Orange County Public Schools

Middle School Site 21-M-E-2100% Design / Construction Kick-off

Community MeetingNovember 16, 2015

WINNER

Orange County Public SchoolsOrange County Public Schools

Middle School Site 21-M-E-2Meeting Agenda

• Introductions

• Welcome School Board Member, Daryl Flynn

• Project Update – Facilities Meeting OrganizerArchitect: HuntonBrady ArchitectsConstruction Manager: Pirtle Construction Company

• Questions and Answers

• Adjournment

2

Orange County Public SchoolsOrange County Public Schools

Middle School Site 21-M-E-2Rezoning Process

• Rezoning for 21-M-SE-2 has tentatively been scheduled to begin in February 2016

• Families will be notified via Connect Orange

• All information will also be on the OCPS website at the following address: http://bit.ly/1NuTbw6

3

Orange County Public Schools School Site

4

Tim

be

r Sp

rin

gs B

lvd

.

N

Gu

y R

oad

.

Orange County Public Schools

Conceptual Elevations 9

EAST ELEVATION

WEST ELEVATION

Orange County Public Schools

Conceptual Elevations 10

NORTH ELEVATION

SOUTH ELEVATION

Orange County Public Schools

Conceptual Rendering – Technology Resource Center 11

Orange County Public Schools

12Classrooms

Orange County Public Schools

Example Classroom

13

Orange County Public Schools

Example Computer Lab

14

Orange County Public Schools

Example Science Lab

15

Orange County Public Schools

Example Media Center & Furniture

16

Orange County Public Schools

Example Band Room

17

Orange County Public Schools

Cafeteria with Multiple Serving Lines

18

Orange County Public Schools

Example Gymnasium

19

Orange County Public Schools

Conceptual Rendering 20

Orange County Public Schools

21

On-site stormwater retention and treatment

Drought tolerant, Florida native/naturalized plants

Low flow water fixtures utilized

Energy simulation used to design HVAC equipment

Energy savings is 27% better than reference base bldg

Light colored roof - reduce heat island effect

Refrigerant is non-ozone depleting

CO2 Monitoring

Variable air volume distribution + variable speed drives

Energy efficient motors on fans and pumps

High performance glazing – energy savings

Daylighting potential maximized by wings

Energy Efficient Lighting

Low VOC paint

Recycled Content Materials

Locally manufactured materials

Sustainability

Orange County Public Schools

Project Schedule 22

• Design January 2015- October 2015

• Bid/Permit November 2015- December 2015

• Construction January 2016 -June 2017

• School Opens August 2017

Proposed Schedule

Orange County Public Schools

Construction Schedule 23

Orange County Public Schools

QUESTIONS?