I. UPAH
1. Kepala Tukang hari 60,000Rp
2. Mandor hari 60,000Rp
3. Tukang Batu hari 55,000Rp
4. Tukang Kayu hari 55,000Rp
5. Tukang Cat hari 55,000Rp
6. Tukang Besi hari 55,000Rp
7. Tukang Beronjong hari 55,000Rp
8. Tukang Listrik hari 55,000Rp
9. Tukang Las hari 55,000Rp
10. Pekerja hari 38,000Rp
II. SATUAN BAHAN LOKAL
1. Batu Kali m3 91,500Rp
2. Batu Gunung m3 -Rp
3. Batu Pecah Tan an 5 -7 m3 137 100R
SATUAN
DAFTARHARGA
NO URAIAN
SATUAN UPAH, BAHAN DAN PEKERJAAN
HARGA
. ,
4. Batu Pecah Tangan 3 -4 m3 143,100Rp
5. Batu Pecah Tangan 2 -3 m3 150,000Rp
6. Batu Pecah Tangan 1 -2 m3 156,100Rp
7. Abu Batu m3 139,300Rp
8. Pasir Urug m3 74,000Rp
9. Pasir Pasangan m3 87,900Rp
Pasir Pasangan kg 62.79
10. Kerikil Cor / Beton m3 85,400Rp
Kerikil Cor / Beton kg 63.26
11. Tanah Cadas m3 -Rp
12. Tanah Urug m3 66,600Rp
13. Kerikil Timbun m3 68,000Rp
14. Kapur Padam m3 350,000Rp
15. Tanah Liat m3 69,900Rp
16. Air ltr 1,000Rp
17. Kapur Pasang m3 -Rp
II. BAHAN KAYU
1. Kayu Kelas I
Papan m3 2,963,000Rp
Balok m3 2,772,000Rp2. Kayu Kelas II
Papan m3 2,416,000Rp
Balok m3 2,063,000Rp
3. Kayu Kelas III
Papan m3 1,767,000Rp
Balok m3 1,632,000Rp
4. Kayu Bekisting Kelas IV
Papan m3 1,365,000Rp
-
8/2/2019 Analisa Kota Padang 2009
2/11
SATUANNO URAIAN HARGA
Balok m3 1,407,000Rp
5. Kayu Pancang 5/7, kelas III btg -Rp
6. Kayu Panjang Bulat, dia. 5 - 15 cm btg -Rp
7. Formite/Spacer bh 13,926Rp
8. Bambu Ukuran Besar btg -Rp
9. Bambu Ukuran Sedang btg -Rp
10. Bilik Bambu m2 -Rp11. Ijuk Saringan kg 8,180Rp
12. Plastik Hitam m2 10,700Rp
13. Dolken Kayu Galam, dia. (8-10) cm, panjang 4 m btg 55,707Rp
III. BAHAN BESI, BAJA Dan KAWAT
1 Besi Scuare Tube m -Rp
2 Besi Lis Kaca m -Rp
3 Kawat Ayak Aluminium m' -Rp
4 Kawat Ayam m' -Rp
5 Kawat Beton kg 14,250Rp
6 Kawat Beronjong kg -Rp
7 Kawat Duri rol 5,260Rp
8 Kawat Kassa m' -Rp
9 Kawat Las kg 21,100Rp
10 Kawat Nyamuk m' 18,600Rp
11 Kawat Patri m' -Rp
12 Besi Beton kg 8,800Rp
13 Besi Profil IWF kg 17,588Rp
-
15 Paku Biasa kg 16,400Rp
16 Paku Eternit kg -Rp
17 Paku Seng kg 24,900Rp
18 Paku Anti Karat kotak -Rp
19 Paku Beton kotak -Rp
20 Paku Sekrup kg 19,435Rp
21 Plat Begol Kuda-Kuda kg -Rp
22 Tiang m' -Rp
23 Sealant tube -Rp
24 Sekrup Fixer bh -Rp
25 Aluminium Strip m' -Rp
26 Pintu Aluminium m' -Rp
27 Pintu Lipat m2 -Rp
28 Pintu Gulung Besi m2 -Rp
29 Sunscreen Aluminium m2 -Rp
30 Rollingdoor Aluminium m2 -Rp
31 Besi Siku L 30.30.3 kg 6,740Rp
32 Vertical Blind dan Venetion Blind m2 150,000Rp
33 Besi Strip kg 20,500Rp
34 Profil Kaca m' -Rp
35 Profil Aluminium m' -Rp36 Pengelasan cm 1,911Rp
BAHAN PENUTUP ATAP
1 Seng Gelombang BJLS 20 lbr 38,300Rp
2 Seng Plat BJLS 20 lbr 43,800Rp
3 Seng Plat BJLS 30 lbr 58,400Rp
4 Seng Warna lbr 54,100Rp
5 Genteng Metal lbr 5,300Rp
6 Perabung Genteng Metal m' -Rp
7 Genteng Keramik (Merk KIA) bh -Rp
8 Perabung Genteng Keramik bh -Rp
-
8/2/2019 Analisa Kota Padang 2009
3/11
SATUANNO URAIAN HARGA
9 Atap Asbes Gelombang lbr 27,778Rp
10 Asbes Semen m2 -Rp
11 Perabung Asbes lbr 14,438Rp
12 Atap Fiberglass Gelombang lbr -Rp
13 Atap Plastik lbr -Rp
14 Seng Gelombang Zincalume Koala lbr -Rp
15 Seng Plat Zincalume Koala lbr -Rp16 Seng Plat BJLS 28 m' -Rp
BAHAN DINDING DAN LOTENG
1 Triplek Tebal 3 mm lbr 44,928Rp
2 Triplek Tebal 4 mm lbr 54,432Rp
3 Triplek Tebal 6 mm lbr 77,760Rp
4 Plywood tebal 4 mm (1.20 x 2.40) cm m2 137,376Rp
5 Plywood tebal 9 mm (90 x 220) cm m2 -Rp
6 Plywood tebal 9 mm (1.20 x 2.40) cm m2 112,608Rp
7 Teakwood tebal 4 mm ukuran (120 x 240) cm lbr 74,000Rp
8 Formika m2 15,000Rp
9 Profil Aluminium T m' -Rp
10 Kawat diameter 4 mm kg -Rp
11 Ramset bh -Rp
12 Akustik lbr -Rp
13 Eternit m2 -Rp
14 Gypsum Board lbr -Rp
15 Multiplex tebal 6 mm lbr -Rp
-
17 Papan Lambriseering m' 2,657,600Rp
18 List Profil Lambriseering m' 3,625Rp
19 Wall paper m' -Rp
20 Les Plafond Biasa 1 x 4 m' -Rp
21 Les Profil 4 x 4 m' 13,100Rp
22 Les Kaca m' 7,260Rp
23 Kaca Bening Tebal 3 mm m2 44,900Rp
24 Kaca Bening Tebal 5 mm m2 59,900Rp
25 Kaca Raiben Tebal 3 mm m2 55,700Rp
26 Kaca Raiben Tebal 5 mm m2 77,500Rp
27 Kaca Patri Tebal 3 mm m2 -Rp
28 Nako Polos ( Rangka + kaca 5 mm ) m2 16,220Rp
BAHAN PENGGANTUNG/PENGUNCI
1 Kunci Tanam Merk SES bh 168,000Rp
2 Kunci Tanam Antik Merk SES bh -Rp
3 Engsel Pintu Nilon (Lokal) bh 11,500Rp
4 Engsel Jendela Antik bh -Rp
5 Engsel Jendela Nilon (Lokal) bh 4,900Rp
6 Engsel Jendela Antik bh -Rp
7 Hak Angin bh -Rp8 Hak Angin Antik bh 15,000Rp
9 Tarikan Pintu Ganda bh -Rp
10 Tarikan Pintu Ganda Antik set -Rp
11 Hand Vatent/Tarikan Jendela set -Rp
12 Hand Vatent/Tarikan Jendela Antik bh 8,500Rp
13 Gerendel Pintu bh -Rp
14 Gerendel Pintu Antik bh -Rp
15 Gerendel Jendela bh -Rp
16 Gerendel Jendela Antik bh 4,000Rp
-
8/2/2019 Analisa Kota Padang 2009
4/11
SATUANNO URAIAN HARGA
VII. BAHAN PABRIKASI LOKAL
1 Batu Bata bh 600Rp
2 Batu Kerawang bh 6,600Rp
3 Batu Pealimanan Hijau m2 -Rp
4 Batu Pealimanan Kuning m2 -Rp
5 Bata Berongga Ekspos (5 x 11 x 24) bh -Rp
6 Batu Granit kg -Rp7 Batu Teraso kg -Rp
8 Hollow Brick 20 bh 2,800Rp
9 Hollow Brick 15 bh 2,100Rp
10 Hollow Brick 10 bh 1,400Rp
11 Bata Pelapis Dinding bh -Rp
12 Batu Paras bh -Rp
13 Batu Tempel Hitam bh -Rp
14 Buis Beton Tanpa Tulangan dia 15 cm m 41,000Rp
15 Buis Beton Tanpa Tulangan dia 20 cm m 46,000Rp
16 Buis Beton Tanpa Tulangan dia 30 cm m 56,500Rp
17 Buis Beton Tanpa Tulangan dia 40 cm m 66,600Rp
18 Buis Beton Tanpa Tulangan dia 60 cm m 84,900Rp
19 Buis Beton Tanpa Tulangan dia 80 cm m 112,400Rp
20 Buis Beton Tanpa Tulangan dia 100 cm m 139,700Rp
21 Buis Beton Bertulang dia 15 cm m 121,000Rp
22 Buis Beton Bertulang dia 20 cm m 123,200Rp
23 Buis Beton Bertulang dia30 cm m 171,400Rp
24 Buis Beton Bertulang dia 40 cm m 213,200Rp
,
26 Buis Beton Bertulang dia 80 cm m 321,300Rp
27 Buis Beton Bertulang dia 100 cm m 387,700Rp
28 Batacone kg -Rp
VIII. BAHAN KERAMIK, SEMEN DAN ASPAL
1. Keramik Dinding Ukuran 10 x 20 bh 1,475Rp
2. Keramik Dinding Ukuran 20 x 20 bh -Rp
3. Ubin PC 20 x 20 cm bh 1,869Rp
4. Ubin PC 30 x 30 cm bh 3,358Rp
5. Ubin PC 40 x 40 cm bh 4,848Rp
6. Ubin Warna 20 x 20 bh 1,962Rp
7. Ubin Warna 30 x 30 bh 3,526Rp
8. Ubin Warna 40 x 40 bh 5,090Rp
9. Ubin Granit 30 x 30 bh 21,022Rp
10. Ubin Granit 40 x 40 bh 46,063Rp
11. Ubin Teraso 30 x 30 bh 5,663Rp
12. Ubin Teraso 40 x 40 bh 5,946Rp
13. Ubin Teralux Kerang ( 40 x 40 ) bh -Rp
14. Ubin Teralux Kerang ( 30 x 30 ) bh -Rp
15. Ubin Teralux Marmer ( 60 x 60 ) bh -Rp
16. Ubin Teralux Marmer ( 40 x 40 ) bh -Rp17. Ubin Teralux Marmer ( 30 x 30 ) bh -Rp
18. Teraco Cor m3 -Rp
19. Keramik Artistik ( 10 x 20 ) bh -Rp
20. Keramik Artistik ( 10 x 10 ) bh -Rp
21. Keramik Artistik ( 5 x 20 ) bh -Rp
22. Ubin Keramik 33 x 33 bh 4,100Rp
23. Ubin Keramik 30 x 30 bh 3,700Rp
24. Ubin Keramik 20 x 20 bh 1,920Rp
25. Ubin Keramik 10 x 33 bh -Rp
26. Mozaik Lantai bh -Rp
27. Porselin ( 11 x 11 ) bh 927.710Rp
-
8/2/2019 Analisa Kota Padang 2009
5/11
SATUANNO URAIAN HARGA
28. Porselin ( 10 x 20 ) bh -Rp
29. Porselin ( 20 x 20 ) bh -Rp
30. Internal Cove m' -Rp
31. Marmer Lantai bh -Rp
32. Marmer ( Dinding ) bh -Rp
32. Karpet m2 -Rp
33. Underlayer/rubber corrugated m2 -Rp34. Parquet m2 -Rp
35. Gymfloor m2 -Rp
36. Vynil bh -Rp
37. Vynil Karet bh 20,000Rp
38. Floor hardener kg -Rp
39. Semen (PC) @ 50 Kg zak 49,000Rp
Semen (PC) @ 50 Kg kg 980Rp
40. Semen Putih Kg 2,098Rp
41. Semen Merah m3 540,000Rp
42. Tepung AA/Semen warna kg 6,500Rp
43. Kloset Duduk bh 1,200,000Rp
44. Kloset Jongkok Porselen bh 155,800Rp
45. Kloset Jongkok Teraso bh 155,800Rp
46. Urinoir bh 1,289,500Rp
47. Wastafel bh 670,500Rp
48. Bak Teraso 0.3 m3 bh 300,630Rp
49. Bak Fiberglass 0.3 m3 bh 273,300Rp
50. Bak Fiberglass 1 m3 bh 1,128,100Rp
IX. BAHAN CAT dan FINISHING
1. Cat Tembok Merk Matex kg 13,400Rp
2. Cat Tembok Merk Catylac kg 19,600Rp
3. Cat Minyak Merk Platon kg 38,700Rp
4. Cat Minyak Merk Catylac kg -Rp
5. Minyak Cat ltr 9,200Rp
6. Minyak Bekisting ltr 11,900Rp
7. Cat Dasar kg 18,800Rp
8. Dempul Tembok kg 17,000Rp
9. Plamur Tembok kg 17,000Rp
10. Plamur Kayu kg 17,100Rp
11. Menie Kayu kg 16,300Rp
12. Menie Besi kg 16,300Rp
13. Residu kg 13,300Rp
14. Amplas Kayu hl 2,500Rp
15. Kuas bh 7,500Rp
16. Lem Rakol kg 20,000Rp
17. Lem Vynil kg -Rp
18. Lem kg -Rp
19. Kapur Sirih kg 1,120Rp
20. Solar ltr 5,500Rp21. Minyak Pelumas ltr 26,800Rp
22. Soda Api kg 28,700Rp
23. Sabun kg 9,500Rp
24. Alang - Alang ikat 1,500Rp
25. Strotox kg -Rp
26. Waterstop lebar 150 mm m -Rp
27. Waterstop lebar 200 mm m -Rp
28. Waterstop lebar 230 - 320 mm m -Rp
X. BAHAN PIPA
1. Pipa Galvanis dm 4" m' 100,689Rp
-
8/2/2019 Analisa Kota Padang 2009
6/11
SATUANNO URAIAN HARGA
2. Pipa Galvanis dm 3" m' 75,517Rp
3. Pipa Galvanis dm 1 1/2"" m' 37,759Rp
4. Pipa Galvanis dm 1" m' 37,758Rp
5. Pipa Galvanis dm 3/4" m' 18,879Rp
6. Pipa Galvanis dm 1/2" m' 12,586Rp
7. Pipa PVC dm 4" m' 31,250Rp
8. Pipa PVC dm 3" m' 21,750Rp9. Pipa PVC dm 2" m' 13,117Rp
10. Pipa PVC dm 1 1/2" m' 9,575Rp
11. Pipa PVC dm 1" m' 6,383Rp
12. Pipa PVC dm 3/4" m' 8,417Rp
13. Pipa PVC dm 1/2" m' 5,267Rp
14. Kran Air dm 1/2" bh 30,700Rp
15. Kran Air dm 3/4" bh 28,000Rp
16. Seal Tape bh 2,810Rp
17. Floor Drain bh 21,800Rp
PERALATAN
1. Mesin Las jam 29,874Rp
2. Mesin Perakitan jam 193,812Rp
Padang, Januari 2009Konsultan Perencana
CV. MITRA SAKINAH CONSULTANT
Ir. MARTIOS ALIUS
Direktur
-
8/2/2019 Analisa Kota Padang 2009
7/11
KEGIATAN :
PEKERJAAN :
LOKASI : PADANG
TAHUN : 2009
HARGA
SATUAN
1 1 m' Pagar sementara dari kayu tinggi 2 meter
Bahan1.2500 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 69,634.25Rp
2.5000 Kg Semen Portland 980.00Rp 2,450.00Rp
0.0050 M3 Pasir beton 87,900.00Rp 439.50Rp
0.0090 M3 Koral beton 85,400.00Rp 768.60Rp
0.0720 M3 Kayu 5/7 1,407,000.00Rp 101,304.00Rp
0.0600 Kg Paku biasa 2" - 5" 16,400.00Rp 984.00Rp
0.4000 Lt Residu 13,300.00Rp 5,320.00Rp
Tenaga0.2000 Oh. Tukang Kayu 55,000.00Rp 11,000.00Rp
0.4000 Oh Pekerja 38,000.00Rp 15,200.00Rp
0.0200 Oh Kep. Tukang 60,000.00Rp 1,200.00Rp
0.0200 Oh. Mandor 60,000.00Rp 1,200.00Rp
28,600.00Rp 180,900.35Rp 209,500.35Rp
euntungan dan ver ead 0 % 2,860.00Rp 18,090.04Rp 20,950.04Rp
Jumlah 230,450.39Rp
2 1 m' Pagar Sementara dari Seng bergelombang tinggi 2 m
Bahan.2500 Btg. Dolken Kayu 8-10/400cm 55,707.40Rp 69,634.25Rp
2.5000 Kg. Semen Portland 980.00Rp 2,450.00Rp
PEKERJAAN PERSIAPAN
DAFTAR ANALISA
NO URAIAN
HARGA SATUAN PEKERJAAN
UPAH BAHAN JUMLAH
.2000 Lbr. Seng gelombang 3"-5" 38,300.00Rp 45,960.00Rp
0.0050 m3. Pasir Beton 87,900.00Rp 439.50Rp
0.0090 m3. Koral Beton 85,400.00Rp 768.60Rp
0.0720 m3. Kayu 5/7 (kayu klas IV) 1,407,000.00Rp 101,304.00Rp
0.0600 Kg. Paku Biasa 2"-5" 16,400.00Rp 984.00Rp
0.4500 Kg. Meni Besi 16,300.00Rp 7,335.00Rp
Tenaga0.2000 Oh. Tukang Kayu 55,000.00Rp 11,000.00Rp
0.4000 Oh Pekerja 38,000.00Rp 15,200.00Rp
0.0200 Oh Kep. Tukang 60,000.00Rp 1,200.00Rp
0.0200 Oh. Mandor 60,000.00Rp 1,200.00Rp
28,600.00Rp 228,875.35Rp 257,475.35Rpeuntungan dan ver ead 0 % 2,860.00Rp 22,887.54Rp 2,860.00Rp
Jumlah 260,335.35Rp
3 1 m' Pagar sementara dari kawat duri tinggi 1.8 meter
Bahan.0000 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 55,707.40Rp
2.0000 Kg Semen portland 980.00Rp 1,960.00Rp
25.0000 Kg Kawat Duri 5,260.00Rp 131,500.00Rp
0.0050 M3 Pasir beton 87,900.00Rp 439.50Rp
0.0090 M3 Koral beton 85,400.00Rp 768.60Rp
0.0600 Kg Paku biasa 2" - 5" 16,400.00Rp 984.00Rp
Tenaga0.2000 Oh. Tukang Kayu 55,000.00Rp 11,000.00Rp
0.3000 Oh Pekerja 38,000.00Rp 11,400.00Rp
0.0200 Oh Kep. Tukang 60,000.00Rp 1,200.00Rp
0.0200 Oh. Mandor 60,000.00Rp 1,200.00Rp
24,800.00Rp 191,359.50Rp 216,159.50Rpeun ungan an ver ea 2,480.00Rp 19,135.95Rp 21,615.95Rp
Jumlah 237,775.45Rp
-
8/2/2019 Analisa Kota Padang 2009
8/11
HARGA
SATUAN
NO URAIAN UPAH BAHAN JUMLAH
4 1 m' Pengukuran dan Pemasangan Bouwplank
Bahan0.0 20 M3 Kayu 5/7 (kayu klas IV) 1,407,000.00Rp 16,884.00Rp
0.0200 Kg Paku (2-5") 16,400.00Rp 328.00Rp
0.0070 M3 Papan 3/20 1,365,000.00Rp 9,555.00Rp
Tenaga0. 000 Oh. Tukang Kayu 55,000.00Rp 5,500.00Rp
0. 000 Oh Pekerja 38,000.00Rp 3,800.00Rp
0.0 00 Oh Kep. Tukang 60,000.00Rp 600.00Rp
0.0050 Oh. Mandor 60,000.00Rp 300.00Rp
10,200.00Rp 26,767.00Rp 36,967.00Rpeuntungan dan ver ead 0 % 1,020.00Rp 2,676.70Rp 3,696.70Rp
Jumlah 40,663.70Rp
5 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
Bahan1.2500 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 69,634.25Rp
0.1800 M3 Kayu Papan 3/20 (klas IV) 1,365,000.00Rp 245,700.00Rp
0. 500 Kg Paku biasa 16,400.00Rp 13,940.00Rp
. 000 Kg Besi strip 20,500.00Rp 22,550.00Rp
5.0000 Kg Semen portland 980.00Rp 34,300.00Rp
0. 500 M3 Pasir pasang 87,900.00Rp 13,185.00Rp
0. 000 M3 Pasir beton 87,900.00Rp 8,790.00Rp
0.1500 M3 Koral beton 85,400.00Rp 12,810.00Rp
30.0000Bh Bata merah 600.00Rp 18,000.00Rp0.2500 Lbr Seng plat 38,300.00Rp 9,575.00Rp
2.0000 Bh Jendela nako 16,220.00Rp 32,440.00Rp
0.0 00 M2 kaca polos 44,900.00Rp 3,592.00Rp
0. 500 Bh Kunci tanam 168,000.00Rp 25,200.00Rp
0.0600 Lmb Plywood 4 mm 137,376.00Rp 8,242.56Rp
Tenaga2. . . , . , .
.0000 Oh Tukang batu 55,000.00Rp 55,000.00Rp
2.0000 Oh Pekerja 38,000.00Rp 76,000.00Rp
0. 000 Oh Kep. Tukang 60,000.00Rp 18,000.00Rp
0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp
262,000.00Rp 517,958.81Rp 779,958.81Rpeun ungan an ver ea 26,200.00Rp 51,795.88Rp 77,995.88Rp
Jumlah 857,954.69Rp
6 1 m2 Pembuatan gudang semen dan alat-alatBahan
1.7000 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 94,702.58Rp
0.2100 M3 Kayu Papan 3/20 (klas IV) 1,365,000.00Rp 286,650.00Rp
0. 000 Kg Paku biasa 16,400.00Rp 4,920.00Rp
0.5000 Kg Semen portland 980.00Rp 10,290.00Rp
0.0 00 M3 Pasir beton 87,900.00Rp 2,637.00Rp
0.0500 M3 Koral beton 85,400.00Rp 4,270.00Rp
.5000 Lbr Seng gelombang bjls 32 38,300.00Rp 57,450.00Rp
Tenaga2.0000 Oh. Tukang Kayu 55,000.00Rp 110,000.00Rp
.0000 Oh Pekerja 38,000.00Rp 38,000.00Rp
0.2000 Oh Kep. Tukang 60,000.00Rp 12,000.00Rp
0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp
163,000.00Rp 460,919.58Rp 623,919.58Rpeun ungan an ver ea 16,300.00Rp 46,091.96Rp 62,391.96Rp
Jumlah 686,311.54Rp
7 1 m2 Pembuatan rumah jaga / konstruksi kayu
Bahan.0000 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 167,122.20Rp
0.2760 M3 kayu Papan 3/20 (klas IV) 1,365,000.00Rp 376,740.00Rp
0.7000 Kg Paku biasa 16,400.00Rp 11,480.00Rp
1.5000 Lbr Seng gelombang bjls 32 38,300.00Rp 57,450.00Rp
-
8/2/2019 Analisa Kota Padang 2009
9/11
HARGA
SATUAN
NO URAIAN UPAH BAHAN JUMLAH
Tenaga.5000 Oh. Tukang Kayu 55,000.00Rp 82,500.00Rp
.0000 Oh Pekerja 38,000.00Rp 38,000.00Rp
0. 500 Oh Kep. Tukang 60,000.00Rp 9,000.00Rp
0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp
132,500.00Rp 612,792.20Rp 745,292.20Rpeun ungan an ver ea 13,250.00Rp 61,279.22Rp 74,529.22Rp
Jumlah 819,821.42Rp
8 1 m2 Pembersihan Lapangan dan peralatanTenaga
0.1000 Oh Pekerja 38,000.00Rp 3,800.00Rp
0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp
6,800.00Rp 6,800.00Rpeun ungan an ver ea 680.00Rp 680.00Rp
Jumlah 7,480.00Rp
9 1 m2 Pembuatan bedeng buruh
Bahan.2500 tg olken kayu -1 /4 cm 55,707.40Rp 69,634.25Rp
0. 60 M3 Kayu Papan 3/20 (klas IV) 1,365,000.00Rp 253,890.00Rp
0. 000 Kg Paku biasa 16,400.00Rp 4,920.00Rp
.0000 Kg Semen portland 980.00Rp 17,640.00Rp
0.0 00 M3 Pasir beton 87,900.00Rp 2,637.00Rp
0.0500 M3 Koral beton 85,400.00Rp 4,270.00Rp
1.5000Lbr Seng gelombang bjls 32 38,300.00Rp 57,450.00Rp. 50 Lbr Polywood 4mm 137,376.00Rp 185,457.60Rp
Tenaga2.0000 Oh. Tukang Kayu 55,000.00Rp 110,000.00Rp
.0000 Oh Pekerja 38,000.00Rp 38,000.00Rp
0.2000 Oh Kep. Tukang 60,000.00Rp 12,000.00Rp
0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp
, . , . , .eun ungan an ver ea 16,300.00Rp 59,589.89Rp 75,889.89Rp
Jumlah 834,788.74Rp
10 1 m2 Pembuatan bak adukan ukuran (40x50x20) cm
Bahan0.0 60 M3 Kayu Papan 3/20 (klas IV) 1,365,000.00Rp 49,140.00Rp
0.0 00 Kg Paku biasa 16,400.00Rp 1,312.00Rp
.0000 Btg Kaso 5/7 1,407,000.00Rp 1,407,000.00Rp
Tenaga0. 000 Oh. Tukang Kayu 55,000.00Rp 16,500.00Rp
0.0015 Oh. Mandor 60,000.00Rp 90.00Rp
16,590.00Rp 1,457,452.00Rp 1,474,042.00Rpeun ungan an ver ea 1,659.00Rp 145,745.20Rp 147,404.20Rp
Jumlah #############
11 1 m2 Pembuatan stegger dari bambu, ukuran (40 x 50 x 20) cm
Bahan1.0000 Btg Bambu 6-8 / 600 cm -Rp -Rp
0.2500 Kg Tali ijuk -Rp
Tenaga0.0 70 Oh. Tukang Kayu 55,000.00Rp 935.00Rp
0.0020 Oh Kep. Tukang 60,000.00Rp 120.00Rp
0.2500 Oh Pekerja 38,000.00Rp 9,500.00Rp
0.0 0 Oh. Mandor 60,000.00Rp 780.00Rp
11,335.00Rp -Rp 11,335.00Rpeun ungan an ver ea 1,133.50Rp -Rp 1,133.50Rp
Jumlah 12,468.50Rp
12 1 m2 Pembuatan jalan sementara
Bahan0.1500 # M3 Batu belah 15/20 91,500.00Rp 13,725.00Rp
0.0900 # M3 Batu pecah 5/7 137,100.00Rp 12,339.00Rp
0.0 00 # M3 Pasir pasang 87,900.00Rp 879.00Rp
Tenaga.0000 Oh Pekerja 38,000.00Rp 38,000.00Rp
0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp
41,000.00Rp 26,943.00Rp 67,943.00Rpeuntungan dan ver ead 0 % 4,100.00Rp 2,694.30Rp 6,794.30Rp
-
8/2/2019 Analisa Kota Padang 2009
10/11
HARGA
SATUAN
NO URAIAN UPAH BAHAN JUMLAH
13 1 m3 Bongkar beton bertulang
Tenaga6.6670 Oh Pekerja 38,000.00Rp 253,346.00Rp
0.3330 Oh. Mandor 60,000.00Rp 19,980.00Rp
273,326.00Rp 273,326.00Rpeun ungan an ver ea , .6p 27,332.60Rp
Jumlah 300,658.60Rp
14 1 m3 Bongkar dinding tembok bata merahTenaga
6.6670 Oh Pekerja 38,000.00Rp 253,346.00Rp
0.3330 Oh Mandor 60,000.00Rp 19,980.00Rp
273,326.00Rp 273,326.00Rpeun ungan an ver ea 27,332.60Rp 27,332.60Rp
Jumlah 300,658.60Rp
15 Bongkar lantai beton/bata
Tenaga2.0000 Oh Pekerja 38,000.00Rp 76,000.00Rp
0. 000 Oh Mandor 60,000.00Rp 6,000.00Rp
82,000.00Rp 82,000.00Rpeun ungan an ver ea 8,200.00Rp 8,200.00Rp
Jumlah 90,200.00Rp
16 Mengupas Plesteran lama (Anal L 6 /10 m2)Tenaga
0.5000 Oh Pekerja 38,000.00Rp 19,000.00Rp
0.0250 Oh Mandor 60,000.00Rp 1,500.00Rp
20,500.00Rp 20,500.00Rp
0. 000 untuk 1 m2 2,050.00Rp 2,050.00Rpeuntungan dan ver ead 0 % 205.00Rp 205.00Rp
, .
17 Menurunkan atap genteng (Anal L 7 /10 m2)
Tenaga2.0000 Oh Pekerja 38,000.00Rp 76,000.00Rp
0.1000 Oh Mandor 60,000.00Rp 6,000.00Rp
82,000.00Rp 82,000.00Rp0. 000 untuk 1 m2 8,200.00Rp 8,200.00Rp
eun ungan an ver ea 820.00Rp 820.00Rp
Jumlah 91,020.00Rp
18 Menurunkan atap seng (Anal L 8 /10 m2)
Tenaga0.5000 Oh Tukang Kayu 55,000.00Rp 27,500.00Rp
.0000 Oh. Pekerja 38,000.00Rp 38,000.00Rp
65,500.00Rp 65,500.00Rp0. 000 untuk 1 m2 6,550.00Rp 6,550.00Rp
eun ungan an ver ea 655.00Rp 655.00Rp
Jumlah 72,705.00Rp
19 Menurunkan rangka atap seng (Anal L 9 /10 m2)
Tenaga0.2500 Oh Tukang Kayu 55,000.00Rp 13,750.00Rp
0.0250 Oh Kepala Tukang Kayu 60,000.00Rp 1,500.00Rp
.0000 Oh Pekerja 38,000.00Rp 38,000.00Rp
0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp56,250.00Rp 56,250.00Rp
0. 000 untuk 1 m2 5,625.00Rp 5,625.00Rpeun ungan an ver ea 562.50Rp 562.50Rp
Jumlah 62,437.50Rp
-
8/2/2019 Analisa Kota Padang 2009
11/11
HARGA
SATUAN
NO URAIAN UPAH BAHAN JUMLAH
20 Membongkar balok loteng/kuda-kuda ( Anal L 10/m3)
Tenaga2.5000 Oh Tukang Kayu 55,000.00Rp 137,500.00Rp
0.2500 Oh Kepala Tukang Kayu 60,000.00Rp 15,000.00Rp
1.7500 Oh Pekerja 38,000.00Rp 66,500.00Rp
0. 750 Oh. Mandor 60,000.00Rp 52,500.00Rp
271,500.00Rp 271,500.00Rpeun ungan an ver ea 27,150.00Rp 27,150.00Rp
Jumlah 298,650.00Rp
21 Membongkar loteng papan ( Anal L 11/10 m2)
Tenaga0.6000 Oh Tukang Kayu 55,000.00Rp 33,000.00Rp
0.0600 Oh Kepala Tukang Kayu 60,000.00Rp 3,600.00Rp
2.0000 Oh Pekerja 38,000.00Rp 76,000.00Rp
0. 000 Oh. Mandor 60,000.00Rp 6,000.00Rp
118,600.00Rp 118,600.00Rp
0.1000 untuk 1 m2 11,860.00Rp 11,860.00Rpeun ungan an ver ea 1,186.00Rp 1,186.00Rp
Jumlah 131,646.00Rp
22 Membongkar balok loteng/kuda-kuda dipakai lagi( Anal L 12/m3)
Tenaga6.0000 Oh Tukang Kayu 55,000.00Rp 330,000.00Rp
0.6000Oh Kepala Tukang Kayu 60,000.00Rp 36,000.00Rp4.0000 Oh Pekerja 38,000.00Rp 152,000.00Rp
0.2000 Oh. Mandor 60,000.00Rp 12,000.00Rp
530,000.00Rp 530,000.00Rpeun ungan an ver ea 53,000.00Rp 53,000.00Rp
Jumlah 583,000.00Rp