DIMENSION NOTE:DO NOT SCALE OFF DRAWINGS. ALL MEASUREMENTS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.

IF UNCLEAR OF ANY ITEMS ON THESE DRAWINGS, REFER TO CONTRACT. THE CONTRACT TAKES PRECEDENCE OVER THESE DRAWINGS.

CONTRACTORS SHALL CHECK ALL DIMENSIONS & SITE CONDITIONS PRIOR TO COMMENCING FABRICATION OR CONSTRUCTION. ANY DISCREPANCIES TO BE BROUGHT TO THE SUPERVISORS ATTENTION.

ALL INTERNAL/EXTERNAL PAINTING BY OTHERS UNLESS NOTED OTHERWISE IN CONTRACT.

ROOF PLUMBER NOTE:DOWNPIPES SHOWN INDICATIVELY. FINAL POSITION TO BE DETERMINED BY ROOF PLUMBER ONSITE IN ACCORDANCE WITH NCC 3.5.2 & TO AUST. STANDARDS.

WATERPROOFING NOTE:PROVIDE WATERPROOFING TO WET AREAS AS PER NCC 3.8.1 & TO COMPLY WITH AS.3740.

CONCRETE NOTE:REFER TO ENGINEERS DETAILS WHERE APPLICABLE.

7,000

298kO/A

6.404 j9’

( Ol1.000 k 5.000

folk rood

ALFRESCO 7

METAL SQUARELINE GUTTER.

270MM CAVITY BRICKWORK W/- SELECTED RENDER FINISH.

C150015 ROOF PURLINS. REFER TO ENGINEERS DETAILS.

310 UB 32 BEAM. REFER TO ENGINEERS DETAILS.

310 UB 32 COLUMNS. REFER TO ENGINEERS DETAILS.

VILLABOARD LINING TO ALFRESCO SOFFIT.

FLOORPLAN1:100

SHEET INDEXA01 FLOORPLAN / SITEPLAN

A02 ELEVATIONS

5.73

0AL

FRES

CO

ROOF AREAS:

ROOF AREA ON SLOPE 29.83ROOF AREA ON FLAT 29.83

Soak Well Type No.SW 900x6001 1 0.4 m3

Total Capacity 0.4 m3Roof Area GF 29.8 m2

Total Area 29.8 m2Capacity Required (Area x 0.0125) 0.4 m3

Extra Capacity Provided 0.0 m3

NOTE: ALL DOWNPIPES CONNECTED TO SOAKWELLS

WITH PVC STORMWATER PIPE

NOTE: Boundary Measurements are Approximate only.

#51LOT 27

SITEPLAN1:200

+7,000

R.O.W. 1

VIEW STREET

AREA STATSEXISTING AREAS

HOUSE 175.81

PROPOSED AREAS

PATIO 30.00

205.81 m2

Q<A- Ko lW

ULTIMATE ADDITIONS PTY LTDBUILDERS REG # 102052

Revisions:

1> 5:-2:- 6:-3:- 7:-4:- 8:-

PROPOSED ALFRESCO

FLOORPLAN /SITEPLAN

CONLIN

LOT 28 (#53) VIEW ST NORTH PERTH

©2017 HI-TECH DRAFTING

Drawn:J.ReynoldsStatus:JT__Date:

25/07/201 7

Scale as shown @ A3

A 0 1

Project No:

1 0864Printed:

25/07/201 7TH PERTH, 53 VIEW ST\10864 BL 2017.07.25.pinZ:\2 017\10864 NO

MITRED EDGE TO BEAM / COLUMN CONNECTION.'

TOP PFC 2.957 U/S PFC 2.657 “

310 UB 32 COLUMNS. REFER TO ENGINEERS DETAILS.'

RAISED CONC. PAVING. APPROX. 2c (172mm) ABOVE­

GROUND LEVEL. FL 0.000 (00c)

310 UB 32 BEAM. REFER TO ENGINEERS DETAILS.'

300 PFC FASCIA BEAM. REFER "TO ENGINEERS DETAILS.

RL28.93Q

ELEVATION 11:100

ZINCALUME METAL DECK ROOF SHEETING @ 1° PITCH. INSTALL

" TO MANUFACTURERS

SPECIFICATIONS.

MITRED EDGE TO BEAM / ' COLUMN CONNECTION.

310 UB 32 COLUMNS. REFER TO ' ENGINEERS DETAILS.

270MM CAVITY BRICKWORK W/- " SELECTED RENDER FINISH.

415* ZINCALUME METAL DECK ROOF

2\ ELEVATION 21:100

Q SECTION A-A

ZINCALUME METAL DECK ROOF SHEETING @ 1° PITCH. INSTALL

TO MANUFACTURERS SPECIFICATIONS.

VTOP PFC 2.957U/S PFC 2.657

METAL SQUARELINE GUTTER.

270MM CAVITY BRICKWORK W/- SELECTED RENDER FINISH.

FL 0.000 (00c)

T\ ELEVATION 41:100

310 UB 32 COLUMNS. REFER TO " ENGINEERS DETAILS.

300 PFC FASCIA BEAM. REFER 'TO ENGINEERS DETAILS.

310 UB 32 COLUMNS. REFER TO ' ENGINEERS DETAILS.

RL28.930

RAISED CONC. PAVING.- APPROX. 2c (172mm) ABOVE

GROUND LEVEL.

ELECTRICAL LEGEND GF

No. SYMBOL TYPE

1 5 DIMMER SWITCH

8 020w RECESSED CF DOWN-LIGHT (20w)

ULTIMATE ADDITIONS PTY LTDBUILDERS REG #102052

Revisions:

1>

2:-

3:-4:-

PROPOSED ALFRESCO

ELEVATIONS

CONLIN

LOT 28 (#53) VIEW ST NORTH PERTH

©2017 HI-TECH DRAFTING

Drawn:

Status:BLDate:

25/07/201 7

Scale as shown @ A3

A 0 2

1 0864

25/07/201 7

Z:\2017\1 0864 NORTH PERTH, 53 VIEW ST\1 0864 BL 2 0 1 7.07.25.pl

top related