1

Wind Energy Hamburg 2018

Practical Engineering to Mitigate

Subsea Power Cable RisksSubsea UK 26.09.2018

2

Who and where?

bpp@bpp-cables.com

bpp-cables.com

3

BPP-Cables Overview

BPP-TECH (Parent)

Specialist Engineering company working in the offshore energy, & insurance industries

▪ Vessel and subsea equipment

▪ Power cables, risers, umbilicals, flexibles and hoses

▪ Delivery Management & QA/QC

▪ Engineering design analysis

▪ Risk & reliability

▪ Mooring assessments

▪ Instrumentation & monitoring

BPP-Cables

Established in 2009 (owned by BPP-TECH and Keppel Offshore & Marine)

London - Houston – Jakarta - Aberdeen – Newcastle

Complementary skill sets brings variety for engineers

4

Our specialist areas:

Our specialist areas include:

▪ Reducing project risks & costs

▪ Optimised cable designs & fitness for purpose reviews

▪ Engineering analysis and advice regarding installation / protection / repair

▪ In-depth knowledge of marine & subsea equipment

▪ Engineering and management support services

▪ Whole or part project delivery management

▪ Highly skilled on-site / on-board engineers

▪ Insured risk & forensic failure analysis

Independent perspective

5

Offshore Energy Experience since 1980’s

Engineering principles apply across the subsea spectrum…

6

Subsea Cable RiskWe can input at any stage of the process

▪ Risks exist throughout the power cable lifecycle

▪ Wide variety of risks and ways in which they can be addressed

▪ Risks are present during

Design of Cables &

Infrastructure

Manufacture & Factory

Acceptance Testing

Packing, transportation

& storage

Installation & burial

ServiceRecovery &

Repair

7

Subsea Cable Risk

Planning is key

8

Cable Engineering – Tools for the JobBPP-Cables evaluate and optimise cable designs

▪ Constructional reviews

▪ Finite Element for design verification, parametric models, local fatigue and stresses

▪ Global & local including laying, hauling, bending, crushing and side wall pressure calculations

▪ Dynamic, including clashing and extreme loading

▪ Thermal analysis and cable rating calculations

▪ Fatigue and service life assessments

▪ Environmental Impact

▪ Installation methodologies

▪ Mechanical, electrical and environmental testing

Quality toolbox contains selection of tools

Abaqus Ansys BPP-Softcore ETAP OrcaFlex SolidWorks

9

Design Tools

Software tools allow cable design engineers to:

▪ Rapidly understand the effect of design changes

▪ Optimise power cable and umbilical designs to:

▪ Extend fatigue life

▪ Expand operational envelopes

▪ Verify feasibility of designs for given conditions

Engineering-led projects for:

cable vibration analysis,

roller impact assessment,

H.V. dynamic cable development…

10

Cable Components & Protections SystemsCable Components

▪ Optimise conductors

▪ Electrical insulation

▪ Shielding materials

▪ Water, oil and gas blocking layers

▪ Mechanical protection

▪ Armouring

Protection Systems

The interface of the cable to the

host structure requires protection:

▪ Bend restrictors

▪ Bend limiters

▪ Bend stiffeners

▪ Articulated armour

Added complexities

11

Consultancy to aid Decision-making

• Understanding risks

• Minimising those risks

• Improving performance

• Potentially extending operating asset life

Impartial, engineering and experience-based opinions

12

During Installation▪ Excessive tension, torque and/or bending

▪ Crushing/crimping

▪ Poor tension control

▪ Looping and kinking during laying

▪ Fatigue during lay suspension

▪ Impact during burial

Prevention is best

13

During ServiceIn-service subsea cable failures can be caused by sub-optimal design, installation and/or third party

damage. Typical problems include one or more of the following:

▪ Mechanical damage including wear and fatigue

▪ Overheating

▪ Sub-standard materials/material degradation

▪ Layer separation and instability

▪ Thermo-mechanical movement

▪ Overbending

▪ Crushing

▪ Corrosion

▪ Gassing

▪ Problems with joints, connectors and terminations

▪ Dropped objects / dragged anchors / fishing / trawling

▪ Scour & shifting sandbanks

▪ Extreme weather

▪ Marine life damage

▪ Contact at cable / pipeline crossing locations

▪ Exposure to adverse agents, temperatures and pressure

Some of the above apply to onshore cables

14

When it hasn’t gone to plan…

We see things you don’t want to see!

15

…and investigate possible causes…

Dissection, Testing and Client Confidentiality

16

…and go back a few spaces and we try to find

solutionsIdeally, engage BPP at an early stage of the process

▪ Risks exist throughout the power cable lifecycle

▪ Wide variety of risks and ways in which they can be addressed

▪ Risks are present during

Design of Cables &

Infrastructure

Manufacture & Factory

Acceptance Testing

Packing, transportation

& storage

Installation & burial

ServiceRecovery &

Repair

17

Summary

BPP Cable Lifecycle Knowledge

Design and Manufacture – Array and Export

Installation

Protection

Performance

Incidents, Failures and Remedial Actions

Well-placed to support floating offshore wind developments too…

18

JIP Launching

O & M focus should include Cables – Array and Export - as key infrastructure elements (alongside Topsides)

Let’s evaluate collected data cleverly and use it to:

Improve Performance & Reduce Downtime

Predict Lifespan & Transfer Knowledge to other Assets

Let’s work together

19

Questions?

Thank you