ams software review acc daq monitoring

18
AMS Software Review AMS Software Review ACC ACC DAQ Monitoring DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011

Upload: donoma

Post on 04-Feb-2016

64 views

Category:

Documents


0 download

DESCRIPTION

AMS Software Review ACC DAQ Monitoring. Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011. ACC DAQ Monitoring. ACC Electronic Scheme:. ACC DAQ Monitoring. History: Starting time: Cosmic Data Taking Period at CERN after AMS-02 Pre-Integration May 200 by - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: AMS Software Review  ACC DAQ Monitoring

AMS Software Review AMS Software Review ACCACC DAQ Monitoring DAQ Monitoring

Ch Chung, A. Goerres, Th. Kirn

I. Phys. Institute B,

KSC, 31st January 2011

Page 2: AMS Software Review  ACC DAQ Monitoring

2

ACC DAQ Monitoring

ACC Electronic Scheme:

Page 3: AMS Software Review  ACC DAQ Monitoring

3

ACC DAQ Monitoring

History:• Starting time: Cosmic Data Taking Period at CERN after

AMS-02 Pre-Integration May 200 by

Ph. v. Doetinchem, continued by A. Goerres

to be continued by Ch. Chung + Th. Kirn

Page 4: AMS Software Review  ACC DAQ Monitoring

4

ACC DAQ Monitoring Block-Files

Mean ADC values for each of the 4 PMTs of S0, S1, S2 and S3 crate

Number of TDC Hits for each of the 4 PMTs of S0, S1, S2 and S3 crate

mean JLV1 trigger pattern for each AND/OR of PMTs corresponding to one set; SFEA board temperature sensors, Global DALLAS sensors on each PMT box

Median ADC values for each of the 4 PMTs of S0, S1, S2 and S3 crate

Page 5: AMS Software Review  ACC DAQ Monitoring

5

ACC DAQ Monitoring

S0WAKE +Z

S1RAM +Z

S2WAKE -Z

S3RAM -Z

Black (SFEA2 input channel 0) Red (SFEA2 input channel 1)Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3)

Page 6: AMS Software Review  ACC DAQ Monitoring

6

ACC DAQ Monitoring

S2WAKE -Z

Black (SFEA2 input channel 0) Red (SFEA2 input channel 1)Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3)

Page 7: AMS Software Review  ACC DAQ Monitoring

7

ACC DAQ Monitoring

S0WAKE +Z

S1RAM +Z

S2WAKE -Z

S3RAM -Z

Black (SFEA2 input channel 0) Red (SFEA2 input channel 1)Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3)

Mean ADC values for each of the 4 PMTs of S0, S1, S2 and S3 crateCalculated out of 500 ADC values, not pedestal corrected

Page 8: AMS Software Review  ACC DAQ Monitoring

8

ACC DAQ Monitoring

S0WAKE +Z

S1RAM +Z

S2WAKE -Z

S3RAM -Z

Black (SFEA2 input channel 0) Red (SFEA2 input channel 1)Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3)

Median ADC values for each of the 4 PMTs of S0, S1, S2 and S3 crateMedian value range 700 – 1000, ADC value range 300 – 2000, Running value: ADC value above median → median increase by 0.5 ADC value below median → median decrease by 0.3

Page 9: AMS Software Review  ACC DAQ Monitoring

9

ACC DAQ Monitoring

Raw Data: Stored time marks of discriminator transactions in TDC

Page 10: AMS Software Review  ACC DAQ Monitoring

10

ACC DAQ Monitoring

TDC: Discriminator threshold for all channels set to 200

Page 11: AMS Software Review  ACC DAQ Monitoring

11

ACC DAQ Monitoring

S0WAKE +Z

S1RAM +Z

S2WAKE -Z

S3RAM -Z

Black (SFEA2 input channel 0) Red (SFEA2 input channel 1)Green (SFEA2 input channel 2) Blue (SFEA2 input channel 3)

Mean number of TDC Hits, averaged over 1500 entries

Page 12: AMS Software Review  ACC DAQ Monitoring

12

ACC DAQ Monitoring

• JLV1-trigger: Percentage of events which get a veto-flag

• ADC values as a function of the corresponding JLV1 pattern

• events with JLV1 off pattern for certain PMT contribute ~10% at 500 ADC counts and ~0.1% at 1000 ADC counts at threshold 200

Page 13: AMS Software Review  ACC DAQ Monitoring

13

ACC DAQ Monitoring

Temperature Sensors S-crates, Temperature Sensors on PMT-boxes

Operational: -30°C … +45°C

Non-Operational: -35°C … +50°C

Page 14: AMS Software Review  ACC DAQ Monitoring

14

2010 KSC Cosmic Data Period → ACC Stability

Page 15: AMS Software Review  ACC DAQ Monitoring

15

- TRD-track for prediction of ACC-hit

- only the center of panel is taken into account

2010 KSC Cosmic Data Period

Wake Ram

Page 16: AMS Software Review  ACC DAQ Monitoring

16

2010 KSC Cosmic Data Period

ACC Signal MOP / 1000 events2010.09.01 – 2011.01.21

Zoom ..Change of Trigger Conditions:“1 out of 4”

Page 17: AMS Software Review  ACC DAQ Monitoring

During ISS end to end test period all 16 PMTs are stable less than 2% level

Page 18: AMS Software Review  ACC DAQ Monitoring

Wake +Z

Wake -Z

RAM +Z

RAM -Z

2010 KSC Cosmic Data Period ACC Stability