an evidence-based assessment of the impact of cycling ......04/06/2014 1 an evidence-based...

18
04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon, Senior Advisor (Cycling and walking) Department of Transport and Main Roads 2| Type footer details here | 4 June 2014

Upload: others

Post on 25-Jan-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

1

An evidence-based assessment of the

impact of cycling infrastructure in South

East Queensland

Michael Langdon, Senior Advisor (Cycling and walking)

Department of Transport and Main Roads

2 | Type footer details here | 4 June 2014

Page 2: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

2

Overview

• Bicycle Traffic & Travel Behaviour Changes

• Data from: Traffic Counts, Intercept Surveys &

Census Journey to Work Data

• Bridges, Missing Links & End of Trip.

Definitions:

• Route Change: Existing cyclists will change their route to use the new

facility

• Mode Change: users of other transport (car, public transport etc.) will

change mode of transport to cycle along the new facility

– Walk: refers to walking for the entire length of the previous journey

– PT: refers to any public motorised passenger transport such as bus,

train, or ferry.

– Car: refers to any private motorised transport such as cars, trucks,

motorcycles or taxis whether as a driver or passenger.

Bridges

Goodwill

KurilpaGo-Between

Eleanor Schonell

Sir Leo Hielsher(Gateway)

Ted Smout

Page 3: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

3

Goodwill Bridge

• Daily Traffic: Commuter

2,000 bicycles

9,000 pedestrians

• Route Change: 70%

• Mode Change: 30%

– Walk: 29%

– PT: 51%

– Car: 20%

• Source: Abrahams (2002)

Page 4: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

4

Go-between Bridge

• Daily Traffic: Commuter

1,900 bicycles

1,300 pedestrians

• Route Change: 75%

• Mode Change: 25%

– Walk: 2%

– PT: 8%

– Car: 15%

• Source: TMR (2010)

River crossings

Goodwill Victoria Kurilpa Grey St Go-Between2009 56% 34% 11%2011 35% 9% 20% 4% 32%

Change -21% -25% 20% -7% 32%

9%

increase

in cyclists

volumes

between

2009-

2011

Page 5: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

5

Bicentennial Bikeway Diversion

Bicentennial Bikeway DiversionKurilpa Bridge Daily Traffic

0

500

1000

1500

2000

2500

05/1

0/20

09

05/1

1/20

09

05/1

2/20

09

05/0

1/20

10

05/0

2/20

10

05/0

3/20

10

05/0

4/20

10

05/0

5/20

10

05/0

6/20

10

05/0

7/20

10

05/0

8/20

10

05/0

9/20

10

05/1

0/20

10

05/1

1/20

10

05/1

2/20

10

05/0

1/20

11

05/0

2/20

11

05/0

3/20

11

05/0

4/20

11

05/0

5/20

11

05/0

6/20

11

05/0

7/20

11

05/0

8/20

11

05/0

9/20

11

05/1

0/20

11

05/1

1/20

11

05/1

2/20

11

05/0

1/20

12

05/0

2/20

12

05/0

3/20

12

05/0

4/20

12

05/0

5/20

12

05/0

6/20

12

05/0

7/20

12

05/0

8/20

12

05/0

9/20

12

05/1

0/20

12

05/1

1/20

12

Bic

ycle

s

Page 6: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

6

Eleanor Schonell Bridge

• Daily Traffic: Commuter

1,100 bicycles

2,400 pedestrians

• Route Change: 38%

• Mode Change: 60%

– Walk: 2%

– PT: 43%

– Car: 17%

• Source: TMR (2008)

Eleanor Schonell BridgeOrigin Suburb/Locality

18% Yeronga 3% Highgate Hill 13% Fairfield 3% Woolloongabba 10% Annerley 2% Bardon 10% Moorooka 2% Camp Hill 8% West End 2% Coopers Plains 5% Coorparoo 2% East Brisbane 5% Yeerongpilly 2% Milton 4% Dutton Park 2% New Farm 4% Taringa 2% Toowong

Destination Suburb/Locality

60% St Lucia 11% Brisbane CBD 7% Indooroopilly 5% Milton 5% Toowong 4% Taringa 3% Yeronga 2% Dutton Park 2% West End 1% Annerley

Page 7: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

7

• Daily Traffic: Commuter

200 bicycles

50 pedestrians

• Route Change: 15%

• Mode Change: 85%

– Walk: 15%

– PT: 15%

– Car: 54%

• Source: TMR (2010)

Sir Leo Hielscher (Gateway) Bridge

Page 8: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

8

• Daily Traffic: Recreational

600 bicycles

200 pedestrians

• Route Change: 83%

• Mode Change: 17%

– Walk: 2%

– PT: 0%

– Car: 15%

• Source: TMR (2010)

Ted Smout Bridge

Page 9: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

9

• Normanby Pedestrian Cycle Link

• Western Freeway Bikeway ‘Missing Link’

• Toowong

Overpass

• Veloway 1

Stage C

Missing Links

• Daily Traffic: Commuter

600 bicycles

1,100 pedestrians

• Route Change: 8%

• Mode Change: 92%

– Walk: 6%

– PT: 42%

– Car: 44%

• Source: TMR (2010)

Normanby Pedestrian Cycle Link

Page 10: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

10

Normanby

Pedestrian

Cycle Link

Origin-

Destination

Map

Page 11: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

11

To

CBD

55% increase in the average daily numbers of cyclists

130 Cyclists per day

220

ToowongOverpass Opened in

2009

1km

Count Site

Western Freeway Bikeway

Toowong OverpassTo

CBD

32% increase in the average daily numbers of cyclists

130 Cyclists per day

220

ToowongOverpass Opened in

2009

1km

Count Site

290

Page 12: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

12

Page 13: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

13

• Daily Traffic: Commuter

800 bicycles

0 pedestrians

• Route Change: 90%

• Mode Change: 10%

– Walk: 0%

– PT: 6%

– Car: 4%

• Source: TMR (2013)

Veloway 1 – Stage C

Survey Site

Origin 2009

Page 14: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

14

Origin 2013

Survey Site

• Daily Traffic: Commuter

• Route Change: 22%

• Mode Change: 78%

– Walk: 0%

– PT: 93%

– Car: 6%

• Source: Burke et al (2010)

King George Square Cycle Centre

Page 15: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

15

• Daily Traffic: Commuter

• Route Change: 36%

• Mode Change: 64%

– Walk: 6%

– PT: 66%

– Car: 28%

• Source: TMR (2010)

Brisbane CBD

Brisbane Bike WeekRide to Work Day 2011

CBD

CBD

Bikeways

Census DayBicycle Journey to Work

Page 16: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

16

SummaryBicycle

VolumesRoute Mode Walk PT Car Reference

Goodwill Bridge 2,000 70% 30% 29% 51% 20% Abrahams (2002)Eleanor Schonell

Bridge1,100

38% 60% 2% 43% 17% TMR (2008)Sir Leo Hielscher (Gateway) Bridge

20015% 85% 15% 15% 54% TMR (2010)

Go-Between Bridge 1,900 75% 25% 2% 8% 15% TMR (2010)

Normanby Pedestrian Cycle Link

6008% 92% 6% 42% 44% TMR (2010)

Ted Smout Bridge 600 83% 17% 2% 0% 15% TMR (2010)Fig Tree Pocket to

Jindalee 'missing link'1,000*

45% 55% N/A N/A N/A TMR (2010)Toowong Overpass 400 68% 32% N/A N/A N/A TMR (2010)

Veloway 1 - Stage C 800 90% 10% 0% 6% 4% TMR (2013)King George Square

Cycle CentreN/A

22% 78% 0% 93% 6% Burke et al (2010)Brisbane CBD N/A 36% 64% 6% 66% 28% TMR (2010)

* Count from Dean St counter site at CBD end of corridor

Diversion rates: ‘rules of thumb’

TO...

Cyclist Cyclist

FROM... Inner city Other areas Weekday Weekend

Car 10% 15% 10% 5%

Public transport 20% 0% 15% 5%

Route Change 65% 55% 70% 70%

Mode Change 5% 30% 5% 20%

Very little mode shift from car

Most demand is reassigned to another route

More mode change in outer urban, rural areas and on weekends

No shift from PT outside inner city area and little on the weekend

Page 17: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

17

Take home messages

• Duplicating existing links will result in high route

change

• Overcoming a major barrier, with a direct connection

to an activity centre will result in high mode change

• Mode change will always be relative to the

alternative transport options available

• Behaviour change is usually only one of many

reasons why projects go ahead

References

• Goodwill Bridge Induced Walking and Cycling Traffic

(Australia) -

http://cyclingresourcecentre.org.au/images/uploads/post/att

achment/Goodwill_Bridge_Thesis.pdf

• Benefits of inclusion of active transport in infrastructure

projects - http://www.cbdbug.org.au/wp-

content/uploads/north-brisbane-cycleway/135-00825-

file8.pdf

• Evaluation of King George Square Cycle Centre -

http://www.griffith.edu.au/__data/assets/pdf_file/0009/2083

68/urp-rp30-burke-et-al-2010.pdf

Page 18: An evidence-based assessment of the impact of cycling ......04/06/2014 1 An evidence-based assessment of the impact of cycling infrastructure in South East Queensland Michael Langdon,

04/06/2014

18

An evidence-based assessment of the

impact of cycling infrastructure in South

East Queensland

Michael Langdon, Senior Advisor (Cycling and walking)

Department of Transport and Main Roads