Constellation Space Transportation Planning Office Charter
33
SOMD Established with concurrence of ESMD in December 2008
Develop methodology and corporate processes to manage NASA Human System Operations activities while continuing to develop further NASA Human Systems capabilities
Constellation Space Transportation Program• Manage the production, sustaining engineering, launch preparations, and
recovery of the Ares I/Orion vehicle configuration that will transport crew safely to/from the ISS• ESMD/CxP will manage DDTE test flights through Certification completion• SOMD/CSTP will manage post-DDTE operations flights
Status of CSTP Implementation Plan
44
● Initiate definition of Program Processes
●Continue Program Planning, Prepare Program Plan
●Develop System Integration Plan
●Define Production Structure and WBS Structure
FY09 FY10 FY11 FY12…
Effective November 23, 2008
●Establish Project Offices/Managers
●Partner Sub-System Managers assignments
●Establish Sharing for DDTE Production Engineering with MSFC and JSC
●Facility and System O&M
●Support T&E Flight Tests
●Establish Planning Office
●Prepare draft Formulation Authorization Document
● Initiate Multi-Center agreements for Program support
● Initiate CSTP WBS Structure with CxP
●Prepare initial CSTP level II FY10-15 resource requirements
55
Constellation Space TransportationPlanning Office - Evolution
Feb Apr
May
Jun
Jul
Aug
Sep
Oct
2008
Jan
Feb
Mar
Apr
Jul
Aug
Sep Nov
Bill Hill TeamImplementation of Hawes-Geyer
Recommendations
05/20/2008Status to SMC
09/24/2008Out-brief to SMC
•Agency approved•CSTPO Kickoff
06/11/2008KSC Implementation
Plan submitted to Bill Hill team.
Feb
Mar
Apr
May Jul
Dec
May
12/10/2007Out-brief to Administrator• Bill Hill team
kicked off
Dec
CSTPO
12/04/2008SOMD/ESMD letter establishing CSTPO
2009
07/2009CxP CSTP Strategic Alliance Agreement
Signed
Hawes-Geyer TeamMethodology for Development &
Operations
10/18/2007Out-brief to
SOMD/ESMD
02/2007Hawes-Geyer Team Kickoff
Mar Jan
Oct JunJun
2007
Nov
66
Constellation Space Transportation Program
Established a partnership between ESMD and SOMD Post-DDTE Programmatic Structure with authority and
responsibility for: • Program control, including budget, schedule, and program content• Maintaining requirements baseline • Maintaining technical capability to perform systems engineering
within established performance criteria• Maintaining configuration control system and Certification of Flight
Readiness process• Manufacturing and Production of the flight and ground hardware to
support the manifest.• Directing pre-launch processing, launch execution, mission
operations, recovery operations, and turnaround operations• Partnering with ISS Program Customer and Mission Operations
Directorate at the JSC
End State
99
Summary
Operations Program Planning established early enough to • Gain Sub-System Sustaining Design Experience• Participate in Flight Hardware Evolution• Create Solid Engineering Relationships
Operations Program Elements imbedded at all critical levels• Sub-system engineering• SE&I Development and Products• Mission Planning and Operations Elements• Program and Program Elements• SMA and Engineering Technical Authority
NASA recognizes the unique demands of pursuing development and operations within Human Space Systems. We have a solid programmatic plan to provide space system operations while developing the next series of exploration Human Space Systems