xto shaefer unit 1h spacing unit map

Post on 24-Apr-2015

89 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Proposed natural gas production unit for a Marcellus Shale drilling permit request from XTO Energy, an ExxonMobil subsidiary — Town of Deposit, Delaware County, NY.I've uploaded this and similar PDF's in order to help landowners better "see" the overall plan — and to better illustrate a blog post here:http://nyshalegasnow.blogspot.com/2013/02/exxonmobils-xto-now-camped-out-with-5.html

TRANSCRIPT

311-1-1

289-1-5

289-1-6

311-1-27

Proposed target entry42.1198265, -75.3621845

TMD = 6,631' / TVD = 5,994'311-2-11.1

311-2-12.1

311-2-13

311-2-14

311-1-22

311-1-14

290-1-15

290-1-17

!

!

1058'

!

!20'

311-1-23

311-1-26

311-1-1

311-1-3

311-1-4

311-1-17.3

311-2-11.2

311-1-7

311-1-5

311-1-3311-1-6

311-1-2

311-1-14.111

311-2-9

311-2-10

Proposed surface hole42.121412, -75.365989

Proposed bottom hole42.1280926, -75.372014

TMD = 10,122' / TVD = 5,994'

579.95 ac

Copyright:© 2011 National Geographic Society, i-cubed±

11/01/2012 ALL COORDINATES IN NAD 1927, STATE PLANE NY EASTSCHAEFER SPACING UNIT MAP TOWN OF DEPOSIT, DELAWARE CO., NY

1 inch = 1,000 feetTax parcelSchaefer spacing unitOther spacing unitNY State ForestNY Faults

Well boreOutside target formationWithin target formation

579.95 ac

Copyright:© 2011 NationalGeographic Society, i-cubed

1 inch = 8,000 feet

SPACING UNITSWITHIN 1.5 MILES±

UNIT BOUNDARY IS PRELIMINARYAND SUBJECT TO CHANGE

top related