DAFTAR ANALISA PEKERJAAN TAHUN 2014 NO URAIAN HARGA HARGA HARGA HARGA SATUAN UPAH BAHAN JUMLAH (Rp) (Rp) (Rp) (Rp) 1 2 3 4 5 6 I PEKERJAAN PERSIAPAN (SNI 03-2835-2002) 1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER 1.2500 btg Bambu Sedang 10,000.00 12,500.00 2.5000 kg Semen Portland 1,340.00 3,350.00 1.2000 lbr Seng gelombang 3" - 5" 82,500.00 99,000.00 0.0050 m3 Pasir Beton 131,000.00 655.00 0.0090 m3 Koral beton 152,000.00 1,368.00 0.0720 m3 Kayu Meranti Usuk 5/7 5,500,000.00 396,000.00 0.0600 kg Paku biasa 2" - 5" 15,400.00 924.00 0.4500 kg Meni Besi 16,000.00 7,200.00 0.2000 oh Tukang Kayu 82,000.00 16,400.00 0.4000 oh Pekerja 50,000.00 20,000.00 0.0200 oh Kepala Tukang 88,000.00 1,760.00 0.0200 oh Mandor 95,000.00 1,900.00 Total : 40,060.00 520,997.00 561,057.00 2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK 0.0120 m3 Kayu Usuk Meranti 5/7 5,500,000.00 66,000.00 0.0200 kg Paku Biasa 2" - 5" 15,400.00 308.00 0.0070 m3 Kayu Papan Meranti 3/20 6,050,000.00 42,350.00 0.1000 oh Tukang Kayu 82,000.00 8,200.00 0.1000 oh Pekerja 50,000.00 5,000.00 0.0100 oh Kepala Tukang 88,000.00 880.00 0.0050 oh Mandor 95,000.00 475.00 Total : 14,555.00 108,658.00 123,213.00 3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN 1.2500 btg Dolken Kayu Ø 8 - 10/4m 99,000.00 123,750.00 0.1800 m3 Kayu Meranti 2,585,000.00 465,300.00 0.8500 kg Paku Biasa 2" - 5" 15,400.00 13,090.00 1.1000 kg Besi Strip 8,800.00 9,680.00 35.0000 kg Semen Portland 1,340.00 46,900.00 0.1500 m3 Pasir Pasang 152,000.00 22,800.00 0.1000 m3 Pasir Beton 131,000.00 13,100.00 0.1500 m3 Koral Beton 152,000.00 22,800.00 30.0000 bh Bata Merah 3,300.00 99,000.00 0.2500 lbr Seng Plat 55,000.00 13,750.00 2.0000 bh Jendela Nako 32,000.00 64,000.00 0.0800 m2 Kaca Polos 121,000.00 9,680.00 0.1500 bh Kunci Tanam 24,200.00 3,630.00 0.0600 lbr Plywood 4 mm 71,500.00 4,290.00 2.0000 oh Tukang Kayu 82,000.00 164,000.00 1.0000 oh Tukang Batu 76,000.00 76,000.00 2.0000 oh Pekerja 50,000.00 100,000.00 0.3000 oh Kepala Tukang 88,000.00 26,400.00 0.0500 oh Mandor 95,000.00 4,750.00 Total : 371,150.00 911,770.00 1,282,920.00 4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT 1.7000 btg Bambu Sedang 10,000.00 17,000.00 0.2100 m3 Kayu Meranti 2,585,000.00 542,850.00 0.3000 kg Paku Biasa 2" - 5" 15,400.00 4,620.00 10.5000 kg Semen Portland 1,340.00 14,070.00 0.0300 m3 Pasir Beton 131,000.00 3,930.00 0.0500 m3 Koral Beton 152,000.00 7,600.00 1.5000 lbr Seng gelombang BJLS 30 99,000.00 148,500.00 2.0000 oh Tukang Kayu 82,000.00 164,000.00 1.0000 oh Pekerja 50,000.00 50,000.00 0.2000 oh Kepala Tukang 88,000.00 17,600.00 0.0500 oh Mandor 95,000.00 4,750.00 Total : 236,350.00 738,570.00 974,920.00 5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU 3.0000 btg Bambu Sedang 10,000.00 30,000.00 0.2760 m3 Kayu Meranti 2,585,000.00 713,460.00 0.7000 kg Paku biasa 2" - 5" 15,400.00 10,780.00 1.5000 lbr Seng gelombang BJLS 28 99,000.00 148,500.00 1.5000 oh Tukang Kayu 82,000.00 123,000.00 1.0000 oh Pekerja 50,000.00 50,000.00 0.1500 oh Kepala Tukang 88,000.00 13,200.00 0.0500 oh Mandor 95,000.00 4,750.00 Total : 190,950.00 902,740.00 1,093,690.00

Upload: ikomang-giya-pramardika

Post on 15-Nov-2015

270 views

Category:

Documents


11 download

DESCRIPTION

asd

TRANSCRIPT

000000000

AAAAAAAAA

AnalisaDAFTAR ANALISA PEKERJAANTAHUN 2014

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456IPEKERJAAN PERSIAPAN (SNI 03-2835-2002)11 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER1.2500btgBambu Sedang10,000.0012,500.002.5000kgSemen Portland1,340.003,350.001.2000lbrSeng gelombang 3" - 5"82,500.0099,000.000.0050m3Pasir Beton131,000.00655.000.0090m3Koral beton152,000.001,368.000.0720m3Kayu Meranti Usuk 5/75,500,000.00396,000.000.0600kgPaku biasa 2" - 5"15,400.00924.000.4500kgMeni Besi16,000.007,200.000.2000ohTukang Kayu82,000.0016,400.000.4000ohPekerja50,000.0020,000.000.0200ohKepala Tukang88,000.001,760.000.0200ohMandor95,000.001,900.00Total :40,060.00520,997.00561,057.00

21 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK0.0120m3Kayu Usuk Meranti 5/75,500,000.0066,000.000.0200kgPaku Biasa 2" - 5"15,400.00308.000.0070m3Kayu Papan Meranti 3/206,050,000.0042,350.000.1000ohTukang Kayu82,000.008,200.000.1000ohPekerja50,000.005,000.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :14,555.00108,658.00123,213.00

31 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN1.2500btgDolken Kayu 8 - 10/4m99,000.00123,750.000.1800m3Kayu Meranti2,585,000.00465,300.000.8500kgPaku Biasa 2" - 5"15,400.0013,090.001.1000kgBesi Strip8,800.009,680.0035.0000kgSemen Portland1,340.0046,900.000.1500m3Pasir Pasang152,000.0022,800.000.1000m3Pasir Beton131,000.0013,100.000.1500m3Koral Beton152,000.0022,800.0030.0000bhBata Merah3,300.0099,000.000.2500lbrSeng Plat55,000.0013,750.002.0000bhJendela Nako32,000.0064,000.000.0800m2Kaca Polos121,000.009,680.000.1500bhKunci Tanam24,200.003,630.000.0600lbrPlywood 4 mm71,500.004,290.002.0000ohTukang Kayu82,000.00164,000.001.0000ohTukang Batu76,000.0076,000.002.0000ohPekerja50,000.00100,000.000.3000ohKepala Tukang88,000.0026,400.000.0500ohMandor95,000.004,750.00Total :371,150.00911,770.001,282,920.00

41 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT1.7000btgBambu Sedang10,000.0017,000.000.2100m3Kayu Meranti2,585,000.00542,850.000.3000kgPaku Biasa 2" - 5"15,400.004,620.0010.5000kgSemen Portland1,340.0014,070.000.0300m3Pasir Beton131,000.003,930.000.0500m3Koral Beton152,000.007,600.001.5000lbrSeng gelombang BJLS 3099,000.00148,500.002.0000ohTukang Kayu82,000.00164,000.001.0000ohPekerja50,000.0050,000.000.2000ohKepala Tukang88,000.0017,600.000.0500ohMandor95,000.004,750.00Total :236,350.00738,570.00974,920.00

51 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU3.0000btgBambu Sedang10,000.0030,000.000.2760m3Kayu Meranti 2,585,000.00713,460.000.7000kgPaku biasa 2" - 5"15,400.0010,780.001.5000lbrSeng gelombang BJLS 2899,000.00148,500.001.5000ohTukang Kayu82,000.00123,000.001.0000ohPekerja50,000.0050,000.000.1500ohKepala Tukang88,000.0013,200.000.0500ohMandor95,000.004,750.00Total :190,950.00902,740.001,093,690.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

61 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN0.1000ohPekerja50,000.005,000.000.0500ohMandor95,000.004,750.00Total :9,750.009,750.00

71 M2 PEMBUATAN BEDENG BURUH1.2500btgBambu Sedang10,000.0012,500.000.1860m3Kayu Meranti2,585,000.00480,810.000.3000kgPaku Biasa 2" - 5"15,400.004,620.0018.0000kgSemen Portland1,340.0024,120.000.0300m3Pasir Beton131,000.003,930.000.0500m3Koral Beton152,000.007,600.001.5000lbrSeng gelombang BJLS 2899,000.00148,500.001.3500lbrPlywood 4 mm71,500.0096,525.002.0000ohTukang Kayu82,000.00164,000.001.0000ohPekerja50,000.0050,000.000.2000ohKepala Tukang88,000.0017,600.000.0500ohMandor95,000.004,750.00Total :236,350.00778,605.001,014,955.00

71 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM0.0360m3Kayu Terentang2,585,000.0093,060.000.0800kgPaku Biasa 2" - 5"15,400.001,232.001.0000btgKaso 5/784,700.0084,700.000.3000ohTukang kayu82,000.0024,600.000.0015ohMandor95,000.00142.50Total :24,742.50178,992.00203,734.50

81 M2 PEMBUATAN STEGGER DARI BAMBU1.0000btgBambu10,000.0010,000.000.2500kgTali Ijuk37,500.009,375.000.0170ohTukang Kayu82,000.001,394.000.0020ohPekerja50,000.00100.000.2500ohKepala Tukang88,000.0022,000.000.0130ohMandor95,000.001,235.0024,729.0019,375.0044,104.00

91 M2 PEMBUATAN JALAN SEMENTARA0.1500m3Batu Kali 180,000.0027,000.000.0900m3Batu Pecah 5 - 7182,500.0016,425.000.0100m3Pasir Pasang152,000.001,520.001.0000ohPekerja50,000.0050,000.000.0500ohMandor95,000.004,750.00Total :54,750.0044,945.0099,695.00

101 M3 BONGKARAN BETON BERTULANG6.6670ohPekerja50,000.00333,350.000.3330ohMandor95,000.0031,635.00Total :364,985.00364,985.00

121 M3 BONGKARAN DINDING TEMBOK BATA MERAH6.6670ohPekerja50,000.00333,350.000.0330ohMandor95,000.003,135.00Total :336,485.00336,485.00

1310 M3 MEMBONGKAR s.d.a DINDING TEMBOK YANG TIPIS TERHITUNG DENGAN MEMBERSIHKAN BATAS - BATASNYA2.0000ohPekerja50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :109,500.00109,500.00

1410 M3 MEMBONGKAR LANTAI YANG LAMA BERIKUT PEKERJAAN MEMBERSIHKAN BATA-BATA ATAU LAIN - LAIN YANG DIBONGKAR1.0000ohPekerja50,000.0050,000.000.1000ohMandor95,000.009,500.00Total :59,500.0059,500.00

1510 M3 MENGUPAS PLESTERAN YANG LAMA0.5000ohPekerja50,000.0025,000.000.0250ohMandor95,000.002,375.00Total :27,375.0027,375.00

1610 M3 MENURUNKAN ATAP GENTENG ATAU SIRAP JIKA GENTENG ATAU SIRAP DIPAKAI LAGI0.2000ohPekerja50,000.0010,000.000.1000ohMandor95,000.009,500.00Total :19,500.0019,500.00IIPEKERJAAN TANAH (SNI 2835 : 2008)11 M3 GALIAN TANAH BIASA DALAM 1 METER0.7500ohPekerja50,000.0037,500.000.0250ohMandor95,000.002,375.00Total :39,875.0039,875.0021 M3 GALIAN TANAH BIASA DALAM 2 METER0.9000ohPekerja50,000.0045,000.000.0450ohMandor95,000.004,275.00Total :49,275.0049,275.00

31 M3 GALIAN TANAH BIASA DALAM 3 METER1.0500ohPekerja50,000.0052,500.000.0670ohMandor95,000.006,365.00Total :58,865.0058,865.0041 M3 GALIAN TANAH KERAS DALAM 1METER1.0000ohPekerja50,000.0050,000.000.0320ohMandor95,000.003,040.00Total :53,040.0053,040.00

51 M3 GALIAN TANAH CADAS DALAM 1 METER1.5000ohPekerja50,000.0075,000.000.0600ohMandor95,000.005,700.00Total :80,700.0080,700.0061 M3 GALIAN TANAH LUMPUR DALAM 1 METER1.2000ohPekerja50,000.0060,000.000.0450ohMandor95,000.004,275.00Total :64,275.0064,275.00

71 M2 PEKERJAAN STRIPPING SETINGGI 1 METER0.0500ohPekerja50,000.002,500.000.0050ohMandor95,000.00475.00Total :2,975.002,975.00

81 M3 PEMBUANGAN TANAH SEJAUH 15 METER0.3300ohPekerja50,000.0016,500.000.0100ohMandor95,000.00950.00Total :17,450.0017,450.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

1710 M3 MENURUNKAN ATAP SENG0.5000ohPekerja50,000.0025,000.000.1000ohMandor95,000.009,500.00Total :34,500.0034,500.00

1810 M3 MENURUNKAN RANGKA ATAP DARI KAYU JIKA KAYU BONGKARAN DIPAKAI0.2500ohTukang Kayu82,000.0020,500.000.0250ohKepala Tukang Kayu88,000.002,200.000.0500ohPekerja50,000.002,500.00Total :25,200.0025,200.00

1910 M3 MEMBONGKAR LANTAI 2 DARI KAYU, DINDING LUAR, LANTAI JEMBATAN (LAPISAN ATAU DARI BAWAH DIHITUNG TERPISAH)0.6000ohTukang Kayu82,000.0049,200.000.0600ohKepala Tukang Kayu88,000.005,280.002.0000ohPekerja50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :109,500.00109,500.00

2010 M3 MEMBONGKAR KAYU DARI BALOK LANTAI 2, KUDA - KUDA GELEGAR JEMBATAN DAN SEBAGAINYA (KAYU DIPAKAI LAGI)6.0000ohTukang Kayu82,000.00492,000.000.6000ohKepala Tukang Kayu88,000.0052,800.004.0000ohPekerja50,000.00200,000.000.2000ohMandor95,000.0019,000.00Total :219,000.00219,000.00

211 M2 PEKERJAAN MENANAM RUMPUT1.0000m2Tanaman Rumput19,800.0019,800.000.0500ohPekerja50,000.002,500.000.0050ohMandor95,000.00475.00Total :2,975.002,975.00

221 M3 PENGANGKUTAN BAHAN KE LOKASI SEJAUH RATA - RATA 200M'1.0000ohPekerja50,000.0050,000.00Total :50,000.0050,000.00

91 M3 URUGAN KEMBALI0.1920ohPekerja50,000.009,600.000.01900hMandor95,000.001,805.00Total :11,405.0011,405.00

101 M3 PEMADATAN TANAH ( Per 20 Cm )0.5000ohPekerja50,000.0025,000.000.0500ohMandor95,000.004,750.00Total :29,750.0029,750.00

111 M3 URUGAN PASIR 1.2000m3Pasir Urug135,000.00162,000.000.3000ohPekerja50,000.0015,000.000.0100ohMandor95,000.00950.00Total :15,950.00162,000.00177,950.00

121 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM6.0000m3Ijuk7,700.0046,200.000.1500ohPekerja50,000.007,500.000.0150ohMandor95,000.001,425.00Total :8,925.0046,200.0055,125.00

131 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan1.2000m3Sirtu100,800.00120,960.000.2500ohPekerja50,000.0012,500.000.0250ohMandor95,000.002,375.00Total :14,875.00120,960.00135,835.00

141 M3 URUGAN TANAH PILIHAN DIPADATKAN1.2000m3Tanah Urug115,500.00138,600.000.5000ohPekerja50,000.0025,000.000.0500ohMandor95,000.004,750.00Total :29,750.00138,600.00168,350.00151 M3 URUGAN LIMESTONE PADAT1.2000m3Limestone126,500.00151,800.000.2500ohPekerja50,000.0012,500.000.0250ohMandor95,000.002,375.00Total :14,875.00151,800.00166,675.00

IIIPEKERJAAN PONDASI (SNI 2836 : 2008)11 M3 BATU BELAH CAMP. 1 PC : 3 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.00202.0000kgSemen Portland1,375.00277,750.000.4850m3Pasir Pasang152,000.0073,720.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00569,270.00714,995.0021 M3 BATU BELAH CAMP. 1 PC : 4 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.00163.0000kgSemen Portland1,375.00224,125.000.5200m3Pasir Pasang152,000.0079,040.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00520,965.00666,690.00

21 M3 BATU BELAH CAMP. 1 PC : 5 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.00136.0000kgSemen Portland1,375.00187,000.000.5440m3Pasir Pasang152,000.0082,688.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00487,488.00633,213.0031 M3 BATU BELAH CAMP. 1 PC : 6 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.00117.0000kgSemen Portland1,375.00160,875.000.5610m3Pasir Pasang152,000.0085,272.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00463,947.00609,672.0041 M3 BATU BELAH CAMP. 1 PC : 8 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.0091.0000kgSemen Portland1,375.00125,125.000.5840m3Pasir Pasang152,000.0088,768.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00431,693.00577,418.0051 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI0.4800m3Batu Belah 15 cm / 20 cm181,500.0087,120.00194.0000kgSemen Portland1,375.00266,750.000.3120m3Pasir Beton131,000.0040,872.000.4680m3Koral Beton152,000.0071,136.00126.0000kgBesi Beton10,000.001,260,000.001.8000kgKawat Beton13,750.0024,750.003.4000ohPekerja50,000.00170,000.000.8500ohTukang Batu 76,000.0064,600.000.0850ohKepala Tukang88,000.007,480.000.1700ohMandor95,000.0016,150.00258,230.001,750,628.002,008,858.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

61 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M0.4500m3Batu Belah 15 cm / 20 cm181,500.0081,675.00194.0000kgSemen Portland1,375.00266,750.000.3120m3Pasir Beton131,000.0040,872.000.4680m3Koral Beton152,000.0071,136.002.4000ohPekerja50,000.00120,000.000.8000ohTukang Batu 76,000.0060,800.000.0800ohKepala Tukang88,000.007,040.000.1190ohMandor95,000.0011,305.00Total :199,145.00460,433.00659,578.00

71 M3 PASANGAN BATU KOSONG1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.000.4320m3Pasir Urug135,000.0058,320.000.7800ohPekerja50,000.0039,000.000.3900ohTukang Batu 76,000.0029,640.000.0390ohKepala Tukang88,000.003,432.000.0390ohMandor95,000.003,705.00Total :75,777.00276,120.00351,897.00

SNI 03-3436-2002

81 M' PONDASI BORED PILE DIAMETER 30 CMA.Pengeboran O 13/m' Bored pile0.1550JamCrawler CraneERROR:#REF!ERROR:#REF!0.1550JamMesin Bor80,000.0012,400.000.1800ohTukang Gali76,000.0013,680.000.0090ohMandor 95,000.00855.001.0000LsOli + Solar46,750.0046,750.000.2200Alat Bantu40,000.008,800.00Total A :61,285.0021,200.0082,485.00B.Beton K-300, Bored Pile0.0707m3Beton K-300865,678.1861,203.450.4250ohTukang batu76,000.0032,300.000.0210ohMandor 181,500.003,811.501.0000LsPipa Tremi dan Casing pelindung100,000.00100,000.00Total B :36,111.50161,203.45197,314.95

C.Pembesian 6 O 13 Beugel O 8 Spiral7.2936KgBesi O 1310,000.0072,936.00141.5600KgBeugel Besi O810,000.0015,600.000.2827433388Total C :0.088,536.0088,536.000.3945840373Total A + B + C :97,396.50270,939.45368,335.951.5619241141IVPEKERJAAN DINDING (SNI 6897 : 2008)7.2936393143

11 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0043.5000kgSemen Portland1,375.0059,812.500.0800m3Pasir Pasang152,000.0012,160.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00533,972.50583,782.50

21 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0032.9500kgSemen Portland1,375.0045,306.250.0910m3Pasir Pasang152,000.0013,832.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00521,138.25570,948.25

11 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.0018.9500kgSemen Portland1,375.0026,056.250.0380m3Pasir Pasang152,000.005,776.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.0024,905.00185,832.25210,737.2521 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.0014.3700kgSemen Portland1,375.0019,758.750.0400m3Pasir Pasang152,000.006,080.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00179,838.75204,743.7581 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.0011.5000kgSemen Portland1,375.0015,812.500.0430m3Pasir Pasang152,000.006,536.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00176,348.50201,253.5031 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.009.6800kgSemen Portland1,375.0013,310.000.0450m3Pasir Pasang152,000.006,840.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00174,150.00199,055.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

31 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0026.5500kgSemen Portland1,375.0036,506.250.0930m3Pasir Pasang152,000.0014,136.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00512,642.25562,452.2541 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0022.2000kgSemen Portland1,375.0030,525.000.1020m3Pasir Pasang152,000.0015,504.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00508,029.00557,839.0051 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0018.5000kgSemen Portland1,375.0025,437.500.1220m3Pasir Pasang152,000.0018,544.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00505,981.50555,791.50

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

111 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.006.5000kgSemen Portland1,375.008,937.500.0500m3Pasir Pasang152,000.007,600.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00170,537.50195,442.50151 M2 PASANGAN DINDING BEDEG, RANGKA KAYU1.5000m2Bedeg/Bilik Bambu Kelas I385,000.00577,500.000.0140m3Kayu kamper usuk/reng6,600,000.0092,400.000.0120kgPaku Biasa15,400.00184.800.0030m3List Kayu 2/46,600,000.0019,800.000.1000ohPekerja50,000.005,000.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang88,000.00440.000.0020ohMandor95,000.00190.00Total :9,730.00689,884.80699,614.80

SNI 03-2836-2002161 M2 PASANGAN BATA GOSOK60.0000bhBata Gosok5,500.00330,000.0012.4400kgSemen Portland1,375.0017,105.002.0000ohTukang Paras Bali82,000.00164,000.000.4000ohKepala Tukang Paras Bali88,000.0035,200.002.0000ohPekerja / Pekerja Tak Terlatih50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :144,700.00347,105.00491,805.00171 M2 PASANGAN PARAS SILAKARANG22.0000bhBata Paras Silakarang22,000.00484,000.0011.7500kgSemen Portland1,375.0016,156.252.0000ohTukang Paras Bali82,000.00164,000.000.4000ohKepala Tukang Paras Bali88,000.0035,200.002.0000ohPekerja / Pekerja Tak Terlatih50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :308,700.00500,156.25808,856.25181 M2 PASANGAN PARAS KEROBOKAN22.0000bhBata Paras Kerobokan13,750.00302,500.0011.7500kgSemen Portland1,375.0016,156.252.0000ohTukang Paras Bali82,000.00164,000.000.4000ohKepala Tukang Paras Bali88,000.0035,200.002.0000ohPekerja / Pekerja Tak Terlatih50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :308,700.00318,656.25627,356.25

41 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.008.3200kgSemen Portland1,375.0011,440.000.0490m3Pasir Pasang152,000.007,448.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00172,888.00197,793.0051 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 pc : 3 ps12.5000bhBatako Lubang2,750.0034,375.0015.1600kgSemen Portland1,375.0020,845.000.3640m3Pasir Pasang152,000.0055,328.000.2800kgBesi Beton 8 mm10,000.002,800.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00113,348.00138,253.00131 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10), campuran spesi 1 pc : 4 ps12.5000bhBatako2,750.0034,375.0012.1300kgSemen Portland1,375.0016,678.750.3880m3Pasir Pasang152,000.0058,976.000.2800kgBesi Beton 8 mm10,000.002,800.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00112,829.75137,734.7561 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 3 Ps30.0000bhRoster Keramik38,500.001,155,000.0014.0000kgSemen Portland1,375.0019,250.000.0320m3Pasir Pasang152,000.004,864.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.001,179,114.001,204,019.00VPEKERJAAN PLESTERAN (SNI 2837 : 2008)

11 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM15.5040kgSemen Portland1,375.0021,318.000.0160m3Pasir Pasang152,000.002,432.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0023,750.0052,895.0021 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM10.2240kgSemen Portland1,375.0014,058.000.0200m3Pasir Pasang152,000.003,040.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0017,098.0046,243.0031 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM7.7760kgSemen Portland1,375.0010,692.000.0230m3Pasir Pasang152,000.003,496.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0014,188.0043,333.0041 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM6.2400kgSemen Portland1,375.008,580.000.0240m3Pasir Pasang152,000.003,648.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0012,228.0041,373.0041 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM5.1840kgSemen Portland1,375.007,128.000.0260m3Pasir Pasang152,000.003,952.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0011,080.0040,225.0051 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM4.4160kgSemen Portland1,375.006,072.000.0270m3Pasir Pasang152,000.004,104.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0010,176.0039,321.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

61 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM3.4560kgSemen Portland1,375.004,752.000.0290m3Pasir Pasang152,000.004,408.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.009,160.0038,305.0071 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM13.6320kgSemen Portland1,375.0018,744.000.0270m3Pasir Pasang152,000.004,104.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0220ohMandor95,000.002,090.00Total :39,050.0022,848.0061,898.0081 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM10.3680kgSemen Portland1,375.0014,256.000.0310m3Pasir Pasang152,000.004,712.000.2600ohPekerja50,000.0013,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0130ohMandor95,000.001,235.00Total :31,195.0018,968.0050,163.00101 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM8.3200kgSemen Portland1,375.0011,440.000.0320m3Pasir Pasang152,000.004,864.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0220ohMandor95,000.002,090.00Total :39,050.0016,304.0055,354.0091 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM6.9120kgSemen Portland1,375.009,504.000.0350m3Pasir Pasang152,000.005,320.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0220ohMandor95,000.002,090.00Total :39,050.0014,824.0053,874.00101 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM5.8880kgSemen Portland1,375.008,096.000.0360m3Pasir Pasang152,000.005,472.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0220ohMandor95,000.002,090.00Total :39,050.0013,568.0052,618.00111 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM 0.5000kgSemen Portland1,375.00687.500.0130m3Pasir Pasang152,000.001,976.000.0800ohPekerja50,000.004,000.000.4000ohTukang Batu76,000.0030,400.000.0400ohKepala Tukang88,000.003,520.000.0040ohMandor95,000.00380.00Total :38,300.002,663.5040,963.50121 M2 PLESTERAN CIPRAT 1 PC : 2 PS4.3200kgSemen Portland1,375.005,940.000.0060m3Pasir Pasang152,000.00912.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.006,852.0031,757.00151 M2 PLESTERAN GRANIT 1 PC : 2 GRANIT, TEBAL 10 MM10.0000kgSemen Portland1,375.0013,750.0015.0000m3Batu Granit0.00.00.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.0013,750.0038,655.00161 M2 PLESTERAN TERASO 1 PC : 2 BATU TERASO, TEBAL 10 MM10.0000kgSemen Portland1,375.0013,750.0015.0000m3Batu Teraso0.00.00.4500ohPekerja50,000.0022,500.000.2250ohTukang Batu76,000.0017,100.000.0230ohKepala Tukang88,000.002,024.000.0230ohMandor95,000.002,185.00Total :43,809.0013,750.0057,559.00131 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M') 3.1080kgSemen Portland1,375.004,273.500.1500ohPekerja50,000.007,500.000.0750ohTukang Batu76,000.005,700.000.0080ohKepala Tukang88,000.00704.000.0080ohMandor95,000.00760.00Total :14,664.004,273.5018,937.50141 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') 1.6000kgSemen Portland1,375.002,200.000.0700ohPekerja50,000.003,500.000.0350ohTukang Batu76,000.002,660.000.0040ohKepala Tukang88,000.00352.000.0040ohMandor95,000.00380.00Total :6,892.002,200.009,092.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

151 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS 6.3400kgSemen Portland1,375.008,717.500.0120m3Pasir Pasang152,000.001,824.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0010,541.5039,686.50161 M2 PEKERJAAN ACIAN3.2500zakSemen Portland 50 Kg1,375.004,468.750.2000ohPekerja50,000.0010,000.000.1000ohTukang Labur/Cat76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0100ohMandor95,000.00950.00Total :9,430.004,468.7513,898.75

VIPEKERJAAN KAYU (SNI 3434 : 2008)1MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I1.1000m3Balok Kayu Kamper8,030,000.008,833,000.001.2500KgPaku 10 Cm27,500.0034,375.001.0000KgLem Kayu16,500.0016,500.007.0000ohPekerja50,000.00350,000.0021.0000ohTukang Kayu82,000.001,722,000.002.1000ohKepala Tukang88,000.00184,800.000.3500ohMandor95,000.0033,250.00Total :2,290,050.008,883,875.0011,173,925.002MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III1.2000m3Balok Kayu kruing5,280,000.006,336,000.001.2500KgPaku 10 Cm27,500.0034,375.001.0000KgLem Kayu16,500.0016,500.006.0000ohPekerja50,000.00300,000.0018.0000ohTukang Kayu82,000.001,476,000.001.8000ohKepala Tukang88,000.00158,400.000.3000ohMandor95,000.0028,500.00Total :1,962,900.006,386,875.008,349,775.003MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II0.0400m3Papan Kayu Kamper8,800,000.00352,000.000.0500KgPaku 5-7 Cm27,500.001,375.000.3500ohPekerja50,000.0017,500.001.0500ohTukang Kayu82,000.0086,100.000.1050ohKepala Tukang88,000.009,240.000.0180ohMandor95,000.001,710.00Total :114,550.00353,375.00467,925.004MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III0.0400m3Papan Kayu Kruing5,830,000.00233,200.000.0500KgPaku 5-7 Cm27,500.001,375.000.3500ohPekerja50,000.0017,500.001.0500ohTukang Kayu82,000.0086,100.000.1050ohKepala Tukang88,000.009,240.000.0180ohMandor95,000.001,710.00Total :114,550.00234,575.00349,125.00

5MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II0.0400m3Papan Kayu Kamper8,800,000.00352,000.000.5000KgLem Kayu16,500.008,250.001.0000ohPekerja50,000.0050,000.003.0000ohTukang Kayu82,000.00246,000.000.3000ohKepala Tukang88,000.0026,400.000.0500ohMandor95,000.004,750.00Total :327,150.00360,250.00687,400.006MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II0.0240m3Papan Kayu Kamper8,800,000.00211,200.000.3000KgLem Kayu16,500.004,950.000.8000ohPekerja50,000.0040,000.002.4000ohTukang Kayu82,000.00196,800.000.2400ohKepala Tukang88,000.0021,120.000.0400ohMandor95,000.003,800.00Total :261,720.00216,150.00477,870.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

7MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II0.0640m3Papan Kayu Kamper8,800,000.00563,200.000.5000KgLem Kayu16,500.008,250.001.0000ohPekerja50,000.0050,000.003.0000ohTukang Kayu82,000.00246,000.000.3000ohKepala Tukang88,000.0026,400.000.0500ohMandor95,000.004,750.00Total :327,150.00571,450.00898,600.008MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)0.0250m3Papan Kayu Kamper8,800,000.00220,000.000.0300KgPaku 1-2,5 Cm27,500.00825.000.5000KgLem Kayu16,500.008,250.001.0000LbrPlywood 4 mm 71,500.0071,500.000.7000ohPekerja50,000.0035,000.002.1000ohTukang Kayu82,000.00172,200.000.2100ohKepala Tukang88,000.0018,480.000.0350ohMandor95,000.003,325.00Total :229,005.00300,575.00529,580.009MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II 0.0256m3Papan Kayu Kamper8,800,000.00225,280.000.0300KgPaku 1-2,5 Cm27,500.00825.000.5000KgLem Kayu16,500.008,250.001.0000LbrPlywood 4 mm71,500.0071,500.000.8000ohPekerja50,000.0040,000.002.4000ohTukang Kayu82,000.00196,800.000.2400ohKepala Tukang88,000.0021,120.000.0400ohMandor95,000.003,800.00Total :261,720.00305,855.00567,575.00

10MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II 0.0600m3Papan Kayu Kamper8,800,000.00528,000.000.1500KgPaku 1-2,5 Cm27,500.004,125.000.6700ohPekerja50,000.0033,500.002.0000ohTukang Kayu82,000.00164,000.000.2000ohKepala Tukang88,000.0017,600.000.3350ohMandor95,000.0031,825.00Total :246,925.00532,125.00779,050.0011MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I0.0256m3Papan Kayu Kamper8,800,000.00225,280.000.0300KgPaku 1-2,5 Cm27,500.00825.000.3000KgLem Kayu16,500.004,950.001.0000LbrTeakwood 4 mm uk 90x220 cm77,000.0077,000.000.8000ohPekerja50,000.0040,000.002.4000ohTukang Kayu82,000.00196,800.000.2400ohKepala Tukang88,000.0021,120.000.0400ohMandor95,000.003,800.00Total :261,720.00308,055.00569,775.0012MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II0.0250m3Papan Kayu Kamper8,800,000.00220,000.000.0300KgPaku 1-2,5 Cm27,500.00825.000.8000KgLem Kayu16,500.0013,200.001.0000LbrTeakwood 4 mm uk 90x220 cm77,000.0077,000.000.5000LbrFormika77,000.0038,500.000.8500ohPekerja50,000.0042,500.002.5500ohTukang Kayu82,000.00209,100.000.2550ohKepala Tukang88,000.0022,440.000.0430ohMandor95,000.004,085.00Total :278,125.00349,525.00627,650.0013MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M' 1.1000m3Balok Kayu Kamper8,030,000.008,833,000.0015.0000KgBesi Strip Tebal 5 cm8,800.00132,000.005.6000KgPaku 12 Cm27,500.00154,000.004.0000ohPekerja50,000.00200,000.0012.0000ohTukang Kayu82,000.00984,000.001.2000ohKepala Tukang88,000.00105,600.000.2000ohMandor95,000.0019,000.00Total :1,308,600.009,119,000.0010,427,600.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

14MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I1.2000m3Balok Kayu Kamper8,030,000.009,636,000.0015.0000KgBesi Strip Tebal 5 cm8,800.00132,000.005.6000KgPaku 12 Cm27,500.00154,000.006.7000ohPekerja50,000.00335,000.0020.1000ohTukang Kayu82,000.001,648,200.002.0100ohKepala Tukang88,000.00176,880.000.3350ohMandor95,000.0031,825.00Total :2,191,905.009,922,000.0012,113,905.0015MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II1.1000m3Balok Kayu Kamper8,030,000.008,833,000.0015.0000KgBesi Strip Tebal 5 cm8,800.00132,000.003.0000KgPaku 12 Cm27,500.0082,500.002.4000ohPekerja50,000.00120,000.007.2000ohTukang Kayu82,000.00590,400.000.7200ohKepala Tukang88,000.0063,360.000.1200ohMandor95,000.0011,400.00Total :785,160.009,047,500.009,832,660.0016MEMASANG 1 M2 RANGKA ATAP / USUK RENG GENTENG KERAMIK, KAYU KELAS II0.0140m3Kaso-Kaso ( 5 x 7 ) Cm5,500,000.0077,000.000.0036m3Reng ( 2 x 3 ) Cm6,600,000.0023,760.000.2500KgPaku 5 Cm dan 10 Cm27,500.006,875.000.1000ohPekerja50,000.005,000.000.1000ohTukang Kayu82,000.008,200.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :14,555.00107,635.00122,190.0017MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II0.0140m3Kaso-Kaso ( 5 x 7 ) Cm5,500,000.0077,000.000.0072m3Reng ( 2 x 3 ) Cm6,600,000.0047,520.000.2500KgPaku 5 Cm dan 10 Cm27,500.006,875.000.1000ohPekerja50,000.005,000.000.1000ohTukang Kayu82,000.008,200.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :14,555.00131,395.00145,950.0018MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II0.1650m3Balok Kayu Kamper8,030,000.001,324,950.000.2000KgPaku 5 Cm dan 10 Cm27,500.005,500.000.1200ohPekerja50,000.006,000.000.1200ohTukang Kayu82,000.009,840.000.0120ohKepala Tukang88,000.001,056.000.0060ohMandor95,000.00570.00Total :17,466.001,330,450.001,347,916.0019MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III0.0154m3Kaso-Kaso ( 5 x 7 ) Cm5,500,000.0084,700.000.2000KgPaku 7 Cm dan 10 Cm27,500.005,500.000.1500ohPekerja50,000.007,500.000.3000ohTukang Kayu82,000.0024,600.000.0300ohKepala Tukang88,000.002,640.000.0750ohMandor95,000.007,125.00Total :41,865.0090,200.00132,065.0020MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III0.0163m3Kaso-Kaso ( 5 x 7 ) Cm5,500,000.0089,650.000.2500KgPaku 7 Cm dan 10 Cm27,500.006,875.000.2000ohPekerja50,000.0010,000.000.3000ohTukang Kayu82,000.0024,600.000.0300ohKepala Tukang88,000.002,640.000.0100ohMandor95,000.00950.00Total :38,190.0096,525.00134,715.0021MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II0.0108m3Papan Kayu Kamper8,800,000.0095,040.000.1000KgPaku 5 Cm dan 7 Cm27,500.002,750.000.1000ohPekerja50,000.005,000.000.2000ohTukang Kayu82,000.0016,400.000.0200ohKepala Tukang88,000.001,760.000.0050ohMandor95,000.00475.00Total :23,635.0097,790.00121,425.00

22MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II0.0110m3Papan Kayu Kamper8,800,000.0096,800.000.0500KgPaku 5 Cm dan 7 Cm27,500.001,375.000.1000ohPekerja50,000.005,000.000.2000ohTukang Kayu82,000.0016,400.000.0200ohKepala Tukang88,000.001,760.000.0050ohMandor95,000.00475.00Total :23,635.0098,175.00121,810.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

23MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III0.0280m3Balok Kayu Kamper8,030,000.00224,840.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.1500ohPekerja50,000.007,500.000.4500ohTukang Kayu82,000.0036,900.000.0450ohKepala Tukang88,000.003,960.000.0080ohMandor95,000.00760.00Total :49,120.00228,965.00278,085.0024MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II0.0280m3Balok Kayu Kamper8,030,000.00224,840.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.8600LbrTeakwood 4 mm uk 90x220 cm77,000.0066,220.000.5600KgLem Kayu16,500.009,240.000.1500ohPekerja50,000.007,500.000.4500ohTukang Kayu82,000.0036,900.000.0450ohKepala Tukang88,000.003,960.000.0080ohMandor95,000.00760.00Total :49,120.00304,425.00353,545.0025MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II0.0280m3Balok Kayu Kamper8,030,000.00224,840.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.8600LbrPlywood tebal 4 mm uk 120 x 240 cm71,500.0061,490.000.5600KgLem Kayu16,500.009,240.000.2000ohPekerja50,000.0010,000.000.6000ohTukang Kayu82,000.0049,200.000.0600ohKepala Tukang88,000.005,280.000.0100ohMandor95,000.00950.00Total :65,430.00299,695.00365,125.0026MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA HOLO1.5000BtgRangka Holo25,300.0037,950.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.8600LbrTeakwood 4 mm uk 90x220 cm77,000.0066,220.000.5600KgLem Kayu16,500.009,240.000.1500ohPekerja50,000.007,500.000.4500ohTukang Kayu82,000.0036,900.000.0450ohKepala Tukang88,000.003,960.000.0080ohMandor95,000.00760.00Total :49,120.00117,535.00166,655.0027MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA HOLO1.5000BtgRangka Holo25,300.0037,950.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.8600LbrPlywood tebal 4 mm uk 120 x 240 cm71,500.0061,490.000.5600KgLem Kayu16,500.009,240.000.2000ohPekerja50,000.0010,000.000.6000ohTukang Kayu82,000.0049,200.000.0600ohKepala Tukang88,000.005,280.000.0100ohMandor95,000.00950.00Total :65,430.00112,805.00178,235.0028MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I0.0070m3Papan Kayu Kamper8,800,000.0061,600.000.1000KgPaku 5 Cm dan 10 Cm27,500.002,750.000.1500KgPaku Skrup 10 cm27,500.004,125.000.6000ohPekerja50,000.0030,000.001.8000ohTukang Kayu82,000.00147,600.000.1800ohKepala Tukang88,000.0015,840.000.0300ohMandor95,000.002,850.00Total :196,290.0068,475.00264,765.0029MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM0.4000LbrPlywood tebal 4 mm uk 120 x 240 cm71,500.0028,600.000.0500KgPaku 1 Cm dan 2.5 Cm27,500.001,375.000.0250ohPekerja50,000.001,250.000.0750ohTukang Kayu82,000.006,150.000.0080ohKepala Tukang88,000.00704.000.0010ohMandor95,000.0095.00Total :8,199.0029,975.0038,174.00

SNI 03-2836-2002281 M2 PASANGAN USUK GENTENG KAYU KAMPER0.0140M3Kayu Kamper6,600,000.0092,400.000.1500kgPaku27,500.004,125.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang Kayu88,000.00440.000.0500ohPekerja / Pekerja Tak Terlatih50,000.002,500.000.0250ohMandor95,000.002,375.00Total :5,315.0096,525.00101,840.00291 M2 PASANGAN RENG GENTENG KAYU KAMPER0.0040M3Kayu Kamper6,600,000.0026,400.000.1000kgPaku27,500.002,750.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang Kayu88,000.00440.000.0500ohPekerja / Pekerja Tak Terlatih50,000.002,500.000.0250ohMandor95,000.002,375.00Total :9,415.0029,150.0038,565.00301 M2 PASANGAN USUK EKSPOSE DENGAN PLAFOND PLAYWOOD0.0140M3Kayu Kamper6,600,000.0092,400.000.1500kgPaku27,500.004,125.000.3900LbrPlaywood115,500.0045,045.000.4000ohTukang Kayu82,000.0032,800.000.0400ohKepala Tukang Kayu88,000.003,520.000.2700ohPekerja / Pekerja Tak Terlatih50,000.0013,500.000.0135ohMandor95,000.001,282.50Total :51,102.50141,570.00192,672.50

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

VIIPEKERJAAN BETON ( SNI 7394:2008)1MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87247.0000kgSemen Portland1,375.00339,625.008690.62071428570.6207m3Pasir Beton131,000.0081,313.579990.740.7400m3Koral Beton152,000.00112,480.00215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00113,749.00538,793.57652,542.572MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78276.0000kgSemen Portland1,375.00379,500.000.5914m3Pasir Beton131,000.0077,477.140.7496m3Koral Beton152,000.00113,943.70215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00576,295.85690,044.853MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72299.0000kgSemen Portland1,375.00411,125.000.5707m3Pasir Beton131,000.0074,763.570.7533m3Koral Beton152,000.00114,506.67215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00605,770.24719,519.244MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66326.0000kgSemen Portland1,375.00448,250.000.5429m3Pasir Beton131,000.0071,114.290.7622m3Koral Beton152,000.00115,857.78215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00640,597.06754,346.065MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61352.0000kgSemen Portland1,375.00484,000.000.5221m3Pasir Beton131,000.0068,400.710.7637m3Koral Beton152,000.00116,082.96215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00673,858.68787,607.686MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58371.0000kgSemen Portland1,375.00510,125.000.4986m3Pasir Beton131,000.0065,312.860.7756m3Koral Beton152,000.00117,884.44215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00698,697.30812,446.307MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56384.0000kgSemen Portland1,375.00528,000.000.4943m3Pasir Beton131,000.0064,751.430.7696m3Koral Beton152,000.00116,983.70215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00715,110.13828,859.13

8MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53406.0000kgSemen Portland1,375.00558,250.000.4886m3Pasir Beton131,000.0064,002.860.7600m3Koral Beton152,000.00115,520.00215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00743,147.86856,896.86

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

9MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52413.0000kgSemen Portland1,375.00567,875.000.4864m3Pasir Beton131,000.0063,722.140.7563m3Koral Beton152,000.00114,957.04215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00751,929.18865,678.1810MEMBUAT 1 M BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49439.0000kgSemen Portland1,375.00603,625.000.4786m3Pasir Beton131,000.0062,692.860.7452m3Koral Beton152,000.00113,268.15215.0000ltAir25.005,375.002.1000ohPekerja50,000.00105,000.000.3500ohTukang Batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.1050ohMandor95,000.009,975.00Total :144,655.00784,961.01929,616.0111MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48448.0000kgSemen Portland1,375.00616,000.000.4764m3Pasir Beton131,000.0062,412.140.7407m3Koral Beton152,000.00112,592.59215.0000ltAir25.005,375.002.1000ohPekerja50,000.00105,000.000.3500ohTukang Batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.1050ohMandor95,000.009,975.00Total :144,655.00796,379.74941,034.74

12PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR10.5000kgBesi Beton (Polos/ Ulir)10,000.00105,000.000.1500kgKawat Beton13,750.002,062.500.0700ohPekerja50,000.003,500.000.0700ohTukang Besi79,000.005,530.000.0070ohKepala Tukang88,000.00616.000.0040ohMandor95,000.00380.00Total :10,026.00107,062.50117,088.50Total Untuk 1 Kg :11,708.85131 M2 PASANG BEKISTING UNTUK PONDASI0.0400m3Kayu Kelas III2,585,000.00103,400.000.3000kgPaku Biasa 5' - 10'15,400.004,620.000.1000ltrMinyak Bekisting33,550.003,355.000.5200ohPekerja50,000.0026,000.000.2600ohTukang Kayu82,000.0021,320.000.0260ohKepala Tukang88,000.002,288.000.0260ohMandor95,000.002,470.00Total :52,078.00111,375.00163,453.00

141 M2 PASANG BEKISTING UNTUK SLOOF0.0450m3Kayu Kelas III2,585,000.00116,325.000.3000kgPaku Biasa 5' - 10'15,400.004,620.000.1000ltrMinyak Bekisting33,550.003,355.000.5200ohPekerja50,000.0026,000.000.2600ohTukang Kayu82,000.0021,320.000.0260ohKepala Tukang 88,000.002,288.000.0260ohMandor95,000.002,470.00Total :52,078.00124,300.00176,378.00151 M2 PASANG BEKISTING UNTUK KOLOM0.0400m3Kayu Kelas III2,585,000.00103,400.000.4000kgPaku Biasa 5' - 12'15,400.006,160.000.2000ltrMinyak Bekisting33,550.006,710.000.0150m3Kayu Usuk 4/62,585,000.0038,775.000.3500lbrPlywood 9 mm115,500.0040,425.002.0000btgDolken Kayu 8" - 10"/4 m99,000.00198,000.000.6600ohPekerja50,000.0033,000.000.3300ohTukang Kayu82,000.0027,060.000.0330ohKepala Tukang88,000.002,904.000.0330ohMandor95,000.003,135.00Total :66,099.00393,470.00459,569.00211 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)0.2000m3Kayu Kelas III2,585,000.00517,000.001.5000kgPaku Biasa 5' - 12'15,400.0023,100.000.4000ltrMinyak Bekisting33,550.0013,420.00157.5000kgBesi Beton10,000.001,575,000.002.2500kgKawat Beton13,750.0030,937.50336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.005.3000ohPekerja50,000.00265,000.000.2750ohTukang Batu76,000.0020,900.001.3000ohTukang Kayu82,000.00106,600.001.0500ohTukang Besi79,000.0082,950.000.2620ohKepala Tukang88,000.0023,056.000.2650ohMandor95,000.0025,175.00Total :523,681.002,803,557.503,327,238.50

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

221 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)0.2700m3Kayu Kelas III2,585,000.00697,950.002.0000kgPaku Biasa 5' - 12'15,400.0030,800.000.6000ltrMinyak Bekisting33,550.0020,130.00210.0000kgBesi Beton10,000.002,100,000.003.0000kgKawat Beton13,750.0041,250.00336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.005.6500ohPekerja50,000.00282,500.000.2750ohTukang Batu76,000.0020,900.001.5600ohTukang Kayu82,000.00127,920.001.4000ohTukang Besi79,000.00110,600.000.3230ohKepala Tukang88,000.0028,424.000.2830ohMandor95,000.0026,885.00Total :597,229.003,534,230.004,131,459.00231 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)0.4000m3Kayu Kelas III2,585,000.001,034,000.004.0000kgPaku Biasa 5' - 12'15,400.0061,600.002.0000ltrMinyak Bekisting33,550.0067,100.00315.0000kgBesi Beton10,000.003,150,000.004.5000kgKawat Beton13,750.0061,875.00336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1500m3Kayu Kelas II balok5,280,000.00792,000.003.5000lbrPlywood 9 mm115,500.00404,250.0020.0000btgDolken Kayu 8" /4 m99,000.001,980,000.007.0500ohPekerja50,000.00352,500.000.2750ohTukang Batu76,000.0020,900.001.6500ohTukang Kayu82,000.00135,300.002.1000ohTukang Besi79,000.00165,900.000.4030ohKepala Tukang88,000.0035,464.000.3530ohMandor95,000.0033,535.00Total :743,599.008,194,925.008,938,524.00241 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)0.3200m3Kayu Kelas III2,585,000.00827,200.003.2000kgPaku Biasa 5' - 12'15,400.0049,280.001.6000ltrMinyak Bekisting33,550.0053,680.00210.0000kgBesi Beton10,000.002,100,000.003.0000kgKawat Beton13,750.0041,250.00336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1400m3Kayu Kelas II balok5,280,000.00739,200.002.8000lbrPlywood 9 mm115,500.00323,400.0016.0000btgDolken Kayu 8" /4 m99,000.001,584,000.006.3500ohPekerja50,000.00317,500.000.2750ohTukang Batu76,000.0020,900.001.6500ohTukang Kayu82,000.00135,300.001.4000ohTukang Besi79,000.00110,600.000.3330ohKepala Tukang88,000.0029,304.000.3180ohMandor95,000.0030,210.00Total :643,814.006,362,110.007,005,924.00251 M3 MEMBUAT PLAT LANTAI BETON BERTULANG (150 KG BESI + BEKISTING0.3200m3Kayu Kelas III2,585,000.00827,200.003.2000kgPaku Biasa 5' - 12'15,400.0049,280.001.6000ltrMinyak Bekisting33,550.0053,680.00157.5000kgBesi Beton10,000.001,575,000.002.2500kgKawat Beton13,750.0030,937.50336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1200m3Kayu Kelas II balok5,280,000.00633,600.002.8000lbrPlywood 9 mm115,500.00323,400.0032.0000btgDolken Kayu 8" /4 m99,000.003,168,000.005.3000ohPekerja50,000.00265,000.000.2750ohTukang Batu76,000.0020,900.001.3000ohTukang Kayu82,000.00106,600.001.0500ohTukang Besi79,000.0082,950.000.2650ohKepala Tukang88,000.0023,320.000.2650ohMandor95,000.0025,175.00523,945.007,305,197.507,829,142.50

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

261 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)0.2400m3Kayu Kelas III2,585,000.00620,400.003.2000kgPaku Biasa 5' - 12'15,400.0049,280.001.6000ltrMinyak Bekisting33,550.0053,680.00157.5000kgBesi Beton10,000.001,575,000.002.2500kgKawat Beton13,750.0030,937.50336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1600m3Kayu Kelas II balok5,280,000.00844,800.002.8000lbrPlywood 9 mm115,500.00323,400.0024.0000btgDolken Kayu 8" /4 m99,000.002,376,000.005.3000ohPekerja50,000.00265,000.000.2750ohTukang Batu76,000.0020,900.001.3000ohTukang Kayu82,000.00106,600.001.0500ohTukang Besi79,000.0082,950.000.2620ohKepala Tukang88,000.0023,056.000.2650ohMandor95,000.0025,175.00523,681.006,517,597.507,041,278.50271 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)0.2500m3Kayu Kelas III2,585,000.00646,250.003.0000kgPaku Biasa 5' - 12'15,400.0046,200.001.2000ltrMinyak Bekisting33,550.0040,260.00210.0000kgBesi Beton10,000.002,100,000.003.0000kgKawat Beton13,750.0041,250.00336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1050m3Kayu Kelas II balok5,280,000.00554,400.002.5000lbrPlywood 9 mm115,500.00288,750.0014.0000btgDolken Kayu 8" /4 m99,000.001,386,000.005.6500ohPekerja50,000.00282,500.000.2750ohTukang Batu76,000.0020,900.001.5600ohTukang Kayu82,000.00127,920.001.4000ohTukang Besi79,000.00110,600.000.3230ohKepala Tukang88,000.0028,424.000.2830ohMandor95,000.0026,885.00597,229.005,747,210.006,344,439.00161 M2 PASANG BEKISTING UNTUK BALOK0.0400m3Kayu Kelas III2,585,000.00103,400.000.4000kgPaku Biasa 5' - 12'15,400.006,160.000.2000ltrMinyak Bekisting33,550.006,710.000.0180m3Kayu Usuk 4/62,585,000.0046,530.000.3500lbrPlywood 9 mm115,500.0040,425.002.0000btgDolken Kayu 8" - 10"/4m99,000.00198,000.000.6600ohPekerja50,000.0033,000.000.3300ohTukang Kayu82,000.0027,060.000.0330ohKepala Tukang88,000.002,904.000.0330ohMandor95,000.003,135.00Total :66,099.00401,225.00467,324.00

171 M2 PASANG BEKISTING UNTUK LANTAI0.0400m3Kayu Kelas III2,585,000.00103,400.000.4000kgPaku Biasa 5' - 12'15,400.006,160.000.2000ltrMinyak Bekisting33,550.006,710.000.0150m3Kayu Usuk 4/62,585,000.0038,775.000.3500lbrPlywood 9 mm115,500.0040,425.006.0000btgDolken Kayu 8" - 10"/4m99,000.00594,000.00 0.6600ohPekerja50,000.0033,000.000.3300ohTukang Kayu82,000.0027,060.000.0330ohKepala Tukang88,000.002,904.000.0330ohMandor95,000.003,135.00Total :66,099.00789,470.00855,569.00181 M2 PASANG BEKISTING UNTUK DINDING0.0300M3Kayu Kelas III2,585,000.0077,550.000.4000KgPaku Biasa 5' - 12'15,400.006,160.000.2000LtrMinyak Bekisting33,550.006,710.000.0200M3Kayu Usuk 4/62,585,000.0051,700.000.3500LbrPlywood 9 mm115,500.0040,425.003.0000BtngDolken Kayu 8" - 10"/4m99,000.00297,000.004.0000BhFormite/penjaga jarak bekisting/spacer2,000.008,000.000.6600OhPekerja50,000.0033,000.000.3300OhTukang Kayu82,000.0027,060.000.0330OhKepala Tukang88,000.002,904.000.0330OhMandor95,000.003,135.0066,099.00487,545.00553,644.00191 M2 PASANG BEKISTING UNTUK TANGGA0.0300m3Kayu Kelas III2,585,000.0077,550.000.4000kgPaku Biasa 5' - 12'15,400.006,160.000.1500ltrMinyak Bekisting33,550.005,032.500.0150m3Kayu Usuk 4/62,585,000.0038,775.000.3500lbrPlywood 9 mm115,500.0040,425.002.0000btgDolken Kayu 8" - 10"/4m99,000.00198,000.000.6600ohPekerja50,000.0033,000.000.3300ohTukang Kayu82,000.0027,060.000.0330ohKepala Tukang88,000.002,904.000.0330ohMandor95,000.003,135.00Total :66,099.00365,942.50432,041.50201 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON0.0264m3Kayu Kelas III (Papan)2,585,000.0068,244.000.6000kgPaku Biasa 5' - 12'15,400.009,240.000.5000btgDolken Kayu 8" - 10"/4m99,000.0049,500.000.1500ohPekerja50,000.007,500.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang 88,000.00440.000.0080ohMandor95,000.00760.00Total :12,800.00126,984.00139,784.00211 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)0.0020m3Kayu Kelas III2,585,000.005,170.000.0100kgPaku Biasa 5' - 12'15,400.00154.003.0000kgBesi Beton10,000.0030,000.000.0450kgKawat Beton13,750.00618.754.0000kgSemen Portland1,340.005,360.000.0060m3Pasir Beton131,000.00786.000.0090m3Koral Beton152,000.001,368.000.1800ohPekerja50,000.009,000.000.0200ohTukang Batu76,000.001,520.000.0200ohTukang Kayu82,000.001,640.000.0200ohTukang Besi79,000.001,580.000.0060ohKepala Tukang88,000.00528.000.0090ohMandor95,000.00855.00Total :15,123.0043,456.7558,579.75

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

SNI 03-2836-200230MEMBUAT 1 M BETON TUMBUK (1 PC : 3 PS : 5 KR)218.0000kgSemen Portland1,340.00292,120.000.5200m3Pasir Beton131,000.0068,120.000.8700m3Koral Beton152,000.00132,240.001.6500ohPekerja50,000.0082,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang88,000.002,200.000.0800ohMandor95,000.007,600.00Total :111,300.00492,480.00603,780.0031MEMBUAT 1 M BETON CAMPURAN (1 PC : 2 PS : 3 KR)232.0000kgSemen Portland1,340.00310,880.000.5200m3Pasir Beton131,000.0068,120.000.7800m3Koral Beton152,000.00118,560.001.6500ohPekerja50,000.0082,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang88,000.002,200.000.0800ohMandor95,000.007,600.00Total :111,300.00497,560.00608,860.0032MEMBUAT 1 M BETON BERTULANG CAMPURAN (1 PC : 1,5 PS : 2,5 KR)386.0000kgSemen Portland1,340.00517,240.000.4700m3Pasir Beton131,000.0061,570.000.7800m3Koral Beton152,000.00118,560.001.6500ohPekerja50,000.0082,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang88,000.002,200.000.0800ohMandor95,000.007,600.00Total :111,300.00697,370.00808,670.0033MEMBUAT 1 M3 TIANG PANCANG PRESTRESSED BETON440.0000KgSemen Portland1,340.00589,600.000.5000m3Pasir Beton131,000.0065,500.000.120.8000m3Koral Beton152,000.00121,600.002.4600GlnRapidrant0.00.00.2000ohPekerja50,000.0010,000.000.0750ohTukang Batu76,000.005,700.000.0075ohKepala Tukang88,000.00660.000.0200ohMandor95,000.001,900.00Total :18,260.00776,700.00794,960.0033MEMBUAT 1 M' PASANG BUIS BETON 1/2 DIAMETRE 50 CM1.0000BjBuis Beton 1/2 Diameter 50 cm82,500.0082,500.000.1200KgSemen1,340.00160.800.120.0130m3Pasir Pasangan152,000.001,976.000.2000ohPekerja50,000.0010,000.000.0750ohTukang Batu76,000.005,700.000.0075ohKepala Tukang88,000.00660.000.0200ohMandor95,000.001,900.00Total :18,260.0084,636.80102,896.8034MEMBUAT 1 M' PASANG BUIS BETON 1/2 DIAMETRE 25 CM1.0000BjBuis Beton 1/2 Diameter 25 cm47,000.0047,000.000.1200KgSemen1,340.00160.800.0130m3Pasir Pasangan152,000.001,976.000.2000ohPekerja50,000.0010,000.000.0750ohTukang Batu76,000.005,700.000.0075ohKepala Tukang88,000.00660.000.0200ohMandor95,000.001,900.00Total :18,260.0049,136.8067,396.80221 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)0.0030m3Kayu Kelas III2,585,000.007,755.000.0200kgPaku Biasa 5' - 12'15,400.00308.003.6000kgBesi Beton10,000.0036,000.000.0500kgKawat Beton13,750.00687.505.5000kgSemen Portland1,340.007,370.000.0090m3Pasir Beton131,000.001,179.000.0150m3Koral Beton152,000.002,280.000.2970ohPekerja50,000.0014,850.000.0330ohTukang Batu76,000.002,508.000.0330ohTukang Kayu82,000.002,706.000.0330ohTukang Besi79,000.002,607.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,976.0055,579.5080,555.50

SNI 03-3436-2002

231 M2 PERANCAH / STEGER (MENGGUNAKAN BURUH)0.5769LsDolken Kayu 8" - 10"/4m99,000.0057,113.100.0179m3Kayu Perancah2,585,000.0046,271.501.0000KgPaku15,400.0015,400.000.1795ohPekerja Tidak Terlatih50,000.008,975.000.0769ohPekerja Terlatih60,000.004,614.000.1026ohTukang kayu82,000.008,413.200.0256ohMandor95,000.002,432.00Total :24,434.20118,784.60143,218.80241 M3 COR BETON BASEMENT0.0M2Bekisting 0.0150.000KgBesi Beton11,708.851,756,327.501.000M3Beton K300865,678.18865,678.18Total :0.02,622,005.682,622,005.68

251 M3 COR BETON PONDASI2.000M2Bekisting ( 3 X Pakai)54,484.33108,968.67110.000KgBesi Beton11,708.851,287,973.501.000M3Beton K300865,678.18865,678.18Total :0.02,262,620.352,262,620.35

261 M3 COR BETON DINDING5.000M2Bekisting ( 3 X Pakai)184,548.00922,740.00150.000KgBesi Beton11,708.851,756,327.501.000M3Beton K300865,678.18865,678.18Total :0.03,544,745.683,544,745.68

271 M3 COR SLOOF 4.000M2Bekisting ( 3 X Pakai)58,792.67235,170.67200.000KgBesi Beton11,708.852,341,770.001.000M3Beton K300865,678.18865,678.18Total :0.03,442,618.853,442,618.85281 M3 COR BETON LANTAI7.000M2Bekisting ( 2 X Pakai)427,784.502,994,491.501.000M2Pekerjaan Steger143,218.80143,218.80100.000KgBesi Beton11,708.851,170,885.001.000M3Beton K300865,678.18865,678.18Total :0.05,174,273.485,174,273.48291 M3 COR BETON KOLOM6.667M2Bekisting ( 3 X Pakai)153,189.671,021,315.51200.000KgBesi Beton11,708.852,341,770.001.000M3Beton K300865,678.18865,678.18Total :0.04,228,763.694,228,763.69

301 M3 COR BETON BALOK6.250M2Bekisting ( 3 X Pakai)155,774.67973,591.67300.000KgBesi Beton11,708.853,512,655.001.000M3Beton K300865,678.18865,678.18Total :0.05,351,924.855,351,924.85

311 M3 COR BETON TANGGA10.500M2Bekisting ( 3 X Pakai)144,013.831,512,145.25150.000KgBesi Beton11,708.851,756,327.501.000M3Beton K300865,678.18865,678.18Total :0.04,134,150.934,134,150.93

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

VIIIPEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)11 M2 PASANG ATAP GENTENG KODOK KARANG PILANG SETARA GOOD YEAR21.0000bhGenteng Kodok Good Year4,200.0088,200.000.1500ohPekerja50,000.007,500.000.0750ohTukang Kayu82,000.006,150.000.0075ohKepala Tukang88,000.00660.000.0080ohMandor95,000.00760.00Total :15,070.0088,200.00103,270.0021 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT25.0000bhGenteng Plentong Dicat2,400.0060,000.000.1500ohPekerja50,000.007,500.000.0750ohTukang Kayu82,000.006,150.000.0075ohKepala Tukang 88,000.00660.000.0080ohMandor95,000.00760.00Total :15,070.0060,000.0075,070.0031 M2 PASANG BUBUNGAN GENTENG KODOK KARANG PILANG3.5000bhGenteng bubungan15,000.0052,500.008.0000kgSemen Portland1,340.0010,720.000.0320m3Pasir Pasang152,000.004,864.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Kayu82,000.0016,400.000.0200ohKepala Tukang88,000.001,760.000.0020ohMandor95,000.00190.00Total :38,350.0068,084.00106,434.0041 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM0.7500lbrAsbes Gelombang 1.8 mx0.92mx5mm42,000.0031,500.000.1200kgPaku Pancing 60 x 23027,500.003,300.000.1400ohPekerja50,000.007,000.000.0700ohTukang Kayu82,000.005,740.000.0070ohKepala Tukang Kayu88,000.00616.000.0070ohMandor95,000.00665.00Total :14,021.0034,800.0048,821.0051 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M2.4000lbrBubungan Stel Gelombang49,500.00118,800.006.0000kgPaku Skrup 3,5"27,500.00165,000.000.0840ohPekerja50,000.004,200.000.1250ohTukang Kayu82,000.0010,250.000.0130ohKepala Tukang88,000.001,144.000.0040ohMandor95,000.00380.00Total :15,974.00283,800.00299,774.0061 M2 PEKERJAAN ATAP SIRAP60.0000bhGenteng Sirap7,700.00462,000.000.2000kgPaku Biasa 1/2" - 1"27,500.005,500.000.1660ohPekerja50,000.008,300.000.2500ohTukang Kayu82,000.0020,500.000.0250ohKepala Tukang88,000.002,200.000.0080ohMandor95,000.00760.00Total :31,760.00467,500.00499,260.0071 M2 PEKERJAAN ATAP NOK SIRAP0.4000lbrSeng plat 3" x 6" BJLS 2855,000.0022,000.000.0600kgPaku biasa 1/2" - 1"27,500.001,650.000.0500kgPaku biasa 2" - 5"15,400.00770.000.0040m3Kayu papan 3 cm8,800,000.0035,200.000.1250ohPekerja50,000.006,250.000.2500ohTukang kayu82,000.0020,500.000.0250ohKepala Tukang88,000.002,200.000.0060ohMandor95,000.00570.00Total :29,520.0059,620.0089,140.0081 M2 PASANG ATAP ALANG-ALANG 3 M16.5000lbrAlang - alang13,750.0089,375.000.5000glgTali pengikat16,500.008,250.000.2000ohPekerja50,000.0010,000.000.0050ohMandor95,000.00475.00Total :10,475.0097,625.00108,100.0081 M2 PEKERJAAN ATAP SENG GELOMBANG0.7000lbrSeng Gelombang 3" x 6" BJLS 2899,000.0069,300.000.0200kgPaku Biasa 1/2" - 1"27,500.00550.000.1200ohPekerja50,000.006,000.000.0600ohTukang Kayu82,000.004,920.000.0060ohKepala Tukang 88,000.00528.000.0060ohMandor95,000.00570.00Total :12,018.0069,850.0081,868.0091 M2 PASANGAN LAPISAN ALUMINIUM FOIL1.0500m2Aluminium Foil203,500.00213,675.000.1500ohPekerja50,000.007,500.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang 88,000.00440.000.0080ohMandor95,000.00760.00Total :12,800.00213,675.00226,475.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

131 M' PKERJAAN TALANG PATAHAN ATAP0.5000LbrSeng Plat44,000.0022,000.000.0150kgPaku27,500.00412.500.0190M3Kayu Papan Kruing5,830,000.00110,770.000.4000ohTukang Kayu82,000.0032,800.000.0250ohKepala Tukang Kayu88,000.002,200.000.0400ohPekerja / Pekerja Tak Terlatih50,000.002,000.000.0013ohMandor95,000.00123.50Total :37,123.50133,182.50170,306.00131 M' PASANGAN LIST PLAFOND1.0500MList Kayu Profit33,000.0034,650.000.0100kgPaku27,500.00275.000.0210ohTukang Kayu82,000.001,722.000.0020ohKepala Tukang Kayu88,000.00176.000.0210ohPekerja / Pekerja Tak Terlatih50,000.001,050.000.0010ohMandor95,000.0095.00Total :3,043.0034,925.0037,968.00141 M2 PASANGAN KREPYAK JARO0.0225M3Kayu Kamper Papan8,800,000.00198,000.002.2500ohTukang Kayu82,000.00184,500.000.2250ohKepala Tukang Kayu88,000.0019,800.000.7500ohPekerja / Pekerja Tak Terlatih50,000.0037,500.000.0375ohMandor95,000.003,562.50Total :3,562.50198,000.00201,562.50101 M1 PASANG NOK SENG GELOMBANG0.3000lbrSeng Plat 3" x 6" BJLS 2855,000.0016,500.000.0400kgPaku biasa 1/2" - 1"27,500.001,100.000.1500ohPekerja50,000.007,500.000.0700ohTukang Kayu82,000.005,740.000.0080ohKepala Tukang 88,000.00704.000.0060ohMandor95,000.00570.00Total :14,514.0017,600.0032,114.00111 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU1.0000BHMurda / Puntal Paras275,000.00275,000.000.0130kgSemen1,340.0017.420.0500ohPekerja / Pekerja Tak Terlatih50,000.002,500.000.0250ohMandor95,000.002,375.00Total :4,875.00275,017.42279,892.42

IXPEKERJAAN PLAFOND / LANGIT - LANGIT (SNI 2839-2008)1MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM1.1000lbrAsbes semen16,500.0018,150.000.0100kgPaku Biasa 1/2" - 1"27,500.00275.000.0300ohPekerja50,000.001,500.000.0700ohTukang Kayu82,000.005,740.000.0070ohKepala Tukang 88,000.00616.000.0040ohMandor95,000.00380.00Total :8,236.0018,425.0026,661.0021 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/3 MM, 4MM, 6MM0.3750lbrTRIPLEKS71,500.0026,812.500.0300kgPaku Biasa 1/2" - 1"27,500.00825.000.1000ohPekerja50,000.005,000.000.1000ohTukang Kayu82,000.008,200.000.0100ohKepala Tukang 88,000.00880.000.0050ohMandor95,000.00475.00Total :14,555.0027,637.5042,192.5031 M2 PASANG LANGIT-LANGIT LAMBRIZIRING0.0150m3Kayu Papan 8,800,000.00132,000.000.0100kgPaku Biasa 1/2" - 1"27,500.00275.000.8000ohPekerja50,000.0040,000.000.8000ohTukang Kayu82,000.0065,600.000.0800ohKepala Tukang 88,000.007,040.000.0400ohMandor95,000.003,800.00Total :116,440.00132,275.00248,715.0041 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL1.0500m1List Kayu Profil 4/5 cm33,000.0034,650.000.1000kgPaku list 27,500.002,750.000.0500ohPekerja50,000.002,500.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang 88,000.00440.000.0030ohMandor95,000.00285.00Total :7,325.0037,400.0044,725.0051 M2 PASANG LANGIT-LANGIT AKUSTIK UKURAN (60 x 120) CM + RANGKA ALUMINIUM3.6000m1Profil Aluminium "T"181,500.00653,400.000.1500kgKawat Diameter 4 mm23,000.003,450.001.0500m1Ramset12,000.0012,600.001.5000LembrAkustik 60 cm x 120 cm45,100.0067,650.000.5000ohPekerja50,000.0025,000.000.5000ohTukang Besi79,000.0039,500.000.0500ohKepala Tukang 88,000.004,400.000.0250ohMandor95,000.002,375.00Total :71,275.00737,100.00808,375.00 SNI 03-2836-200261 M2 PASANG LANGIT-LANGIT ASBES + RANGKA0.0120m3Kamper Usuk 4/6 cm5,170,000.0062,040.000.0600kgPaku Biasa 2" - 5"27,500.001,650.001.1000lbrAsbes16,500.0018,150.000.1800ohPekerja50,000.009,000.000.3200ohTukang Kayu82,000.0026,240.000.0320ohKepala Tukang88,000.002,816.000.0090ohMandor95,000.00855.00Total :38,911.0081,840.00120,751.0071 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM0.1100kgPaku Sekrup22,000.002,420.000.3640lbrGypsum Board (120x240x9)62,700.0022,822.80

0.1000ohPekerja50,000.005,000.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang88,000.00440.000.0050ohMandor95,000.00475.00Total :10,015.0025,242.8035,257.8081 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM0.1100kgPaku Kalsiboard27,500.003,025.000.3640lbrKalsiboard 4.5 mm62,700.0022,822.800.1000ohPekerja50,000.005,000.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang88,000.00440.000.0050ohMandor95,000.00475.00Total :10,015.0025,847.8035,862.80

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

71 M2 PLAFOND GYPSUM, RANGKA KAYU0.364LbrGypsum Board (120x240x9)62,700.0022,822.800.023M3Kayu Kruing Usuk5,170,000.00118,910.000.260KgPaku Kalsiboard27,500.007,150.000.300OHPekerja50,000.0015,000.000.350OHTukang Kayu82,000.0028,700.000.035OHKepala Tukang Kayu88,000.003,080.000.0150OHMandor95,000.001,425.00Total :4,505.00148,882.80153,387.8081 M2 PLAFOND GYPSUM, RANGKA HOLO0.364LbrGypsum Board (120x240x9)62,700.0022,822.801.500BtgRangka Holo25,300.0037,950.000.110KgPaku Kalsiboard33,000.003,630.000.34722222220.300OHPekerja50,000.0015,000.000.350OHTukang Kayu82,000.0028,700.000.035OHKepala Tukang Kayu88,000.003,080.000.0150ohMandor95,000.001,425.00Total :33,205.0064,402.8097,607.8091 M2 PLAFOND KALSIBOARD, RANGKA KAYU0.034LbrKalsiboard (4,5 x 1220 x 2420) mm93,500.003,179.000.023M3Kayu Kruing Usuk5,170,000.00118,910.000.260KgPaku Kalsiboard27,500.007,150.000.300OHPekerja50,000.0015,000.000.350OHTukang Kayu82,000.0028,700.000.035OHKepala Tukang Kayu88,000.003,080.000.0150OHMandor95,000.001,425.00Total :4,505.00129,239.00133,744.00101 M2 PLAFOND KALSIBOARD, RANGKA HOLO0.034LbrKalsiboard (4,5 x 1220 x 2420) mm93,500.003,179.001.500BtgRangka Holo25,300.0037,950.000.110KgPaku Kalsiboard33,000.003,630.000.300OHPekerja50,000.0015,000.000.350OHTukang Kayu82,000.0028,700.000.035OHKepala Tukang Kayu88,000.003,080.000.0150ohMandor95,000.001,425.00Total :33,205.0044,759.0077,964.00XPEKERJAAN SANITASI ( SNI 2002 )1MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK0.03387074921.0000bhKloset duduk/ monoblok2,354,000.002,354,000.006% x harga klosetPerlengkapan141,240.003.3000ohPekerja50,000.00165,000.001.1000ohTukang batu76,000.0083,600.000.0010ohKepala Tukang88,000.0088.000.1600ohMandor95,000.0015,200.00Total :263,888.002,495,240.002,759,128.002MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN1.0000bhKloset jongkok porselen159,500.00159,500.006.0000kgSemen Portland1,340.008,040.000.0100m3Pasir Pasang152,000.001,520.001.0000ohPekerja50,000.0050,000.001.5000ohTukang batu76,000.00114,000.001.5000ohKepala Tukang88,000.00132,000.000.1600ohMandor95,000.0015,200.00Total :311,200.00169,060.00480,260.003MEMASANG 1 BUAH URINOIR1.0000bhUrinoir2,376,000.002,376,000.0030% x harga UrinPerlengkapan712,800.006.0000kgSemen Portland1,340.008,040.000.0100m3Pasir Pasang152,000.001,520.001.0000ohPekerja50,000.0050,000.001.0000ohTukang batu76,000.0076,000.000.1000ohKepala Tukang88,000.008,800.000.1000ohMandor95,000.009,500.00Total :144,300.003,098,360.003,242,660.004MEMASANG 1 BUAH WASHTAFEL KIA1.0000bhWashtafel203,500.00203,500.0012% x harga wastPerlengkapan24,420.006.0000kgSemen Portland1,340.008,040.000.0100m3Pasir Pasang152,000.001,520.001.2000ohPekerja50,000.0060,000.001.4500ohTukang batu76,000.00110,200.000.1500ohKepala Tukang88,000.0013,200.000.1000ohMandor95,000.009,500.00Total :192,900.00237,480.00430,380.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

51 M2 PASANG LANTAI UBIN TERALUX UKURAN (40 X 40) CM 6.6300bhUbin Teralux Kerang132,000.00875,160.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00909,432.00933,811.0061 M2 PASANG LANTAI UBIN TERALUX UKURAN (30 X 30) CM 11.8700bhUbin Teralux Kerang132,000.001,566,840.0010.0000kgSemen Portland1,340.0013,400.000.0450m3Pasir Pasang152,000.006,840.001.5000kgSemen warna/semen grouting11,000.0016,500.000.2600ohPekerja50,000.0013,000.000.1300ohTukang batu76,000.009,880.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :25,259.001,603,580.001,628,839.0071 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN (60 X 60) CM 3.1000bhUbin Teralux Marmer 132,000.00409,200.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00443,472.00467,851.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

5MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M31.0000bhBak Fibreglass253,000.00253,000.0018% x harga wastPerlengkapan45,540.001.8000ohPekerja50,000.0090,000.002.7000ohTukang batu76,000.00205,200.000.5400ohKepala Tukang88,000.0047,520.000.1100ohMandor95,000.0010,450.00Total :353,170.00298,540.00651,710.006MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "1.2000m1Pipa galvanis193,600.00232,320.0035% x harga pipaPerlengkapan67,760.000.0540ohPekerja50,000.002,700.000.0900ohTukang Pipa76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0270ohMandor95,000.002,565.00Total :12,897.00300,080.00312,977.007MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"1.2000M'Pipa galvanis627,000.00752,400.0035% x harga pipaPerlengkapan219,450.000.1080OhPekerja50,000.005,400.000.1800OhTukang Pipa76,000.0013,680.000.0180OhKepala Tukang88,000.001,584.000.0054OhMandor95,000.00513.00Total :21,177.00971,850.00993,027.008MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"1.2000m1Pipa PVC17,425.0020,910.0035% x harga pipaPerlengkapan6,098.750.0360ohPekerja50,000.001,800.000.0600ohTukang Pipa76,000.004,560.000.0060ohKepala Tukang88,000.00528.000.0018ohMandor95,000.00171.00Total :7,059.0027,008.7534,067.759MEMASANG 1 M1 PIPA PVC TYPE AW f 2"1.2000m1Pipa PVC25,825.0030,990.0035% x harga pipaPerlengkapan9,038.750.0540ohPekerja50,000.002,700.000.0900ohTukang Pipa76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0027ohMandor95,000.00256.50Total :10,588.5040,028.7550,617.2510MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"1.2000m1Pipa PVC68,950.0082,740.0035% x harga pipaPerlengkapan24,132.500.0810ohPekerja50,000.004,050.000.1350ohTukang Pipa76,000.0010,260.000.0135ohKepala Tukang88,000.001,188.000.0041ohMandor95,000.00389.50Total :15,887.50106,872.50122,760.0011MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"1.0000bhKran air22,000.0022,000.000.0250bhSeal tape3,300.0082.500.0100ohPekerja50,000.00500.000.1000ohTukang Pipa76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :9,455.0022,082.5031,537.50121 UNIT PEKERJAAN SEPTICTANK DAN PERESAPAN3.5000mPekerjaan Galian Tanah39,875.00139,562.509.0000mPasangan Batu Bata 1pc : 3ps204,743.751,842,693.750.1250mPekerjaan beton rabat652,542.5781,567.820.3000mPekerjaan beton bertulang754,346.06226,303.8236.0000kgPembesian11,708.85421,518.602.4000mPekerjaan Bekisting553,644.001,328,745.609.0000mPekerjaan Plesteran 1pc : 2ps46,243.00416,187.004.0000mPipa Hawa D2,5"53,840.00215,360.004.0000mPipa PVC D4"104,408.75417,635.002.0000mPipa Galvanis D1"35,000.0070,000.001.0000bhT Galvanis D1"32,500.0032,500.001.0000bhElbow PVC D2.5"9,000.009,000.0040.0000kgIjuk37,500.001,500,000.000.4000mPekerjaan Urugan Pasir177,950.0071,180.000.4000mBatu Karang143,000.0057,200.000.2000mKoral/Kerikil152,000.0030,400.00Total :702,995.006,156,859.096,859,854.090.0003ohMandor100,000.0030.00Total :703,025.007,857,139.098,560,164.093MENGERJAKAN 100 KG PEKERJAAN PERAKITAN1.0000ltSolar13,200.0013,200.000.1000ltMinyak Pelumas33,550.003,355.000.1000ohPekerja9,000.00900.000.1000ohTukang besi37,500.003,750.000.0010ohKepala TukangTotal :ERROR:#VALUE!0.0050ohMandor100,000.00500.000.8000JamSewa Alat0.00.0Total :ERROR:#VALUE!16,555.00ERROR:#VALUE!4 1M2 MEMBUAT PINTU BESI PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU15.0000KgBesi Siku L 30,30,353,900.00808,500.0032.8000kgBesi Plat BajaERROR:#REF!ERROR:#REF!0.0500kgKawat Las71,500.003,575.001.0500ohPekerja652,542.57685,169.701.0500ohTukang Las Biasa754,346.06792,063.370.1050ohKepala Tukang11,708.851,229.430.0520ohMandor553,644.0028,789.49Total :1,507,251.98ERROR:#REF!ERROR:#REF!51 M2 PASANG ROLLING DOOR BESI1.0000m2Pintu gulung besi0.00.00.2000ohPekerja652,542.57130,508.510.2000ohTukang besi754,346.06150,869.210.0200ohKepala Tukang11,708.85234.180.0010ohMandor553,644.00553.64Total :282,165.550.0282,165.55

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456XIPEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)11 KG PASANG RANGKA ATAP BAJA1.1500kgBesi Profil WF0.00.00.0060ohPekerja0.00.00.0600ohTukang besi0.00.00.0060ohKepala Tukang45,000.00270.000.0003ohMandor45,000.0013.50Total :283.500.0283.5021 KG MEMASANG RANGKA KUDA - KUDA BAJA IWF1.1500kgBesi Baja IWF0.00.00.0060ohPekerja0.00.00.0600ohTukang besi0.00.00.0060ohKepala Tukang0.00.0

31 M2 PASANG ROLLING DOOR ALLUMINIUM1.0000m2Rolling Door Alluminium236,500.00236,500.001.0000ohPekerja50,000.0050,000.001.0000ohTukang Aluminium76,000.0076,000.000.1000ohKepala Tukang88,000.008,800.000.0500ohMandor95,000.004,750.00Total :139,550.00236,500.00376,050.0041 M2 PASANG KUSEN PINTU ALLUMINIUM1.1000mProfil Aluminium10,500.0011,550.002.0000bhSekruf fixer440.00880.000.0600TubeSealant22,000.001,320.000.0430ohPekerja50,000.002,150.000.0430ohTukang Alumium76,000.003,268.000.0043ohKepala Tukang88,000.00378.400.0021ohMandor95,000.00199.50Total :5,995.9013,750.0019,745.9051 M2 PASANG PINTU KACA RANGKA ALLUMINIUM4.4000mPintu Aluminium10,500.0046,200.004.5000mProfil Kaca8,250.0037,125.000.2700TubeSealant22,000.005,940.000.0850ohPekerja50,000.004,250.000.0850ohTukang Alumium76,000.006,460.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :11,977.0089,265.00101,242.00

61 M2 PASANG VENETIONS BLINDS DAN VERTICAL BLINDS1.0000m2Venetions Blinds dan Vertical Blinds (Tirai)0.00.00.3500ohPekerja50,000.0017,500.000.3500ohTukang Alumium76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0180ohMandor95,000.001,710.00Total :48,890.000.048,890.0061 M2 PASANG TERALI BESI STRIP (2 x 3 ) mm6.1770kgBesi strip20,000.00123,540.0027.0800cmPengelasan12,000.00324,960.001.6700ohPekerja50,000.0083,500.001.6700ohTukang Las 76,000.00126,920.000.1670ohKepala Tukang88,000.0014,696.000.0830ohMandor95,000.007,885.00Total :233,001.00448,500.00681,501.0071 M2 KAWAT NYAMUK1.1000m2Kawat Nyamuk22,000.0024,200.0011.1100cmPengelasan12,000.00133,320.001.7160kgBaja Strip (0,2 x 2) cm20,000.0034,320.000.1000ohPekerja50,000.005,000.000.1000ohTukang Besi79,000.007,900.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :14,255.00191,840.00206,095.0081 M2 PASANG JENDELA NAKO & TRALIS1.1000m2Rangka + Kaca Nako32,000.0035,200.0010.0000bhPaku biasa 1 cm - 2,5 cm27,500.00275,000.007.0000m'Besi strip8,800.0061,600.000.2000ohPekerja50,000.0010,000.000.2000ohTukang besi79,000.0015,800.000.0200ohKepala Tukang88,000.001,760.000.0010ohMandor95,000.0095.00Total :27,655.00371,800.00399,455.0091 M1 PASANG TALANG DATAR, SENG BJLS 281.0500lbrSeng plat55,000.0057,750.000.0150kgPaku biasa 0,5" - 1" 27,500.00412.500.0190m3Kayu papan kelas II/III8,800,000.00167,200.000.2000ohPekerja50,000.0010,000.000.4000ohTukang besi79,000.0031,600.000.0250ohKepala Tukang88,000.002,200.000.0100ohMandor95,000.00950.00Total :44,750.00225,362.50270,112.50101 M2 PEK. KUDA -KUDA BAJA RINGAN SETARA SURYA TRUSS0.2630btgRangka C 85085 @ 7 Galvalume225,000.0059,175.000.4240btgRangka C 85085 @ 7 Galvalume181,500.0076,956.000.9560btgReng (Butten 30) @ 6 Galvalume70,000.0066,920.000.0670btgReng Pengikat Kuda-Kuda @6 Galvalume70,000.004,690.000.0070btgTalang Valley @ 3166,000.001,162.000.1940btgPlat Strip @ 12,750.00533.5034.9990bhBaut Kuda-Kuda SDS 6 - 19320.0011,199.6822.0000bhBaut Reng SDS 6 - 16195.004,290.000.4720bhBaut Listplank 6 - 70780.00368.160.4720bhDinabold 10 - 652,150.001,014.801.0000m2Upah Pasang24,000.0024,000.001.0000LsMaterial dan Alat Bantu11,500.0011,500.00Total :24,000.00237,809.14261,809.14XIIPEKERJAAN KUNCI DAN KACA (SNI 2002)11 BH PASANG KUNCI TANAM BIASA1.0000bhKunci tanam biasa24,200.0024,200.000.0100ohPekerja50,000.00500.000.5000ohTukang besi79,000.0039,500.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :41,355.0024,200.0065,555.0021 PS PASANG ENGSEL PINTU1.0000psEngsel pintu60,500.0060,500.000.0150ohPekerja50,000.00750.000.1500ohTukang besi79,000.0011,850.000.0150ohKepala Tukang88,000.001,320.000.0008ohMandor95,000.0076.00Total :13,996.0060,500.0074,496.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

41 M PASANG PLINT UBIN TERALUX UKURAN (10 X 40) CM 2.6500bhPlint Ubin Teralux Kerang132,000.00349,800.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00352,883.60365,490.6051 M PASANG PLINT UBIN TERALUX MARMER UKURAN (10 X 60) CM 1.7000bhPlint Ubin Teralux Marmer 132,000.00224,400.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00227,483.60240,090.6061 M PASANG PLINT UBIN TERALUX MARMER UKURAN (10 X 40) CM 2.6500bhUbin Teralux Marmer 132,000.00349,800.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00352,883.60365,490.6071 M PASANG PLINT UBIN TERALUX MARMER UKURAN (10 X 30) CM 3.5300bhUbin Teralux Marmer 132,000.00465,960.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00469,043.60481,650.60

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

151 M PASANG PLINT UBIN TERALUX UKURAN (10 X 30) CM 3.5300bhPlint Ubin Teralux Kerang132,000.00465,960.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00469,043.60481,650.60

51 M1 PASANG PLIN KERAMIK 10 X 30 CM5.3000bhKeramik 30 x 30 cm5,290.9128,041.821.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.0250kgSemen warna/semen grouting11,000.00275.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.0030,300.4242,907.42

111 M1 PASANG PLIN KERAMIK 10 X 20 CM5.3000bhPlint Keramik 10 x 20 cm132,000.00699,600.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.0250kgSemen warna/semen grouting11,000.00275.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00701,858.60714,465.6031 PS PASANG ENGSEL JENDELA KUPU-KUPU1.0000psEngsel jendela54,000.0054,000.000.0100ohPekerja50,000.00500.000.1000ohTukang besi79,000.007,900.000.0100ohKepala Tukang88,000.00880.000.0005ohMandor95,000.0047.50Total :9,327.5054,000.0063,327.5041 BH PASANG KAIT ANGIN1.0000psKait angin45,700.0045,700.000.0150ohPekerja50,000.00750.000.1500ohTukang besi79,000.0011,850.000.0150ohKepala Tukang88,000.001,320.000.0008ohMandor95,000.0076.00Total :13,996.0045,700.0059,696.0051 BH PASANG KUNCI SLOT1.0000bhKunci slot20,200.0020,200.000.0200ohPekerja50,000.001,000.000.2000ohTukang besi79,000.0015,800.000.0200ohKepala Tukang88,000.001,760.000.0010ohMandor95,000.0095.00Total :18,655.0020,200.0038,855.0061 M2 PASANG KACA, TEBAL 3 - 5 MM1.1000bhKaca121,000.00133,100.000.0150ohPekerja50,000.00750.000.1500ohTukang besi79,000.0011,850.000.0150ohKepala Tukang88,000.001,320.000.0008ohMandor95,000.0076.00Total :13,996.00133,100.00147,096.00XIIIPEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)11 M2 PASANG LANTAI UBIN TERASO UKURAN (40 X 40) CM 6.6300bhUbin Teraso132,000.00875,160.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00909,432.00933,811.0021 M2 PASANG LANTAI UBIN TERASO UKURAN (30 X 30) CM 11.8700bhUbin Teraso132,000.001,566,840.0010.0000kgSemen Portland1,340.0013,400.000.0450m3Pasir Pasang152,000.006,840.001.5000kgSemen warna/semen grouting11,000.0016,500.000.2600ohPekerja50,000.0013,000.000.1300ohTukang batu76,000.009,880.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :25,259.001,603,580.001,628,839.0011 M2 PASANG LANTAI UBIN GRANIT UKURAN (40 X 40) CM 6.6300bhUbin Granit242,000.001,604,460.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.001,638,732.001,663,111.0011 M2 PASANG LANTAI GERANIT 60 X 60 CM SETARA GRANITO1.0500m2Geranit 60 x 60 cm setara granito247,500.00259,875.0011.3800kgSemen Portland1,340.0015,249.200.0420m3Pasir Pasang152,000.006,384.001.5000kgSemen warna/semen grouting11,000.0016,500.000.6200ohPekerja50,000.0031,000.0031,000.000.3500ohTukang batu76,000.0026,600.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0030ohMandor95,000.00285.00Total :60,965.00355,608.20416,573.2021 M PASANG PLINT UBIN GRANIT UKURAN (10 X 40) CM 2.6500bhPlint Ubin Granit132,000.00349,800.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00352,883.60365,490.6081 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN (40 X 40) CM 6.6300bhUbin Teralux Marmer 132,000.00875,160.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00909,432.00933,811.0091 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN (30 X 30) CM 11.8700bhUbin Teralux Marmer 132,000.001,566,840.0010.0000kgSemen Portland1,340.0013,400.000.0450m3Pasir Pasang152,000.006,840.001.5000kgSemen warna/semen grouting11,000.0016,500.000.2600ohPekerja50,000.0013,000.000.1300ohTukang batu76,000.009,880.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :25,259.001,603,580.001,628,839.00101 M PASANG PLINT UBIN TERASO UKURAN (10 X 30) CM 6.6300bhPlint Ubin Teraso132,000.00875,160.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00909,432.00933,811.00111 M PASANG PLINT UBIN TERASO UKURAN (10 X 40) CM 2.6500bhPlint Ubin Teraso132,000.00349,800.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00352,883.60365,490.6031 M PASANG PLINT UBIN GRANIT UKURAN (10 X 30) CM 3.5300bhPlint Ubin Granit132,000.00465,960.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00469,043.60481,650.601 M PASANG PLINT KERAMIK PLATINUM 10 X 60 CM0.3500bhKeramik 60 x 60 cm Platinum22,500.007,875.001.6500kgSemen Portland1,160.001,914.000.0030m3Pasir Pasang155,000.00465.000.1000kgSemen warna15,000.001,500.000.0600ohPekerja50,000.003,000.000.0300ohTukang Batu76,000.002,280.000.0030ohKepala Tukang88,000.00264.000.0030ohMandor95,000.00285.00Total :5,829.0011,754.0017,583.0021 M2 PASANG LANTAI KERAMIK 30 X 30 CM11.8700bhKeramik 30 x 30 cm5,290.9162,803.0910.0000kgSemen Portland1,340.0013,400.000.0450m3Pasir Pasang152,000.006,840.001.5000kgSemen warna/semen grouting11,000.0016,500.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.0099,543.09167,548.0931 M2 PASANG LANTAI KERAMIK 20 X 20 CM26.5000bhKeramik 20 x 20 cm2,064.0054,696.0010.4000kgSemen Portland1,340.0013,936.000.0450m3Pasir Pasang152,000.006,840.001.6200kgSemen warna/semen grouting11,000.0017,820.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.0093,292.00161,297.0041 M2 PASANG LANTAI MARMER 100 X 100 CM1.0600bhMarmer 165,000.00174,900.008.1900kgSemen Portland1,340.0010,974.600.0450m3Pasir Pasang152,000.006,840.000.6500kgSemen warna/semen grouting11,000.007,150.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.00199,864.60267,869.60

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

51 M2 PASANG DINDING KERAMIK 20 X 50 CM1.0500mKeramik 20 x 50 cm76,000.0079,800.009.3000kgSemen Portland1,340.0012,462.000.0180m3Pasir Pasang152,000.002,736.001.9400kgSemen warna/semen grouting11,000.0021,340.000.9000ohPekerja50,000.0045,000.000.4500ohTukang batu76,000.0034,200.000.0450ohKepala Tukang88,000.003,960.000.0450ohMandor95,000.004,275.00Total :87,435.00116,338.00203,773.0061 M2 PASANG DINDING MARMER 100 X 100 CM1.0600bhMarmer 165,000.00174,900.003.0030bhPaku 12 cm27,500.0012.4400kgSemen Portland1,340.0016,669.600.0250m3Pasir Pasang152,000.003,800.000.6500kgSemen warna/semen grouting11,000.007,150.001.3000ohPekerja50,000.0065,000.000.6500ohTukang batu76,000.0049,400.000.0650ohKepala Tukang88,000.005,720.000.0650ohMandor95,000.006,175.00Total :126,295.00202,519.60328,814.6071 M1 PASANG PLIN KAYU 2 X 10 CM0.0030m3Papan Kayu Kelas II8,800,000.0026,400.000.0500kgPaku sekrup 3,5'27,500.001,375.000.1200ohPekerja50,000.006,000.000.1200ohTukang kayu82,000.009,840.000.0120ohKepala Tukang88,000.001,056.000.0060ohMandor95,000.00570.00Total :17,466.0027,775.0045,241.0071 M2 PASANG DINDING BATA PELAPIS UKURAN (3 X 7 X 24)63.0000bhBata Pelapis Dinding5,500.00346,500.0012.4400kgSemen Portland1,340.0016,669.600.0250m3Pasir Pasang152,000.003,800.002.7500kgSemen warna/semen grouting11,000.0030,250.001.0000ohPekerja50,000.0050,000.000.5000ohTukang batu76,000.0038,000.000.0500ohKepala Tukang88,000.004,400.000.0500ohMandor95,000.004,750.00Total :97,150.00397,219.60494,369.6081 M2 PASANG DINDING BATU PARAS (30 X 15)22.0000bhBatu Paras16,500.00363,000.0011.7500kgSemen Portland1,340.0015,745.000.0350m3Pasir Pasang152,000.005,320.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.00384,065.00452,070.0091 M2 PASANG DINDING BATU CANDI HITAM1.1000m2Batu Candi Hitam (20 x 20 x 3 Cm)99,000.00108,900.0011.7500kgSemen Portland1,340.0015,745.000.0350m3Pasir Pasang152,000.005,320.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.00129,965.00197,970.00 SNI 03-2836-2002101 M2 PASANGAN TEGEL DAN SPESI0.0230m2Pasir Pasangan152,000.003,496.001.4400KgSemen1,340.001,929.601.0000M2Tegel 30 x30 TB PC71,500.0071,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang Batu88,000.002,200.000.5000ohPekerja / Pekerja Tak Terlatih50,000.0025,000.000.0250ohMandor95,000.002,375.00Total :27,375.0076,925.60104,300.60111 M2 PASANGAN TEGEL WARNA KUNING DENGAN SPESI0.0230m2Pasir Pasangan152,000.003,496.001.4400KgSemen1,340.001,929.601.0000M2Tegel 30 x30 TB PC71,500.0071,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang Batu88,000.002,200.000.5000ohPekerja / Pekerja Tak Terlatih50,000.0025,000.000.0250ohMandor95,000.002,375.00Total :48,575.0076,925.60125,500.60

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

101 M2 PASANG WALL PAPER, LEBAR 50 CM2.2