an industry approach to precise point positioning gnss ppp workshop d. calle a. mozo p. navarro r....

18
June 12, 2008 AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH , 2013 - GNSS PPP WORKSHOP, OTTAWA, CANADA SESSION 4: USER SOLUTIONS

Upload: leona-gregory

Post on 24-Dec-2015

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING

GNSS PPP WORKSHOP

D. CalleA. MozoP. NavarroR. PírizD. RodríguezG. Tobías

JUNE 13TH , 2013 - GNSS PPP WORKSHOP, OTTAWA, CANADA

SESSION 4: USER SOLUTIONS

Page 2: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013 Page 2

OUTLINE PPP Infrastructure

– Server– Client

Testing on the field – highlights and lessons learned

Regional PPP

Galileo PPP

PPP protection levels

Conclusions

Page 3: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

June 12, 2008

PPP INFRASTRUCTURE

Page 4: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013 Page 4

PPP DEMONSTRATOR SERVER

Multiple servers for redundancy

Page 5: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013

RT PPP DEMONSTRATOR CLIENT

Page 5

Page 6: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

June 12, 2008

PPP TESTING IN THE FIELD

Page 7: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013

KINEMATIC FIELD TESTS

Page 7

Page 8: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013

LEARNED EXPERIENCE

Page 8

correction outage correction outage Correction outages -> PPP products extrapolation.

Loss of lines of sights

Latency and Data rate performance impact

Quickstart for certain applications

Page 9: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

June 12, 2008

REGIONAL PPP

Page 10: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013 Page 10

REGIONAL PPP Global network not always

affordable-> Demonstrator server allows to easily set up a regional network.

Real time PPP comparison– Global products– Regional products

Slight degradation performances

Page 11: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

June 12, 2008

GALILEO PPP

Page 12: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013

GALILEO PPP (1)

4 operational Galileo satellites (E11, E12, E19 and E20) since late 2012.

Large number of contributors to MGEX project (http://igs.org/mgex/) providing RINEX 3.0X and RTCM observations.

IOVs disposition provides up to 3 hours of common view over Europe -> feasibility for PPP solutions.

Page 12

Page 13: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013

GALILEO PPP (2)

TRIMBLE R10 receiver at GMVs premises.

May 31st. 150 minute window with 4 IOV satellites over Tres Cantos.

Postprocessing of the recorded RINEX data.– Static PPP based on IGS

products for precise coordinate determination.

– Galileo only static PPP based on GPS+Galileo products.

Position error below 5 cm.

Page 13

Page 14: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

June 12, 2008

PPP PROTECTION LEVELS

Page 15: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013

PPP PROTECTION LEVELS

Based on process indicators and experimentation we generate a PL.

Conservative approach for the definition of the PLs.

Computed PLs bound the position error in nominal condition and under challenging environments.

Intensive experimentation is foreseen.

Page 15

Page 16: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

June 12, 2008

CONCLUSIONS

Page 17: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

© GMV, 2013Precise Positioning Workshop 2013 June 2013

CONCLUSIONS

Full end user demonstration capability– Focused on robustness and operability– Enables to analyse different performance drivers– Extensive real-time field tests– Promising solutions for some of the main challenges

Regional PPP: Feasible, promising results in real-time

Galileo: Still proof of concept, but upcoming reality

PL: Potential enabler for PPP applications

Page 17

Page 18: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS

June 12, 2008

Thank you

Guillermo Tobías González

GMV - GNSS BU

[email protected]