Page 1: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Amsterdam going digital

…750 years of technology

Ger Baron

Page 2: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

2016 1000

Golden Age Golden

Age

University

of Amsterdam founded

VU University founded

1600

Firs t Stock Exchange

Largest fleet and

harbour in the world

Schiphol

finished

Canals Europe connected

to the internet via Amsterdam

Nobel Prize Van ’t Hoff

National Museum

AMS-IX founded

AMS

Firs t Centra l bank

Water network

Sewers

North Sea

Canal

FttH

Smart Grids Open Data

1st ind. rev. 2nd ind. rev. 3th ind. rev.

Nothing New

Page 3: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Digital Revolution

Page 4: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution
Page 5: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution
Page 6: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Pilot Taxi IGH Artificial Intelligence

Maandag 7 november Tech and the city

Page 7: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

7 7

Pilot Taxi IGH Augmented Reality

Page 8: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

8 8

Pilot Taxi IGH Virtual Reality

Page 9: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

9 9

Pilot Taxi IGH Blockchain

Page 10: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Transitions are all about collaboration

10

Page 11: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Technical

Physical

Economical

Legal

Social

Political

Barriers

Future Toda

y

Page 12: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Our focus

Page 13: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Energy

1

3

Page 14: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

A new market

© Forbes

Page 15: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Residential retrofit

Page 16: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Virtual power plant – City-zen

Storage and trade of surplus

solar energy through home

batteries.

Page 17: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Gaming to make the right decission 17

Page 18: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Heating & cooling

Page 19: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Heating & cooling 19

Page 20: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Futureproof infrastructure 20

Page 21: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Energy storage

The Johan Cruijff

ArenA as football

stadium and power

plant

Page 22: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

New type of sanitation at Buiksloterham

Page 23: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Social value: Cascoland bio-digester

23

Page 24: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Blockchain – Spectral Energy

24

Page 26: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Our focus

Page 27: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

27

Three overarching themes to be met in 5G Field lab Amsterdam ZO

Experience

Mobility

Safety UEFA safety requirement is highly intrusive for visitors partly ineffective and expensive if the perimeter is implemented

(only) in a physical way1

10-30% of people buy ticket but are late or miss out (NPS) >90% of people only attend the event, not the area (ARPU)

Majority of people arrive by car (NPS) and obstruct people work & living in the area

Page 28: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

28

Experience case: Improve stickiness of the area by distribution of

content Creating value by extending DRM & content delivery in the area and to customers

Page 29: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

29

First target – creating digital ecosystem in A’dam ZO Digital security intended to be as safe and less intrusive

Stickiness and experience should be improved by distributing v ideo content of event

Improve stickiness (ARPU)

Digital perimeter (UEFA Req.))

Improve experience (NPS)

People (late) with ticket can watch anywhere

Page 30: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

30

Roles & Responsibilities

City of Amsterdam

• Potential permits for digging, placement of camera’s and deployment of radio equipment • Responsible for public discussions relating usecase(s) of the Fieldlab; privacy e.g.

KPN • E2E day 1 solution indoor & outdoor (3.5GHz 40MHz spectrum bundled with 3.5GHz

40MHz of Amsterdam Arena applications, UE, networking) • Governance communication • After day 1: open approach

Amsterdam Arena

• Facilitation temporary FoC deployment of radio equipment in the area (including Arena), transmission on buildings with various stakeholders

• Adoption / test of 5G Fieldlab usecases by end-users

• Implementation of 5G KPN/Arena/Amsterdam Fieldlab into OMC facilitaties in a v isible way • Ensuring DRM for content of different events for specified ‘experience usecase’

• AIA – 40MHz spectrum license to be bundled with KPN license for on the pitch & outdoor use

Page 31: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution

Our focus

Page 32: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution
Page 33: Amsterdam going digital · AMS First Central bank Water network Sewers North Sea Canal FttH Smart Grids Open Data 1st ind. rev. 2nd ind. rev. th3 ind. rev. Nothing New . Digital Revolution