an experience in conducting a longitudinal profile…

36
An Experience In An Experience In Conducting Conducting A Longitudinal A Longitudinal Profile… Profile… A Study of the Response of San Pedro Creek to the US Army Corps of Engineers (USACE) Flood Control Project Simion Jim Bulldis Joe Farrow Matt Ward Spring 2003 GEOG 642 Watershed Assessment & Restoration

Upload: james-estrada

Post on 01-Jan-2016

30 views

Category:

Documents


2 download

DESCRIPTION

An Experience In Conducting A Longitudinal Profile…. A Study of the Response of San Pedro Creek to the US Army Corps of Engineers (USACE) Flood Control Project. Simion Jim Bulldis Joe Farrow Matt Ward Spring 2003 GEOG 642 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: An Experience In Conducting      A Longitudinal Profile…

An Experience In An Experience In ConductingConducting A Longitudinal Profile… A Longitudinal Profile…

A Study of the Response of San Pedro Creek to the US Army Corps of Engineers (USACE) Flood Control Project

Simion Jim Bulldis Joe Farrow Matt Ward

Spring 2003 GEOG 642

Watershed Assessment & Restoration

Page 2: An Experience In Conducting      A Longitudinal Profile…
Page 3: An Experience In Conducting      A Longitudinal Profile…
Page 4: An Experience In Conducting      A Longitudinal Profile…

Area GeologyArea Geology

Page 5: An Experience In Conducting      A Longitudinal Profile…
Page 6: An Experience In Conducting      A Longitudinal Profile…

Lower San Pedro Creek Longtitudinal Profile

0

2

4

6

8

10

12

14

16

18

0 250 500 750 1000 1250 1500 1750 2000 2250

Distance Upstream (feet)

elev

atio

n

( fee

t ab

ove

mea

n s

eal l

evel

)

THALWEG ELEVWATER ELEVBANKFUL TERRACEMISC

Page 7: An Experience In Conducting      A Longitudinal Profile…

Out In The Field…Out In The Field…

Page 8: An Experience In Conducting      A Longitudinal Profile…

Hwy 1 BridgeHwy 1 Bridge

Sinking sediment surfaceSinking sediment surface Deepest Pools On Restoration Deepest Pools On Restoration

Project ReachProject Reach Water Current Slow or Standing Water Current Slow or Standing

PoolsPools

Page 9: An Experience In Conducting      A Longitudinal Profile…

Highway 1 Bridge at Highway 1 Bridge at Beginning of Monitoring Beginning of Monitoring ProjectProject

Page 10: An Experience In Conducting      A Longitudinal Profile…

Log Revetment Right Bank Log Revetment Right Bank Erosion ControlErosion Control

Left Bank and Streambed consists of Left Bank and Streambed consists of Sands and Cobbles Near Middle of Sands and Cobbles Near Middle of RunRun

Left Bank Streambed Near Top of Left Bank Streambed Near Top of Run Consists of Cobbles and GravelsRun Consists of Cobbles and Gravels

Left Bank Erosion Control Measure Left Bank Erosion Control Measure Consists of Planted Willow StakesConsists of Planted Willow Stakes

Page 11: An Experience In Conducting      A Longitudinal Profile…

Log Revetment on Right Log Revetment on Right Bank Near Bridge by MallBank Near Bridge by Mall

Page 12: An Experience In Conducting      A Longitudinal Profile…

Successful Native Successful Native Riparian Vegetation Riparian Vegetation GrowthGrowth Very Narrow Meandering ChannelVery Narrow Meandering Channel Dense Riparian Growth Dense Riparian Growth Slow Stream Velocity ObservedSlow Stream Velocity Observed

Page 13: An Experience In Conducting      A Longitudinal Profile…

Downstream View of Downstream View of Riparian Corridor and Riparian Corridor and Highway 1Highway 1

Page 14: An Experience In Conducting      A Longitudinal Profile…

Log Revetment on Left Bank Log Revetment on Left Bank With Willow Stakes on With Willow Stakes on Right BankRight Bank

Page 15: An Experience In Conducting      A Longitudinal Profile…

Right Bank Revetment As Right Bank Revetment As Bank Erosion Control Bank Erosion Control MeasureMeasure Streambed Sediment Consists of Streambed Sediment Consists of

Fines and Gravels Fines and Gravels Slow Stream VelocitySlow Stream Velocity Pool Next to Log RevetmentPool Next to Log Revetment

Page 16: An Experience In Conducting      A Longitudinal Profile…

View of Lower Reach to Hwy View of Lower Reach to Hwy 1 Bridge and Right Bank 1 Bridge and Right Bank Log RevetmentLog Revetment

Page 17: An Experience In Conducting      A Longitudinal Profile…

Gravel Bar On Right Bank Gravel Bar On Right Bank TerraceTerrace

Dense Stream Corridor Riparian Dense Stream Corridor Riparian VegetationVegetation

Riffle/Pool Streambed Sediment Riffle/Pool Streambed Sediment Consists of Gravels and FinesConsists of Gravels and Fines

Stream Velocity ModerateStream Velocity Moderate

Page 18: An Experience In Conducting      A Longitudinal Profile…

Upstream View of Riparian Upstream View of Riparian Vegetation With View of Vegetation With View of Top of Pool and Bottom of Top of Pool and Bottom of RiffleRiffle

Page 19: An Experience In Conducting      A Longitudinal Profile…

Downstream View of Narrow Downstream View of Narrow

Channel ReachChannel Reach

Page 20: An Experience In Conducting      A Longitudinal Profile…

Upstream View of Upstream View of Floodplain and SandbarFloodplain and Sandbar

Page 21: An Experience In Conducting      A Longitudinal Profile…

Same Station Including Same Station Including View of Log Revetment For View of Log Revetment For Run and Bottom of MeanderRun and Bottom of Meander

Page 22: An Experience In Conducting      A Longitudinal Profile…

Downstream View of Downstream View of Sandbar and Log Revetment Sandbar and Log Revetment on on Right BankRight Bank

Page 23: An Experience In Conducting      A Longitudinal Profile…

Cross-channel View From Cross-channel View From Right Bank of Project AreaRight Bank of Project Area

Page 24: An Experience In Conducting      A Longitudinal Profile…

Longitudinal View of Project Longitudinal View of Project AreaArea

Page 25: An Experience In Conducting      A Longitudinal Profile…

View of Left Bank Terrace View of Left Bank Terrace and Floodplainand Floodplain

Page 26: An Experience In Conducting      A Longitudinal Profile…

San Pedro Creek Floodplain San Pedro Creek Floodplain FloraFlora

Page 27: An Experience In Conducting      A Longitudinal Profile…

KilldeerKilldeer

Page 28: An Experience In Conducting      A Longitudinal Profile…

Typical Riffle on San Pedro Typical Riffle on San Pedro Creek Restoration AreaCreek Restoration Area

Page 29: An Experience In Conducting      A Longitudinal Profile…

Bottom of Meander With Bottom of Meander With

Riffle and Log RevetmentRiffle and Log Revetment

Page 30: An Experience In Conducting      A Longitudinal Profile…

Close-up Of Log Revetment Close-up Of Log Revetment and Runand Run

Page 31: An Experience In Conducting      A Longitudinal Profile…

Upstream View Of End of Upstream View Of End of Restoration Area With Restoration Area With Revetment On Meander Revetment On Meander With RiffleWith Riffle

Page 32: An Experience In Conducting      A Longitudinal Profile…

Deep Scour Pools Along Log Deep Scour Pools Along Log RevetmentRevetment

Page 33: An Experience In Conducting      A Longitudinal Profile…

View of Right Bank View of Right Bank Revetment and Residential Revetment and Residential Area At Beginning of Area At Beginning of Restoration AreaRestoration Area

Page 34: An Experience In Conducting      A Longitudinal Profile…

View of Narrow Channel and View of Narrow Channel and Meander With SandbarMeander With Sandbar

Page 35: An Experience In Conducting      A Longitudinal Profile…

View of Right Bank of View of Right Bank of Stream With Immersed Stream With Immersed Riparian VegetationRiparian Vegetation

Page 36: An Experience In Conducting      A Longitudinal Profile…

Downstream View of Downstream View of Restoration Area Viewed Restoration Area Viewed From From Left Bank TerraceLeft Bank Terrace