amulung fire stationregion2.bfp.gov.ph/wp-content/uploads/2019/02/2019... · 2019-02-21 · amulung...
TRANSCRIPT
Amulung Fire StationSFO4 Reynaldo M Malupeng
Officer-In-Charge
Amulung, CagayanMunicipality of
AMULUNG, CAGAYAN
I. GENERAL OVERVIEWA. Municipality Profile
AREA PROFILE
PROVINCE NO. OF CITIES
NO. OF MUNICIPALITIES
NO. OF BARANGAYS POPULATION LAND AREA
(km2)
NO. OF ESTABLISHMENTS
(as per BPLO)
AMULUNG 0 0 47 54,110 242.2 km2 698
B. Jurisdictional Map of Municipality
Amulung was officially founded on December 15, 1734 by Manuel Romero who wasthen alcalde mayor of the province. Predominantly populated by the Ilocanos andItawes, it is in this municipality where quaint dialects are spoken. Some Spanishprecede the Itawes translation so that the same sentence or question is substantiallystated or asked twice. Amulung is a mere 25 minute ride to Tuguegarao for it is only 26kilometers away. It is a 2nd class municipality in the province of Cagayan, Philippines.
C. History
II. ADMINISTRATIVE UPDATE
A. Personnel Administration
PROVINCE
OFFICER NON OFFICER
NUP TOTAL
SSUPT SUPT CINSP SINSP INSP SFO4 SFO3 SFO2 SFO1 FO3 FO2 FO1
CAGAYAN 0 0 0 0 0 1 0 1 4 2 4 7 0 19
(as of 11 January 2019)
PROVINCE POPULATION AS OF 2018
IDEAL NUMBER OF PERSONNEL
ACTUAL NUMBER OF PERSONNEL
SHORTAGE OF PERSONNEL
IDEAL NUMBER OFFIRE TRUCKS
ACTUAL NUMBER OF FIRE TRUCKS
SHORTAGE OF FIRE TRUCKS
Amulung 54, 110 28 19 9 2 2 0
Ideal Ratio of Firefighter to Firetruck = 1:14Ideal Ratio of Firefighter to Population = 1:1,933Ideal Ratio of Firetruck to Population = 1:27,055
Table A-1b Total Strength vs Actual Strength TOTAL STRENGTH ON TRNG/ ON SUSPENSION ACTUAL STRENGTH
Amulung Fire Station 19 1 FBRC 18
Table A-2 Training Profile
TRAINING TOTAL
OSEC PSOAC OBC W/OUTOBC OCC FPSC FAIIC FAIC FIC FSBC P/FBRC W/OUT
FBRC NUP
CAGAYAN 0 0 0 0 0 2 6 0 0 0 10 1 0 19
TOTAL 0 0 0 0 0 2 6 0 0 0 10 1 0 19
B. Personnel due for Retirement for 2019
No. of Retirees per month TOTAL
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0
CAGAYAN 0 0 0 0 0 0 0 0 0 0 0 0 0
III. LOGISTICAL UPDATE
CAGAYAN DATE STARTED/ NTP CONTRACT AMOUNT PROGRESS OF
CONSTRUCTIONDATE OF
COMPLETION REMARKS
NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE
A. Status of Fire Station/Sub-Station
STATUS OF CONSTRUCTION OF FIRE STATION BUILDINGSCY 2018
B. Status of Fire Apparatus, Ambulance and Service Vehicle
STATUS REPAIR OF FIRETRUCKCY 2018
CAGAYAN DATE AWARDED
AMOUNT OF CONTRACT
PROGRESS OF CONSTRUCTION
(% ofAccomplishment)
DATE OFCOMPLETION REMARKS
NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE
STATUS REPAIR OF RESCUE TRANSPORT VEHICLECY 2018
REGION II DATE AWARDED BUDGET AMOUNT OF CONTRACT
PROGRESS OF CONSTRUCTION
(% ofAccomplishment)
DATE OFCOMPLETION REMARKS
NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE
STATUS REPAIR OF SERVICE VEHICLE - MOTORCYCLECY 2018
REGION II DATE AWARDED BUDGET AMOUNT OF CONTRACT
PROGRESS OF CONSTRUCTION
(% ofAccomplishment)
DATE OFCOMPLETION REMARKS
NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE
IV. OPERATIONAL UPDATE
• NUMBER OF ESTABLISHMENT INSPECTEDA. Fire Prevention
NUMBER OF ESTABLISHMENT INSPECTEDFIRE PREVENTION COMPARATIVE REPORT
NO. OF ESTABLISHMENT INSPECTED CY 2017 CY 2018 VARIANCE(%)ASSEMBLY 2 1 -50EDUCATIONAL 26 57 119.23HEALTH CARE 0 0 0DETENTION AND CORRECTIONAL 0 0 0RESIDENTIAL 35 103 194.28MERCANTILE 539 633 17.44BUSINESS 11 18 63.64INDUSTRIAL 12 13 8.33STORAGE 7 8 14.29MIXED 0 0 0MISCELLANEOUS 7 3 -57.14TOTAL 639 836 30.83
FIRE PREVENTION COMPARATIVE REPORT
CY 2017 CY 2018 VARIANCE(%)
No. of Building Plan Reviewed/ProcessedAnd Issued FSEC 35 103
194.29
No. of FSIC for Occupancy Permit Issued 35 103 194.29
No. of FSIC for Business/Permit to Operate Issued 576 698 21.18
TOTAL FSIC ISSUED 611 801 31.10
Notice to Comply Issued 0 0 0
Notice to Correct Violations Issued 0 0 0
Abatement Order 0 0 0
Amount of Fire Code Fees Collected 151,367.12 168,996.75 11.65
B. 20% Share of LGU (CY 2010-2013)
MUNICIPALITY 20% LGU SHAREDSTATUS
REMARKSAMOUNTPROCURED/SPEND
REMAINING BALANCE (UNDER LGU ACCOUNT)
1 Abulug 105,665.44 98,988.00 6,677.44 ON PROCESS(LGU)
2 Alcala 71,924.66 71,543.40 381.26 RECEIVED
3 Allacapan 83,734.58 0 83,734.58 ON PROCESS(LGU)
4 Amulung 37,088.79 0 0 ON PROCESS (LGU)
5 Aparri 195,822.54 137,984.00 57,838.54 ON PROCESS(LGU)
6 Baggao189,945.07 183,553.40 6,236.67 RECEIVED
7 Ballesteros 83,687.53 0 83,687.53 ON PROCESS(LGU)
8 Buguey 73,677.03 67,451.00 6,226.03 RECEIVED
9 Calayan
10 Camalaniugan 107,770.26 106,251.00 1,519.26 RECEIVED
11 Claveria 232,626.60 218,647.95 13,978.65 RECEIVED
12 Enrile 74,772.54 0 74,772.54 ON PROCESS(LGU)
13 Gattaran 147,306.70 147,306.70 0 RECEIVED
14 Gonzaga 152,909.80 153,075.00 (165.20) RECEIVED
15 Iguig 45,077.69 45,861.00 (528.31) RECEIVED
MUNICIPALITY 20% LGU SHAREDSTATUS
REMARKSAMOUNT PROCURED
REMAINING BALANCE (UNDER LGU ACCOUNT)
16 Lal-lo 140,633.80 140,633.80 0 RECEIVED
17 Lasam 35,608.46 35,608.46 0 RECEIVED
18 Pamplona 3,284.12 3,290.00 (5.88) RECEIVED
19 Peñablanca 65,985.56 65,985.56 0 RECEIVED
20 Piat 86,612.13 83,923.54 2,282.09 RECEIVED
21 Rizal 3,832.80 0 3,832.80 ON PROCESS(LGU)
22 Sanchez Mira 99,740.21 87,290.00 12,450.21 RECEIVED
23 Solana 130,243.70 129,363.00 880.70 RECEIVED
24 Sta. Ana 90,203.31 0 90,203.31 ON PROCESS(LGU)
25 Sta Praxedes18,069.23 0 18,069.23 ON PROCESS(DBM)
26 Sta Teresita 15,147.80 0 15,147.80 ON PROCESS(LGU)
27 Sto Niño 19,167.80 16,299.00 2,868.80 RECEIVED
28 Tuao 78,164.50 78,125.00 39.50 RECEIVED
29 Tuguegarao City 1,546,801.08 346,500.00 1,200,301.08 RECEIVED(NOT FULLY DELIVERED)
Total 3,935,348.73 2,217,679.81 1,680,428.63
RECEIVED ON PROCESS(LGU)
ON PROCESS (DBM) NO COLLECTION TOTAL
NEGATIVE NEGATIVE NEGATIVE NEGATIVE NEGATIVE
Note: Calayan started Fire code fees collection: CY 2014Fire Code Fees Collection as of CY 2018: P 35,754.00
STATUS OF 20% SHARE OF LGU (CY 2018)
B. Fire SuppressionFIRE INCIDENT COMPARATIVE REPORT
KINDS CLASSIFICATION CY 2017 CY 2018 VARIANCE(%)ST
RUCT
URA
L FI
RE
Residential 0 0 0
Commercial/Mercantile 0 0 0
Mixed 0 0 0
Business/Government Offices 0 0 0
Educational 0 0 0
Miscellaneous 1 0 -100
Healthcare 0 0 0
Industrial 0 0 0
Storage 0 1 100
TOTAL 1 1 0
2017 CLASSIFICATION NUMBER OF INCIDENTS
1 Vehicular 22 Miscellaneous 1
TOP 3 CLASSIFICATION OF FIRECY 2017 AND 2018
2018 CLASSIFICATION NUMBER OF INCIDENTS
1 Storage 12 Vehicular 1
FIRE INCIDENT COMPARATIVE REPORT
KINDS CLASSIFICATION CY 2017 CY 2018 VARIANCE(%)
NONSTRUCTURAL
FIRE
Grass, rubbish and forest fire 0 0 0
Motor Vehicle 2 1 -50
TOTAL 2 1 -50
GRAND TOTAL 2 1 -50
AMOUNT OF DAMAGES 1,485,000.00 105,000.00 -92.93
C. Fire Investigation
CAUSES OF FIRE
DESCRIPTION CY 2017 CY 2018 VARIANCE(%)
Electrical connection 0 1 100
Electrical appliance 0 0 0
Spontaneous combustion 2 0 -100
Unattended cooking/stove 0 0 0
Open flame due to torch/gasera/candle 0 0 0
LPG Explosion 0 0 0
Lighted cigarette butt 0 0 0
Lighted match stick/lighter 0 0 0
Incendiary device/flammable 1 0 -100
Open flame (Garbage) 0 1 100
Fire Crackers 0 0 0
Live Embers 0 0 0
Under Investigation 0 0 0
TOTAL 3 2 -33.33
TOP 3 CAUSES OF FIRECY 2017 AND 2018
2017 CAUSE OF FIRE NUMBER OF INCIDENTS
1 Spontaneous combustion 22 Incendiary device/flammable 1
2018 CAUSE OF FIRE NUMBER OF INCIDENTS
1 Openflame (garbage) 12 Electrical connection 1
CLASSIFICATION OF FIRE
DESCRIPTION CY 2017 CY 2018 VARIANCE(%)
Intentional 1 0 -100
Accidental 2 2 0
Fire cases under investigation 0 0 0
Undetermined 0 0 0
TOTAL 3 2 -33.33
CASUALTIES
Fatalities in civilian 0 0 0
Injuries in civilian 0 0 0
Injured Firefighter 0 0 0
TOTAL 0 0 0
UGNAYAN SA BARANGAY KIDDIE JR FIRE MARSHAL
GOV’T OWNED ESTABLISHMENT
2017 26 10 103
2018 29 11 103
VARIANCE(%) 11.54 10 0
V. ISSUES AND CONCERNS
1. Lack of Personnel to man the station2. Lack of PPE’s (Personnel Protective Equipment
SCBA – Training on Handling andProper Maintenance
3. Lack of FSI, Provide FO1 40 hours trainings4. Inadequate Promotional Materials – such as leaflets,
flyers for Fire Prevention Activities5. Immediate Approval and Release of Fund for
Oplan Ligtas na Pamayanan (OLP)
VI. PICTORIALS
Activities• FIRE SAFETY EDUCATORS CONDUCTED FIRE
DRILL WITHIN AOR.
SIMULTANEOUS EARTHQUAKE DRILLS CONDUCTED
SIMULTANEOUS EARTHQUAKE DRILLS CONDUCTED
THE BFP AMULUNG PERSONNEL CONDUCTED FIRE PREVENTION
MONTH MOTORCADE
BERONG BUMBERO SA PAARALAN
FIRE PREVENTION MONTH CONTEST• POSTER (ELEMENTARY) AND DRAWING CONTEST (HIGH
SCHOOL)
BFP AMULUNG CONDUCTED LECTURES ON BASIC• ROPEMANSHIP: KNOT TYING, ACTUAL DEMONSTRATION
ON RAPELLING, ASCENDING AND DESCENDING TO AMULUNG RESCUE 47
UGNAYAN SA BARANGAY
BFP AMULUNG OPERATION UNIT RESPONDED (VEHICULAR ACCIDENT)
BFP AMULUNG OPERATION UNIT RESPONDED (VEHICULAR ACCIDENT)
SFO4 Reynaldo M MalupengOfficer-in-Charge