an accessibility project for indiranagar metro station a walkable and... · an accessibility...
TRANSCRIPT
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU PROJECT METHODOLOGY
“The Hour Glass Approach”
www.embarqindia.org
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU INTRODUCTION
www.embarqindia.org P R O P O S A L S
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS
Analysis Methodology
The data analysis involves the following steps:
� Existing Analysis
� Analyze the interconnections between urban components� Identify their influences on pedestrian networks
�Transformative Analysis
� Identify ‘Triggers’ that can initiate/facilitate transformation of an urban fabric by influencingthe urban components and their interconnections:
� Access and Proximity to Metro Station
www.embarqindia.org
� Access and Proximity to Metro Station� Land Value� Plot Size� FAR Achieved� Land Ownership� Likelihood of Land Use Change (Residential to Commercial)� Composite of all ‘Triggers’
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS - EXISTING
Land Use Plans – Proposed (CDP 2015) and Existing
Proposed (as per CDP 2015):82% Residential10% Public2% Commercial6% Parks and Open Spaces
www.embarqindia.org
Existing:56% Residential9% Public13% Commercial8% Mixed Use6% Parks and Open Spaces
Proposed Land Use as per CDP 2015 Existing Land Use
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS - EXISTING
Mixed Land Use – Ground Floor and First Floor
Existing Ground Floor Mixed Land Use:54% Residential16% Commercial9% Mixed Use
www.embarqindia.org
Ground Floor Mixed Land Use First Floor Mixed Land Use
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS - EXISTING
Floor Area Ratio – Proposed (CDP 2015) and Existing
Proposed:59% 1.75 FAR0.5% 2.00 FAR28% 2.25 FAR12.5% 3.25 FAR
Existing:1.75 FAR
49% Achieved15% Underachieved35% Overachieved
2.0 FAR
43% Achieved30% Underachieved27% Overachieved
www.embarqindia.org
Proposed FAR as per CDP 2015 Existing FAR
27% Overachieved
2.25 FAR
18% Achieved70% Underachieved12% Overachieved
3.25 FAR
4.0% Achieved96% Underachieved0.0% Overachieved
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS - EXISTING
Building Heights – Proposed (CDP 2015) and Existing
Proposed (as per CDP 2015):70% G+14% G+212% G+36% G+410% G+5
www.embarqindia.org
Existing:9% G48% G+118% G+29% G+34% G+40.7% G+5
Proposed Building Heights as per CDP 2015
Existing Building Heights
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS - EXISTING
Activities and Generators, Street Rating
www.embarqindia.org
Activities and Generators Street Rating
Note: Please refer report for data analysis on Figure Ground, Natural Features, Road Hierarchy, Legibility, Detailed Street Rating and Supply/Demand.
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS - TRANSFORMATIVE
Triggers – Access and Proximity to Metro Station, Land Value
�All edges along CMH Rd, 100 Feet Rd
and Double Rd highly likely to transform
�Interior of all sectors and not
adjoining a major road are unlikely to
transform
�Sector N3 is highly likely to transform
uptil Sri Krishna street along CMH Rd
www.embarqindia.org
Access and Proximity to Metro Station Land Value
�All edges along CMH Rd in sectors N2
and S2 are unlikely to change
�Sector S3 is most unlikely to change
�Interior of sectors N1, S1, N2, S2 and
N3 are likely to transform
�Mottapanapalya and Appareddypalya
are highly likely to transform
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS - TRANSFORMATIVE
Triggers – Plot Size, FAR
�All plots of sizes less than 350 SqM in all
sectors are highly to transform
�Sectors N2 and S2 are highly to transform
�Informal settlement in sector N3 is highly
likely to transform
�Mottapanapalya in sector S2 is highly likely
to transform
www.embarqindia.org
Plot Size Floor Area Ratio
�Sectors N1 and N2 are unlikely to
transform
�Both edges of Indiranagar 100 Feet
Rd highly likely to transform
�BDA Complex in sector N1 is likely to
transform
�Sectors N2 and S2 are likely to
transform
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS - TRANSFORMATIVE
Triggers – Land Ownership, Likelihood of Land Use Change
�Properties in all sectors owned by private
properties are likely to transform
�Institutional properties are likely to transform
�Properties owned by Schools are unlikely to
transform
�Mottapanapalya in sector S2 is highly likely to
transform
Residential properties in sectors N1, N2,
www.embarqindia.org
Land Ownership Likelihood of Land Use Change (Residential to Commercial)
�Residential properties in sectors N1, N2,
N3 and S3 are unlikely to transform
�Mottapanapalya in sector S2 and BDA
Complex in sector N1 are unlikely to
transform
�Both edges of CMH Rd unlikely to
transform any further
�Sectors S2 and S2 are likely to transform
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA ANALYSIS - TRANSFORMATIVE
Triggers – Land Ownership, Likelihood of Land Use Change
�Properties in sector N2 between CMH Road and 5th
Main Road highly likely to transform
�Properties on Sri Krishna Temple Rd in sector N3 are very likely to transform
�Both edges of Indiranagar 100 Feet Rd are highly likely to
transform
�Properties in sector S3 are unlikely to transform
www.embarqindia.org
Composite Transformation
�Properties in sector N1 and remaining properties in sectors N3 and S2 are likely to transform
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA COLLECTION AND STATUTORY DOCUMENT REVIEW
Photo Documentation
www.embarqindia.org
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA COLLECTION AND STATUTORY DOCUMENT REVIEW
Photo Documentation
www.embarqindia.org
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA COLLECTION AND STATUTORY DOCUMENT REVIEW
Photo Documentation
www.embarqindia.org
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU DATA COLLECTION AND STATUTORY DOCUMENT REVIEW
Summary of all data collected and reviewed
The following data has been collected and statutory documents reviewed:
� CDP 2015 - Land Use Plan and FAR� BMRC DPR� BMTC – Bus Routes and Schedules� Administrative Boundaries of City Agencies (BBMP, BESCOM, BWSSB, Post Office, Crime Police,
Traffic Police, and Resident Welfare Associations (RWA)� Mapping Information – Buffer, Area (750 M), Core Area (150 M), Total Station Survey� Census (1990, 2000)� Questionnaire Surveys (750 surveys) - Resident Survey, Visitor Survey, Passerby Survey
www.embarqindia.org
� Questionnaire Surveys (750 surveys) - Resident Survey, Visitor Survey, Passerby Survey� Pedestrian Volume Counts (16 Locations)� Pedestrian OD Surveys� Urban Fabric Data – Building Use, Building Heights, Land Ownership, Road Hierarchy, Activities and
Generators, Parking, Street Sections, Residential Typology� Real Estate Pricing (1990, 2000, 2010)
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU
An Accessibility Project for Indiranagar Metro Station
TOWARDS A WALKABLE AND SUSTAINABLE BENGALURU RECOMMENDED FUTURE STEPS
The following are the recommended future steps:
� Integrate the best practices of this report in terms of intersection design, pedestrian crossing, trafficcalming etc. along the entire 7.2 Km stretch of the Reach-1 of Namma Metro
� EMBARQ to partner with BBMP to integrate the Indiranagar Metro Station Accessibility Proposals into theDPR and Tender Documents and monitor the impacts
� EMBARQ to partner with DULT, BMRC and BBMP to identify consultants to prepare a similar accessibilityproject report for the remaining 5 Metro Stations along reach-1
www.embarqindia.org
project report for the remaining 5 Metro Stations along reach-1
� EMBARQ to partner with DULT, BMRC, BBMP to review the accessibility reports produced by theconsultants
� EMBARQ to partner with DULT, BMRC and BBMP to replicate the accessibility study for all Metro Stations
� EMBARQ to partner with DULT to integrate the accessibility proposals into the CTTP