
E-05 Sn 4703 Sost. Malla y split set- Rugoso 0.46
E-10 Sn4703 Sost. Shortcrete,Malla y split set- Rugoso 0.22
E-12 Sn4703 Sost. Malla y split set- Rugoso 0.27
E-07 Sn4690 Sost. Malla y split set- Rugoso 0.25
E-03 Sn4660 Sost. Malla y split set- Rugoso- VE 280NW 0.08
E-07 Sn4660 0
E-08 Sn4660 0.26
Sost. Malla y split set- Rugoso- Chimenea tapada
Sost. Malla y split set- Rugoso- Desmonte 70%
Sost. Shortcrete,Malla y split set- Rugoso- Bodega
E-10 Sn4660 0.02
E-11 Sn4660 0.04
Sost. Shortcrete y split set- Rugoso-Rampa 351
Sost. Shortcrete y split set- Rugoso-Rampa 351- Comedor
VELOCIDAD (m/s)V2 V3 V4 V5 V6 V7 V8 V9
0.02 0.21 0.29 0.01 0.24 0.31 0.01 0.24
0.03 0.03 0.01 0.02 0.03 0.04 0 0
0.28 0.12 0.12 0.22 0.24 0.27 0.13 0.03
0.19 0.13 0.05 0.14 0.41 0.37 0.24 0.05
0.18 0 0 0.04 0.3 0.19 0 0.3
0.35 0.21 0.28 0.32 0.32 0.29 0.36 0.34
0.05 0.02 0.04 0 0.26 0.28 0 0
0.02 0.01 0.01 0.15 0.01 0.06 0 0
0.23 0.3 0.36 0.34 0.02 0.02 0.1 0.36
0.05 0.02 0.07 0.2 0.01 0.04 0.02 0.07
0.03 0.13 0.02 0.05 0.2 0.15 0.3 0.09
0.01 0.03 0.01 0 0 0.04 0.03 0.01
HORATEMP P. bar. SECCION AREA VELOCIDAD
°C hpa a (m) h (m) m2 m/s m/min
10:52am 9.73 580.1 2.98 2.94 8.19 0.18 10.5
11:13am 9.44 580 3.18 2.95 8.77 0.03 1.7
02:50pm 6.58 579.9 3.55 3.4 11.29 0.18 10.7
03:10pm 7.43 578 3.9 3.07 11.19 0.23 13.6
09:30pm 7.95 580.3 3.52 3.33 10.96 0.14 8.2
09:53pm 8.52 580.1 3.69 3.4 11.73 0.3 18.3
09:08am 9.49 581.3 3 2.86 8.02 0.1 6
03;25pm 8.91 580.2 4.25 3.78 15.02 0.04 2.3
09:00am 6.06 583.4 5.35 4.46 6.69 0.19 11.5
12:25pm 5.21 586.1 5.9 3.58 19.75 0.08 4.9
09:48am 9.47 583.2 5.23 4.2 20.54 0.11 6.6
10:02am 10.27 583.7 4.54 3.68 15.62 0.02 1.1
TOTAL INGRESO
CAUDALm3/min CFM
86 3047
15 516
120 4251
152 5377
90 3174
214 7567
48 1700
34 1202
77 2726
97 3441
136 4787
18 625
TOTAL INGRESO 38413
Estac.UBICACIÓN VELOCIDAD (m/s)
Labor Detalle V1 V2
E-12 Sn4660 0.2 0.16
E-13 Sn4660 0.12 0
E-14 Sn4660 Sost. Malla y split set-Rugoso 0.11 0.1
E-01 Sn4647 0.62 0.11
E-03 Sn4647 0.23 0.1
E-04 Sn4647 Sost. Malla y split set- Rugoso 0.03 0.02
E-05 Sn4647 Sost. Malla y split set- Rugoso 0.18 0.09
E-06 Sn4647 0.17 0.31
E-07 Sn4633 0.21 0.03
Sost. Shortcrete,Malla y split set- Rugoso-Subestacion Electrica
Sost. Shortcrete,Malla y split set- Rugoso-Sn450
Sost. Malla y split set- Rugoso-Desmonte 50%
Sost. Shortcrete y split set- Rugoso
Sost. Malla y split set- Rugoso- Cerca al RB4
Sost. Shortcrete y split set- Rugoso
E-08 Sn4633 0.04 0.04
E-09 Sn4633 0.02 0.09
E-14 Sn4633 0.08 0.01
Sost. Malla y split set-Rugoso- Sn 458 NE-Desmonte 70%
Sost. Shortcrete y split set- Rugoso-Sn 472 NE- Desmonte 60%
Sost. Shortcrete y split set- Rugoso
VELOCIDAD (m/s)HORA
V3 V4 V5 V6 V7 V8 V9
0.1 0.27 0.25 0.28 0.25 0.28 0.15 10:07am
0.03 0.07 0.02 0.01 0.04 0 0.01 10:29am
0.2 0.12 0.09 0.16 0.04 0 0.02 10:11am
0.24 0.26 0.21 0.03 0.16 0.42 0.3 10:53am
0.24 0.13 0 0.26 0.26 0.18 0.21 11:38am
0.13 0.14 0.02 0.17 0.09 0.08 0.13 11:50am
0.2 0.12 0.2 0.19 0.19 0.03 0.03 12:00pm
0.28 0.07 0.01 0.3 0.02 0.09 0.09 12:10pm
0.03 0.09 0.24 0.26 0.3 0.25 0.02 04:03pm
0.01 0.04 0.01 0.01 0.07 0.07 0.17 04:16pm
0.12 0.03 0.08 0.11 0.13 0.01 0.04 04:30pm
1 0.29 0.21 0.2 0.28 0.18 0.2 03:10pm
TEMP P. bar. SECCION AREA VELOCIDAD CAUDAL°C hpa a (m) h (m) m2 m/s m/min m3/min
10.18 584 4.29 4.1 16.45 0.22 12.9 213
9.61 584.8 3.32 3.05 9.47 0.03 2 19
9.84 585.3 3.49 3.45 11.26 0.09 5.6 63
7.42 585.3 5.1 3.4 8.11 0.26 15.7 127
11.46 586.7 3.36 2.68 8.42 0.18 10.7 90
11.84 586.6 3.3 3.3 10.18 0.09 5.4 55
11.32 586.4 4.23 2.84 11.23 0.14 8.2 92
12.61 586.2 3.55 3.1 10.29 0.15 8.9 92
12.09 584.1 3.62 2.75 9.31 0.16 9.5 89
11.34 584.4 5.3 3 4.46 0.05 3.1 14
11.22 584.4 4 3.3 4.94 0.07 4.2 21
9.26 584.9 3.2 3.65 10.92 0.27 16.3 178
TOTAL INGRESO
CAUDALCFM
7511
669
2226
4485
3191
1942
3253
3246
3134
483
732
6299
37172