amping up collectability in a down economy: collateral, liens, and other legal maneuvers

15
AMPING UP COLLECTABILITY IN A DOWN ECONOMY: COLLATERAL, LIENS, AND OTHER LEGAL MANEUVERS Presented at the PEARL Conference – April 2009 Alan M. Mirman Mirman & Bubman, LLP Woodland Hills, California

Upload: chelsi

Post on 11-Feb-2016

40 views

Category:

Documents


0 download

DESCRIPTION

Amping Up Collectability in a Down Economy: Collateral, Liens, and Other Legal Maneuvers. Presented at the PEARL Conference – April 2009 Alan M. Mirman Mirman & Bubman, LLP Woodland Hills, California . TOUGH ECONOMIC TIMES. Bankruptcies and uncompleted projects; - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

AMPING UP COLLECTABILITY IN A

DOWN ECONOMY: COLLATERAL, LIENS, AND OTHER LEGAL MANEUVERS

Presented at the PEARL Conference – April 2009Alan M. Mirman

Mirman & Bubman, LLP Woodland Hills, California

Page 2: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

TOUGH ECONOMIC TIMES Bankruptcies and uncompleted projects; Credit tight even if money is cheap; Some percentage of write-offs is standard -

Not as crucial in a good economy; Several % difference in collections impacts

bottom line; May need to spend more focus, if not more $$

to improve - Plan ahead; Improve documentation; Allocate responsibilities including follow up.

Page 3: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

Rx IN A DOWN ECONOMYHow to stay healthy: Avoid risk; Follow PEARL standards; Pay attention to details; Stay awake during

this presentation!

Page 4: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers
Page 5: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

Evaluation Implementation

Review

STEPS TO IMPROVED COLLECTIONS

Page 6: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

Increased write offs? Are problems external or internal?

Due to sales to non-creditworthy customers? Due to offsets, quality control or other

problem? Due to disputes or lack of enforceable

paperwork?Whatever the answer, look at the causes:

lack of know-how; inadequate staffing; lack of management attention; salespeople on commission.

Page 7: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers
Page 8: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

UNDERSTAND YOUR RIGHTS AND HOW TO IMPROVE THEM

Read the terms and conditions; Require Guarantee/Letter of

Credit/Bond; Security interest in the goods:

Obtaining a security interest Perfecting a security interest

Mechanic’s lien rights.

Page 9: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

INTERNAL CONTROLS TO EFFECTUATE A PLANSystem in place with chain of command

for strengthening rights and reporting problems: Has credit been checked? Were T&C actually sent? Were conflicts between PO and invoice

identified and resolved? Is documentation in order? Were liens filed and properly served?

Page 10: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

Follow up: Quarterly review: is this working? Attack existing problems:

Identify ongoing problems and evaluate potential “fix”

Have lien periods expired? Has written demand been made? Has change order procedure been followed?

How to deal with negative results and find solutions

Page 11: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

Often Ignored Remedy for Sellers:

RECLAMATION Federal statute - 11 U.S.C. § 546(c). If you sell goods and the buyer files bankruptcy you

may be able to recover your goods if you act quickly. 

Make written demand for the return of the goods within 45 days after the buyer receives them.

If buyer files bankruptcy, you have 20 days after the bankruptcy was filed to make your demand.

If buyer or bankruptcy trustee do not return the goods, file an action in bankruptcy court as soon as possible. If successful, the costs involved in the action are recoverable against the bankruptcy estate.

This is a right to be exercised with speed, or not at all.

Page 12: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

Get out of jail card #1:DIDN’T GET A CHANGE

ORDER? Courts generally enforce Change Order clauses,

which normally require advance approval; Exceptions normally rely on whether Owner had

timely notice, and induced contractor to do the work; Some exceptions:

Oral Waiver of clause requiring a writing; Estoppel – promise to pay; reliance by contractor; Unjust Enrichment – if coercion, fraud, mistake or

request; Modification by performance – oral change order is

deemed executed.

Page 13: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

Get out of jail card #2:DELAYS JEOPARDIZE

PAYMENT? Did you give written notification to party that hired

you? Steps to protect rights:

Check your subcontract to see if it incorporates claim procedure from prime contract;

Keep a separate claim file; Document all extra costs; Channel communications through one person; Document and confirm relevant conversations.

Avoid waiver Demand adequate assurance of payment.

Page 14: Amping Up Collectability in a Down Economy:  Collateral, Liens, and  Other Legal Maneuvers

Get out of jail card #3:INCOMPLETE OR INCORRECT

PLANS? Implied warranty that plans and specs are accurate and

sufficient (US Supreme Court case – Spearin Doctrine):“If the contractor is bound to build according to plans and specifications prepared by the owner, the contractor will not be responsible for the consequences of defects in the plans and specifications”

Exceptions: If contractor doesn’t follow the incorrect plans and specs; Whether a reasonably competent contractor would have discovered

the error; Whether the contract provides that contractor assumes the risk of

errors; Failure to make required site visit that would have revealed error.

Broad clause that owner is not responsible because actual conditions may be different than on plans is not as likely to be enforced.