Amsterdam Avenue Proposed Northbound Bike Route
New York City Department of Transportation Presented by the Bicycle and Greenway Program on November 10, 2015 to Community Board 7
![Page 2: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/2.jpg)
Outline
2
• Background
• Design Discussion
• Making it Work
• Alternatives
• Summary
• Next Steps
![Page 3: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/3.jpg)
Background Network History
3
2010 • Columbus Avenue Parking Protected Bicycle
Lane (96th St to 77th St)
2013 • Columbus Avenue Parking Protected Bicycle
Lane (110th St to 96th St and 77th St to 69th St)
2015 • Lincoln Center Bowtie / Columbus Avenue
Parking Protected Bicycle Lane (69th St to 59th St)
Northbound Route • No corresponding northbound protected
route serves the community • CB 7 and electeds asked DOT to study
Amsterdam Avenue • DOT has looked at several NB possibilities
![Page 4: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/4.jpg)
4
• Logical northbound pairing for Columbus Avenue
• Plaza at the 72nd Street subway station forces Broadway traffic to Amsterdam
• High traffic volumes, bus route, local truck route, active curbside loading
Background Amsterdam Avenue
![Page 5: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/5.jpg)
5
• North of 72nd Street • Amsterdam carries traffic from 10th
Ave and Broadway • Connected to network via CPW and
77th/78th
• South of 72nd Street • Network connections • Bowtie considerations
Background Northbound
![Page 6: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/6.jpg)
6 Citi Bike station map inside CB 7 is approximated.
In October 2015, 29% of Citi Bike trips that started in CB 7 also ended in CB 7
Citi Bike expanded to W 86th Street in the fall of 2015
In October 2015, 45% of Citi Bike trips that started in Midtown ended in CB7 (CB 4, 5, or 6)
Source: Citi Bike trip data between September 1st and September 30th 2015
Background Citi Bike
Citi Bike will expand to 130th St by 2018
![Page 7: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/7.jpg)
7
Amsterdam Ave W 85th to W 86th St
12-hour Bike Volume
October 2007 217
October 2011 515
October 2015 609
Source: ATI Data, Bicycles btw. W 85th St and W 86th St on Amsterdam Ave and btw. W 87th St and W 86th St on Columbus Ave in October 2007, 2011, and 2015. 7am-7pm.
Columbus Ave W 87th to W 86th St
12-hour Bike Volume
October 2007 486
October 2011 594
October 2015 724
Background Bike Volumes
• A three fold increase in cycling on Amsterdam since 2007 and almost double on Columbus.
![Page 8: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/8.jpg)
8
Amsterdam Avenue W 72nd St to W 110th St
Injury Summary 2009-2013 (5 years)
Injuries Severe Injuries
Fatalities
Pedestrian 157 16 1 Cyclist 62 3 0 Motorist 294 17 1 Total 513 36 2
Indicates the number of injuries Indicates that a fatality occurred at this location
Amsterdam Ave has a KSI (killed or severely injured) of 8.9 per mile for pedestrians (KSI of 19.7 for all).
Background Injuries
Source: NYPD AIS/TAMS Crash Database
![Page 9: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/9.jpg)
9
Design Existing Issues
59% of vehicles are speeding at off-peak times
Long crossing distances
High peak vehicle volumes
Current design encourages bad driver behavior
Not designed to a neighborhood
scale Source: Radar speed study taken on October 6, 2015 btw. W 81th St and W 82th St on Amsterdam Avenue
![Page 10: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/10.jpg)
Design Proposal
Existing
Proposed
Curbside parking protected lane
Pedestrian safety islands
Lane reduction with turn lanes
Updated curb regulations
10
![Page 11: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/11.jpg)
Design Proposal
11
Bicycle lane protected
from traffic
Reduced crossing distances
Off-peak traffic calming
New trees
Columbus Avenue at W 107th St A
mst
erda
m A
ve
W 79th
Neighborhood scale design
![Page 12: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/12.jpg)
12
In general protected bike lanes in Manhattan improve safety for all users:
• Crashes with injuries have been reduced by 17%
• Pedestrian injuries are down by 22%
• Cyclist injuries show a minor improvement even as bicycle volumes have dramatically increased
• Total injuries have dropped by 20%
Protected bicycle lane projects with 3 years of after data include the following: 9th Ave (16th-31st), 8th Ave (Bank-23rd, 23rd-34th), Broadway (59th-47th, 33rd-26th, 23rd-18th), 1st Avenue (Houston to 34th), 2nd Ave (Houston-34th), Columbus Ave (96th-77th) Note: Only sections of projects that included protected bicycle lanes were analyzed Source: NYPD AIS/TAMS Crash Database
-25% -22%
-2%
Design Safety
514
221
280
100
601
426
166
220
98
484
0
100
200
300
400
500
600
700
Crasheswith
Injuries
MVOccupantInjuries
PedestrianInjuries
CyclistInjuries
TotalInjuries
Num
ber o
f Inj
urie
s
Protected Bicycle Lanes with 3 yrs of After Data:
Before vs After
Before After
-17%
-20%
![Page 13: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/13.jpg)
13
W 86: v/c - 0.81
W 96: v/c - 0.91
W 79: v/c - 0.85
Existing Condition v/c Ratios
Making it Work Existing Capacity
Cross Street Amsterdam 6-7 PM Peak
Volumes (veh/hr)
Delay (s)
Volume-to-
Capacity Ratio
W 96th 1,687 12.8 0.91
W 86th 1,704 6.5 0.81
W 82nd 1,545 3.0 0.66
W 79th 1,330 40.9 0.85
W 77th 1,377 4.8 0.62
The volume-to-capacity ratio is a measure of how “full” a roadway feels and is calculated as a ratio between the measured traffic volume and calculated capacity of the roadway. The result is expressed as a number between 0 and 1. A value of “1” would indicate that the roadway is “full.”
W 77: v/c - 0.62
W 82: v/c - 0.66
Delay is a measure of the average time a vehicle will spend processing through an intersection
Existing Traffic Conditions
![Page 14: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/14.jpg)
Making it Work Daily Volumes
14 Source: ATI Data, Vehicles btw. W 95 St and W 96 St, May 2014
0
200
400
600
800
1000
1200
1400
1600
1800
12:00AM
1:00AM
2:00AM
3:00AM
4:00AM
5:00AM
6:00AM
7:00AM
8:00AM
9:00AM
10:00AM
11:00AM
12:00PM
1:00PM
2:00PM
3:00PM
4:00PM
5:00PM
6:00PM
7:00PM
8:00PM
9:00PM
10:00PM
11:00PM
Amsterdam Avenue Daily Vehicle Volumes Between W 95th St and W 96th St
![Page 15: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/15.jpg)
15 Source: ATI Data, Vehicles btw. W 78 St and W 79 St, October 2014
0
200
400
600
800
1,000
1,200
1,400
1,600
Amsterdam Avenue Daily Vehicle Volumes Between W 78th St and W 79th St
Making it Work Daily Volumes
![Page 16: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/16.jpg)
Making it Work Taxi Usage
16 Note: Study period occurred from 4pm to 7pm on weekdays in April 2015.
• From 4pm to 7pm on weekdays there are approximately 16,065 yellow cab trips that start or end in CB 7
• 50% of trips (8,090) are 1.5 miles or less
• 44% of trips (7,000) are wholly within CB 7 (both start and end)
• 32% of afternoon traffic on Amsterdam Ave is taxis (approximately 400 per hour)
• Large potential for a protected lane to shift trips from taxi to Citi Bike
![Page 17: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/17.jpg)
Mixing zones at all non-two way left turns
Improves visibility of cyclists
Provides space to negotiate conflict
Removes left turns from through lanes
Making it Work Left Turns
Creates left turn vehicle storage
![Page 18: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/18.jpg)
Bike lane continues the length of the block
Turning vehicles queue for turn phase
Pedestrians and cyclists have a leading phase to get a head start
Left-turn bays at 79th, 86th, 96th
Making it Work Left Turns
Split phase allows through traffic to move while holding
left turns, up to 23% more green time given to through
![Page 19: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/19.jpg)
19
Install a paid commercial parking regulation along the east curb of Amsterdam Ave from W. 72nd to W. 96th between 7am and 7pm on weekdays, plus at select locations on west curb
• Maximizes curb space available for
trucks loading or unloading on busy commercial corridor
• Reduces the likelihood of trucks double-parking during peak travel times
• Clear through lanes process traffic more efficiently
Making it Work Deliveries
Existing 1-hr metered parking 9a-7p
![Page 20: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/20.jpg)
Making it Work Overall
20
Existing
Proposed
3 through lanes process efficiently
Traffic is organized into through, turns, and proper
loading zones
Efficient signal progression
![Page 21: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/21.jpg)
21
W 77: v/c - 0.69
W 82: v/c – 0.83
W 86: v/c – 0.91
W 96: v/c - 0.78
W 79: v/c - 0.72
Proposed Condition v/c Ratios
Cross Street
Amsterdam 6-7 PM Peak Volumes
(veh/hr)
Delay (s)
Volume- to-Capacity
Ratio
* W 96th 1,670 5.0 0.78
W 86th 1,687 12.7 0.91
W 82nd 1,530 5.9 0.83
* W 79th 1,317 35.5 0.72
W 77th 1,363 4.5 0.69
Making it Work Expected Outcome
* Benefit from conversion from LPI to Split LPI
Cross Street
Amsterdam 6-7 PM Peak
Volumes (veh/hr)
Delay (s)
Volume-to-Capacity
Ratio
W 96th 1,687 12.8 0.91
W 86th 1,704 6.5 0.81
W 82nd 1,545 3.0 0.66
W 79th 1,330 40.9 0.85
W 77th 1,377 4.8 0.62
Existing
Proposed
![Page 22: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/22.jpg)
Making it Work Parking Consideration
22
25% of the parking space on the corridor will be repurposed
for left turn treatments and pedestrian safety islands
East curb will be converted to daytime
(7am-7pm) commercial loading zones between W 72nd St and W 96th St,
plus targeted loading on the west curb Columbus Avenue at W 106th St
![Page 23: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/23.jpg)
Alternates Studied
23
DOT has studied potential alternatives on nearby
Broadway and Columbus
Note: Any alternative bike route will be paired with pedestrian improvements on Amsterdam to create a safer corridor without bike facilities
Amsterdam Avenue is the preferred northbound route, however it
comes with parking loss and some vehicular capacity reduction
![Page 24: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/24.jpg)
Broadway Route
24
Existing
Proposed
Buffered bicycle lane against the median in the
northbound direction
Minor traffic impact Design challenges between
95th and 97th
Requires new left turn design
![Page 25: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/25.jpg)
Columbus Ave Route
25
Convert southbound lane to a two way path
No changes to vehicular capacity
Learning curve for users, heavy pedestrian access Requires infrastructure
upgrades
![Page 26: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/26.jpg)
Summary
26
Phase I – Amsterdam Avenue Preferred Route
• Protected bicycle lane provides northbound route for cyclists
• Reduced pedestrian crossing distances with islands
• Design for neighborhood street with safety benefits expected for all users
• Lane reduction with left turn treatments
• High peak hour traffic volumes require some adjustments
• Left turn treatments and paid commercial spaces reduce parkable area
• Traffic flow will be maintained
• Connections to new route via CPW at 77th/78th and 90th/91st
![Page 27: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final](https://reader033.vdocuments.site/reader033/viewer/2022051117/5695d44b1a28ab9b02a0f9bb/html5/thumbnails/27.jpg)
27
Phase 1 – 72nd – 110th • Incorporate feedback into plan and
present to board for support
• Implement in Spring 2016, nearly two miles of protected lanes and new infrastructure
Phase 2 – South of 72nd • Gather feedback & develop proposals
• Consider network connections
• Coordinate with 2016 capital project at 71st/Amsterdam/Broadway
• Complete improvements at Columbus/65th Street/Broadway
• Any route will require careful planning through complex intersection of 71st/Amsterdam/Broadway
Next Steps