ampelmann demonstrator by david cerda salzmann. offshore access

35
Ampelmann Demonstrator by David Cerda Salzmann

Upload: annice-wade

Post on 18-Dec-2015

264 views

Category:

Documents


12 download

TRANSCRIPT

Page 1: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Ampelmann Demonstrator

by David Cerda Salzmann

Page 2: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Offshore Access

Page 3: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Offshore Access

Page 4: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Offshore Access

Offshore Access is NOT easy

Page 5: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Offshore Access

Offshore Access

=

Essential for turbine maintenance

Page 6: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Boat-to-ladder

Horns Rev access by boat:

• 1st winter: 5/7 days • 2nd winter: 1/7 days

Limited to calm weather conditions

Page 7: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Helicopter hoisting

Costly, requires deck, hazardous operation

Page 8: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Future Prospects

• Larger wind turbines

• Larger wind farms

• Farther offshore

Need for new access method?

Page 9: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Ampelmann

Page 10: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Ampelmann Solution based on the problem:

Ship is moving, structure is NOT

Page 11: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Ampelmann

Moving vessel

Motion sensor

Motion platform

Active motion compensation

Page 12: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Ampelmann

Page 13: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Ampelmann

• Invented by 2 TU Delft PhD students

• Wind Energy Conference, Berlin 2002

• Code name “Ampelmann”

As easy as crossing the street

Page 14: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Proof of Concept

Page 15: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Proof of Concept

Page 16: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Proof of Concept

The concept works!

Page 17: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Industry comments

• Show that it works full-scale

Build a demonstrator!

• Show that it works offshore

• Prove that the system is safe

Page 18: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Project

Page 19: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Design Requirements

• Hs = 2.0 m on a 50 m vessel

• Cylinder stroke 2 meter

• Maximum footprint 6 x 6 meter

• Redundant System

Page 20: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Planning

Sept 2006 Sept. 2007

FinancePrototype

R & D Shell, Smit, Heerema

Design

Construct

Order components

Onshore testing Offshore testing

Safety & certification

Interest clients

Dem

o

Start company

Page 21: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Planning

Sept 2006 Sept. 2007

FinancePrototype

R & D Shell, Smit, Heerema

Design

Construct

Order components

Onshore testing Offshore testing

Safety & certification

Interest clients

Dem

o

Start company

Components finishedSafety system in developmentProgramming control systemLloyd's Certification

Page 22: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Planning

Sept 2006 Sept. 2007

FinancePrototype

R & D Shell, Smit, Heerema

Design

Construct

Order components

Onshore testing Offshore testing

Safety & certification

Interest clients

Dem

o

Start company

Testing this summer

Page 23: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Planning

Sept 2006 Sept. 2007

FinancePrototype

R & D Shell, Smit, Heerema

Design

Construct

Order components

Onshore testing Offshore testing

Safety & certification

Interest clients

Dem

o

Start company

Commercialize aftersuccessful demo

Page 24: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Planning

Sept 2006 Sept. 2007

FinancePrototype

R & D Shell, Smit, Heerema

Design

Construct

Order components

Onshore testing Offshore testing

Safety & certification

Interest clients

Dem

o

Start company

• Motion platform• Hydraulics• Controls

Page 25: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Motion platform design

• Footprint and cylinder stroke given

6 x 6 m2 m

Page 26: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Motion platform design

• Footprint and cylinder stroke given

• Load case: 10 tonnes

Page 27: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Motion platform design

• Footprint and cylinder stroke given

• Load case: 10 tonnes

• Optimized to forces and workspace

Page 28: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Motion platform design

Motion range:

Vertical 2.5 m

Horizontal 3.3 m

Rotations 50 °

Page 29: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Hydraulic design

• Redundant design

• Low power consumption

• Vessel motion simulations

Page 30: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Hydraulic design

• Pump pressure 240 bar

• Power demand 200 kW

• Piston accumulator

• 2 valves per cylinder

Page 31: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Control design

• Based on flight simulator

• Redundant

• Feed forward

Page 32: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Gangway

Length: 8-16 meter Yaw: 2 x 180 degrees Pitch: +/- 20º

Page 33: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Construction

Assembly this month

Page 34: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

Offshore Testing

Testing this summer

Page 35: Ampelmann Demonstrator by David Cerda Salzmann. Offshore Access

www.ampelmann.nl