    KEGIATAN :

    PEKERJAAN :

    LOKASI : PADANG

    TAHUN : 2009

    I. UPAH

    1. Kepala Tukang hari 60,000Rp

    2. Mandor hari 60,000Rp

    3. Tukang Batu hari 55,000Rp

    4. Tukang Kayu hari 55,000Rp

    5. Tukang Cat hari 55,000Rp

    6. Tukang Besi hari 55,000Rp

    7. Tukang Beronjong hari 55,000Rp

    8. Tukang Listrik hari 55,000Rp

    9. Tukang Las hari 55,000Rp

    10. Pekerja hari 38,000Rp

    II. SATUAN BAHAN LOKAL

    1. Batu Kali m3 91,500Rp

    2. Batu Gunung m3 -Rp

    3. Batu Pecah Tan an 5 -7 m3 137 100R

    SATUAN

    DAFTARHARGA

    NO URAIAN

    SATUAN UPAH, BAHAN DAN PEKERJAAN

    HARGA

    . ,

    4. Batu Pecah Tangan 3 -4 m3 143,100Rp

    5. Batu Pecah Tangan 2 -3 m3 150,000Rp

    6. Batu Pecah Tangan 1 -2 m3 156,100Rp

    7. Abu Batu m3 139,300Rp

    8. Pasir Urug m3 74,000Rp

    9. Pasir Pasangan m3 87,900Rp

    Pasir Pasangan kg 62.79

    10. Kerikil Cor / Beton m3 85,400Rp

    Kerikil Cor / Beton kg 63.26

    11. Tanah Cadas m3 -Rp

    12. Tanah Urug m3 66,600Rp

    13. Kerikil Timbun m3 68,000Rp

    14. Kapur Padam m3 350,000Rp

    15. Tanah Liat m3 69,900Rp

    16. Air ltr 1,000Rp

    17. Kapur Pasang m3 -Rp

    II. BAHAN KAYU

    1. Kayu Kelas I

    Papan m3 2,963,000Rp

    Balok m3 2,772,000Rp2. Kayu Kelas II

    Papan m3 2,416,000Rp

    Balok m3 2,063,000Rp

    3. Kayu Kelas III

    Papan m3 1,767,000Rp

    Balok m3 1,632,000Rp

    4. Kayu Bekisting Kelas IV

    Papan m3 1,365,000Rp

  • 8/2/2019 Analisa Kota Padang 2009

    2/11

    SATUANNO URAIAN HARGA

    Balok m3 1,407,000Rp

    5. Kayu Pancang 5/7, kelas III btg -Rp

    6. Kayu Panjang Bulat, dia. 5 - 15 cm btg -Rp

    7. Formite/Spacer bh 13,926Rp

    8. Bambu Ukuran Besar btg -Rp

    9. Bambu Ukuran Sedang btg -Rp

    10. Bilik Bambu m2 -Rp11. Ijuk Saringan kg 8,180Rp

    12. Plastik Hitam m2 10,700Rp

    13. Dolken Kayu Galam, dia. (8-10) cm, panjang 4 m btg 55,707Rp

    III. BAHAN BESI, BAJA Dan KAWAT

    1 Besi Scuare Tube m -Rp

    2 Besi Lis Kaca m -Rp

    3 Kawat Ayak Aluminium m' -Rp

    4 Kawat Ayam m' -Rp

    5 Kawat Beton kg 14,250Rp

    6 Kawat Beronjong kg -Rp

    7 Kawat Duri rol 5,260Rp

    8 Kawat Kassa m' -Rp

    9 Kawat Las kg 21,100Rp

    10 Kawat Nyamuk m' 18,600Rp

    11 Kawat Patri m' -Rp

    12 Besi Beton kg 8,800Rp

    13 Besi Profil IWF kg 17,588Rp

    -

    15 Paku Biasa kg 16,400Rp

    16 Paku Eternit kg -Rp

    17 Paku Seng kg 24,900Rp

    18 Paku Anti Karat kotak -Rp

    19 Paku Beton kotak -Rp

    20 Paku Sekrup kg 19,435Rp

    21 Plat Begol Kuda-Kuda kg -Rp

    22 Tiang m' -Rp

    23 Sealant tube -Rp

    24 Sekrup Fixer bh -Rp

    25 Aluminium Strip m' -Rp

    26 Pintu Aluminium m' -Rp

    27 Pintu Lipat m2 -Rp

    28 Pintu Gulung Besi m2 -Rp

    29 Sunscreen Aluminium m2 -Rp

    30 Rollingdoor Aluminium m2 -Rp

    31 Besi Siku L 30.30.3 kg 6,740Rp

    32 Vertical Blind dan Venetion Blind m2 150,000Rp

    33 Besi Strip kg 20,500Rp

    34 Profil Kaca m' -Rp

    35 Profil Aluminium m' -Rp36 Pengelasan cm 1,911Rp

    BAHAN PENUTUP ATAP

    1 Seng Gelombang BJLS 20 lbr 38,300Rp

    2 Seng Plat BJLS 20 lbr 43,800Rp

    3 Seng Plat BJLS 30 lbr 58,400Rp

    4 Seng Warna lbr 54,100Rp

    5 Genteng Metal lbr 5,300Rp

    6 Perabung Genteng Metal m' -Rp

    7 Genteng Keramik (Merk KIA) bh -Rp

    8 Perabung Genteng Keramik bh -Rp

  • 8/2/2019 Analisa Kota Padang 2009

    3/11

    SATUANNO URAIAN HARGA

    9 Atap Asbes Gelombang lbr 27,778Rp

    10 Asbes Semen m2 -Rp

    11 Perabung Asbes lbr 14,438Rp

    12 Atap Fiberglass Gelombang lbr -Rp

    13 Atap Plastik lbr -Rp

    14 Seng Gelombang Zincalume Koala lbr -Rp

    15 Seng Plat Zincalume Koala lbr -Rp16 Seng Plat BJLS 28 m' -Rp

    BAHAN DINDING DAN LOTENG

    1 Triplek Tebal 3 mm lbr 44,928Rp

    2 Triplek Tebal 4 mm lbr 54,432Rp

    3 Triplek Tebal 6 mm lbr 77,760Rp

    4 Plywood tebal 4 mm (1.20 x 2.40) cm m2 137,376Rp

    5 Plywood tebal 9 mm (90 x 220) cm m2 -Rp

    6 Plywood tebal 9 mm (1.20 x 2.40) cm m2 112,608Rp

    7 Teakwood tebal 4 mm ukuran (120 x 240) cm lbr 74,000Rp

    8 Formika m2 15,000Rp

    9 Profil Aluminium T m' -Rp

    10 Kawat diameter 4 mm kg -Rp

    11 Ramset bh -Rp

    12 Akustik lbr -Rp

    13 Eternit m2 -Rp

    14 Gypsum Board lbr -Rp

    15 Multiplex tebal 6 mm lbr -Rp

    -

    17 Papan Lambriseering m' 2,657,600Rp

    18 List Profil Lambriseering m' 3,625Rp

    19 Wall paper m' -Rp

    20 Les Plafond Biasa 1 x 4 m' -Rp

    21 Les Profil 4 x 4 m' 13,100Rp

    22 Les Kaca m' 7,260Rp

    23 Kaca Bening Tebal 3 mm m2 44,900Rp

    24 Kaca Bening Tebal 5 mm m2 59,900Rp

    25 Kaca Raiben Tebal 3 mm m2 55,700Rp

    26 Kaca Raiben Tebal 5 mm m2 77,500Rp

    27 Kaca Patri Tebal 3 mm m2 -Rp

    28 Nako Polos ( Rangka + kaca 5 mm ) m2 16,220Rp

    BAHAN PENGGANTUNG/PENGUNCI

    1 Kunci Tanam Merk SES bh 168,000Rp

    2 Kunci Tanam Antik Merk SES bh -Rp

    3 Engsel Pintu Nilon (Lokal) bh 11,500Rp

    4 Engsel Jendela Antik bh -Rp

    5 Engsel Jendela Nilon (Lokal) bh 4,900Rp

    6 Engsel Jendela Antik bh -Rp

    7 Hak Angin bh -Rp8 Hak Angin Antik bh 15,000Rp

    9 Tarikan Pintu Ganda bh -Rp

    10 Tarikan Pintu Ganda Antik set -Rp

    11 Hand Vatent/Tarikan Jendela set -Rp

    12 Hand Vatent/Tarikan Jendela Antik bh 8,500Rp

    13 Gerendel Pintu bh -Rp

    14 Gerendel Pintu Antik bh -Rp

    15 Gerendel Jendela bh -Rp

    16 Gerendel Jendela Antik bh 4,000Rp

  • 8/2/2019 Analisa Kota Padang 2009

    4/11

    SATUANNO URAIAN HARGA

    VII. BAHAN PABRIKASI LOKAL

    1 Batu Bata bh 600Rp

    2 Batu Kerawang bh 6,600Rp

    3 Batu Pealimanan Hijau m2 -Rp

    4 Batu Pealimanan Kuning m2 -Rp

    5 Bata Berongga Ekspos (5 x 11 x 24) bh -Rp

    6 Batu Granit kg -Rp7 Batu Teraso kg -Rp

    8 Hollow Brick 20 bh 2,800Rp

    9 Hollow Brick 15 bh 2,100Rp

    10 Hollow Brick 10 bh 1,400Rp

    11 Bata Pelapis Dinding bh -Rp

    12 Batu Paras bh -Rp

    13 Batu Tempel Hitam bh -Rp

    14 Buis Beton Tanpa Tulangan dia 15 cm m 41,000Rp

    15 Buis Beton Tanpa Tulangan dia 20 cm m 46,000Rp

    16 Buis Beton Tanpa Tulangan dia 30 cm m 56,500Rp

    17 Buis Beton Tanpa Tulangan dia 40 cm m 66,600Rp

    18 Buis Beton Tanpa Tulangan dia 60 cm m 84,900Rp

    19 Buis Beton Tanpa Tulangan dia 80 cm m 112,400Rp

    20 Buis Beton Tanpa Tulangan dia 100 cm m 139,700Rp

    21 Buis Beton Bertulang dia 15 cm m 121,000Rp

    22 Buis Beton Bertulang dia 20 cm m 123,200Rp

    23 Buis Beton Bertulang dia30 cm m 171,400Rp

    24 Buis Beton Bertulang dia 40 cm m 213,200Rp

    ,

    26 Buis Beton Bertulang dia 80 cm m 321,300Rp

    27 Buis Beton Bertulang dia 100 cm m 387,700Rp

    28 Batacone kg -Rp

    VIII. BAHAN KERAMIK, SEMEN DAN ASPAL

    1. Keramik Dinding Ukuran 10 x 20 bh 1,475Rp

    2. Keramik Dinding Ukuran 20 x 20 bh -Rp

    3. Ubin PC 20 x 20 cm bh 1,869Rp

    4. Ubin PC 30 x 30 cm bh 3,358Rp

    5. Ubin PC 40 x 40 cm bh 4,848Rp

    6. Ubin Warna 20 x 20 bh 1,962Rp

    7. Ubin Warna 30 x 30 bh 3,526Rp

    8. Ubin Warna 40 x 40 bh 5,090Rp

    9. Ubin Granit 30 x 30 bh 21,022Rp

    10. Ubin Granit 40 x 40 bh 46,063Rp

    11. Ubin Teraso 30 x 30 bh 5,663Rp

    12. Ubin Teraso 40 x 40 bh 5,946Rp

    13. Ubin Teralux Kerang ( 40 x 40 ) bh -Rp

    14. Ubin Teralux Kerang ( 30 x 30 ) bh -Rp

    15. Ubin Teralux Marmer ( 60 x 60 ) bh -Rp

    16. Ubin Teralux Marmer ( 40 x 40 ) bh -Rp17. Ubin Teralux Marmer ( 30 x 30 ) bh -Rp

    18. Teraco Cor m3 -Rp

    19. Keramik Artistik ( 10 x 20 ) bh -Rp

    20. Keramik Artistik ( 10 x 10 ) bh -Rp

    21. Keramik Artistik ( 5 x 20 ) bh -Rp

    22. Ubin Keramik 33 x 33 bh 4,100Rp

    23. Ubin Keramik 30 x 30 bh 3,700Rp

    24. Ubin Keramik 20 x 20 bh 1,920Rp

    25. Ubin Keramik 10 x 33 bh -Rp

    26. Mozaik Lantai bh -Rp

    27. Porselin ( 11 x 11 ) bh 927.710Rp

  • 8/2/2019 Analisa Kota Padang 2009

    5/11

    SATUANNO URAIAN HARGA

    28. Porselin ( 10 x 20 ) bh -Rp

    29. Porselin ( 20 x 20 ) bh -Rp

    30. Internal Cove m' -Rp

    31. Marmer Lantai bh -Rp

    32. Marmer ( Dinding ) bh -Rp

    32. Karpet m2 -Rp

    33. Underlayer/rubber corrugated m2 -Rp34. Parquet m2 -Rp

    35. Gymfloor m2 -Rp

    36. Vynil bh -Rp

    37. Vynil Karet bh 20,000Rp

    38. Floor hardener kg -Rp

    39. Semen (PC) @ 50 Kg zak 49,000Rp

    Semen (PC) @ 50 Kg kg 980Rp

    40. Semen Putih Kg 2,098Rp

    41. Semen Merah m3 540,000Rp

    42. Tepung AA/Semen warna kg 6,500Rp

    43. Kloset Duduk bh 1,200,000Rp

    44. Kloset Jongkok Porselen bh 155,800Rp

    45. Kloset Jongkok Teraso bh 155,800Rp

    46. Urinoir bh 1,289,500Rp

    47. Wastafel bh 670,500Rp

    48. Bak Teraso 0.3 m3 bh 300,630Rp

    49. Bak Fiberglass 0.3 m3 bh 273,300Rp

    50. Bak Fiberglass 1 m3 bh 1,128,100Rp

    IX. BAHAN CAT dan FINISHING

    1. Cat Tembok Merk Matex kg 13,400Rp

    2. Cat Tembok Merk Catylac kg 19,600Rp

    3. Cat Minyak Merk Platon kg 38,700Rp

    4. Cat Minyak Merk Catylac kg -Rp

    5. Minyak Cat ltr 9,200Rp

    6. Minyak Bekisting ltr 11,900Rp

    7. Cat Dasar kg 18,800Rp

    8. Dempul Tembok kg 17,000Rp

    9. Plamur Tembok kg 17,000Rp

    10. Plamur Kayu kg 17,100Rp

    11. Menie Kayu kg 16,300Rp

    12. Menie Besi kg 16,300Rp

    13. Residu kg 13,300Rp

    14. Amplas Kayu hl 2,500Rp

    15. Kuas bh 7,500Rp

    16. Lem Rakol kg 20,000Rp

    17. Lem Vynil kg -Rp

    18. Lem kg -Rp

    19. Kapur Sirih kg 1,120Rp

    20. Solar ltr 5,500Rp21. Minyak Pelumas ltr 26,800Rp

    22. Soda Api kg 28,700Rp

    23. Sabun kg 9,500Rp

    24. Alang - Alang ikat 1,500Rp

    25. Strotox kg -Rp

    26. Waterstop lebar 150 mm m -Rp

    27. Waterstop lebar 200 mm m -Rp

    28. Waterstop lebar 230 - 320 mm m -Rp

    X. BAHAN PIPA

    1. Pipa Galvanis dm 4" m' 100,689Rp

  • 8/2/2019 Analisa Kota Padang 2009

    6/11

    SATUANNO URAIAN HARGA

    2. Pipa Galvanis dm 3" m' 75,517Rp

    3. Pipa Galvanis dm 1 1/2"" m' 37,759Rp

    4. Pipa Galvanis dm 1" m' 37,758Rp

    5. Pipa Galvanis dm 3/4" m' 18,879Rp

    6. Pipa Galvanis dm 1/2" m' 12,586Rp

    7. Pipa PVC dm 4" m' 31,250Rp

    8. Pipa PVC dm 3" m' 21,750Rp9. Pipa PVC dm 2" m' 13,117Rp

    10. Pipa PVC dm 1 1/2" m' 9,575Rp

    11. Pipa PVC dm 1" m' 6,383Rp

    12. Pipa PVC dm 3/4" m' 8,417Rp

    13. Pipa PVC dm 1/2" m' 5,267Rp

    14. Kran Air dm 1/2" bh 30,700Rp

    15. Kran Air dm 3/4" bh 28,000Rp

    16. Seal Tape bh 2,810Rp

    17. Floor Drain bh 21,800Rp

    PERALATAN

    1. Mesin Las jam 29,874Rp

    2. Mesin Perakitan jam 193,812Rp

    Padang, Januari 2009Konsultan Perencana

    CV. MITRA SAKINAH CONSULTANT

    Ir. MARTIOS ALIUS

    Direktur

  • 8/2/2019 Analisa Kota Padang 2009

    7/11

    KEGIATAN :

    PEKERJAAN :

    LOKASI : PADANG

    TAHUN : 2009

    HARGA

    SATUAN

    1 1 m' Pagar sementara dari kayu tinggi 2 meter

    Bahan1.2500 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 69,634.25Rp

    2.5000 Kg Semen Portland 980.00Rp 2,450.00Rp

    0.0050 M3 Pasir beton 87,900.00Rp 439.50Rp

    0.0090 M3 Koral beton 85,400.00Rp 768.60Rp

    0.0720 M3 Kayu 5/7 1,407,000.00Rp 101,304.00Rp

    0.0600 Kg Paku biasa 2" - 5" 16,400.00Rp 984.00Rp

    0.4000 Lt Residu 13,300.00Rp 5,320.00Rp

    Tenaga0.2000 Oh. Tukang Kayu 55,000.00Rp 11,000.00Rp

    0.4000 Oh Pekerja 38,000.00Rp 15,200.00Rp

    0.0200 Oh Kep. Tukang 60,000.00Rp 1,200.00Rp

    0.0200 Oh. Mandor 60,000.00Rp 1,200.00Rp

    28,600.00Rp 180,900.35Rp 209,500.35Rp

    euntungan dan ver ead 0 % 2,860.00Rp 18,090.04Rp 20,950.04Rp

    Jumlah 230,450.39Rp

    2 1 m' Pagar Sementara dari Seng bergelombang tinggi 2 m

    Bahan.2500 Btg. Dolken Kayu 8-10/400cm 55,707.40Rp 69,634.25Rp

    2.5000 Kg. Semen Portland 980.00Rp 2,450.00Rp

    PEKERJAAN PERSIAPAN

    DAFTAR ANALISA

    NO URAIAN

    HARGA SATUAN PEKERJAAN

    UPAH BAHAN JUMLAH

    .2000 Lbr. Seng gelombang 3"-5" 38,300.00Rp 45,960.00Rp

    0.0050 m3. Pasir Beton 87,900.00Rp 439.50Rp

    0.0090 m3. Koral Beton 85,400.00Rp 768.60Rp

    0.0720 m3. Kayu 5/7 (kayu klas IV) 1,407,000.00Rp 101,304.00Rp

    0.0600 Kg. Paku Biasa 2"-5" 16,400.00Rp 984.00Rp

    0.4500 Kg. Meni Besi 16,300.00Rp 7,335.00Rp

    Tenaga0.2000 Oh. Tukang Kayu 55,000.00Rp 11,000.00Rp

    0.4000 Oh Pekerja 38,000.00Rp 15,200.00Rp

    0.0200 Oh Kep. Tukang 60,000.00Rp 1,200.00Rp

    0.0200 Oh. Mandor 60,000.00Rp 1,200.00Rp

    28,600.00Rp 228,875.35Rp 257,475.35Rpeuntungan dan ver ead 0 % 2,860.00Rp 22,887.54Rp 2,860.00Rp

    Jumlah 260,335.35Rp

    3 1 m' Pagar sementara dari kawat duri tinggi 1.8 meter

    Bahan.0000 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 55,707.40Rp

    2.0000 Kg Semen portland 980.00Rp 1,960.00Rp

    25.0000 Kg Kawat Duri 5,260.00Rp 131,500.00Rp

    0.0050 M3 Pasir beton 87,900.00Rp 439.50Rp

    0.0090 M3 Koral beton 85,400.00Rp 768.60Rp

    0.0600 Kg Paku biasa 2" - 5" 16,400.00Rp 984.00Rp

    Tenaga0.2000 Oh. Tukang Kayu 55,000.00Rp 11,000.00Rp

    0.3000 Oh Pekerja 38,000.00Rp 11,400.00Rp

    0.0200 Oh Kep. Tukang 60,000.00Rp 1,200.00Rp

    0.0200 Oh. Mandor 60,000.00Rp 1,200.00Rp

    24,800.00Rp 191,359.50Rp 216,159.50Rpeun ungan an ver ea 2,480.00Rp 19,135.95Rp 21,615.95Rp

    Jumlah 237,775.45Rp

  • 8/2/2019 Analisa Kota Padang 2009

    8/11

    HARGA

    SATUAN

    NO URAIAN UPAH BAHAN JUMLAH

    4 1 m' Pengukuran dan Pemasangan Bouwplank

    Bahan0.0 20 M3 Kayu 5/7 (kayu klas IV) 1,407,000.00Rp 16,884.00Rp

    0.0200 Kg Paku (2-5") 16,400.00Rp 328.00Rp

    0.0070 M3 Papan 3/20 1,365,000.00Rp 9,555.00Rp

    Tenaga0. 000 Oh. Tukang Kayu 55,000.00Rp 5,500.00Rp

    0. 000 Oh Pekerja 38,000.00Rp 3,800.00Rp

    0.0 00 Oh Kep. Tukang 60,000.00Rp 600.00Rp

    0.0050 Oh. Mandor 60,000.00Rp 300.00Rp

    10,200.00Rp 26,767.00Rp 36,967.00Rpeuntungan dan ver ead 0 % 1,020.00Rp 2,676.70Rp 3,696.70Rp

    Jumlah 40,663.70Rp

    5 1 m2 Pembuatan kantor sementara, dengan lantai plesteran

    Bahan1.2500 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 69,634.25Rp

    0.1800 M3 Kayu Papan 3/20 (klas IV) 1,365,000.00Rp 245,700.00Rp

    0. 500 Kg Paku biasa 16,400.00Rp 13,940.00Rp

    . 000 Kg Besi strip 20,500.00Rp 22,550.00Rp

    5.0000 Kg Semen portland 980.00Rp 34,300.00Rp

    0. 500 M3 Pasir pasang 87,900.00Rp 13,185.00Rp

    0. 000 M3 Pasir beton 87,900.00Rp 8,790.00Rp

    0.1500 M3 Koral beton 85,400.00Rp 12,810.00Rp

    30.0000Bh Bata merah 600.00Rp 18,000.00Rp0.2500 Lbr Seng plat 38,300.00Rp 9,575.00Rp

    2.0000 Bh Jendela nako 16,220.00Rp 32,440.00Rp

    0.0 00 M2 kaca polos 44,900.00Rp 3,592.00Rp

    0. 500 Bh Kunci tanam 168,000.00Rp 25,200.00Rp

    0.0600 Lmb Plywood 4 mm 137,376.00Rp 8,242.56Rp

    Tenaga2. . . , . , .

    .0000 Oh Tukang batu 55,000.00Rp 55,000.00Rp

    2.0000 Oh Pekerja 38,000.00Rp 76,000.00Rp

    0. 000 Oh Kep. Tukang 60,000.00Rp 18,000.00Rp

    0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp

    262,000.00Rp 517,958.81Rp 779,958.81Rpeun ungan an ver ea 26,200.00Rp 51,795.88Rp 77,995.88Rp

    Jumlah 857,954.69Rp

    6 1 m2 Pembuatan gudang semen dan alat-alatBahan

    1.7000 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 94,702.58Rp

    0.2100 M3 Kayu Papan 3/20 (klas IV) 1,365,000.00Rp 286,650.00Rp

    0. 000 Kg Paku biasa 16,400.00Rp 4,920.00Rp

    0.5000 Kg Semen portland 980.00Rp 10,290.00Rp

    0.0 00 M3 Pasir beton 87,900.00Rp 2,637.00Rp

    0.0500 M3 Koral beton 85,400.00Rp 4,270.00Rp

    .5000 Lbr Seng gelombang bjls 32 38,300.00Rp 57,450.00Rp

    Tenaga2.0000 Oh. Tukang Kayu 55,000.00Rp 110,000.00Rp

    .0000 Oh Pekerja 38,000.00Rp 38,000.00Rp

    0.2000 Oh Kep. Tukang 60,000.00Rp 12,000.00Rp

    0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp

    163,000.00Rp 460,919.58Rp 623,919.58Rpeun ungan an ver ea 16,300.00Rp 46,091.96Rp 62,391.96Rp

    Jumlah 686,311.54Rp

    7 1 m2 Pembuatan rumah jaga / konstruksi kayu

    Bahan.0000 Btg Dolken kayu 8-10/400 cm 55,707.40Rp 167,122.20Rp

    0.2760 M3 kayu Papan 3/20 (klas IV) 1,365,000.00Rp 376,740.00Rp

    0.7000 Kg Paku biasa 16,400.00Rp 11,480.00Rp

    1.5000 Lbr Seng gelombang bjls 32 38,300.00Rp 57,450.00Rp

  • 8/2/2019 Analisa Kota Padang 2009

    9/11

    HARGA

    SATUAN

    NO URAIAN UPAH BAHAN JUMLAH

    Tenaga.5000 Oh. Tukang Kayu 55,000.00Rp 82,500.00Rp

    .0000 Oh Pekerja 38,000.00Rp 38,000.00Rp

    0. 500 Oh Kep. Tukang 60,000.00Rp 9,000.00Rp

    0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp

    132,500.00Rp 612,792.20Rp 745,292.20Rpeun ungan an ver ea 13,250.00Rp 61,279.22Rp 74,529.22Rp

    Jumlah 819,821.42Rp

    8 1 m2 Pembersihan Lapangan dan peralatanTenaga

    0.1000 Oh Pekerja 38,000.00Rp 3,800.00Rp

    0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp

    6,800.00Rp 6,800.00Rpeun ungan an ver ea 680.00Rp 680.00Rp

    Jumlah 7,480.00Rp

    9 1 m2 Pembuatan bedeng buruh

    Bahan.2500 tg olken kayu -1 /4 cm 55,707.40Rp 69,634.25Rp

    0. 60 M3 Kayu Papan 3/20 (klas IV) 1,365,000.00Rp 253,890.00Rp

    0. 000 Kg Paku biasa 16,400.00Rp 4,920.00Rp

    .0000 Kg Semen portland 980.00Rp 17,640.00Rp

    0.0 00 M3 Pasir beton 87,900.00Rp 2,637.00Rp

    0.0500 M3 Koral beton 85,400.00Rp 4,270.00Rp

    1.5000Lbr Seng gelombang bjls 32 38,300.00Rp 57,450.00Rp. 50 Lbr Polywood 4mm 137,376.00Rp 185,457.60Rp

    Tenaga2.0000 Oh. Tukang Kayu 55,000.00Rp 110,000.00Rp

    .0000 Oh Pekerja 38,000.00Rp 38,000.00Rp

    0.2000 Oh Kep. Tukang 60,000.00Rp 12,000.00Rp

    0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp

    , . , . , .eun ungan an ver ea 16,300.00Rp 59,589.89Rp 75,889.89Rp

    Jumlah 834,788.74Rp

    10 1 m2 Pembuatan bak adukan ukuran (40x50x20) cm

    Bahan0.0 60 M3 Kayu Papan 3/20 (klas IV) 1,365,000.00Rp 49,140.00Rp

    0.0 00 Kg Paku biasa 16,400.00Rp 1,312.00Rp

    .0000 Btg Kaso 5/7 1,407,000.00Rp 1,407,000.00Rp

    Tenaga0. 000 Oh. Tukang Kayu 55,000.00Rp 16,500.00Rp

    0.0015 Oh. Mandor 60,000.00Rp 90.00Rp

    16,590.00Rp 1,457,452.00Rp 1,474,042.00Rpeun ungan an ver ea 1,659.00Rp 145,745.20Rp 147,404.20Rp

    Jumlah #############

    11 1 m2 Pembuatan stegger dari bambu, ukuran (40 x 50 x 20) cm

    Bahan1.0000 Btg Bambu 6-8 / 600 cm -Rp -Rp

    0.2500 Kg Tali ijuk -Rp

    Tenaga0.0 70 Oh. Tukang Kayu 55,000.00Rp 935.00Rp

    0.0020 Oh Kep. Tukang 60,000.00Rp 120.00Rp

    0.2500 Oh Pekerja 38,000.00Rp 9,500.00Rp

    0.0 0 Oh. Mandor 60,000.00Rp 780.00Rp

    11,335.00Rp -Rp 11,335.00Rpeun ungan an ver ea 1,133.50Rp -Rp 1,133.50Rp

    Jumlah 12,468.50Rp

    12 1 m2 Pembuatan jalan sementara

    Bahan0.1500 # M3 Batu belah 15/20 91,500.00Rp 13,725.00Rp

    0.0900 # M3 Batu pecah 5/7 137,100.00Rp 12,339.00Rp

    0.0 00 # M3 Pasir pasang 87,900.00Rp 879.00Rp

    Tenaga.0000 Oh Pekerja 38,000.00Rp 38,000.00Rp

    0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp

    41,000.00Rp 26,943.00Rp 67,943.00Rpeuntungan dan ver ead 0 % 4,100.00Rp 2,694.30Rp 6,794.30Rp

  • 8/2/2019 Analisa Kota Padang 2009

    10/11

    HARGA

    SATUAN

    NO URAIAN UPAH BAHAN JUMLAH

    13 1 m3 Bongkar beton bertulang

    Tenaga6.6670 Oh Pekerja 38,000.00Rp 253,346.00Rp

    0.3330 Oh. Mandor 60,000.00Rp 19,980.00Rp

    273,326.00Rp 273,326.00Rpeun ungan an ver ea , .6p 27,332.60Rp

    Jumlah 300,658.60Rp

    14 1 m3 Bongkar dinding tembok bata merahTenaga

    6.6670 Oh Pekerja 38,000.00Rp 253,346.00Rp

    0.3330 Oh Mandor 60,000.00Rp 19,980.00Rp

    273,326.00Rp 273,326.00Rpeun ungan an ver ea 27,332.60Rp 27,332.60Rp

    Jumlah 300,658.60Rp

    15 Bongkar lantai beton/bata

    Tenaga2.0000 Oh Pekerja 38,000.00Rp 76,000.00Rp

    0. 000 Oh Mandor 60,000.00Rp 6,000.00Rp

    82,000.00Rp 82,000.00Rpeun ungan an ver ea 8,200.00Rp 8,200.00Rp

    Jumlah 90,200.00Rp

    16 Mengupas Plesteran lama (Anal L 6 /10 m2)Tenaga

    0.5000 Oh Pekerja 38,000.00Rp 19,000.00Rp

    0.0250 Oh Mandor 60,000.00Rp 1,500.00Rp

    20,500.00Rp 20,500.00Rp

    0. 000 untuk 1 m2 2,050.00Rp 2,050.00Rpeuntungan dan ver ead 0 % 205.00Rp 205.00Rp

    , .

    17 Menurunkan atap genteng (Anal L 7 /10 m2)

    Tenaga2.0000 Oh Pekerja 38,000.00Rp 76,000.00Rp

    0.1000 Oh Mandor 60,000.00Rp 6,000.00Rp

    82,000.00Rp 82,000.00Rp0. 000 untuk 1 m2 8,200.00Rp 8,200.00Rp

    eun ungan an ver ea 820.00Rp 820.00Rp

    Jumlah 91,020.00Rp

    18 Menurunkan atap seng (Anal L 8 /10 m2)

    Tenaga0.5000 Oh Tukang Kayu 55,000.00Rp 27,500.00Rp

    .0000 Oh. Pekerja 38,000.00Rp 38,000.00Rp

    65,500.00Rp 65,500.00Rp0. 000 untuk 1 m2 6,550.00Rp 6,550.00Rp

    eun ungan an ver ea 655.00Rp 655.00Rp

    Jumlah 72,705.00Rp

    19 Menurunkan rangka atap seng (Anal L 9 /10 m2)

    Tenaga0.2500 Oh Tukang Kayu 55,000.00Rp 13,750.00Rp

    0.0250 Oh Kepala Tukang Kayu 60,000.00Rp 1,500.00Rp

    .0000 Oh Pekerja 38,000.00Rp 38,000.00Rp

    0.0500 Oh. Mandor 60,000.00Rp 3,000.00Rp56,250.00Rp 56,250.00Rp

    0. 000 untuk 1 m2 5,625.00Rp 5,625.00Rpeun ungan an ver ea 562.50Rp 562.50Rp

    Jumlah 62,437.50Rp

  • 8/2/2019 Analisa Kota Padang 2009

    11/11

    HARGA

    SATUAN

    NO URAIAN UPAH BAHAN JUMLAH

    20 Membongkar balok loteng/kuda-kuda ( Anal L 10/m3)

    Tenaga2.5000 Oh Tukang Kayu 55,000.00Rp 137,500.00Rp

    0.2500 Oh Kepala Tukang Kayu 60,000.00Rp 15,000.00Rp

    1.7500 Oh Pekerja 38,000.00Rp 66,500.00Rp

    0. 750 Oh. Mandor 60,000.00Rp 52,500.00Rp

    271,500.00Rp 271,500.00Rpeun ungan an ver ea 27,150.00Rp 27,150.00Rp

    Jumlah 298,650.00Rp

    21 Membongkar loteng papan ( Anal L 11/10 m2)

    Tenaga0.6000 Oh Tukang Kayu 55,000.00Rp 33,000.00Rp

    0.0600 Oh Kepala Tukang Kayu 60,000.00Rp 3,600.00Rp

    2.0000 Oh Pekerja 38,000.00Rp 76,000.00Rp

    0. 000 Oh. Mandor 60,000.00Rp 6,000.00Rp

    118,600.00Rp 118,600.00Rp

    0.1000 untuk 1 m2 11,860.00Rp 11,860.00Rpeun ungan an ver ea 1,186.00Rp 1,186.00Rp

    Jumlah 131,646.00Rp

    22 Membongkar balok loteng/kuda-kuda dipakai lagi( Anal L 12/m3)

    Tenaga6.0000 Oh Tukang Kayu 55,000.00Rp 330,000.00Rp

    0.6000Oh Kepala Tukang Kayu 60,000.00Rp 36,000.00Rp4.0000 Oh Pekerja 38,000.00Rp 152,000.00Rp

    0.2000 Oh. Mandor 60,000.00Rp 12,000.00Rp

    530,000.00Rp 530,000.00Rpeun ungan an ver ea 53,000.00Rp 53,000.00Rp

    Jumlah 583,000.00Rp