DIMENSION NOTE:DO NOT SCALE OFF DRAWINGS. ALL MEASUREMENTS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
IF UNCLEAR OF ANY ITEMS ON THESE DRAWINGS, REFER TO CONTRACT. THE CONTRACT TAKES PRECEDENCE OVER THESE DRAWINGS.
CONTRACTORS SHALL CHECK ALL DIMENSIONS & SITE CONDITIONS PRIOR TO COMMENCING FABRICATION OR CONSTRUCTION. ANY DISCREPANCIES TO BE BROUGHT TO THE SUPERVISORS ATTENTION.
ALL INTERNAL/EXTERNAL PAINTING BY OTHERS UNLESS NOTED OTHERWISE IN CONTRACT.
ROOF PLUMBER NOTE:DOWNPIPES SHOWN INDICATIVELY. FINAL POSITION TO BE DETERMINED BY ROOF PLUMBER ONSITE IN ACCORDANCE WITH NCC 3.5.2 & TO AUST. STANDARDS.
WATERPROOFING NOTE:PROVIDE WATERPROOFING TO WET AREAS AS PER NCC 3.8.1 & TO COMPLY WITH AS.3740.
CONCRETE NOTE:REFER TO ENGINEERS DETAILS WHERE APPLICABLE.
7,000
298kO/A
6.404 j9’
( Ol1.000 k 5.000
folk rood
ALFRESCO 7
METAL SQUARELINE GUTTER.
270MM CAVITY BRICKWORK W/- SELECTED RENDER FINISH.
C150015 ROOF PURLINS. REFER TO ENGINEERS DETAILS.
310 UB 32 BEAM. REFER TO ENGINEERS DETAILS.
310 UB 32 COLUMNS. REFER TO ENGINEERS DETAILS.
VILLABOARD LINING TO ALFRESCO SOFFIT.
FLOORPLAN1:100
SHEET INDEXA01 FLOORPLAN / SITEPLAN
A02 ELEVATIONS
5.73
0AL
FRES
CO
ROOF AREAS:
ROOF AREA ON SLOPE 29.83ROOF AREA ON FLAT 29.83
Soak Well Type No.SW 900x6001 1 0.4 m3
Total Capacity 0.4 m3Roof Area GF 29.8 m2
Total Area 29.8 m2Capacity Required (Area x 0.0125) 0.4 m3
Extra Capacity Provided 0.0 m3
NOTE: ALL DOWNPIPES CONNECTED TO SOAKWELLS
WITH PVC STORMWATER PIPE
NOTE: Boundary Measurements are Approximate only.
#51LOT 27
SITEPLAN1:200
+7,000
R.O.W. 1
VIEW STREET
AREA STATSEXISTING AREAS
HOUSE 175.81
PROPOSED AREAS
PATIO 30.00
205.81 m2
Q<A- Ko lW
ULTIMATE ADDITIONS PTY LTDBUILDERS REG # 102052
Revisions:
1> 5:-2:- 6:-3:- 7:-4:- 8:-
PROPOSED ALFRESCO
FLOORPLAN /SITEPLAN
CONLIN
LOT 28 (#53) VIEW ST NORTH PERTH
©2017 HI-TECH DRAFTING
Drawn:J.ReynoldsStatus:JT__Date:
25/07/201 7
Scale as shown @ A3
A 0 1
Project No:
1 0864Printed:
25/07/201 7TH PERTH, 53 VIEW ST\10864 BL 2017.07.25.pinZ:\2 017\10864 NO
MITRED EDGE TO BEAM / COLUMN CONNECTION.'
TOP PFC 2.957 U/S PFC 2.657 “
310 UB 32 COLUMNS. REFER TO ENGINEERS DETAILS.'
RAISED CONC. PAVING. APPROX. 2c (172mm) ABOVE
GROUND LEVEL. FL 0.000 (00c)
310 UB 32 BEAM. REFER TO ENGINEERS DETAILS.'
300 PFC FASCIA BEAM. REFER "TO ENGINEERS DETAILS.
RL28.93Q
ELEVATION 11:100
ZINCALUME METAL DECK ROOF SHEETING @ 1° PITCH. INSTALL
" TO MANUFACTURERS
SPECIFICATIONS.
MITRED EDGE TO BEAM / ' COLUMN CONNECTION.
310 UB 32 COLUMNS. REFER TO ' ENGINEERS DETAILS.
270MM CAVITY BRICKWORK W/- " SELECTED RENDER FINISH.
415* ZINCALUME METAL DECK ROOF
2\ ELEVATION 21:100
Q SECTION A-A
ZINCALUME METAL DECK ROOF SHEETING @ 1° PITCH. INSTALL
TO MANUFACTURERS SPECIFICATIONS.
VTOP PFC 2.957U/S PFC 2.657
METAL SQUARELINE GUTTER.
270MM CAVITY BRICKWORK W/- SELECTED RENDER FINISH.
FL 0.000 (00c)
T\ ELEVATION 41:100
310 UB 32 COLUMNS. REFER TO " ENGINEERS DETAILS.
300 PFC FASCIA BEAM. REFER 'TO ENGINEERS DETAILS.
310 UB 32 COLUMNS. REFER TO ' ENGINEERS DETAILS.
RL28.930
RAISED CONC. PAVING.- APPROX. 2c (172mm) ABOVE
GROUND LEVEL.
ELECTRICAL LEGEND GF
No. SYMBOL TYPE
1 5 DIMMER SWITCH
8 020w RECESSED CF DOWN-LIGHT (20w)
ULTIMATE ADDITIONS PTY LTDBUILDERS REG #102052
Revisions:
1>
2:-
3:-4:-
PROPOSED ALFRESCO
ELEVATIONS
CONLIN
LOT 28 (#53) VIEW ST NORTH PERTH
©2017 HI-TECH DRAFTING
Drawn:
Status:BLDate:
25/07/201 7
Scale as shown @ A3
A 0 2
1 0864
25/07/201 7
Z:\2017\1 0864 NORTH PERTH, 53 VIEW ST\1 0864 BL 2 0 1 7.07.25.pl
top related